Solicitation W58RGZ15R0178

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W58RGZ-15-R-0178

X

2017APR03

2017MAY03

DOA1

2017APR03 SEE SCHEDULE

W58RGZ

ARMY CONTRACTING COMMAND-REDSTONE

REDSTONE ARSENAL AL 35898-5280

RICHARD HESTER

(256)876-5333

CCAM-AL-M

RICHARD.B.HESTER.CIV@MAIL.MIL

X 1 25

1 65

X 1

X 3 X 16

X 18 X 19 X 23

X 31

X 33

X 36

X 47

X 48

X 54

X 64

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: RICHARD HESTER

Buyer Office Symbol/Telephone Number: CCAM-AL-M/(256)876-5333

Type of Contract 1: Firm Fixed Price

Kind of Contract: Maintenance Contracts

*** End of Narrative A0000 ***

1. For purposes of Block 12 on page 1, the offer acceptance period is 120 days from the date for receipt of offers specified in Block

9, unless a different period is inserted by the offeror in the blank in Block 12.

2. No Government Furnished Material (GFM), other than the reparables, will be provided.

3. Facsimile and Electronic submissions are not authorized. Proposals shall be mailed to:

Army Contracting Command-Redstone

CCAM-ALM, Brent Hester

Bldg 5303, 2nd Floor

Redstone Arsenal, AL 35898-5280

4. If any offeror chooses to hand carry their proposal, the offeror must reach the appointed location (identified as building 5303, 5300 Martin Road, Redstone Arsenal, AL 35898, Foyer) by the date and time as stated in block 9 on page 1 of the solicitation. Please be advised that Redstone Arsenal is a restricted facility and should an offeror choose to hand carry a proposal, a minimum of 72 hours notice to the Contracting Officer is required in order to ensure access by the closing date/time of the solicitation. Any unauthorized entity must be identified as having a need, as validated by the Contracting Officer, in order to gain access to the post. The contracting office must notify the Gate personnel, who monitor post access, a minimum of 48 hours prior to an entity gaining entrance to the restricted post. Please note that any proposals delivered late as a result of failure to comply with the procedure will not be accepted, IAW FAR 52.215-1 entitled "Instructions to Offerors-Competitive Acquisition".

5. The Contractor may be requested to submit cost or pricing data if only one offer is received IAW DFARS clause 252.215-7008, entitled

"Only One Offer."

6. When applicable, the Contractor is reminded to complete the Foreign Military Sales (FMS) Customer DA FORM 2410 (Component Removal and Repair Overhaul Record), submitted with the item for repair, in accordance with DA Pamphlet 738-751 and TB-1500-341-01. Upon completion of repair, if authorized, the Contractor is reminded to fill out U.S. Army DA FORM 2410 and return it to the FMS Customer with the repaired asset(s), along with the FMS Customer version of the DA FORM 2410.

7. The National Defense Authorization Act for Fiscal Year 1993, Public Law 102-404, Section 326, prohibits use of ODC in Department of

Defense Contract awarded on or after 1 JUN 93, unless appropriate authority is granted.

8. The following websites are provided for the purpose of obtaining/reviewing various Army publications and technical manuals/bulletins:

a. http://www.logsa.army.mil/etms/online.htm - Technical Manuals and Bulletins

b. http://www.usapa.army.mil/ - DA Pamphlets and Army Regulations

*** END OF NARRATIVE A0001 ***

2 65

REPRINT

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

This requirement is restricted to the following approved sources:

- Sikorsky Aircraft Corporation (CAGE code: 78286)

- GE Aviation Systems LLC (CAGE code: 35012)

This will be a five (5) year Firm-Fixed-Priced Maintenance and Overhaul (M&O) Indefinite-Delivery Indefinite-Quantities (IDIQ) contract with minimum and maximum quantities.

The Government intends to award only one contract as a result of this solicitation.

Items, prices, and amounts for the first ordering period are effective from date of contract award to 365 days after effective date of contract.

Ordering periods are in 365 days increments beginning with date of contract award.

Prices are established based on the ordering period at the time the order is placed.

Ordering periods are as follows:

Ordering period 1: Date of contract award - 365 days after contract award

Ordering period 2: 366-731 days after contract award

Ordering period 3: 732-1096 days after contract award

Ordering period 4: 1097-1461 days after contract award

Ordering period 5: 1462-1826 days after contract award

Funds will be obligated upon the issuance of each Delivery Order.

Quantities:

Minimum: 60 each

Maximum: 418 each

The Maximum quantity includes a FMS quantity of 70 each.

The FMS Customer and geographical location for deliveries, inspection and acceptance points are unknown at this time.

*** END OF NARRATIVE B0001 ***

3 65

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

The Contractor is required to submit a

Maintenance & Overhaul (M&O) Plan in accordance with Section C, Statement of Work/Specifications

- Contractor Specification, Exhibit A, and

Attachment 0002 (M&O Plan Description &

Guidance). The documentation shall be submitted within 30 days after contract award.

