W56HZV-19-R-0204_-_SIGNED.pdf

PDF 107 KB Posted

Attached to
Feeder Delinker
Solicitation number
W56HZV19R0204
Issued by

About this file

SOLICITATION W56HZV19R0204

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

Offeror To Complete Block 12, 17, 23, 24, & 30

1. Requisition Number Page Of

2. Contract No. 3. Award/Effective Date 4. Order Number 5. Solicitation Number 6. Solicitation Issue Date

7. For Solicitation Information Call:

A. Name B. Telephone Number (No Collect Calls) 8. Offer Due Date/Local Time

9. Issued By Code 10. This Acquisition is Unrestricted OR Set Aside: % For:

Small Business Women-Owned Small Business (WOSB) Eligible Under the Women-Owned Small Business Program

Hubzone Small Business EDWOSB

Service-Disabled Veteran-Owned Small Business NAICS:

Email: 8(A) Size Standard:

11. Delivery For FOB Destination Unless Block Is Marked

12. Discount Terms 13a. This Contract Is A Rated Order Under DPAS (15 CFR 700) 13b. Rating

See Schedule 14. Method Of Solicitation RFQ IFB RFP

15. Deliver To Code 16. Administered By Code

Telephone No.

17a. Contractor/Offeror Code Facility 18a. Payment Will Be Made By Code

Telephone No.

17b. Check If Remittance Is Different And Put Such Address In Offer

18b. Submit Invoices To Address Shown In Block 18a Unless Block Below Is Checked See Addendum

19.

Item No.

20.

Schedule Of Supplies/Services

21.

Quantity

22.

Unit

23.

Unit Price

24.

Amount

(Use Reverse and/or Attach Additional Sheets As Necessary)

25. Accounting And Appropriation Data 26. Total Award Amount (For Govt. Use Only)

27a.Solicitation Incorporates By Reference FAR 52.212-1, 52.212-4. FAR 52.212-3 And 52.212-5 Are Attached. Addenda Are Are Not Attached.

27b.Contract/Purchase Order Incorporates By Reference FAR 52.212-4. FAR 52.212-5 Is Attached. Addenda Are Are Not Attached.

28. Contractor Is Required To Sign This Document And Return _________ 29. Award Of Contract: Ref. Offer Copies to Issuing Office. Contractor Agrees To Furnish And Deliver All Items Set Forth Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified.

Dated . Your Offer On Solicitation (Block 5), Including Any Additions Or Changes Which Are Set Forth Herein, Is Accepted As To Items:

30a. Signature Of Offeror/Contractor 31a. United States Of America (Signature Of Contracting Officer)

30b. Name And Title Of Signer (Type Or Print) 30c. Date Signed 31b. Name Of Contracting Officer (Type Or Print) 31c. Date Signed

Authorized For Local Reproduction Previous Edition Is Not Usable

Standard Form 1449 (Rev. 2/2012) Prescribed By GSA-FAR (48 CFR) 53.212

W56HZV-19-R-0204 2019AUG14

KATHY KESSLER (586)282-3538

KATHY.A.KESSLER.CIV@MAIL.MIL

2019SEP03 03:00pm

W56HZV

U.S. ARMY CONTRACTING COMMAND

WARREN, MICHIGAN 48397-5000

332994

X DOA4

X

SEE SCHEDULE

1PN61

DILLON AERO, INC.

8009 E DILLONS WAY

SCOTTSDALE, AZ 85260-1809

SEE SCHEDULE

X X

X 1

1 41

19.

Item No.

20.

Schedule Of Supplies/Services

21.

Quantity

22.

Unit

23.

Unit Price

24.

