W56HZV19R0161__full_solicitation.pdf
PDF 110 KB Posted
- Attached to
- Pintle Assembly - 1005-01-598-3870
- Solicitation number
- W56HZV-19-R-0161
About this file
Full solicitation incorporating amendment 0001 and 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_0003_-_First-Article-Waiver-Worksheet.pdf | ||
| W56HZV19R0161-0002.pdf | ||
| W56HZV19R0161.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W56HZV-19-R-0161
X
2019JUN12
2019JUL12
DOA4
2019JUN12 SEE SCHEDULE
W56HZV
U.S. ARMY CONTRACTING COMMAND
WARREN, MICHIGAN 48397-5000
DAWN M. HESSELL
(586)282-5844
CCTA-ALS-E
DAWN.M.HESSELL.CIV@MAIL.MIL
1 59
X 1
X 6 X 14
X 18 X 20 X 24
X 29
X 31
X 35
X 44
X 45
X 53
X 57
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
THE FOLLOWING AMENDMENTS HAVE BEEN INCORPORATED
Buyer Name: DAWN M. HESSELL
Buyer Office Symbol/Telephone Number: CCTA-ALS-E/(586)282-5844
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
Weapon System: Machine Gun, Caliber .50 M2 Series w/Tri
*** End of Narrative A0000 ***
Amendment 0002
1. The purpose of Amendment 0002 is to make the following changes.
a. A waiver of the First Article Test (FAT) may be granted.
b. Attachment 0003 First Article Waiver Worksheet is added.
c. FAT waiver must be submitted with your proposal in accordance with Section L, LS7304, Provision for Waiver of Required First Article Approval. Use
Attachment 0003 FAT Waiver Worksheet with your request.
d. Provision LS7304 Provision for Waiver of Required FAT is added to Section L.
e. Clause FAR 52.211-8 time of Delivery is revised.
2. All other terms and conditions of the solicitation remain unchanged.
THE PURPOSE OF AMENDMENT 0001 IS TO CORRECT THE CLOSING DATE OF THE SOLICITATION DATE. CLOSING DATE OF SOLICITATION IS 12 JULY 2019.
*** END OF NARRATIVE A0003 ***
SOLICITATION NARRATIVE
This procurement is for:
Noun: Pintle Assembly
NSN: 1005-01-598-3870
P/N: 13046102
Quantity: 1,898
Option: 100% / 365 days
FOB: Destination
Procurement is 100% Small Business Set-aside
Technical Data Package:
Distribution Level: D
TDP review date: 26 July 2018
2 59
W56HZV-19-R-0161 REPRINT
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Export Controlled. JCP Certification is required.
A link to the TDP is available in FBO. Use the TDP uploaded with this solicitation.
A Start of Work Meeting is required
Higher-Level Contract Quality Requirement
FAR clause 52.246-11 QMS Requirements: ISO 9001:2015 (21 Oct 2015) or equivalent
First Article Test is required. FAT waivers may be granted.
Phosphate Coating Procedure is required to be submitted 60 days after award.
Acceptance Inspection Equipment (AIE) is required before FAT.
MIL-STD 1916 is required, see Section E.
Please read through this solicitation. There are several clauses and provisions throughout this solicitation that require information to be filled-in. Sign, scan, and upload the solicitation to
FBO.
All responsible sources may submit a quote which, if timely received, shall be considered.
Quotes must be submitted electronically via FBO.
Joint Certification Program (EXPORT CONTROL)
You must be certified under the United States/Canada Joint Certification Program (JCP) https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/ to be granted access to the technical data (TDP) for this solicitation via
FBO (http://www.fbo.gov ). Your firm must request access to the TDP in FedBizOpps. If you do not have access to FedBizOpps, recommend you register as soon as possible.
*** END OF NARRATIVE A0001 ***
SECTION A CLAUSES & PROVISIONS
Electronic Contracting AS6311
(a) All Army Contracting Command Warren solicitations will be publicized on the Federal Business Opportunities website
(https://www.fbo.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
(b) As of 10 August 2015, unless directed to do otherwise in Section L of this solicitation, vendors are required to submit a quote or proposal via the Federal Business Opportunities (FBO) system. Proposals or quotes submitted after this date using any other mechanism, including the Army Single Face to Industry Bid Response System (ASFI BRS) may be deemed non-responsive.