The M&O Plan must be submitted and approved before assets will be shipped in order for the

PVA to be conducted.

PVA must be approved before overhaul/upgrade may_________________________________________________ begin.______

(End of narrative A001)

0001 PRODUCT VERIFICATION AUDIT

0001AA PRODUCT VERIFICATION AUDIT $ ___________________________ __________________

SERVICE REQUESTED: PRODUCT VERIFICATION AUDIT

This CLIN represents the Product Verification Audit

(PVA) for the Digital Data Computer NSN: 5895-01-590-

6682, as shown in CLIN 0002AA.

This is a Firm Fixed Price CLIN.

Offeror is required to fill in a proposed firm fixed unit price for the PVA:

PVA shall be in accordance with Clause 52.209-4723, "Product Verification Audit (PVA) Statement of Work".

PVA shall be conducted within 90 days after receipt of reparables. The Contractor shall prepare 3 assets for PVA. The Contractor is required to notify the

Government Quality Office for scheduling of the PVA by email to the following address:

QS-Contracts@amrdec.army.mil

With copy emailed to the Contract Specialist at:

richard.b.hester.civ@mail.mil

The Contractor will prepare and forward, through the cognizant Government Quality Element, finalized audit reports within 10 working days after completion of the PVA to the email address above.

4 65

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

NOTE: A copy of the cover letter for the report shall be forwarded to the Contract Specialist at:

U.S. Army Contracting Command - Redstone

Bldg 5303, 2nd Floor

ATTN: CCAM-AL-M, Brent Hester

Redstone Arsenal, Alabama 35898-5000 or emailed to:

richard.b.hester.civ@mail.mil

PVA requires approval prior to Government acceptance of contract deliverable assets.

Failure to pass the PVA may lead to Termination for____________________________________________________

Default of the contract.________________________

Payment Instructions: The Contractor will go into_____________________

Wide Area Work Flow (WAWF) to receive payment for the

PVA. The Contractor shall use DODAAC W58H0Z when submitting the PVA invoice in WAWF. The Contracting

Officer will approve the PVA invoice.

(End of narrative C001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

0002 COMPUTER DIGITAL DATA

NSN: 5895-01-590-6682

0002AA OVERHAUL WITH UPGRADE COMPUTER DIGITAL DATA (US) $ $ ________________________________________________ ______________ __________________

COMMODITY NAME: COMPUTER DIGITAL DATA

CLIN CONTRACT TYPE:

Firm Fixed Price

Estimated yearly quantities for CLIN 0002AA are:

Ordering Period 1: 30 each minimum qty

Ordering Period 2: 36 each estimated qty

Ordering Period 3: 36 each estimated qty

Ordering Period 4: 36 each estimated qty

Ordering Period 5: 36 each estimated qty

The minimum quantity to be issued as delivery order 0001 is 60 assets. The minimum quantity of

30 for CLIN 0002AA is an estimate. Each asset will be aligned to the applicable line item

(0002AA or 0002AB).

5 65

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Funds for the ordering period 1 quantity set forth herein shall be obligated on delivery order

0001, to be issued simultaneously with the award of the firm fixed price contract.

(End of narrative B001)

System: UH-60

INPUT NSN: 5895-01-558-8745

INPUT P/N: 70600-01827-101

OUTPUT NSN: 5895-01-590-6682

OUTPUT P/N: 70600-01827-102

Overhaul with Upgrade shall be in accordance with the clause in section C entitled 'Statement of

Work/Specifications Contractor Specifications'.

This Firm-Fixed-Price CLIN includes all labor charges, replacement parts and material, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in section C entitled Statement of Work/Specifications - Contractor Specifications.

Offeror is required to fill in a proposed firm fixed unit price for each ordering period:

ORDERING PERIOD 1 - U/P $__________(FFP) 30 EA MIN

ORDERING PERIOD 2 - U/P $__________(FFP) 36 EA EST

ORDERING PERIOD 3 - U/P $__________(FFP) 36 EA EST

ORDERING PERIOD 4 - U/P $__________(FFP) 36 EA EST

ORDERING PERIOD 5 - U/P $__________(FFP) 36 EA EST

(End of narrative C001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE SECTION J PACKAGING REQUIREMENTS

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: A

For Packaging Instructions refer to section J

Attachment 0001, Packaging Instructions.

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

Refer to Section F for delivery schedule requirements.