Amount

32a. Quantity In Column 21 Has Been

Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________

32b. Signature Of Authorized Government Representative 32c. Date 32d. Printed Name and Title of Authorized Government Representative

32e. Mailing Address of Authorized Government Representative 32f. Telephone Number of Authorized Government Representative

32g. E-Mail of Authorized Government Representative

33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number Correct For Partial Final Complete Partial Final

38. S/R Account No. 39. S/R Voucher Number 40. Paid By

41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer 41c. Date 42b. Received At (Location)

42c. Date Rec’d (YY/MM/DD) 42d. Total Containers

Standard Form 1449 (Rev. 2/2012) Back

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SUPPLEMENTAL INFORMATION

Buyer Name: KATHY KESSLER

Buyer Office Symbol/Telephone Number: CCTA-HDB-N/(586)282-3538

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

Weapon System: Machine Gun, 7.62mm, M134 (Mini-Gun)

*** End of Narrative A0000 ***

1. This action is being executed as a noncompetitive negotiation acquisition IAW FAR 15, contract by negotiation.

2. This solicitation is sole sourced to Dillon Aero (CAGE CODE: 1PN61). The Technical Data Package (TDP) is not considered adequate for competition as the drawings are owned by Dillon Aero.

3. This solicitation will result in a Firm-Fixed Price contract for the following requirement:

NSN MFG P/N NOUN QTY U/I

1005014909689 DAFD2000-1 Feeder De-linker 25 ea

4. The contractor is authorized to ship early at no additional cost to the Government.

5. All shipments will be FOB Destination to the following ship to address:

SR ARMY GENERAL SUPPLY LMP STOCK RECOR

DLA DISTRIBUTION ANNISTON

7 FRANKFORD AVE 362

ANNISTON, AL, 36201-4199

A.1. Electronic Contracting

(a) All Army Contracting Command Warren solicitations will be publicized on the Federal Business Opportunities website

(https://www.fbo.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.

(b) As of 10 August 2015, unless directed to do otherwise in Section L of this solicitation, vendors are required to submit a quote or proposal via the Federal Business Opportunities (FBO) system. Proposals or quotes submitted after this date using any other mechanism, including the Army Single Face to Industry Bid Response System (ASFI BRS) may be deemed non-responsive.

(c) Requirements for the online FBO bid submission:

(1) Vendors must log into the FBO System to be able to submit electronic responses for opportunities.

(2) Vendors must be registered in the System for Award Management (SAM) at "../../../../Documents/SharePoint%20Drafts/www.sam.gov" (a

Federal Government owned and operated free web site) and have a CAGE Code and CCR Marketing Partner Identification Number (MPIN).

(3) Once logged into the FBO System, vendors will be asked to enter basic information and directed to upload one or more files containing the proposal/quote and any additional information as outlined in the solicitation.

(4) FBO will send an email to vendors registered email address confirming the electronic submission.

(5) For additional information on submitting electronic bid responses via the FBO system see the FBO Vendor Guide Section 4.3.1

Submitting an Electronic Response https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf .

Note to offerors:

(d) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.

(e) It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government

2 41

W56HZV-19-R-0204 REPRINT

DILLON AERO, INC.

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

infrastructure (in this case, received through FBO) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.

Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.

(f) Solicitations may remain posted on the FBO after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.

(g) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the

Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.

(h) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit theProcurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.

2. ACKNOWLEDGEMENT OF AMENDMENTS _____________________________

Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:

Amendment Number: Date:

3. ARMY CONTRACTING COMMAND WARREN (DTA) OMBUDSPERSON ___________________________________________________

Information regarding the Ombudsperson for this contract is located at the following website:

http://acc.army.mil/contractingcenters/acc-wrn/CompMgmtOffice.html

A.4. ALL OR NONE-COMMERCIAL ITEM ACQUISITION

(a) This provision serves as an addendum that modifies paragraph (h) of FAR 52.212-1, entitled INSTRUCTIONS TO OFFERORS--COMMERCIAL

ITEMS. Paragraph (h) is modified to say that the proposal or quote must offer to provide the total quantity of the items in this solicitation.

(b) Only one award will be made as a result of this solicitation. Offers submitted for less than the total quantities of all the items in this solicitation will NOT be considered for award.

