SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
Offeror To Complete Block 12, 17, 23, 24, & 30
1. Requisition Number Page Of
2. Contract No. 3. Award/Effective Date 4. Order Number 5. Solicitation Number 6. Solicitation Issue Date
7. For Solicitation Information Call:
A. Name B. Telephone Number (No Collect Calls) 8. Offer Due Date/Local Time
9. Issued By Code 10. This Acquisition is Unrestricted OR Set Aside: % For:
Small Business Women-Owned Small Business (WOSB) Eligible Under the Women-Owned Small Business Program
Hubzone Small Business EDWOSB
Service-Disabled Veteran-Owned Small Business NAICS:
Email: 8(A) Size Standard:
11. Delivery For FOB Destination Unless Block Is Marked
12. Discount Terms 13a. This Contract Is A Rated Order Under DPAS (15 CFR 700) 13b. Rating
See Schedule 14. Method Of Solicitation RFQ IFB RFP
15. Deliver To Code 16. Administered By Code
Telephone No.
17a. Contractor/Offeror Code Facility 18a. Payment Will Be Made By Code
Telephone No.
17b. Check If Remittance Is Different And Put Such Address In Offer
18b. Submit Invoices To Address Shown In Block 18a Unless Block Below Is Checked See Addendum
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
(Use Reverse and/or Attach Additional Sheets As Necessary)
25. Accounting And Appropriation Data 26. Total Award Amount (For Govt. Use Only)
27a.Solicitation Incorporates By Reference FAR 52.212-1, 52.212-4. FAR 52.212-3 And 52.212-5 Are Attached. Addenda Are Are Not Attached.
27b.Contract/Purchase Order Incorporates By Reference FAR 52.212-4. FAR 52.212-5 Is Attached. Addenda Are Are Not Attached.
28. Contractor Is Required To Sign This Document And Return _________ 29. Award Of Contract: Ref. Offer Copies to Issuing Office. Contractor Agrees To Furnish And Deliver All Items Set Forth Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified.
Dated . Your Offer On Solicitation (Block 5), Including Any Additions Or Changes Which Are Set Forth Herein, Is Accepted As To Items:
30a. Signature Of Offeror/Contractor 31a. United States Of America (Signature Of Contracting Officer)
30b. Name And Title Of Signer (Type Or Print) 30c. Date Signed 31b. Name Of Contracting Officer (Type Or Print) 31c. Date Signed
Authorized For Local Reproduction Previous Edition Is Not Usable
Standard Form 1449 (Rev. 2/2012) Prescribed By GSA-FAR (48 CFR) 53.212
W56HZV-19-Q-0230 2020JAN07
TYLER WONSOWICZ (586)282-4010
TYLER.J.WONSOWICZ.CIV@MAIL.MIL
2020JAN21
W56HZV
U.S. ARMY CONTRACTING COMMAND
DETROIT ARSENAL, MI 48397-5000 X
X 100
334519
X DOA4
X
SEE SCHEDULE
SEE SCHEDULE
X X
X 1
1 54
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
32a. Quantity In Column 21 Has Been
Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________
32b. Signature Of Authorized Government Representative 32c. Date 32d. Printed Name and Title of Authorized Government Representative
32e. Mailing Address of Authorized Government Representative 32f. Telephone Number of Authorized Government Representative
32g. E-Mail of Authorized Government Representative
33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number Correct For Partial Final Complete Partial Final
38. S/R Account No. 39. S/R Voucher Number 40. Paid By
41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer 41c. Date 42b. Received At (Location)
42c. Date Rec’d (YY/MM/DD) 42d. Total Containers
Standard Form 1449 (Rev. 2/2012) Back
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: TYLER WONSOWICZ
Buyer Office Symbol/Telephone Number: CCTA-HTB-C/(586)282-4010
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
Weapon System: Detection and Alarm Devices
*** End of Narrative A0000 ***
1. This Solicitation will result in a contract for the following item:
NSN: 6665-01-539-5590
Part No.: 5-15-33946
Noun: Carrier Assembly, Reference
Basic Qty: 460 EA
Option Qty %: 100%
U/I: EA
2. Under the authority of 41 U.S.C. 1903, as implemented by FAR 18.2, Emergency Acquisition Flexibilities, this contract action has been determined to be streamlined and expedited using commercial and simplified acquisition procedures in accordance with FAR 12.102(f)(1).