6 65

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(End of narrative F001)

0002AB OVERHAUL COMPUTER DIGITAL DATA (US) $ $ ___________________________________ ______________ __________________

COMMODITY NAME: COMPUTER DIGITAL DATA

CLIN CONTRACT TYPE:

Firm Fixed Price

Estimated yearly quantities for CLIN 0002AB are:

Ordering Period 1: 30 each minimum qty

Ordering Period 2: 36 each estimated qty

Ordering Period 3: 36 each estimated qty

Ordering Period 4: 36 each estimated qty

Ordering Period 5: 36 each estimated qty

The minimum quantity to be issued as delivery order 0001 is 60 assets. The minimum quantity of

30 for CLIN 0002AB is an estimate. Each asset will be aligned to the applicable line item

(0002AA or 0002AB).

Funds for the ordering period 1 quantity set forth herein shall be obligated on delivery order

0001, to be issued simultaneously with the award of the firm fixed price contract.

(End of narrative B001)

System: UH-60

INPUT NSN: 5895-01-590-6682

INPUT P/N: 70600-01827-102

OUTPUT NSN: 5895-01-590-6682

OUTPUT P/N: 70600-01827-102

Overhaul shall be in accordance with the clause in section C entitled 'Statement of Work/Specifications

Contractor Specifications'.

This Firm-Fixed-Price CLIN includes all labor charges, replacement parts and material, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in section C entitled Statement of Work/Specifications - Contractor Specifications.

Offeror is required to fill in a proposed firm fixed unit price for each ordering period:

ORDERING PERIOD 1 - U/P $__________(FFP) 30 EA MIN

ORDERING PERIOD 2 - U/P $__________(FFP) 36 EA EST

ORDERING PERIOD 3 - U/P $__________(FFP) 36 EA EST

ORDERING PERIOD 4 - U/P $__________(FFP) 36 EA EST

ORDERING PERIOD 5 - U/P $__________(FFP) 36 EA EST

(End of narrative C001)

7 65

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE SECTION J PACKAGING REQUIREMENTS

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: A

For Packaging Instructions refer to section J

Attachment 0001, Packaging Instructions.

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

Refer to Section F for delivery schedule requirements.

(End of narrative F001)

0003 COMPUTER DIGITAL DATA

NSN: 5895-01-590-6682

0003AA OVERHAUL WITH UPGRADE COMPUTER DIGITAL DATA (FMS) $ $ _________________________________________________ ______________ __________________

COMMODITY NAME: COMPUTER DIGITAL DATA

CLIN CONTRACT TYPE:

Firm Fixed Price

Estimated yearly quantities for CLIN 0003AA are:

Ordering Period 1: 0 each estimated qty

Ordering Period 2: 8 each estimated qty

Ordering Period 3: 8 each estimated qty

Ordering Period 4: 9 each estimated qty

Ordering Period 5: 9 each estimated qty

The maximum quantity for Foreign Military Sales

(FMS) requirements is 70 each.

This CLIN will only be used if a FMS customer requires this item. If no FMS Customers are identified, the US Army Requirer may utilize the

FMS quantity.

(End of narrative B001)

8 65

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

System: UH-60

INPUT NSN: 5895-01-558-8745

INPUT P/N: 70600-01827-101

OUTPUT NSN: 5895-01-590-6682

OUTPUT P/N: 70600-01827-102

Overhaul with Upgrade shall be in accordance with the clause in section C entitled 'Statement of

Work/Specifications Contractor Specifications'.

This Firm-Fixed-Price CLIN includes all labor charges, replacement parts and material, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in section C entitled Statement of Work/Specifications - Contractor Specifications.

Offeror is required to fill in a proposed firm fixed unit price for each ordering period:

ORDERING PERIOD 1 - U/P $__________(FFP) 0 EA EST

ORDERING PERIOD 2 - U/P $__________(FFP) 8 EA EST

ORDERING PERIOD 3 - U/P $__________(FFP) 8 EA EST

ORDERING PERIOD 4 - U/P $__________(FFP) 9 EA EST

ORDERING PERIOD 5 - U/P $__________(FFP) 9 EA EST

(End of narrative C001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE SECTION J PACKAGING REQUIREMENTS

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: A

For Packaging Instructions refer to section J

Attachment 0001, Packaging Instructions.

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

Refer to section F for delivery schedule requirements.

(End of narrative F001)

0003AB OVERHAUL COMPUTER DIGITAL DATA (FMS) $ $ ____________________________________ ______________ __________________

9 65

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

COMMODITY NAME: COMPUTER DIGITAL DATA

CLIN CONTRACT TYPE:

Firm Fixed Price

Estimated yearly quantities for CLIN 0003AB are:

Ordering Period 1: 0 each estimated qty

Ordering Period 2: 9 each estimated qty

Ordering Period 3: 9 each estimated qty

Ordering Period 4: 9 each estimated qty

Ordering Period 5: 9 each estimated qty

The Maximum quantity for FMS requirements is 70 each.

This CLIN will be used only if a FMS Customer

Requires this item. If no FMS Customers are identified, the US Army Requirer may utilize the

FMS quantity.