*** END OF NARRATIVE A0001 ***

3 41

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SUPPLIES OR SERVICES AND PRICES/COSTS

0001 Feeder Delinker

NSN: 1005-01-490-9689

Mfr CAGE: 1PN61

Mfr Part Number: DAFD2000-1

0001AA FEEDER DELINKER 25 EA $ $ ________________ ______________ __________________

COMMODITY NAME: Feeder Delinker

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: EH9C0372EH PRON AMD: 03

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 1PN61

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

FEEDER DELINKER

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Inspection/Acceptance at Origin means the contractor

MUST contact DCMA to arrange for a Government inspection BEFORE production under CLIN 0001AA is shipped. Failure to have production inspected and accepted at Origin will result in its rejection at Destination. Rejected production will be returned at the contractor's expense.

(End of narrative E001)

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 W56HZV8338V352 W562RP J W562RP 2

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 25 0180

FOB POINT: Destination

SHIP TO:

(W562RP) SR ARMY GENERAL SUPPLY LMP STOCK RE

CENTRAL RECEIVING POINT

7 FRANKFORD AVE BLDG 362

ANNISTON,AL,36201-4199

4 41

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

MARK FOR: SR ARMY GENERAL SUPPLY LMP STOCK RE

CENTRAL RECEIVING POINT

7 FRANKFORD AVE BLDG 362

ANNISTON,AL,36201-4199

Early delivery is authorized at no additional cost to the Government.

(End of narrative F001)

5 41

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0002 OPTION 1: FEEDER DELINKER

OPTION QUANTITY, PURSUANT TO THE CLAUSE

ENTITLED OPTION FOR INCREASED QUANTITY---

SEPARATELY PRICED LINE ITEM (52.217-4001).

This Option may be extercised 365 days after award.

Options are not part of the contract unless exercised.

Part or all of this option may be added to the contract by exercise of the option clause, at the discretion of the Government.

IUID not required.

(End of narrative A001)

0002AA OPTION 1: FEEDER DELINKER 25 EA $ $ ___________________________ ______________ __________________

COMMODITY NAME: OPTION 1: FEEDER DELINKER

CLIN CONTRACT TYPE:

Firm Fixed Price

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

DAFD2000-1

LEVEL PRESERVATION: Military

LEVEL PACKING: B

UNIT PACK: 001

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Inspection/Acceptance at Origin means the contractor

MUST contact DCMA to arrange for a Government inspection BEFORE production under CLIN 0001AA is shipped. Failure to have production inspected and accepted at Origin will result in its rejection at Destination. Rejected production will be returned at the contractor's expense.

(End of narrative E001)

Deliveries or Performance _________________________

DOC SUPPL

6 41

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 25 0120

FOB POINT: Destination

SHIP TO:

(W562RP) SR ARMY GENERAL SUPPLY LMP STOCK RE

CENTRAL RECEIVING POINT

7 FRANKFORD AVE BLDG 362

ANNISTON,AL,36201-4199

WHEN CLIN HAS BEEN EXERCISED:

Early delivery is authorized at no additional cost to the Government.

(End of narrative F001)

7 41

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1 TECHNICAL DATA PACKAGE INFORMATION

The following Xd item applies to this solicitation:

[ X ] 1. There is no Technical Data Package (TDP) included with this solicitation.

[ ] 2. The TDP for this solicitation resides within FedBizOpps (https://www.fbo.gov ), associated with this solicitation number, and can be accessed via this URL:

-1-

To access the data through FBO:

a. Log on to the FBO web site.

b. Enter Marketing Partner Identification Number (MPIN).

c. Search for the solicitation number.

d. If solicitation is Export Controlled, select Verify MPIN.

(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec

2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..

(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(3) To obtain these TDPs, vendors and contractors must have a current DD 2345, Militarily Critical Technical Data

Agreement on file with Defense Logistics Information Service (DLIS).\~ Currently certified contractors should enter the MPIN which will be verified before proceeding to the next step.\~ To obtain certification, go to http://www.dlis.dla.mil/jcp/

Click on documents and follow instructions provided. Processing time is estimated at six (6) to ten (10) weeks after receipt. FBO will allow access to export controlled TDPs once certification is confirmed.

