1. Scope of Work. This contract encompasses the manufacturing, shipment, and assembly of a collapsible Command and Control Suite (C2S) type structure which can be quickly disassembled and redeployed depending on mission requirements. The assembly or disassembly should be accomplishable by a minimum of four individuals, taking no longer that 45-60 minutes.

2. Configuration of C2S.

2.1. Standard configuration should not exceed and area of 36’x15’.

2.2. Preferably the structure will not sit flat on the ground, rather on legs or block type structures that elevate it off the ground.

2.3. Overall the C2S should consist of four total rooms, three of which are approximate 8’x8’ to be used for interviews, and the fourth, approximately 8’x15’ which will be a designated assigned personnel workspace area.

2.4. The POD or Modular building when assembled should resemble a “T” configuration with the work space area being the center piece, and one or two interview rooms connected on either side of the main section (see diagram provided page 3).

2.5. Each area/room must be assessable via its own doorway, and each door must have its own cipher lock assembly for security.

2.6. The center wall(s) connecting two of the interview rooms, which will be butting up against the main work space area must have two-way mirrors installed so that individuals in the main work area can observe what is going on in the two adjoining work spaces.

2.7. The walls between each of the work areas must have sound proofing so that conversations cannot be overheard, between the rooms.

2.8. The main work area must have NIPR and SIPR connectivity via a Power over Ether switch box (there will be approximately three NIPR and three SIPR computers)

2.9. Each of the work areas must have its own/separate Heating, Ventilation, and Air Conditioning capability.

2.10. A separate external power generation system, preferably a diesel fueled generator must accompany the structure (size to be recommended by the contractor due to the size of the

2 | P a g e structure). Due to some of the power infrastructures on the continent, power conversion for 50 and/or 60 Herz will be required.

2.11. Each of the smaller work areas must have at least on small table and a minimum of three chairs in it.

2.12. The larger work area will require at least two larger sized tables and the appropriate number of chairs to accommodate the internal size of the structure.

3. Transportation and Assembly.

3.1. Contractor must provide in the estimate a transportation cost for shipping the C2S from the location of the production plant, or warehouse to the site in Garoua, Cameroon.

3.2. In the cost of the contract there must be included a fee for a Field Service Representative to travel from CONUS to Cameroon to assemble the C2S on location after its arrival.