(c) Requirements for the online FBO bid submission:
(1) Vendors must log into the FBO System to be able to submit electronic responses for opportunities.
(2) Vendors must be registered in the System for Award Management (SAM) at www.sam.gov (a Federal Government owned and operated free web site) and have a CAGE Code and CCR Marketing Partner Identification Number (MPIN).
(3) Once logged into the FBO System, vendors will be asked to enter basic information and directed to upload one or more files containing the proposal/quote and any additional information as outlined in the solicitation.
(4) FBO will send an email to vendors registered email address confirming the electronic submission.
(5) For additional information on submitting electronic bid responses via the FBO system see the FBO Vendor Guide Section 4.3.1
Submitting an Electronic Response (https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf ).
3 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Note to offerors:
(d) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
(e) It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the
Government infrastructure (in this case, received through FBO) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
(f) Solicitations may remain posted on the FBO after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.
(g) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the
Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(h) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
ACKNOWLEDGEMENT OF AMENDMENTS AS7001
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
A0001 N/A __________________ ___________
A0002 ___________ __________________
DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE (WARREN) AS7227
(a) This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Title
22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(b) To be eligible to gain access to this export controlled TDP (via FedBizOpps) an offeror must have a current DD 2345, Militarily
Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, go to <"http://www.dlis.dla.mil/jcp/ ">, click on documents, and follow instructions provided. Processing time is
4 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
estimated at six (6) to ten (10) weeks after receipt. FBO will allow access to export controlled TDPs once certification is confirmed.
Upon receipt of certification, an offeror may request the TDP in accordance with the instructions stated in the solicitation's Section
C.
(c) Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.
(d) Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the
TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
ARMY CONTRACTING COMMAND WARREN (DTA) OMBUDSPERSON AS7040
Information regarding the Ombudsperson for this contract is located at the following website:
http://acc.army.mil/contractingcenters/acc-wrn/CompMgmtOffice.html
ALL OR NONE AS7316
Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE.
ACCEPTANCE APPENDIX (AS6850)
(a) Contract Number W56HZV- -1- is awarded to -2- .
(b) The contractor, in its proposal, provided data for various solicitation clauses, and that data has been added in this contract.
(c) Any attachments not included within this document will be provided by TACOM-Warren directly to the administrative contracting officer (ACO) via e-mail as required. Technical data packages that are only available on CD-ROM will be mailed by TACOM-Warren to the
ACO. Within one week of this award, any office not able to obtain these attachments from TACOM's website
(https://contracting.tacom.army.mil/ ) and still requiring a copy, can send an e-mail request to the buyer listed on the front page of this contract.
(d) The following Amendment(s) to the solicitation are incorporated into this contract: -4-
*** END OF NARRATIVE A0002 ***
5 59
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 PINTLE ASSEMBLY
0001AA FIRST ARTICLE TEST 1 EA $ ** NSP ** $ ** NSP ** __________________ ______________ __________________
COMMODITY NAME: PINTLE ASSEMBLY
A FIRST ARTICLE TEST REPORT IS REQUIRED IN ACCORDANCE
WITH THE FAR CLAUSE 52.209-3 "FIRST ARTICLE
APPROVAL - CONTRACTOR TESTING,". CDRL A003
NOTE TO OFFEROR:
Please fill in the dollar amount you have INCLUDED in
Production CLIN 0002 to cover the cost of performing the First Article Test (FAT) and writing the FAT
Report:
THE GOVERNMENT IS REQUESTING OFFERORS FILL IN THE
DOLLAR AMOUNT ABOVE. IF THE GOVERNMENT WAIVES
THE FAT, THIS AMOUNT WILL BE SUBTRACTED FROM THE
PRODUCTION CLIN.
THE REQUEST FOR FAT WAIVER AND ATTACHMENT 0003 "FAT
WAIVER WORKSEHET" MUST BE SUBMITTED WITH YOUR
PROPOSAL IN ACCORDANCE WITH LS7304. REQUESTS FOR
FAT WAIVER THAT ARE SUBMITTED AFTER THE
SOLICITATION CLOSES, WILL NOT BE ACCEPTED.