(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the

Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

e. If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the FBO system administrator at Army Contract Command - Warren (DTA) with all the information needed to grant a contractor access. FBO will subsequently automatically generate an email stating when the requesting contractor has permission to view or download TDP items.

Allow two (2) to three (3) working days to complete this FBO-TDP access/approval process through the FBO system.

*** END OF NARRATIVE C0001 ***

8 41

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

PACKAGING AND MARKING

D. The following requirements shall apply:

PRESERVATION: -MILITARY-

LEVEL OF PACKING:-B-

QUANTITY PER UNIT PACKAGE:-001-

SPECIFICATION/STANDARD: -MIL-STD-2073-1-

D.1. Marking: In addition to any special marking markings called out by the specification/standard above;

D.2 All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, including bar coding and a MSL label. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel. Passive RFID tagging is required in all contracts that contain DFARS clause

252.211-7006. Contractors must check the solicitation and/or contract for this clause. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html for the current DoD Suppliers Passive RFID Information Guide and Supplier Implementation Plan.

If the item has Unique Item Identifier (UII) markings then the concatenated UII needs to be 2D bar coded and applied on the unit package, intermediate and exterior containers, and the palletized unit load.

D.3 Heat Treatment and Marking of Wood Packaging Materials: All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure tractability to the original source of heat treatment. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.

Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens; on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood products verified in accordance with their National Plant Protection Organizations compliance program. In addition, wood used as dunnage for blocking and bracing, to include ISO containers, shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.

D.4 The specification/standard cited is intended to give a clear and accurate description of the technical packaging requirements for the item being procured, including the procedure by which it can be determined that the requirements have been met. Specific instructions and/or tailoring of the specification/standard is detailed in the supplemental instructions in paragraph G below. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing and without affecting the serviceability of the item will be considered and responded to within 10 days of submission to PCO with copies to the ACO. The government reserves the right to require testing to validate alternate industrial preservation methods, materials, blocking, bracing, cushioning, and packing.

D.5 Hazardous Materials (as applicable):

D.5.1 .Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.

(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)

D.5.2 When applicable, packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the applicable performance packaging contained in the following documents:

International Air Transport Association (IATA) Dangerous Goods Regulations

International Maritime Dangerous Goods Code (IMDG)

Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49

Joint Service Regulation AFJMAN24-204/TM38-250/NAVSUPPUB 505/MCO

P4030.19/DLAM 4145.3 (for military air shipments).

D.5.3. If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the

United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.

9 41

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

D.5.4. When applicable, a Product Safety Data Sheet (SDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.

D.6. Supplemental Instructions: Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. All variations must be approved by the Contracting Office prior to implementation. The load shall be contained in a manner that will permit safe handling during shipment and storage.

Packaging shall be in accordance with MIL-STD-2073-1 and have successfully passed test levels of ASTM D 4169, Distribution Cycle 18, Assurance Level II, Acceptance Criterion 3, Military packing Level B . The warehouse stacking height shall be 16 ft. The shipping unit shall be the unit pack. Marking shall be in accordance with MIL-STD-129.

Testing shall be witnessed by the Government Quality Assurance Representative. Packaged gross weight and size shall be included on the test report as well as a detailed description of the packaging. The Contractor is exempted from testing if other data can be provided

(see para. 5.6 of MIL-STD-2073-1) and is acceptable to the Government. Similar items do not require retesting.

*** END OF NARRATIVE D0001 ***

10 41

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

INSPECTION AND ACCEPTANCE

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984

QUALITY ASSURANCE REQUIREMENTS

ARDEC 367 REQ Selection #1.

1.) INSPECTION AND ACCEPTANCE POINTS: ORIGIN

The Government's inspection of the supplies offered under this contract/purchase order shall take place at ORIGIN. Offeror must specify below the exact name, address, and CAGE of the facility, or his subcontractor's facility, where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.

