Notice of Revision_Special Packaging Instructions.pdf
PDF 157 KB Posted
- Attached to
- MEMBRANE ASSEMBLY, VESTIBULE, TYPE II
- Solicitation number
- W56HZV19Q0215
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W56HZV19Q0215.pdf | ||
| Special Packaging Instructions.pdf | ||
| First-Article-Waiver-Worksheet.pdf | ||
| FORM 069 Cost Estimate Letter.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTICE OF REVISION (NOR)
THIS REVISION DESCRIBED BELOW HAS BEEN AUTHORIZED FOR THE DOCUMENT LISTED
1. ORIGINATOR’S NAME
2. DATE
3. PROCURING ACTIVITY NO.
4. NOR NO.
5. DODAAC
6. AFFECTED DOCUMENT
a. DOCUMENT TITLE
b. CAGE CODE
c. DOCUMENT NO. d. REVISION
e. OUTSTANDING NORs
7. CONFIGURATION ITEM (OR SYSTEM) TO WHICH ECP APPLIES
8. DESCRIPTION OF REVISION
9. APPROVING ACTIVITY
a. TYPED NAME
c. DECISION
b. TITLE
d. DECISION DATE
Approved as Modified
GENERAL ENGINEER
None
25-MAR-19
See attached sheet.
Statement A, Approved for public release; distribution is unlimited.
11-APR-19
ASPL PKG INSTR - MEMBRANE
ASSEMBLY,VESTIBULE,DUCTED,TYPE II
Charles Harris W912F1
COLL PROT EQUIP, NBC: TENT,EXTENDABLE MODULAR, TYPE II
James Lenth
81361 P5-19-13772-20
252-0024 252-0024-004
APPROVED
ECP
252-0024-004.pdf Page 1 of 5
SPECIAL PACKAGING INSTRUCTION (SPI)
DOD SPI INDEX NUMBER
NOMENCLATURE
SPI NUMBER
QUPUI
EA 1
P5---19---13772---20
DRAWING/PART NO.
UNIT PACK AND MILITARY PRESERVATION REQUIREMENTS
NATIONAL STOCK NUMBER
AP14578352
5---19---13772MEMBRANE ASSEMBLY, VESTIBULE, TYPE II
4240---01---457---8352
ITEM WEIGHT---
APPROVAL REVISION DATE
5.0 lbs.
4 Oct 2001PAGE NUMBER NUMBEROF PAGES
Z24---0386---029 Z24---130(A)
DISTRIBUTION STATEMENT A: Approved for public release. Distribution is Unlimited.
RP
STEPS SPECIFICATION STYLE TYPE GRADE CLASS SIZE AND REMARKS (INCHES)
UNIT PACK LOGISTICS DATA (Approximate unit pack weight and size)
WEIGHT (POUNDS) CUBE (CUBIC FEET)
INTERMEDIATE PACKAGING
MARKING
REMARKS
(B)1 Heat SealClosure (C)2
RSC CF W6c WR 28 x 24 x 7Supplemental Container (D)3 Closure (D)4 Method 2B7
QUALITY PERFORMANCE & TESTING REQUIREMENTS
MIL---DTL---117
ASTM D5118
ASTM D1974
IAWMIL---STD---2073---1
As specified hereon.
IAWMIL---STD---129
As specified hereon.
IAWMIL---STD---2073---1
As specified hereon. SEE NOTE (F)
10.2 lbs.
X ( )
X X
( )X
X
2.973 cu. ft.
SIZE (EXTERIOR INCHES)
28.25 x 24.25 x 7.5
UNIT PACKMATERIALS
Clean and dry in accordance with (IAW) MIL---STD---2073---1 using any applicable method that is not injurious to the item.
Container (Bag)
Methods of Preservation (MOP) --- 31
2 III B 30 X 35
LEVEL OF PACK (EXTERIOR PACKAGING): Level A or B IAWMIL---STD---2073---1 & Contract As specified hereon.( )
( )X
The current revision to each of the specifications, standards, and drawings listed on this SPI in effect on the date of invitation for bid constitute a mandatory part of this Instruction. Unless otherwise specified, materials will be minimum size IAWMIL---STD---2073---1 or material specifications. Tolerances shall be IAWmaterial specifications.
Clean and dry in accordance with (IAW) MIL---STD---2073---1 using any applicable method that is not injurious to the item.
(A) --- This SPI is not applicable for Interplant shipments. Packaging andmarking for interplant shipments are for supplies and materials that do not directly enter the military supply system. Typical interplant shipments are shipments from a vendor to a subcontractor or a prime contractor, or between contractors and subcontractors, or from a vendor or contractor to a military arsenal, plant, or other activity for evaluation, immediate use, or further processing as specified in the applicable contract.
(B) --- FoldMembrane Assembly in thirds to obtain a dimension of about 27 x 23 x 6 inches. Place folded MembraneAssembly in specified bag (Step 1). Bagmaterial shall conform toA---A---3174 as specified in MIL---DTL---117 and shall have an minimum thickness of 4 mil.
ITEM SIZE ---
ITEM SI
B
Original Preparer: Revised by:
27 x 23 x 6 inchesITEM SIZE ---
ITEM CODE ---
ITEM DATA
C. Williamson Regina Ryan
(folded dimensions)
NOR CONTINUATION SHEET(APPROX)
Date: 1 April 2019
ITEM CODE ---
Date: 2001
CCDC CBC
81361
Z38, Z39, Z40, 252 R29, Z36, Z37, 252-0024-004.pdf Page 2 of 5
NOMENCLATURE
SPI NUMBER
P5---19---13772---20
PAGE NUMBER
DRAWING/PART NO.