(End of narrative B001)

System: UH-60

INPUT NSN: 5895-01-590-6682

INPUT P/N: 70600-01827-102

OUTPUT NSN: 5895-01-590-6682

OUTPUT P/N: 70600-01827-102

Overhaul shall be in accordance with the clause in section C entitled 'Statement of Work/Specifications

Contractor Specifications'.

This Firm-Fixed-Price CLIN includes all labor charges, replacement parts and material, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in section C entitled Statement of Work/Specifications - Contractor Specifications.

Offeror is required to fill in a proposed firm fixed unit price for each ordering period:

ORDERING PERIOD 1 - U/P $__________(FFP) 0 EA EST

ORDERING PERIOD 2 - U/P $__________(FFP) 9 EA EST

ORDERING PERIOD 3 - U/P $__________(FFP) 9 EA EST

ORDERING PERIOD 4 - U/P $__________(FFP) 9 EA EST

ORDERING PERIOD 5 - U/P $__________(FFP) 9 EA EST

(End of narrative C001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE SECTION J PACKAGING REQUIREMENTS

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: A

For Packaging Instructions refer to section J

Attachment 0001, Packaging Instructions.

10 65

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

Refer to Section F for delivery schedule requirements.

(End of narrative F001)

0004 CONTAINERS

0004AA CONTRACTOR FURNISHED CONTAINERS $ _______________________________ __________________

SERVICE REQUESTED: CONTAINERS

CLIN CONTRACT TYPE:

Firm Fixed Price

This CLIN is for contractor furnished containers for CLINs 0002AA, 0002AB, 0003AA, and 0003AB.

P/N: 13414-038

NSN: 8145-00-485-8256

The Government's estimated quantity per ordering period is 10 each.

Offeror is required to fill in a proposed firm fixed unit price for each ordering period:

Ordering Period 1 $____________ EACH

Ordering Period 2 $____________ EACH

Ordering Period 3 $____________ EACH

Ordering Period 4 $____________ EACH

Ordering Period 5 $____________ EACH

The contractor shall provide the container in accordance with Section C, entitled Statement of

Work and Section J, Packaging Requirements.

The Government cannot determine at the time of contract award, how many of the assets to be

11 65

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

overhauled/repaired will be received by the

Contractor in unserviceable containers or received without containers.

The Contractor, IAW Section C Statement of Work, shall submit a Report of Discrepancy (ROD) SF

Form 364 through the DCMA QAR for verification within 7 working days to the address shown on

Data Item A002. When assets are received in unserviceable containers or without containers, approval of the PCO via a contract modification is required before replacement containers are purchased.

(End of narrative C001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

0005 SCRAP

0005AA SCRAP $ ______ __________________

SERVICE REQUESTED: SCRAP

CLIN CONTRACT TYPE:

Firm Fixed Price

This CLIN is for assets scrapped from CLINs

0002AA, 0002AB, 0003AA, and 0003AB.

The Government's estimated quantity per ordering period is 10 each.

Offeror is required to fill in a proposed firm fixed unit price for each ordering period:

Ordering Period 1 $____________ EACH

Ordering Period 2 $____________ EACH

Ordering Period 3 $____________ EACH

Ordering Period 4 $____________ EACH

Ordering Period 5 $____________ EACH

Scrapped assets from CLINs 0002AA, 0002AB, 0003AA, and 0003AB shall be in accordance with

Section C, entitled Statement of Work

Specifications - Contractor Specifications.

12 65

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Units authorized to be scrapped in accordance with Section C shall be reflected as an increase in CLIN 0005AA with a corresponding decrease in quantity and funds in CLINs 0002AA, 0002AB, 0003AA, or 0003AB as applicable.

In the event the Procuring Contracting Officer

(PCO) determines that certain items shall be scrapped, the contractor shall scrap such items at the fixed unit price in Section B hereof and make disposition in accordance with the contractor's approved Government property procedures.

The Government may, at it's discretion, replace any items scrapped by input of additional assets and said scrap quantities will not count as part of the total maximum quantity.

Scrap requires authorization by the PCO via formal modification. In no event shall the contractor scrap an item prior to receiving a contractual modification for a unit.

(End of narrative C001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

0006 CONTRACT DATA REQUIREMENTS LIST _______________________________

This CLIN is "Not Separately Priced" (NSP)

The Contractor shall provide Data Items A001 - A004 in accordance with the Contract Data Requirements

List, Exhibits A, B, C, and D.

(End of narrative A001)

A001 TECHNICAL REPORT - STUDY/SERVICES $ ** NSP ** _________________________________ __________________

SERVICE REQUESTED: DATA ITEM A001

DATA ACQUISITION DOCUMENT NUMBER : DI-MISC-80508B

Data Item A001 refers to the maintenance and overhaul plan as outlined in section C Statement of

Work/Specifications - Contractor Specifications

13 65

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

paragraph V and Attachment 0002 Maintenance and

Overhaul Plan Description and Guidance. The overhaul plan shall be submitted to this office within 30 days after contract award date.