INSPECTION POINT: ORIGIN

a. NAME

b. CAGE

c. ADDRESS, CITY, STATE, ZIP

ACCEPTANCE POINT: ORIGIN

a. NAME

b. CAGE

c. ADDRESS, CITY, STATE, ZIP

FIRST ARTICLE TEST REPORT (FATR) ACCEPTANCE: DESTINATION

The Government's acceptance of the First Article Test Report (if required) offered under this order shall take place at DESTINATION.

Destination: (SEND TO: usarmy.ria.rdecom-ardec.mbx.rdar-qep@mail.mil)

*** END OF NARRATIVE E0001 ***

11 41

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

CONTRACT ADMINISTRATION DATA

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS DEC/2018

(a) Definitions. As used in this clause--

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and

Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and

Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov ; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this

Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the

WAWF home page at https://wawf.eb.mil/ .

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer

Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items--

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

COMBO

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

N/A

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some Combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in

12 41

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC -3-

Issue By DoDAAC W56HZV

Admin DoDAAC -5-

Inspect By DoDAAC -6-

Ship To Code -7-

Ship From Code -8-

Mark For Code -9-

Service Approver (DoDAAC) N/A

Service Acceptor (DoDAAC) N/A

Accept at Other DoDAAC N/A

LPO DoDAAC N/A

DCAA Auditor DoDAAC N/A

Other DoDAAC(s) N/A

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and

Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

-16-

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

13 41

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SPECIAL CONTRACT REQUIREMENTS

HS 7144

Demilitarization (Demil) and/or Trade Security Controls Clause for Procurement of Munitions List Items (MLI) and Commerce Control List

Items (CCLI)

DEMILITARIZATION AND TRADE SECURITY CONTROL REQUIREMENTS AND PROCEDURES

I. Demil and/or Trade Security Controls (TSCs) Summary:

A. This procurement action has a demil and/or TSC consideration requirement. The demil and trade security control provisions in this solicitation implement the policy and requirements of the Arms Export Control Act, 22 United States Code (U.S.C.), Section 2778, the

International Traffic in Arms Regulations (ITAR) at 22 Code of Federal Regulations (CFR), Parts 120-130, the Export Administration

Regulations (EAR), at 15 CFR 730-774 and the Export Administration Act. Regulatory requirements and guidance are contained in Federal

Acquisition Regulation (FAR) 45.6, Reporting, Redistribution, and Disposal of Contractor Inventory and Defense Federal Acquisition

Regulation (DFAR) 245.604, Restrictions on Purchase or Retention of Contractor Inventory.

B. Demil and TSC policy is promulgated via Department of Defense (DoD) regulations and in the establishment of contract requirements.

Accordingly, the governments right to require demilitarization under this clause is a contractual right, subject to the authority and discretion of the Procuring Contracting Officer (PCO). Therefore the PCO may or may not forward contractor demilitarization waiver request for review and approval, even when there is certifiable contractors compliance with all existing TSC regulations. The waiver approval process is described in paragraph VI of this clause.

C. The DoD policy and requirements for demil and TSCs are contained in the DoD 4160.21-M-1, Demil and TSCs Manual. This manual is hereby incorporated by reference, and its terms, conditions, and procedures are valid and enforceable as contractual requirements. If there is a conflict between the Demil and TSCs Manual and the Demil and TSC Clause herein, the Demil and TSCs Manual takes precedence.

D. This contract requires the manufacture, assembly, test, maintenance, repair, and/or delivery of military/defense items. This clause sets forth the requirements for the control and corresponding certification and verification of disposition of contract excess property.

The requirements under this clause are applicable to any contractor and/or subcontractor who perform work under this contract. This clause is a mandatory flow-down clause; accordingly, contractor/subcontractor must include this clause in subcontracts for work under this solicitation and resulting contract.