NATIONAL STOCK NUMBER
AP14578352
5---19---13772MEMBRANE ASSEMBLY, VESTIBULE, TYPE II
4240---01---457---8352
(C) --- Closure (Step 2) shall be accomplished in accordance with the bag (Step 1) or barrier material supplier’s recommendations for dwell, pressure and temperature requirements. The volume of trapped air within the bag shall be kept to aminimum by compressing the bag around the contents, or carefully drawing a vacuum inside the bag, prior to final heat sealing. Caution shall be taken to prevent damage to the item or rupture of bag.
(D) --- Place the baggedMembrane Assembly into specified box (Step 3) and close (Step 4).
(E) --- Palletization andUnitization. The shipping container,whennot requiring skids, shall beplacedon the pallet IAWMIL---STD---147 and ANSI MH1 when:
---Shipments of identical items packed in shipping container(s) exceed the total of 50 cubic feet per destination and do not exceed the size or weight limitations for palletized loads.
---The total number of containers, not having identical items going to the samedestination, weighs250 pounds or greater (excluding pallet), or has a volume of 20 cubic feet or greater and does not exceed the size or weight limitations for palletized loads.
(F) --- PACKAGING QUALITY ASSURANCE PROVISIONS
This section outlines the requirements for conducting appropriate quality conformance inspections, examinations, tests and acceptance for packaging and shall be required as specified in the contract.
1. Classification of inspections. The inspection requirements for the packaged item described herein are conducted during First Article Testing (FAT) and Production Lot Testing (Conformance).
2. First Article Testing. The first article inspection and approval (if FAT is required by the contract) consists of the contractor inspectionof items prior to regular production.Note: If required, packaging inspections shall be part of the FAT and be included as part of the FAT Report submittal to the Government (see paragraph 2.d). The first article testing shall be conducted as follows:
a. Sampling. The first article packaging sample shall consist of not less than three unit pack containers and their contents, and when heat seal seam testing is required, three empty barrier bags.
Packaged samples shall be producedusing the samemethods,materials andequipment aswill beused during regular production.
252-0024-004.pdf Page 3 of 5
SPI NUMBER
P5---19---13772---20
PAGE NUMBER
DRAWING/PART NO.
NATIONAL STOCK NUMBER
AP14578352
5---19---13772MEMBRANE ASSEMBLY, VESTIBULE, TYPE II
4240---01---457---8352
b. Visual Examination and Tests. Shall be as specified in MIL---STD---2073---1, Appendix G, and:
(1). Packaged samples shall be examined IAW the preservation examinations to determine compliance IAW Table G---I of MIL---STD---2073---1.
(2). Leakage and heat seal seam tests are required for sealed containers as specified in Table G---II of MIL---STD---2073---1. Note: Method of Preservation 10 does NOT require tests.
(3). Compliant wood requirements shall be IAW the contract. Examination shall include review and acceptance of wood packaging material, containers, pallets and dunnage.
(4). The level of pack shall be as specified in the contract. The exterior shipping configuration shall include examination to verify compliance with MIL---STD---2073---1 guidelines for intermediate and shipping containers for the level of pack specified.
(5). Packaged samples shall be marked IAWMIL---STD---129.
c. Certificate of Compliance. Certification shall be required for ALL packaging materials, containers, including level of pack, and palletization materials specified in this SPI. Format shall be IAW the contract and shall include, at a minimum, the contractor’s name, address, phone number, contract number, item name, part number and/or national stock number, a statement specifying with what it complies (i.e. material, size, specification, standard), date, printed name and title of certifying official, and shall be signed.
d. Packaging report: The following shall be included as a minimum:
(1) Test data (leakage and heat seal seam tests) if required
(2) Certificate of compliance sheets
(3) Preservation/packaging inspection provisions
(4) Photographs of the unit pack(s) including opened package with the item packed inside
(5) Photographs of markings/labels for each packaging configuration
(6) Photographs of the packing configuration including box seal certification, if applicable
e. Acceptance criteria. Samples that fail to comply with any of the applicable requirements shall be rejected.
252-0024-004.pdf Page 4 of 5
SPI NUMBER
P5---19---13772---20
PAGE NUMBER
DRAWING/PART NO.
NATIONAL STOCK NUMBER
AP14578352
5---19---13772MEMBRANE ASSEMBLY, VESTIBULE, TYPE II
4240---01---457---8352
3. Production Lot Testing (Conformance).
a. Sampling. Sampling size shall be IAW the Attributes Sampling Plan Table of MIL---STD---1916 for visual examination. Verification Level I shall be used. If required, three samples from the sampling size shall be selected for destructive testing (leakage and heat seal seam tests).
b. Visual Examinations and Tests. Shall be conducted IAW 2.b above. If applicable, destructive testing will be conducted after visual examination.
c. Certificate of Compliance. If the above FAT has passed the packaging FAT, then providing the Certificate ofCompliance forConformance is not required.Otherwise, theCertificate ofCompliance shall be prepared IAW 2.c above.
252-0024-004.pdf Page 5 of 5