For a sample of a M&O Plan, please visit the following link:

http://amcomdmz.redstone.army.mil/casl_cmo/casldba.cas l_cmo_samsar, and select "AMCOM Maintenance and

Overhaul (M&O) SAR" then "Example M&O Plan".

Note: A copy of the plan shall be forwarded to the contract specialist at:

Army Contracting Command - Redstone

ATTN: Brent Hester, CCAM-ALM

Bldg. 5303 2nd Floor

Redstone Arsenal, AL 35898-5280

(End of narrative C001)

Deliveries or Performance _________________________

A002 REPORT OF SHIPPING AND PACKAGING DISCREPANCIES $ ** NSP ** ______________________________________________ __________________

SERVICE REQUESTED: DATA ITEM A002

DATA ITEM A002 - DATA ACQUISITION DOCUMENT NUMBER :

DI-MGMT-80503

Submission of the Report of Shipping and Packaging

Discrepancy shall occur within 10 days of discovering the discrepancy. Refer to attachments

0003 (Standard Form 364) and 0004 (Report of

Discrepancy Guidance) for completing the Report of

Discrepancy.

(End of narrative C001)

Deliveries or Performance _________________________

A003 QUALITY DEFICIENCY REPORT $ ** NSP ** _________________________ __________________

SERVICE REQUESTED: DATA ITEM A003

DATA ITEM A003 - DATA ACQUISITION DOCUMENT NUMBER :

DI-QCIC-80736

14 65

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

No report is necessary unless there is a deficiency.

Contractor shall submit NO LATER THAN 10 days after discovery of deficiency.

(End of narrative C001)

Deliveries or Performance _________________________

A004 DEPOT MAINTENANCE PRODUCTION REPORT $ ** NSP ** ___________________________________ __________________

SERVICE REQUESTED: DATA ITEM A004

DATA ITEM A004 - DATA ACQUISITION DOCUMENT NUMBER :

DI-ALSS-80728A

Date of first submission is 3 working days after receipt of reparables.

Frequency of submission is monthly.

Date of subsequent submissions - No later than 10 days after the end of the month.

Data shall be prepared in accordance with Attachment

0005, Template for Depot Maintenance Production

Report, and submitted to the following email addresses:

usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil & usarmy.uh60m-oteam@mail.mil

(End of narrative C001)

Deliveries or Performance _________________________

15 65

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C-1

Statement of Work/Specifications Contractor Specifications

a. The Contractor, as an independent Contractor, and not as an agent or employee of the Government, shall furnish all services, facilities, labor, parts, materials, equipment, tools and data (other than Government Furnished Property), necessary to accomplish the overhaul with upgrade or overhaul of the UH-60 Computer Digital Data that is required to return the items as specified in section B, to condition code A as defined by Army Regulation 725-50. Upon completion of the overhaul with upgrade or overhaul, the items shall be packaged as defined in section D of this solicitation and shipped to the destinations as specified in each individual delivery order.

b. Prior to commencement of overhaul with upgrade or overhaul, the Contractor shall disassemble and inspect the item to the extent necessary to determine the total cost to overhaul with upgrade or overhaul. The contractor shall continue the overhaul with upgrade or overhaul on all items when the total cost to overhaul with upgrade or overhaul does not exceed $22,339.00/unit. The overhaul with upgrade and overhaul CLINs 0002AA, 0002AB, 0003AA, and 0003AB are fixed price. The contractor will be required to complete the overhaul on all end items regardless of the damage as long as the total contractor cost to overhaul with upgrade or overhaul does not exceed

$22,339.00/unit. The contractor will be required to provide data other certified cost and pricing data and a report of discrepancy

(ROD) signed by the DCMA QAR to the Procuring Contracting Officer (PCO) to confirm that the total unit cost to overhaul will exceed

$22,339.00. This data will include at minimum material cost (80% of material cost will be supported by current vendor quotes), labor hours, labor rates, overheads, G&A and profit rate. Mor infomration to support the contractor's price may be requested by the

Government. In no event will any asset be scrapped prior to an approved modification by the PCO. No additional funding except for missing parts will be provided to the contractor to complete the overhaul with upgrade or overhaul of the end item. The Government cannot guarantee the condition of the assets sent to the contractor for overhaul with upgrade or overhaul.

c. In the event the total contractor unit cost to overhaul is determined (approved by the PCO) to exceed $22,339.00, the contractor shall scrap such items at the fixed unit price in section B hereof and make disposition in accordance with the contractor's approved Government property procedures. Such scrapped items shall count toward the quantities ordered hereunder. The Government may, at its discretion, replace any items scrapped by input of additonal assets, and said scrap quantities will not count as part of the total maximum quantity.

