W56PFY-16-T-0126_Amendment.pdf

PDF 73 KB Posted

Attached to
COMMAND AND CONTROL
Solicitation number
W56PFY-16-T-0126
Issued by

About this file

Amendment 0001 reflects the changes and incorporates the questions and answers.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to extent the closing date of the solicitation.

1.- New closing date of solicitation: 30 September 2016 at 01 AM Eastern Time Zone 2.- Description of line item #4 changed from "Technician" to "Field Service Representative(s)" 3.- Questions and Answ ers are included as an attachment.

4.- There is no other chage to the terms and conditions.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Sep-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W56PFY-16-T-0126

X 9B. DATED (SEE ITEM 11)

27-Sep-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Sep-2016

CODE

414TH CSB - PARC AFRICA

ATTN: FERNANDO RAMIREZ

VIA DELLA PACE 197

VICENZA 36100

W56PFY 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W56PFY-16-T-0126

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 29-Sep-2016 01:00 PM to 30-Sep-2016 01:00 AM.

SUPPLIES OR SERVICES AND PRICES

CLIN 0004

The CLIN description has changed from Technician to Field Service Representative.

The CLIN extended description has changed from:

1- The Contractor Shall provide a technician or representative to travel from CONUS to Cameroon to assemble the C2S system at the shipping location. 2- The technicial shall provide hands on train to the U.S. personnal on ground and provide diagrams and manual(s) for future reference.3- Contractor shuld include under this CLIN all costs associated with airfares, transportation, and perdiem while performing duties under this contract.

To:

1- The Contractor Shall provide Field Service Representative(s) to travel from CONUS to Cameroon to assemble the C2S system at the shipping location. 2- The technicial shall provide hands on train to the U.S. personnal on ground and provide diagrams and manual(s) for future reference.3- Contractor shuld include under this CLIN all costs associated with airfares, transportation, and perdiem while performing duties under this contract..

The following have been added by full text:

QUESTIONS AND ANSWERS

COMMAND AND CONTROL SUITE Q&As

1. Can you please clarify the role of the FSR? In the CLIN structure, it talks about the FSR is there to train US personnel. In the SOW, it talks about the FSR is there to assemble the structure.

To be clear, one person cannot assemble the structure, it requires a minimum of four personnel.

If the requirement is to assemble the structure without assistance from the military, four FSRs will be required. If the requirement is to provide technical expertise to the military and help them assemble, one FSR will be sufficient.

***Government Response*** The Government needs the contractor to send forward FSR required to set up the shelter, the number of FSR required is upon the contractor determination to meet the installation requirement. This is a Firm Fixed Price Contract.

Contractor question:

2. The SOW asks for sound proofing so conversations cannot be overheard. We are able to add sound deadening panels on the walls and carpet squares to the floor to increase the STC rating but the one way mirrors are going to be an issue. The nature of those mirrors allows for sounds to move between rooms, you may not be able to hear the conversation clearly but you will be able to hear people speaking. Has that been considered by the Government when it developed this requirement?

***Government Response*** The Government is requiring sound proofing so that conversations between the office area and the interview rooms cannot be overheard by others walking by or in the next room. The Government required the mirrors on the walls between the mail office area and two of the connecting rooms so that personnel can observe the interviews conducted. In accordance with the statement of work, the sound proofing is required. There cannot be any conversations overheard from one room to another.

The method of sound proofing is up to the contractor technical determination.

3. My question is about the tradeoff between the price of a diesel generator versus a gasoline generator. The diesel generator is twice as expensive and needs to be moved by forklift/crane/truck whereas the gasoline generator is smaller, lighter and can be moved on the wheels mounted to the frame. My original ROM response to the sources sought was for a gasoline generator. Does the government want a separate quote for each different version of generator?

***Government Response*** Diesel generators commonly used in the Continent of Africa. It is the contractor determination of size and power output of the generator to sustain operability of the required supply.

The following have been modified:

52.212-1

52.212-1 ADDENDUM - INTRUCTIONS TO OFFERORS

a) General Instructions

1. Quotations shall be submitted to Fernando Ramirez at Fernando.d.ramirez.mil@mail.mil and Michelle Spence at michelle.a.spence2.civ@mail.mil. The electronic bid shall be submitted no later than 30 September 2016 at 01:00 AM Eastern Time Zone.

2. Partial quotes are not acceptable. This award will be made on an all or nothing basis.

3. Contractor shall submit all proposals/quotes in English.

4. Contractor shall submit proposals/quotes in US Dollars.

b) Quote preparation instructions

1. Offeror's quote shall consist of the following sections:

Factor A. Technical submission

The contractor shall submit the technical specifications stated in Contract Line Item Number (CLIN) schedule and the Statement of Work of this soliciation. Offerors who fail to submit all of the specified information will not be considered for award.

Factor B. Price submission:

For price submission the contractor will use the issued solicitation pages 1- 3. In addition the Contractor must sign on page 1 block 30a.

Factor C. Past Performance:

Past Performance- Past performance information is required in accordance with FAR 13.106-2 (b)(3)(ii)(D) Any other reasonable basis:

Below is the required information for past performance:

From the closing date of this solicitation, furnish information indicated below for contracts in progress and the three

(3) most recent government and commercial contracts offeror has performed during the past three (3) years of the same scope and similar dollar value as that contained in the solicitation.

i. Contract Number

ii. Contract Date

iii. Contract Amount

iv. Contracting Agency

v. Project Officer & Phone #

vi. Project Description

Satisfactory or higher past performance rating on the government and commercial projects similar in nature, scope and dollar value to the subject solicitation during the past three (3) years will be considered as “Acceptable Past Performance”.

If the offeror is a new entrant to the business and/or no past performance data is available, the offeror shall indicate “NEUTRAL” on the past performance proposal and the offeror will be considered to have a “Neutral Rating.” . It will be considered to be “Neutral”.

The Government reserves the right to investigate the offeror’s past performances; not limited to the listed past performances on the Past Performance proposal.

3. Failure to submit the paragraph 2 above requirements shall be grounds for determining the offer technically unacceptable, and ineligible for contract award.

4. The terms “Quotation” and “Quoter” shall be substituted for “Offer” and “Offeror” in this solicitaiton.

5. Partial quotes are not acceptable. This award will be made on an all or nothing basis. The Contractor shall submit a quote for ALL of the items listed in this solicitation. Failure to provide a quote for all items shall be grounds for determining the offer technically unacceptable and ineligible for contract award.

6. Contractor shall submit all proposals/quotes in English.

7. Contractor shall submit proposals/quotes in US Dollars.

(End of Addendum)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .