Manifold Assembly QA Log 12-10-19.pdf
PDF 97 KB Posted
- Attached to
- MANIFOLD ASSEMBLY
- Solicitation number
- W56HZV-19-R-0294
View the file
Other files
| File | Type | Posted |
|---|---|---|
| First Article Waiver (FAT) Worksheet.pdf | ||
| W56HZV-19-R-0294 0001.pdf | ||
| Manifold Assembly QA Log 12-5-19.pdf | ||
| Special Packaging Instructions - Manifold.pdf | ||
| W56HZV19R0294.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question Number Question/Comments Answer/Response Date Received Date Posted 1 The Type I manifold is mentioned in Section A but does not appear anywhere else in the Solicitation, will Type I manifolds be a required deliverable? From our experience with this NSN, Type I manifolds were phased out and the Thermal Bypass Valve (Type II) was preferred.
Based on all current platforms, the Type II manifold (NSN 4730‐01‐315‐3360, PN 12346082) is the manifold contractors would be providing.
4‐Dec‐19 5‐Dec‐18
2 After comparing Drawing 12346082 Revision J to Revision H the only difference between the two drawings is the Distribution Statement, all other requirements are the same. Is that correct?
The only changes to Drawing 12346082 were to add Distribution, ITAR and Destruction statements to the drawing.
9‐Dec‐19 10‐Dec‐19
Manifold Assembly
W56HZV‐19‐R‐0294
Question and Answer Log
File details come from the government source that posted it. Updated .