d. Overhaul with upgrade or overhaul shall be accomplished IAW contractor specifications, processes and procedures. The

Contractor shall notify the PCO through the cognizant ACO of any change or deviation from the list of specifications, processes and procedures provided by the Contractor with its proposal IAW the clause in Section L entitled, "Identification of Specifications, Processes and Procedures," and attached to this contract.

e. Reserved

f. Upon receipt of the reparables, containers shall be reviewed for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the item envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Items received without containers or containers determined to be unserviceable shall be processed

IAW the Contractor's locally approved Government Property procedures. Components received improperly packaged, damaged with corrosion/deterioration or those with shipping discrepancies shall be reported IAW data item A002.

g. Any Contractor paint facility which is used in the performance of this contract shall comply with the Environmental Protection

Agency and Occupational Safety and Health Administration standards for painting as implemented by TM 55-1500-345-23, with change 12

Painting and Marking of Army Aircraft.

h. Data and reports shall be submitted IAW the Contract Data Requirements List, DD Form 1423, Exhibits A, B, C, and D. Data shall be packaged, packed and marked as necessary to assure safe delivery to the addressees indicated by Data Items A001 - A004.

i. Product Verification Audit (PVA) shall be conducted IAW CLIN 0001AA and local clause 52.209-4723, Product Verification Audit

(PVA) Statement of Work. The maintenance and overhaul plan must be prepared IAW Data Item A001 and must be approved before the PVA may be conducted.

j. The Army Maintenance Managment System - Aviation (TAMMS-A): The contractor shall complete the forms and records as specified in DA PAM 738-751, TB 1500-341-01, TM 1-1500-328-23.

k. Reserved

l. Reserved

m. Reserved

n. Inventory Transactions - The contractor shall provide a Depot Maintenance Production Report IAW Data Item A004.

16 65

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

o. Reserved

p. Reserved

q. The Government reserves the right to replace any items scrapped.

r. Reserved

s. Quality Deficiency Report: The contractor shall prepare the Quality Deficiency Report IAW Data Item A003.

t. Reserved

u. Shipping containers NSN: 8145-00-485-8256, P/N: 13414-018 shall be utilized. If containers are not received in serviceable or approved containers, the containers shall be Contractor Furnished Material (CFM) or Government Furnished

Material (GFM). Approval of the PCO is required before replacement containers are purchased. Shipment: The method of shipment must use a procedure so that the package can be tracked in case the shipment is not received by AMCOM.

v. Overhaul Documentation: The Contractor shall provide overhaul documentation in accordance with data item A001. The documentation shall include all technical information, procedures and processes the contractor utilized in the overhaul of the item.

*** END OF NARRATIVE C0001 ***

17 65

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION D - PACKAGING AND MARKING

D-1

Bar Code Markings

Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -

Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.

*** END OF NARRATIVE D0001 ***

18 65

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

E-1

Calibration

The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National

Conference of Standards Laboratories (ANSI/NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test

Equipment) or ISO 10012:2003 (Quality Assurance Requirements for Measuring Equipment). Terminology shall be as defined by International

Organization for Standardization (ISO) 8402, Quality Management and Quality Assurance - Vocabulary.

E-2

Product Verification Audit Statement of Work

Purpose: The purpose of this PVA SOW is to provide guidance to the contractor in the preparation for and execution of the PVA. The primary concept of the PVA is to validate that the contractor's overhaul processes and procedures comply with contract technical requirements. The PVA candidate(s) are used to evaluate that the contractor processes and procedures are adequate to ensure component integrity.

(a) The Contractor shall perform overhaul and present for acceptance THREE units of Lot/Item 0001AA as specified in this contract.

This clause does not supersede instructions contained in depot overhaul work requirements, commercial overhaul manuals, or other applicable documents. It does not relieve the contractor from maintaining a quality system that will assure overhauled items conform to contractual requirements. Contractors may request to delay scheduled PVAs in frequency or waive PVA requirements of selected items in cases where accumulated objective evidence indicates that a consistent quality item is being delivered. The Command's actions will be based on the overall performance history, failure impact, supply impact, length of program, and nonscheduled PVAs accomplished by the

AMRDEC Engineering Directorate (ED). Like or similar items may be grouped for these purposes provided concurrence is obtained from

AMRDEC ED. The contractor may be directed by the Contracting Officer (CO) to increase or decrease the scope of a PVA pursuant to the

"Changes" clause of the contract.

(b) The Contractor shall:

(1) With the concurrence of the cognizant government quality element and AMCOM, schedule and perform PVA as required by the terms of the contract or as otherwise required.

(2) Notify AMCOM through the cognizant government quality assurance element, with information copy to the AMRDEC ED, ATTN: QS-

Contracts@amrdec.army.mil, of the date the PVA candidates will be available. Notification shall be provided at least 20 working days prior to the selected date if facilities are within the Continental United States. If facilities are outside the Continental United

States, notification shall be provided at least 95 working days prior to the selected date to allow sufficient time for travelers to gain theater clearance.