E. The demil and TSC requirements apply to all materials and property (government furnished equipment (GFE), special tools and special test equipment, manufactured parts in whatever stage of assembly, and associated technical data including technical manuals, drawings, process sheets, and working papers) bought, assembled, produced, or provided by the government under this contract regardless of the type of contract and regardless of who has title to the material. The intent is to control military/defense items in accordance with statutory and regulatory requirements. Bidders/offerors proposed prices under this solicitation and any resulting contract should include any and all cost(s) to comply with this clause and the governments demil and TSC requirements.

F. In general, the demil requirements must be met upon completion of the contract. For indefinite delivery contracts as defined by FAR

16.501-2, demil requirements must be met upon the expiration of the potential contractual performance period as described in section A of the contract and/or in section B (the schedule) of the contract; or upon contract termination if the contract is earlier terminated.

Contractor(s) awarded a contract with demil requirements shall be responsible for maintaining an inventory system capable of recording, safeguarding and tracking all material, work in process, components associated or related to the performance of the contract for the purpose (not intended to be exclusive) of enabling the contractor to fulfill its demil obligations under this clause. The contractor will provide a copy of demil certificates to the PCO within 30 days for inclusion in the contract file.

G. Paragraph VIII. c. of this clause applies to the demil of excess U.S. Government furnished equipment/technical data (GFE) provided to a contractor in support of this contract; see excess GFE definition II. b. below. If the contractor is not using GFE in performance of this contract, disregard this paragraph.

H. The contractor agrees that demil performed under this contract will be conducted in accordance with this clause or DoD 4160.21-M-1, Demil Manual, and all demilitarized material will meet or exceed the definition of scrap as defined by this clause.

II. Definitions:________________

A. Contract excess property is property of the type covered by this contract for which the contractor does not claim payment or has been denied payment and all GFE not returned to the government upon completion of the contract. This includes, but is not limited to, rejects and overruns. Contract excess property (whether title to the property is in the Government or not) includes completed or partially completed parts, components, subassemblies, assemblies, end items, special tools and test equipment, and all associated technical manuals, technical data, packaging and labeling. Contract excess property shall be controlled and final disposition determined by assigned demil code unless waived.

B. Excess GFE is equipment/technical data provided by the U. S. Government to the contractor that the contractor no longer needs to

14 41

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

satisfy the contracts requirements, which the government does not want returned during or at the completion of the contract.

C. Demilitarization is the act of destroying the military offensive and defensive characteristics inherent in certain types of equipment and material to the degree necessary to preclude its restoration to a usable condition. The term includes mutilation, dumping at sea, cutting, crushing, shredding, melting, burning or alteration designed to prevent the further use of this equipment and material for its originally intended military purpose. It applies equally to material in unserviceable and serviceable condition.

D. Scrap is material that has no value except for its basic material content.

E. Munitions list item (MLI) is any item contained in the U. S. Munitions List, 22 CFR 120-130.

F. Commerce control list item (CCLI) is a multi-use (military, commercial and other strategic use) item under the jurisdiction of the

Bureau of Export Administration, U. S. Department of Commerce, through the Export Administration Regulations, 15 CFR 730-774. The types of items on the CCL may be commodities (i. e., equipment, materials, electronics), software, or a particular technology.

G. Trade security control (TSC) is control procedures designed to preclude the sale or shipment of Munitions List or Commerce Control

List items to any entity whose interests are inimical to those of the United States. These controls are also applicable to such other selected entities as may be designated by the Deputy Under Secretary of Defense (Trade Security Policy).

H. Commercial type property is material, equipment, software, or technology not generally considered to be unique and peculiar to DoD and possessing commercial marketability.

I. Significant military equipment (SME) is material for which special export controls are warranted because of their capacity for substantial military utility or capability. Items designated as SME require worldwide demil as prescribed in DoD 4160.21-M-1, Demil

Manual, appendix 4.

J. Ammunition, explosives, and dangerous articles (AEDA) is any substance that by its composition and chemical characteristics, alone or when combined with another substance, is or becomes an explosive or propellant or is hazardous or dangerous to personnel, animal or plant-life, structures, equipment or the environment as a result of blast, fire, fragment, radiological or toxic effects. AEDA is not a criterion for demil. AEDA items not on the Munitions List would be coded A or Q.