3. Packaging requirements are according to the Section D Narrative.
4. First Article Test (FAT) is required.
5. All shipments will be FOB Destination to the following address:
SU W0MC ARMY GENERAL SUPPLY (W562RM)
CENTRAL RECIEVING
10TH STREET AND K AVENUE
TEXARKANA, TX, 75507-5000
*** END OF NARRATIVE A0001 ***
A.1__ Electronic Contracting
Interested Offerors shall submit a quote via email to the Contract Specialist, Tyler Wonsowicz, tyler.j.wonsowicz.civ@mail.mil, and cc the corresponding Contracting Officer, Lee Tappy, lee.f.tappy.civ@mail.mil, with the subject header: Proposal Submission - W56HZV-19-Q-
0230 (company name). Once a proposal is received, the Contract Specialist/Contracting Officer will reply with the respective Offeror stating receipt of proposal submission.
(a) All Army Contracting Command Warren solicitations will be publicized on the System for Award Management website
(https://www.sam.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
(b) As of 10 August 2015, unless directed to do otherwise in Section L of this solicitation, vendors are required to submit a quote or proposal via SAM. Proposals or quotes submitted after this date using any other mechanism, including the Army Single Face to Industry
Bid Response System (ASFI BRS) may be deemed non-responsive.
(c) Requirements for the online SAM bid submission:
(1) Vendors must log into SAM to be able to submit electronic responses for opportunities.
(2) Vendors must be registered in SAM at www.sam.gov (a Federal Government owned and operated free web site) and have a CAGE
Code and CCR Marketing Partner Identification Number (MPIN).
(3) Once logged into SAM, vendors will be asked to enter basic information and directed to upload one or more files containing the proposal/quote and any additional information as outlined in the solicitation.
(4) SAM will send an email to vendors registered email address confirming the electronic submission.
Note to offerors:
2 54
W56HZV-19-Q-0230
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(d) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
(e) It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the
Government infrastructure (in this case, received through SAM) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
(f) Solicitations may remain posted on SAM after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.
(g) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the
Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(h) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
A.2__ ACKNOWLEDGEMENT OF AMENDMENTS
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
A.3__ ARMY CONTRACTING COMMAND WARREN (DTA) OMBUDSPERSON
Information regarding the Ombudsperson for this contract is located at the following website:
http://acc.army.mil/contractingcenters/acc-wrn/CompMgmtOffice.html
A.4__ DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE
3 54
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(a) This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Title
22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(b) To be eligible to gain access to this export controlled TDP (via Contract Specialist, Tyler Wonsowicz, tyler.j.wonsowicz.civ@mail.mil) an offeror must have a current DD 2345, Militarily Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the
United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at:
http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. Contract Specialist will allow access to export controlled TDPs once certification is confirmed. Upon receipt of certification, an offeror may request the TDP in accordance with the instructions stated in the solicitation's Section C.
(c) Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.
(d) Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the
TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
A.5__ ALL OR NONE
Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE.
*** END OF NARRATIVE A0002 ***
4 54
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
0011 PRODUCTION QUANTITY 460 EA $ $ ___________________ ______________ __________________
NSN: 6665-01-539-5590
COMMODITY NAME: CARRIER ASSEMBLY, REFERENCE
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 79986
Mfr Part Number: 20001239-10
PRON: EH9C1181EH PRON AMD: 01
AMS CD: SMS2B1100000
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W56HZV9162V800 W562RM J 2
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 230 0270
002 230 0300
FOB POINT: Destination
SHIP TO:
(W562RM) SU W0MC ARMY GENERAL SUPPLY
DLA DISTRIBUTION RED RIVER
HIGHWAY 82 WEST
TEXARKANA,TX,75507-5000
0012 UNEXERCISED OPTION 460 EA $ $ __________________ ______________ __________________
NSN: 6665-01-539-5590
COMMODITY NAME: CARRIER ASSEMBLY, REFERENCE
Mfr CAGE: 79986
Mfr Part Number: 20001239-10
OPTION FOR INCREASED QUANTITY-SEPEARATELY PRICED LINE
ITEM (52.217-7).