Approval of Acceptance Inspection Equipment (AIE) is required before First Article Test, in accordance with CDRL A001.
Approval of Phosphate Coating Procedure is required before First Article Test, in accordance with
CDRL A002.
Technical Data Package:
Top Level Drawing: 13046102
Date: 09 June 2017, Rev A
Technical Data Package List (TDPL):
Date: 26 July 2018
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
Government Approval/Disapproval Days: 30
6 59
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0180
FOB POINT: Destination
SHIP TO:
(Y00006) SEE FIRST ARTICLE TEST CLAUSE
FOR DISTRIBUTION
7 59
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0002 PINTLE ASSEMBLY
NSN: 1005-01-598-3870
Mfr CAGE: 19200
Mfr Part Number: 13046102
0002AA PRODUCTION QUANTITY 1898 EA $ $ ___________________ ______________ __________________
COMMODITY NAME: PINTLE ASSEMBLY
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH8E1531EH PRON AMD: 02
AMS CD: SM2B1100000
Approval of Acceptance Inspection Equipment (AIE) is required before First Article Test and
Production, in accordance with CDRL A001.
Approval of Phosphate Coating Procedure is required before First Article Test and Production, in accordance with CDRL A002.
Approval of First Article Test and First Article
Test Report is required before Production, in accordance with CDRL A003.
Inspection/Acceptance at origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order. Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.
Early delivery is acceptable at no additional cost to the Government.
Technical Data Package List (TDPL):
Date: 26 July 2018
(End of narrative B001)
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 13046102
REVISION: A
DATE: 09-JUN-2017
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
8 59
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W56HZV8206V150 W562RP J 2
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 300 0360
002 300 0390
003 300 0420
004 300 0450
005 300 0480
006 300 0510
007 98 0540
FOB POINT: Destination
SHIP TO:
(W562RP) SR ARMY GENERAL SUPPLY LMP STOCK RE
DLA DISTRIBUTION ANNISTON
7 FRANKFORD AVE 362
ANNISTON,AL,36201-4199
9 59
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0003 UNEXERCISED OPTION QUANTITY $ $ ___________________________ ______________ __________________
COMMODITY NAME: PINTLE ASSEMBLY
CLIN CONTRACT TYPE:
Firm Fixed Price
OPTION QUANTITY, PURSUANT TO THE CLAUSE ENTITLED
OPTION FOR INCREASED QUANTITY--- SEPARATELY PRICED
LINE ITEM (52.217-7).
The quantity stated for the option CLIN DOES NOT form a part of the basic contractual quantity.
Part or all of it may be added to the contract by exercise of the option clause, at the discretion of the Government.
The failure of the offeror to insert a unit price applicable to the option quantity shall mean that the offeror will supply all or any part of the option, if exercised by the Government, at the basic contract unit price, and the offer will be evaluated for award accordingly.
Early delivery is acceptable at no additional cost to the Government.
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
FOB POINT: Destination
SHIP TO:
(W562RP) SR ARMY GENERAL SUPPLY LMP STOCK RE
DLA DISTRIBUTION ANNISTON
7 FRANKFORD AVE 362
ANNISTON,AL,36201-4199
10 59
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0004 CONTRACT DATA REQUIREMENTS LIST (CDRL) ______________________________________
THE CONTRACTOR WILL PREPARE AND DELIVER THE DATA IN
ACCORDANCE WITH THE REQUIREMENTS. QUANTITIES AND
SCHEDULES SET FORTH IN THE CONTRACT DATA
REQUIREMENTS LIST (DD FORM 1423), SECTION J,
EXHIBITS, AS REQUIRED.