III. Applicability:___________________

This solicitation/contract is for the production of MLIs or CCLIs and contract excess may require demil and/or TSCs. This clause is applicable to prime and subcontractors.

IV. Contractor Demil and TSCs:_______________________________

A. The contractor will demil and apply TSCs as required on all contract excess property as dictated by the government assigned demil code and its definition and the demilitarization and trade security controls matrix in paragraph IX of this clause. Demil codes and definitions can be accessed per paragraph VIII of this clause.

B. The contractor will contact the PCO for declassification, safety and demil instructions for contract excess property with an assigned demil code of P, F, or G.

C. The contractor will demil all associated excess technical data.

V. Demil Certification and Verification (DC&V):_______________________________________________

A. During or upon completion of manufacturing under this contract, the prime contractor shall notify the PCO in a timely manner that a government representative is required to witness demil of contract excess property produced under this contract whether the prime contractor or a subcontractor is performing the demil.

B. Subcontractors shall notify the prime contractor in a timely manner who shall notify the PCO that a government representative is required to witness demil of contract excess property produced under this contract.

C. The Government Quality Assurance Representative will forward all demil certificates and the final DD Form 250 to the PCO so that final payment can be made. The PCO will not release the final DD Form 250 for payment unless all pertinent demilitarization certificates from all prime and subcontractors involved have been received. If the contractor is using the Wide Area Workflow (WAWF)

Receipt-Acceptance system, the QAR will ensure all demil certificates are attached to the final WAWF Receiving Report before accepting the shipment. The Demil Certification and Verification Certificate will become part of the contract file.

D. A contractors representative certifies and a technically qualified U.S. Government QAR (United States citizen) is designated as the

U.S. Government official responsible for executing the Demil verification unless another U.S. Government official is designated in writing by the PCO. Both shall actually witness the demil; and both shall sign and date the DA Form 7579 available at

15 41

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

http://www.apd.army.mil/ .

VI. Demil Waivers:__________________

A. The contractor may request a demil waiver for contractual requirements. However, any waiver must be predicated upon disposition of material in a manner that is consistent with the guidelines and intent of applicable demil and TSC laws and regulations. All requests for demil waivers must be submitted in writing through the PCO to the Armys Demil PM. Waiver request must be approved prior to contractor disposition of any contract excess property and prior to the release of final DD Form 250 for payment. All waiver requests must specify the items, quantity, proposed disposition of the material, and any additional terms. If written approval of the request for a demil waiver is not granted within 45 days of submission, the demil request shall be deemed disapproved. The contractor is not entitled to demil waiver. Contact the PCO for additional specific guidance.

B. When a demil waiver is approved, all packaging and Government property containing non-removable markings shall have these markings permanently obliterated before any non-demilitarized disposition.

VII. Disputes - any disputes concerning this clause shall be addressed in accordance with the Disputes clause in this______________ solicitation/contract.

VIII. Contractor Access and Identification of Demilitarization Requirements:____________________________________________________________________________

A. Contractors will identify demilitarization requirements by accessing the assigned demilitarization code via the Internet using the following steps:

A.1. Logon to the WebFLIS Web site http://www.dlis.dla.mil/WebFlis/pub/pub_search.aspx . This displays the Federal Logistics

Information System WebFLIS Public Inquire.

A.2. Enter NIIN or NSN and click on Go. This page displays the demilitarization code under the icon DMIL. Make note of the assigned demilitarization code.

A.3. Click on the icon "DMIL" provided on this Web site. Print these demilitarization code definitions for future reference and close the screen.

B. The contractors demilitarization requirement:

B.1. The contractor's demilitarization requirement is based on the demilitarization code ("A," "B," "C," "D," "E," "F," "G," "P," or

"Q") assigned to the property and its corresponding definition.

B.2. Match the demilitarization code with its definition. Demilitarize excess property in accordance with the demilitarization code definition.

Note: If an NSN has NOT been assigned to the property in question, the demilitarization code for the property is not in this database.