5 54
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
The quantity stated for the option CLIN DOES NOT
Forma part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the Government.
The failure of the offeror to insert a unit price applicable to the option quantity shall mean that the offeror will supply all or any part of the option, if exercised by the Government, at the basic contract unit price, and the offer will be evaluated for award accordingly.
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 230 0270
002 230 0300
FOB POINT: Destination
SHIP TO:
(W562RM) SU W0MC ARMY GENERAL SUPPLY
CENTRAL RECIEVING
10TH STREET AND K AVENUE
TEXARKANA,TX,75507-5000
0013 FIRST ARTICLE TEST 20 EA $ ** NSP ** $ ** NSP ** __________________ ______________ __________________
COMMODITY NAME: CARRIER ASSEMBLY, REFERENCE
A First Article Test Report is required in accordance with the Clause entitled "First Article Approval --
Contractor Testing", FAR 52.209-3.
The price for First Article testing in the total amount of $_______ is included in the total amount for CLIN 0011.
After submission of the First Article Test report, 6 54
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
the Government will have 15 days to approve or disapprove.
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Government Approval/Disapproval Days: 15
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 20 0210
FOB POINT: Destination
SHIP TO:
(Y00006) SEE FIRST ARTICLE TEST CLAUSE
FOR DISTRIBUTION
7 54
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1__ START OF WORK MEETING
a. The contractor shall hold a start of work meeting at its facility, unless some other location is designated in the contract, within thirty (30) days after contract award. The Start of Work Meeting is to assure a clear and mutual understanding of the contract terms, conditions, line items, technical requirements and sequence of events needed for successful execution of the subject contract effort.
The contractor shall participate with the Government to arrange a schedule and agenda for the meeting.
b. The contractor shall at a minimum invite Government contracting personnel (PCO/Contract Specialist). At the discretion of the PCO, other Government technical personnel may be invited to the meeting: Contracting Officer's Representative (COR) identified in Section G or in an appointment letter; Quality Assurance personnel; DCMA; etc. All Government invitees shall be given at least 14 days advance notice of the time, date, and location of the start of work meeting. The preferred method of notification is by email. The contractor shall provide the Government with minutes of the Start of Work Meeting within ten (10) days after the meeting is held.
C.2__ TECHNICAL DATA PACKAGE INFORMATION
The following Xd item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[ X ] 2. The TDP for this solicitation resides within DOD Safe Site (https://safe.apps.mil/ ). Offerors shall email the Contracting
Specialist, Tyler Wonsowicz, tyler.j.wonsowicz.civ@mail.mil, with subject header: TDP Pick-up Request - W56HZV-19-Q-0230 (company name).
The email shall have the following information:
Company Name and CAGE Code
Names of person accessing TDP
Email of person picking up (company email only)
* Note: One TDP Pick-up request per offeror *
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, vendors and contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with
Defense Logistics Information Service (DLIS). Currently certified contractors should enter the MPIN which will be verified before proceeding to the next step. To obtain certification, go to http://www.dlis.dla.mil/jcp/
Click on documents and follow instructions provided. Processing time is estimated at six (6) to ten (10) weeks after receipt. SAM will allow access to export controlled TDPs once certification is confirmed.
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.
Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, send an email requesting TDP Pick-up the Contract Specialist, Tyler Wonsowicz, tyler.j.wonsowicz.civ@mail.mil.
f. If multiple individuals in the contractors organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.
Those same individuals MUST be registered in beta.SAM. Any individuals no longer with the company should be deleted.
g. It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed Use and Non-
Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.
h. Reserve.
C.3__ USE OF CLASS I and CLASS II OZONE DEPLETING SUBSTANCES
(a) Definitions.