(End of narrative A001)
A001 ACCEPTANCE INSPECTION EQUIPMENT (AIE) 1 EA $ ** NSP ** $ ** NSP ** _____________________________________ ______________ __________________
COMMODITY NAME: DATA ITEM
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 1 SEE DD FORM 1423
FOB POINT: Destination
SHIP TO:
(Y00003) SEE NARRATIVE ON DD 1423
11 59
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A002 PHOSPHATE COATING PROCEDURE 1 EA $ ** NSP ** $ ** NSP ** ___________________________ ______________ __________________
COMMODITY NAME: DATA ITEM
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 1 SEE DD FORM 1423
FOB POINT: Destination
SHIP TO:
(Y00003) SEE NARRATIVE ON DD 1423
A003 MEETING MINUTES 1 EA $ ** NSP ** $ ** NSP ** _______________ ______________ __________________
COMMODITY NAME: DATA ITEM
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 1 SEE DD FORM 1423
FOB POINT: Destination
SHIP TO:
(Y00003) SEE NARRATIVE ON DD 1423
12 59
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A004 FIRST ARTICLE TEST REPORT (FATR) 1 EA $ ** NSP ** $ ** NSP ** ________________________________ ______________ __________________
COMMODITY NAME: DATA ITEM
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 1 SEE DD FORM 1423
FOB POINT: Destination
SHIP TO:
(Y00003) SEE NARRATIVE ON DD 1423
13 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
SECTION C CLAUSES / PROVISIONS
TECHNICAL DATA PACKAGE INFORMATION CS6334
The TDP for this solicitation resides within FedBizOpps (<"https://www.fbo.gov ">), associated with this solicitation number.
To access the data through FBO:
a. Log on to the FBO web site.
b. Enter Marketing Partner Identification Number (MPIN).
c. Search for the solicitation number.
d. If solicitation is Export Controlled, select Verify MPIN.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.)
or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, vendors and contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). Currently certified contractors should enter the MPIN which will be verified before proceeding to the next step. To obtain certification, go to <"http://www.dlis.dla.mil/jcp/ ">
Click on documents and follow instructions provided. Processing time is estimated at six (6) to ten (10) weeks after receipt.
FBO will allow access to export controlled TDPs once certification is confirmed.
(4) Upon completion of the purposes for which Government Technical Data has been provided, the contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.
Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the FBO system administrator at Army Contract Command - Warren (DTA) with all the information needed to grant a contractor access. FBO will subsequently automatically generate an email stating when the requesting contractor has permission to view or download TDP items. Allow
2 - 3 working days to complete this FBO-TDP access/approval process through the FBO system.
f. If multiple individuals in the contractors organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request 3is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.
Those same individuals MUST be registered in Federal Business Opportunities (FBO). Any individuals no longer with the company should be deleted. Questions related to registration in FBO should be directed to <"https://www.fbo.gov/index "> The FBO helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in FBO.
g. It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed Use and Non-
Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.
h. A user guide for FBO can be found at <"https://www.fbo.gov "> - on the right is User Guides - click on Vendor.
HEAVY PHOSPHATE COATING REQUIREMENT CS7510
The following requirements regarding heavy phosphate coatings are applicable to this solicitation and any resultant contract in addition to those requirements set forth in specification MIL-DTL-16232.
14 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
a. Paragraph 3.1 of MIL-DTL-16232 refers to "Preproduction Inspection." The procedure shall be submitted in accordance with the
Contract Data Requirements List (CDRL) contained in the contract. The contract number must be cited on all phosphate coating procedures submitted for review and approval. Procedures shall include product name and manufacturer of all chemicals/materials to be used. All processes, equipment, controls along with testing and test frequencies used for phosphating including application of supplemental finishes shall be described in detail.
b. Paragraph 3.2.5-c of MIL-DTL-16232 refers to the "Chromic acid rinse, (Classes 1, 2 and 3)." The final rinse shall be checked by a standard free and total acid titration along with a pH reading "prior to starting production and at least every 8 hours thereafter."
c. Paragraph 4.7.3 of MIL-DTL-16232 refers to "Weight per unit area of phosphate coatings." The frequency for testing coating weight is "per lot, at least every 8 hours."
d. Paragraph 4.7.5 of MIL-DTL-16232 refers to "Accelerated corrosion resistance." Accelerated corrosion resistance shall be determined in accordance with 4.7.5.1. The frequency for testing accelerated corrosion resistance per ASTM B117 is "per lot, at least every 8 hours."
e. The "product name" along with the manufacturer of the supplemental dry film lubricant or CARC paint (primer/topcoat) shall be stated in the procedure and shall be traceable to the applicable Qualified Products List (QPL) or Qualified Products Database (QPD) at Assist
Online. QPD products may be obtained at the quick search site, type the specification number (i.e., 3150) in the second block and click the "Submit" button. Then click on the specification (i.e., MIL-PRF-3150). In the next screen, click on the word
"Qualification".
To obtain MIL Specs, MIL Standards, QPL and QPD products see <"https://assist.dla.mil/online/start ">.
f. A thickness range for the supplemental dry film lubricant or CARC paint (primer/topcoat) shall be stated in the procedure along with a frequency for testing. A daily frequency is required.
g. Heat cured dry film lubricant shall be air dried for 1.0 hour (until dry to touch) after dipping/spraying or flash dried at 155-175 degrees F for 10 - 30 minutes and then heat cured at a temperature of 375-425 degrees F for 55-65 minutes per paragraph 4.4.2.2 of MIL-
PRF-46010.
h. Air cure dry film lubricant shall be air dried at room temperature for 24 hours minimum.
i. Adhesion testing shall be stated in the procedure for a supplemental coating of dry film lubricant per ASTM D2510 or CARC paint per
ASTM D3359, method B along with the frequency for testing. A daily frequency is required.
j. Salt spray testing of parts with phosphate and supplemental dry film lubricant per ASTM B117 for 100 hours shall be stated in the procedure along with the frequency for testing. The frequency for testing is "per lot or weekly." Parts shall show no more than 3 rust spots per 3" x 6" area with none larger than 1.0mm in diameter. Salt spray testing of parts with phosphate and primer per ASTM
B117 for 336 hours shall be included in the procedure for supplemental coatings of CARC paint along with a frequency for testing. The frequency for salt spray testing is "per lot or monthly." Parts shall show no visible rust exceeding rust grade no. 9 per ASTM D610, no more than 5 blisters per 4" x 6" area with none larger than 3/64 inch in diameter. Under film attack at the scribe shall not exceed
1/8 inch.
k. Topcoat color shall be visual/equipment checked against the specified chip no. of SAE AMS-STD-595 per paint batch. The procedure shall include the specified color chip number.
l. Cure of the paint shall be checked daily by solvent wipe per paragraph 4.2.3.2 of MIL-DTL-53072. The manufacturer of the MEK solvent shall be stated in the procedure.
USE OF CLASS I and CLASS II OZONE DEPLETING SUBSTANCES CS7151
(a) Definitions.
(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) of the Clean Air Act, (42 U.S.C. 7671a(a)), complete list provided at:
http://www.epa.gov/ozone/science/ods/index.html
(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.
15 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitly requiring the use of any CIODS, does require a feature that the contractor can meet or produce only by the use of CIODS.
(b) Per Section 326 of Public Law 102-484, the Army cannot award any contract that directly or indirectly requires the use of CIODS without the approval of the Senior Acquisition Official, per current Army Policy the approval authority is the Army Acquisition
Executive. Thus, no CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.
(c) No Class II Ozone Depleting Substances shall be required in the performance of this contract without government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.
REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN CS7522
(a) The contractor is subject to provisions of the TACOM LCMC OPSEC Standing Operating Procedures (SOP/Plan), or other U.S. Government
OPSEC plan, per AR 530-1, Operations Security. This SOP/Plan specifies the governments critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.
(b) The contractor will receive a copy of the SOP/Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by G2, TACOM LCMC or individual organizations supporting OPSEC Officers.
(c) The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is
OPSEC Level I.
OPSEC TRAINING REQUIREMENT CS7523
Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at:
https://securityawareness.usalearning.gov/opsec/index.htm .
Within 10 days of completing the training, the contractor shall provide certificates/proof of completion to the Procuring Contracting
Officer (PCO).
FOUO/CUI/Technical documents must be marked and contain distribution statements per AR 380-5 and
DoDD5230.24
CONFIGURATION MANAGEMENT DOCUMENTATION CS7110
a. The Configuration Change Management section of SAE EIA-649-1 Configuration Management Requirement for Defense Contracts, Paragraph
3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1), and the General Note in paragraph 3.3.2.4(1) which reads as Generally, Minor RFVs address product changes that are temporary and do not impact the baseline.
b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and
Waivers.
c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the Technical Data Package (TDP) should not be processed per SAE EIA-649-1 and should be referred to FAR Part 48 Value Engineering.
16 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
d. All Engineering Change Proposals (ECPs) submitted will be deemed routine. If an ECP is considered as an emergency or urgent, that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.
e. For ECPs, RFVs, Notices of Revision (NORs) or Specification Change Notices (SCNs), the contractor must submit the applicable documentation listed in sub-paragraphs e (i) through e (iv) to the Administrative Contracting Officer (ACO), with an information copy to the Procuring Contracting Officer (PCO). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.
(i) Documentation or use of DD Form 1692 (current revision) and delivery of data per DI-SESS-80639 is detailed in paragraph 3.3.1 of
EIA-649-1 for ECPs.
(ii) Documentation or use of DD Form 1694 (current revision) and delivery of data per DI-SESS-80640 is detailed in paragraph 3.3.2 of
EIA-649-1 for RFVs.
(iii) Documentation or use of DD Form 169 (current revision) and delivery of data per DI-SESS-80642 is detailed in paragraph 3.3.4 of
EIA-649-1 for NORs.
(iv) Documentation and delivery of data per DI-SESS-80643 is detailed in Paragraph 3.3.3 of EIA-649-1 for SCNs.
f. Questions regarding the status of previously submitted ECP or RFV should be directed to the PCO. Incorporation of an approved RFV and/or ECP will require a contract modification execution.
g. The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract. If a delivery date change is needed, a contract modification is required.
START OF WORK MEETING CS6005
a. The contractor shall hold a start of work meeting at its facility, unless some other location is designated in the contract, within
30 days after contract award. The Start of Work Meeting is to assure a clear and mutual understanding of the contract terms, conditions, line items, technical requirements and sequence of events needed for successful execution of the subject contract effort.
The contractor shall participate with the Government to arrange a schedule and agenda for the meeting.
b. The contractor shall invite the Government personnel listed in CDRL A003.
All Government invitees shall be given at least 7 days advance notice of the time, date, and location of the start of work meeting.
The preferred method of notification is by email.
c. The contractor shall provide the Government with minutes of the Start of Work Meeting within 7 days after the meeting is held.
Meeting minutes are in accordance with CDRL A003.
*** END OF NARRATIVE C0001 ***
17 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
SECTION D - PACKAGING CLAUSE
Packaging Requirements Sheet DS6418
DATE: 27 July 2018
NSN: 1005-01-598-3870
A. The preservation, packing, and marking requirements for the item identified above shall be accomplished in accordance with the requirements in the specification/standard defined below.
B. The following requirements shall apply:
PRESERVATION: MILITARY
LEVEL OF PACKING: B
QUANTITY PER UNIT PACKAGE: 001
SPECIFICATION/STANDARD: MIL-STD-2073-1
C. Marking: In addition to any special marking markings called out by the Specification / standard above;
C.1. All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, including bar coding and a MSL label. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel. Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. Contractors must check the solicitation and/or contract for this clause. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html for the current DoD Suppliers Passive RFID Information Guide and Supplier
Implementation Plan. If the item has Unique Item Identifier (UII) markings then the concatenated UII needs to be 2D bar coded and applied on the unit package, intermediate and exterior containers, and the palletized unit load.
D. Heat Treatment and Marking of Wood Packaging Materials:
E. All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure tractability to the original source of heat treatment. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens; on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood products verified in accordance with their National Plant Protection Organizations compliance program. In addition, wood used as dunnage for blocking and bracing, to include ISO containers, shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.
F. The specification/standard cited is intended to give a clear and accurate description of the technical packaging requirements for the item being procured, including the procedure by which it can be determined that the requirements have been met. Specific instructions and/or tailoring of the specification/standard is detailed in the supplemental instructions in paragraph G below. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing and without affecting the serviceability of the item will be considered and responded to within 10 days of submission to PCO with copies to the ACO. The government reserves the right to require testing to validate alternate industrial preservation methods, materials, blocking, bracing, cushioning, and packing.
G. Hazardous Materials (as applicable):
G.1 Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
G.2. When applicable, packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the
18 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
applicable performance packaging contained in the following documents:
a. International Air Transport Association (IATA) Dangerous Goods Regulations
b. International Maritime Dangerous Goods Code (IMDG)
c. Code of Federal Regulations (CFR) Title 29, Title 40, and Title 49
d. Joint Service Regulation AFJMAN24-204/TM38-250/NAVSUPPUB 505/MCO P4030.19/DLAM 4145.3 (for military air shipments).
G.3. If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the
United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
G.4. When applicable, a Product Safety Data Sheet (SDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
H. Supplemental Instructions:
Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of
50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized.
All variations must be approved by the Contracting Office prior to implementation. The load shall be contained in a manner that will permit safe handling during shipment and storage.
Packaging shall be in accordance with MIL-STD-2073-1 and have successfully passed test levels of ASTM D 4169, Distribution Cycle 18, Assurance Level II, Acceptance Criterion 3, and Military packing Level B. The warehouse stacking height shall be 16 ft. The shipping unit shall be the unit pack. Marking shall be in accordance with MIL-STD-129. Testing shall be witnessed by the Government Quality
Assurance Representative. Packaged gross weight and size shall be included on the test report as well as a detailed description of the packaging. The Contractor is exempted from testing if other data can be provided (see para. 5.6 of MIL-STD-2073-1) and is acceptable to the Government. Similar items do not require retesting.
*** END OF NARRATIVE D0001 ***
19 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/ or https://www.acquisition.gov/
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-1 CONTRACTOR INSPECTION REQUIREMENTS APR/1984
E-2 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-4 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
QMS Requirements: ISO 9001:2015 (21 Oct 2015) or equivalent
Tailored by excluding paragraph 8.3
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
SECTION E CLAUSES
ACCEPTANCE INSPECTION EQUIPMENT (AIE) ES7102
(a) The contractor shall use a calibration system with traceability to a national or international standard for the AIE used on this contract.
(b) The contractor shall provide all AIE (except for any AIE listed as available in Section H or Appendix I) necessary to assure conformance of material to the contract requirements.
(c) AIE shall be available for use on the First Article (FA) submission, if FA is required, or prior to use for acceptance of production material on this contract.
(d) Contractor furnished AIE shall be made (i) to the AIE designs specified in Section C, or (ii) to any other design provided the contractor's proposed AIE design is approved by the Government. Contractor's proposed AIE design for inspection of characteristics listed as "Critical, Special or Major" shall be submitted to the Government for review and approval as directed on the Contract Data
Requirements List, DD Form 1423, A001. Government approval of AIE design shall not be considered to modify the contract requirements.
(e) When the contractor submits its proposed AIE on commercial off the shelf equipment, the contractor shall include the manufacturer's name and model number, and sufficient information to show capability of the proposed AIE to perform the inspection required. When submitting proposed AIE design documentation on commercial computer controlled test and measuring equipment include information on (1) test program listing (2) flowcharts showing accept and reject limits and computer generated test stimuli (3) calibration program listing (4) sample of the printout of an actual test and calibration (5) test plan to verify accuracy of inspection and correctness of accept or reject decision (6) identification of the equipment by model name and number.
20 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(f) Resubmission of the contractor's proposed AIE design for Government approval on a follow on Government contract is not required, provided the inspection characteristic parameters specified in the technical data package and the previously Government approved AIE designs have not changed. In this situation, the contractor shall provide written correspondence in the place of the AIE designs that indicates the prior Government approval and states that no changes have occurred.
(g) The Government reserves the right to disapprove, at any time during the performance of this contract, any AIE that is not accomplishing its intended use in verifying an inspection or test characteristic.
(h) If the contractor changes the design after the initial approval, the modified design must be submitted for approval prior to use.
SUPPLEMENTAL REQUIREMENTS TO FIRST ARTICLE APPROVAL (CONTRACTOR TESTING) ES6026
(a) In accordance with the requirements under FAR clause 52.209-3, found in Section I of this document, the first article approval item(s) shall be examined and tested as required by the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.
(b) The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.