(3) Provide technical personnel, tooling, measuring and test equipment, work area, forms, and clerical assistance, as required, to perform the PVA. If test cell or other specialized equipment is required; notification of readiness for PVA shall include the availability of these.

(c) The initial PVA will be performed on one of the first three (3) items overhauled. The PVA candidate will be selected by the AMRDEC

PVA Team Chairman at random from the three (3) tendered for acceptance to the Government. For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.

(d) The item selected for PVA will be inspected for adherence to preservation, packaging, packing, and marking requirements prior to removal from the shipping container. A visual inspection and functional test will be performed prior to disassembly.

(e) The PVA Team will review the shop travelers, production processes, procedures, tooling, and equipment used to overhaul the item being audited for adequacy and conformance to the contractual requirements. The PVA will include verification through objective evidence that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the PVA candidate are maintained in accordance with applicable calibration standards.

(f) Disassembly will be performed in an area accessible only to audit personnel. Normally, audit participation will be limited to specified production and quality assurance personnel of the contractor activity, the cognizant government Quality Assurance

Representative (QAR), and the AMRDEC PVA Team Chairman and team personnel.

(g) Visual inspection, dimensional checks (such as backlash, end clearance, running clearance, etc.) and nondestructive testing are accomplished during and after disassembly IAW applicable technical directives. Findings are recorded for comparison with historical data and conformance evaluation. A 100% inspection (or as set forth in relevant specifications) of all physical characteristics, to include but not limited to, any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings. Depot Maintenance Work

Requirements (DMWRs), Maintenance Engineering Orders (MEOs), and/or any other special/functional testing as set forth in this contract.

(h) Applicable accessories and components will be functionally tested and inspected to contractual/work specifications. The PVA team

19 65

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

will review subcontractor certifications for testing and inspections. At the request of the PVA Team Chairman, processes (such as shotpeening, heat treating, etc.) performed by subcontractors will also be audited. Contractor shall be able to demonstrate that all testing, inspection procedures, and acceptance methods are documented in the appropriate area of the overhaul documents, and are approved and controlled by management.

(i) The PVA item shall be reassembled and functionally tested IAW applicable specifications and made ready for government aceptance including preservation, packing, packaging, marking, and update of historical records and all applicable documentation.

(j) Conduct of the PVA will be planned in a manner that adequately allows examination/audit of all procedures involved. Each step in the process shall be analyzed to determine compliance to specifications. It may not be logical or possible, due to time constraints, to track the same item throughout the PVA; therefore, at the AMRDEC PVA Team Chairman's discretion, examination of representative assemblies amy be used as evidence of compliance to specification requirements. The AMRDEC PVA Team Chairman will determine the scope and detail of the PVA process. The AMRDEC PVA Team Chairman may delegate follow-up actions to the government QAR, when it is determined to be prudent to the PVA.

(k) During the course of the PVA, the PVA Team Chairman may request progress meetings to provide status to the contractor. After the

PVA is completed, the AMRDEC PVA Team Chairman will conduct an exit critique attended by all concerned contractor personnel and the cognizant government QAR. The context of the audit findings and corrective actions will be discussed and any disputes will be resolved.

Findings, classifications, and corrective actions will be discussed and determinations made as to cause of defect established (i.e., workmanship, tooling, technical requirements, etc.). The contractor's management personnel shall take immediate action to correct and preclude recurrence of all defects attributable to failure to comply with requirements.

(l) All defects will be recorded on the AMRDEC PVA Audit Finding Record by the PVA Team. The PVA Team Chairman will provide copies of each Finding to the contractor quality assurance element and the cognizant government QAR. This will allow immediate actions to begin in the resolution of the defect. Corrective actions as well as actions taken to prevent recurrence shall also be documented on this form by the contractor. The form shall be signed, as a minimum, by the contractor's quality manager or designated representative and the AMRDEC PVA Team Chairman. Further actions outlined below pertain to specific actions required by the contractor depending on the classification of the defects.

1. Observation: In the event an observation Finding is discovered, the contractor is not required to provide a written response, but it is encouraged to do so.

2. Minor: In the event a minor defect is discovered, the following actions shall be taken:

a. The contractor shall isolate the cause of the defect and initiate corrective actions.

b. All minor defects shall require a written response addressing corrective actions taken and actions taken to prevent recurrence.

c. In the event a minor defect is a recurring deficiency, regardless of weapon system or date when original discrepancy was noted, it will be written into the report as a minor defect, but the corrective actions required below for a major defect will apply.