(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) of the Clean Air Act, (42 U.S.C. 7671a(a)), complete list provided at:
http://www.epa.gov/ozone/science/ods/index.html
(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, 8 54
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.
(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitly requiring the use of any CIODS, does require a feature that the contractor can meet or produce only by the use of CIODS.
(b) Per Section 326 of Public Law 102-484, the Army cannot award any contract that directly or indirectly requires the use of CIODS without the approval of the Senior Acquisition Official, per current Army Policy the approval authority is the Army Acquisition
Executive. Thus, no CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.
(c) No Class II Ozone Depleting Substances shall be required in the performance of this contract without government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.
C.4__ CONFIGURATION MANAGEMENT DOCUMENTATION
a. The Configuration Change Management section of SAE EIA-649-1 Configuration Management Requirement for Defense Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1), and the General Note in paragraph 3.3.2.4(1) which reads as Generally, Minor RFVs address product changes that are temporary and do not impact the baseline.
b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and
Waivers.
c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the Technical Data Package (TDP) should not be processed per SAE EIA-649-1 and should be referred to FAR Part 48 Value Engineering.
d. All Engineering Change Proposals (ECPs) submitted will be deemed routine. If an ECP is considered as an emergency or urgent;
that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.
e. For ECPs, RFVs, Notices of Revision (NORs) or Specification Change Notices (SCNs), the Contractor must submit the applicable documentation listed in sub-paragraphs e (i) through e (iv) to the Administrative Contracting Officer (ACO), with an information copy to the Procuring Contracting Officer (PCO). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.
(i) Documentation or use of DD Form 1692 (current revision) and delivery of data per DI-SESS-80639 is detailed in paragraph 3.3.1 of EIA-649-1 for ECPs.
(ii) Documentation or use of DD Form 1694 (current revision) and delivery of data per DI-SESS-80640 is detailed in paragraph 3.3.2 of EIA-649-1 for RFVs.
(iii) Documentation or use of DD Form 169 (current revision) and delivery of data per DI-SESS-80642 is detailed in paragraph 3.3.4 of EIA-649-1 for NORs.
(iv) Documentation and delivery of data per DI-SESS-80643 is detailed in Paragraph 3.3.3 of EIA-649-1 for SCNs.
f. Questions regarding the status of previously submitted ECP or RFV should be directed to the PCO. Incorporation of an approved RFV and/or ECP will require a contract modification execution.
g. The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract. If a delivery date change is needed, a contract modification is required.
*** END OF NARRATIVE C0001 ***
PACKAGING AND MARKING
D.__ PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS)
(a) Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1, and the Special Packaging Instruction, see below.
(1) LEVEL OF PRESERVATION: Military
(2) LEVEL OF PACKING: B
(3) QUANTITY PER UNIT PACKAGE: 001
9 54
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(4) SPECIAL PACKAGING INSTRUCTION NUMBER. P5-15-33946-10
(a) REVISION N/A
(b) DATE OF REVISION 17 DEC 2018
(c) THE REQUIRED SPECIAL PACKAGING INSTRUCTION (SPI) IS AVAILABLE ON THE WEB AT THE FOLLOWING URL:
**** The SPI will be availaible on the beta.SAM.gov Solicitation Posting as an attachment.****
(Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobes website (http://get.adobe.com/reader/ ) for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging
Instructions in Adobe .PDF images using Internet Explorer, try the following: Go to "Tools," then "Internet Options." Click on the
"Advanced" tab. Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")
(b) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
(c) Marking:
(1) In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not.
Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.
(2) Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html (best viewed with Internet Explorer 11 or higher) for the current DoD
Suppliers Passive RFID Information Guide. When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at http://dodprocurementtoolbox.com/page/unique-id/tools ) for development of the UII and MIL-STD-129 for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.
(d) Heat Treatment and Marking of Wood Packaging Materials (WPM):
(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging
Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.
(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging
Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org ). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:
http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.
(3) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.
The ALS approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp. Foreign manufacturers shall comply with ISPM -15 and shall have the marking of WPM verified in accordance with their National Plant Protection Organizations compliance program.