Contact the PCO for the demilitarization requirements for property if the demilitarization code could not be identified in this database.

C. Due to numerous variables, the Government may not know which disposal option is most advantageous for GFE until the end of the contract. Three GFE disposal options available to the government are:

Option 1:

C.1.1 Have the contractor demilitarize the excess GFE per the assigned demilitarization code.

C.1.2. The cost of contractor demilitarization will be negotiated.

C.1.3. The PCO will provide the contractor with the pertinent demilitarization instructions for property without codes assigned.

C.1.4. The PCO will ensure that demilitarization certification and verification is properly documented.

Option 2:

C.2.1 Abandon or sell the excess GFE and transfer the title to the contractor.

C.2.2 Prior to the Government transferring the title of demilitarized or un-demilitarized excess GFE and regardless of its serviceability, all TSC laws must be satisfied. Therefore the contractor must be in possession of an approved end use certificate (EUC), DLA Form 1822 before the Government transfers title to the property.

C.2.3. The EUC is the U.S. Governments instrument to ensure the contractor is aware of and agrees to assume the responsibility for future TSC requirements and demilitarization cost and liabilities for the excess GFE. The demilitarization and TSC requirements for

MLI/CCLI do not diminish over time. For complete TSC requirements see paragraph IX of this clause and DOD 4160.21-M-1, Demilitarization

Manual.

C.2.4. Contractors and other persons must obtain the permission of the PCO prior to any subsequent disposition or sale. Any subsequent disposition or sale will be accomplished in accordance with DOD 4160.21-M-1, Demilitarization Manual.

Option 3:

C.3 The contractor returns the excess GFE to the Governments control for disposal and the government ensures adequate disposal occurs per DOD 4160.21-M-1, Demilitarization Manual.

16 41

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

*** END OF NARRATIVE H0001 ***

17 41

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

CONTRACT CLAUSES

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE OCT/2018

2 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE JUL/2016

3 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES JUL/2018

DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES

4 52.212-4 CONTRACT TERMS AND CONDITIONS--COMMERCIAL ITEMS OCT/2018

5 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS DEC/2013

6 252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS SEP/2011

7 252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING OCT/2016

8 252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT MAY/2016

9 252.225-7001 BUY AMERICAN AND BALANCE OF PAYMENTS PROGRAM--BASIC DEC/2017

10 252.225-7002 QUALIFYING COUNTRY SOURCES AS SUBCONTRACTORS DEC/2017

11 252.225-7016 RESTRICTION ON ACQUISITION OF BALL AND ROLLER BEARINGS JUN/2011

12 252.225-7048 EXPORT-CONTROLLED ITEMS JUN/2013

13 252.232-7010 LEVIES ON CONTRACT PAYMENTS DEC/2006

14 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR MAY/2019

EXECUTIVE ORDERS--COMMERCIAL ITEMS

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division

E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other

Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).

(3) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)

(4) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(5) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the contracting officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sep 2006), with Alternate I (Oct 1995)(41 U.S.C. 4704 and

10 U.S.C. 2402).

___ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).

___ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of

Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

_X__ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) (Pub. L. 109-282) (31 U.S.C. 6101 note).

___ (5) [Reserved].

___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section

743 of Div. C).

_X__ (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for

Debarment (Oct 2015) (31 U.S.C. 6101 note).

___ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).

___ (10) [Reserved]

18 41

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

___ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).

___ (ii) Alternate I (NOV 2011) of 52.219-3.

___ (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

___ (ii) Alternate I (JAN 2011) of 52.219-4.

___ (13) [Reserved]

___ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2011) (15 U.S.C. 644).

___ (ii) Alternate I (Nov 2011) of 52.219-6.

___ (iii) Alternate II (Nov 2011) of 52.219-6.

___ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003)(15 U.S.C. 644).

___ (ii) Alternate I (Oct 1995) of 52.219-7.

___ (iii) Alternate II (Mar 2004) of 52.219-7.

___ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)).

___ (17)(i) 52.219-9,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.