3. Major: In the event a major defect is discovered, the following actions shall be taken:

a. The contractor shall halt any work in progress at the responsible station until corrective action is acceptable to the PVA Chairman.

b. The contractor shall provide the QAR information reflecting the total quantity shipped, if any, and to what destination pertaining to any item that could contain the identified defect.

c. The contractor shall determine impact of the defect on products previously delivered under this contract, if any, and initiate corrective action to address those units at no additional cost to AMCOM.

d. The contractor shall isolate the cause of the defect and initiate corrective actions. All findings shall require an in-depth written response outlining corrective actions to prevent recurrence.

e. The contractor shall review/revise work documents for the specified operation responsible for the defect to ascertain that they are complete, adequate, and sufficiently defined to assure that, if followed and completed by both production, maintenance and inspection personnel, they will provide objective evidence of a quality operation.

f. The contractor shall assure the cognizant QAR and the AMRDEC PVA Team Chairman that positive, effective, corrective action has been initiated that will prevent recurrence of the cited defect. This assurance can be verbal at first, however, a written report from the contractor quality element containing all corrective actions completed and actions taken to prevent recurrence shall be provided to the QAR and the AMRDEC PVA Team Chairman within 24 hours after the verbal response.

4. Critical: In the event a critical defect is discovered, the following actions shall be taken:

a. All actions outlined in paragraph 3 above shall be completed.

b. Upon request, the contractor shall provide the AMRDEC Aviation Engineering Directorate technical information necessary for the issuance of a Safety of Flight Message or Aviation Safety Action Message to the field (if necessary).

c. Government acceptance/release of product will cease immediately until corrective actions are acceptable to the contracting officer.

NOTE: Systemic quality and overhaul process discrepancies that affect the outcome of product(s) outside the scope of the PVA will

20 65

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

require the cognizant QAR to issue a Corrective Action Request.

(m). Upon completion of the disassembly and testing portion of the selected PVA candidate, without finding any critical or major defects, the other two completed candidates will be released as PVA candidates. In the event that a critical or major defect is found in the audit candidate, the contractor shall satisfy the PVA Team Chairman that such a defect does not exist in the other 2 PVA candidates prior to acceptance, and effective corrective action has been initiated to preclude reoccurrence of the defect.

(n). The contractor shall prepare and forward, through the cognizant government quality element, finalized audit reports within ten

(10) working days after completion of the PVA to Commander, U.S. Army Research Development and Engineering Command, ATTN: QS-

Contracts@amrdec.army.mil, Redstone Arsenal, AL 35898-5000 and the Acquisition Center address as shown on Order 0001. (In the event reorganization changes this address, the contractor will be notified of the new, correct address by the CO). The report shall include:

1. Name and location of contractor

2. Contract number or equivalent

3. Descriptive noun, national stock number, part number, and serial number of the item audited

4. Complete description of each audit finding, with corrective action taken, and action taken to prevent recurrence.

5. The audit report shall be signed, as a minimum, by the contractor's quality manager or his designated representative.

Objections, accompanied with explanations, on any audit finding(s) shall be specifically annotated and forwarded to AMCOM for resolution. Objection by the contractor as to the existence of a defect or as to its classification will be resolved by the PVA

Chairman. Further non-concurrence will be referred to the PCO for final resolution IAW the clause entitled "Disputes" as stated in the contract.

(o) The AMRDEC PVA Chairman will acknowledge receipt of the Final Audit Report and complete the following within 10 working days of receipt:

1. Review the Final PVA Report for compliance and completeness

2. Review the report for acceptance/rejection of corrective action and actions taken to prevent recurrence.

3. Forward a written reply to the AMCOM CO and/or cognizant government quality element, recommending acceptance or rejection of the Final Audit Report.

4. If the Final Audit Report is disapproved, the Contractor shall repeat any or all PVA tests, per Government request. If deemed in the best interests of the government, contract termination may be initiated. Upon request for additional tests, the

Contractor shall make any necessary changes, modifications, or repairs to the PVA item. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following disapproval. The Contractor shall then conduct the tests and deliver a revised report to the Government under the terms and conditions and within the time specified by the Government.

These actions must be coordinated with the cognizant government QAR. The Government shall take action on this report within 10 working days. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(p) The PVA unit is to be representative of the deliverable quantity. The Contractor shall overhaul both the PVA item and the contractual quantity at the same facility. In the event that there is a change to the process planning (i.e. changes in process sources, parts sources, or location where work is to be performed) after approval of the Final Audit Report, the contractor is required to provide notification of such changes to the CO, so that a determination can be made whether a new PVA is warranted. Notification is required 10 business days prior to shipment of the next delivery.

(q) The PVA candidates shall be shipped IAW contract delivery schedules or released to supply activity upon acceptance of the Final

Audit Report. The Contractor SHALL NOT retain the PVA item approved under this contract to serve as the manufacturing standard of acceptance.

(r) If the…

This is the start of the file's text. The full file is on GovTribe.