(e) Hazardous Materials (As applicable):
10 54
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.
(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
(2) Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).
(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the
United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
(f) This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the
SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to
PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.
(g) SUPPLEMENTAL INSTRUCTIONS:
PLACE A RED X AND THE WORDS SHORT BOX ON THE FRONT OF ANY BOX THAT HAS A SHORT QUANTITY, THEN PLACE THAT BOX/BOXES WITH THE MARKINGS
SHOWING ON THE TOP FRONT OF THE PALLET LOAD.
*** END OF NARRATIVE D0001 ***
INSPECTION AND ACCEPTANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
2 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984
3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
4 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
Quality Management System - ISO 9001:2015 Requirements (not including paragraph 8.3)
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
E.1__ USE OF MIL-STD 1916
(a) The Government will not accept lots whose samples submitted for acceptance contain non-conformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD 1916, DOD Preferred Methods of Acceptance of Product. The
Verification Level (VL) shall be VL-III (major) for major characteristics and VL III (minor) for minor characteristics.
11 54
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(b) MIL-STD HDBK-1916 provides guidance on the use of MIL-STD 1916. This handbook is not contractually binding.\
E.2__ SUPPLEMENTAL REQUIREMENTS TO FIRST ARTICLE APPROVAL (CONTRACTOR TESTING)
(a) In accordance with the requirements under FAR clause 52.209-3, found in Section I of this document, the first article approval item(s) shall be examined and tested as required by the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.
(b) The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.
(c) The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:
(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.
(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.
(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the
First Article Test Report.
(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the
First Article Test Report.
(5) Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.
(d) Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.
(e) A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. Evidence of the QAR's verification will be provided. One copy of the First Article Test Report will be copy furnished to the PCO.
(f) Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the
Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional first article testing resulting from any of the causes listed herein that were instituted by the contractor and not due to changes directed by the
Government shall be borne by the Contractor.
E.3__ PRODUCTION LOT TESTING (CONFORMANCE INSPECTION - Contractor)
(a)The Contractor shall conduct production lot testing (PLT) for each production lot to be tendered to the Government for acceptance.
(b) The samples shall be selected, examined, and tested in accordance with MIL-STD-1916.
12 54
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(c) The samples shall be randomly selected from the entire lot by, or in the presence of, the Government Quality Assurance
Representative (QAR). The Contractor shall notify the QAR in writing at least five (5) workdays in advance, when the lot is ready for sample selection. The Contractor shall inspect production lots for conformance to the contracts requirements prior to selecting PLT samples. Unless otherwise authorized by the Contracting Officer, test samples shall not be submitted pursuant to this provision where the Contractor has determined that the lot does not conform to all contract requirements.
(d) Within ten (10) days of completing PLT on any given lot, the Contractor shall deliver to the Government a report that documents whether production lots conform to PLT requirements. The PLT report shall verify whether all required inspections and tests have been completed successfully. The report shall be submitted to the Government in accordance with CDRL in Section J.
(e) Within thirty (30) workdays after receipt of the PLT report by the government, the government will notify the Contractor in writing whether the specific lot has been approved, conditionally approved, or rejected. The Contractor shall maintain PLT report(s) for a period of two years after contract expiration, during which time they shall be available for Government review.
(f) If the PLT sample fails to meet any contractual requirement, the lot from which the test samples were drawn shall be rejected by the
Government. In that event, the Contractor shall take immediate corrective action at no increase in the contract price, and shall submit an additional PLT sample (from the reworked lot or from a new lot) for inspection. Corrective action shall apply to all items including, if applicable, basic items, repair parts, and in-process or final assembly items produced or in production since the last successful production lot test.
(g) PLT samples not consumed or destroyed in testing may be delivered as part of the production quantities due under the contract.
E.4__ INSPECTION AND ACCEPTANCE POINTS: ORIGIN
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
E.5__ REWORK AND REPAIR OF NONCONFORMING MATERIAL
(a) Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the
Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, to the Contracting Officer
13 54
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
for review and written approval prior to implementation.
(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
(e) The rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical Data
Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
E.6__ FIRST ARTICLE TESTING (CONTRACTOR) UTILIZATION OF ECBC LAB (TSA)
(a) CLIN 0011, CARRIER ASSEMBLY, REFERENCE has a requirement for First Article Testing.
(b) The elements of First Article Testing (FAT) that can be performed by the Research Development & Engineering Command (RDECOM)
Chemical & Biological Center (C&B Center), Design Engineering & Test Facility (DE&TF) Rock Island at the prices stated will be included as attachment 0003 to the solicitation.
Prices are valid for 180 days after contract award. These prices shall be included in the total FAT price proposed.
(c) These elements may not be all inclusive of the FAT Requirements as stated in the solicitation. It is the successful offerors responsibility to ensure that all FAT Requirements are met.
(d) It is not a requirement of this solicitation to utilize the ECBC Rock Island Lab, but an option available to all interested offerors.
(e) If it is determined that the C&B Center DE&TF, Rock Island, will be utilized for conducting any of the above testing, it is the successful contractors responsibility to contact the Chief, DE&TF to establish a Test Service Agreement (TSA) for necessary C&B center support. See attachment 0003 for contact information.
(f) The TSA will not be part of the resultant contract, but an independent agreement between the contractor and C&B Center Rock Island.
Payment to C&B center will be the responsibility of the successful offeror.
(g) It is in the contractors best interest to contact the C&B Center DE&TF as soon after contract award as possible to start the TSA process. Delay in contract performance due to failure to contact the lab and make arrangements in a timely manner is not an excusable delay.
A copy of the TSA Customers Guide is provided as an attachment to help expedite the TSA process. Please coordinate with the C&B Center
Rock Island regarding Electronic Funds Transfer (EFT) payments.
(h) Contractor shall annotate below whether the ECBC Lab will be utilized for this requirement.
____ The C&B Center Lab will be utilized for this requirement.
____ The C&B Center Lab will not be utilized for this requirement.
*** END OF NARRATIVE E0001 ***
DELIVERIES OR PERFORMANCE
5 52.242-15 STOP-WORK ORDER AUG/1989
6 52.242-17 GOVERNMENT DELAY OF WORK APR/1984
7 52.247-34 F.O.B. DESTINATION NOV/1991
8 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999
9 52.211-8 TIME OF DELIVERY JUN/1997
14 54
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS
AFTER DATE OF
CONTRACT
0011 230 270
0011 230 300
REQUIRED DELIVERY SCHEDULE IF FAT IS WAIVED
ITEM NO. QUANTITY WITHIN DAYS
AFTER DATE OF
CONTRACT
0011 230 210
0011 230 240
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFERORS PROPOSED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS
AFTER DATE OF
CONTRACT
OFFERORS PROPOSED DELIVERY SCHEDULE IF FAT IS WAIVED
ITEM NO. QUANTITY WITHIN DAYS
AFTER DATE OF
CONTRACT
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the
Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the
Contractors date of receipt of the contract or notice of award by adding
(1) five calendar days for delivery of the award through the ordinary mails, or
(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term working day excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
(End of Clause)
15 54
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
10 252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION MAR/2016
(a) Definitions. As used in this clause--
"Automatic identification device" means a device, such as a reader or interrogator, used to retrieve data encoded on machine-readable media.
"Concatenated unique item identifier" means
(1) For items that are serialized within the enterprise identifier, the linking together of the unique identifier data elements in order of the issuing agency code, enterprise identifier, and unique serial number within the enterprise identifier; or
(2) For items that are serialized within the original part, lot, or batch number, the linking together of the unique identifier data elements in order of the issuing agency code; enterprise identifier; original part, lot, or batch number; and serial number within the original part, lot, or batch number.
"Data matrix" means a two-dimensional matrix symbology, which is made up of square or, in some cases, round modules arranged within a perimeter finder pattern and uses the Error Checking and Correction 200 (ECC200) specification found within International Standards
Organization (ISO)/International Electrotechnical Commission (IEC) 16022.
"Data qualifier" means a specified character (or string of characters) that immediately precedes a data field that defines the general…