Attachment_0007_Provisioning_Requirements_Statement.doc

DOC document 38 KB Posted

Attached to
Fire Suppression Refill System (FSRS) Tool Load
Solicitation number
W56HZV18R0045
Issued by

View the file

Other files

File Type Posted
W56HZV18R0045-0004.pdf PDF
question_and_answer_log-_FSRS_Tool_Load_W56HZV-18-R-0045_2018JUN22.pdf PDF
W56HZV18R0045-0003.pdf PDF
11B4550120.pdf PDF
11B4540010.pdf PDF
question_and_answer_log-_FSRS_Tool_Load_W56HZV-18-R-0045_2018JUN19_20.pdf PDF
FSRS_Tool_Load_BOM_-_11_June.xlsx XLSX spreadsheet
Air_Storage_Tank_-_11JUN2018.pdf PDF
W56HZV18R0045-0002.pdf PDF
W56HZV18R0045-0001.pdf PDF
11B4550092.pdf PDF
FSRS_Tool_Load_BOM.XLSX XLSX spreadsheet
Attachment_0009_LMI_Data_Spreadsheet_example.xlsx XLSX spreadsheet
Attachment_0008_LMI_data_requirements.doc DOC document
att0002_W56HZV18R0045xlsx.xlsx XLSX spreadsheet
FSRS_Tool_Load.pdf PDF
Attachment_0006_Provisioning_Data_Requirements.doc DOC document
FSRS_Att_0005_Tool_Component_List.xlsx XLSX spreadsheet
W56HZV18R0045.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 0006

PROVISIONING REQUIREMENTS STATEMENT

(GEIA-STD-0007-A)

Attachment 009

Solicitation No. W56HZV-09-R-0056

This Provisioning Requirements Statement (PRS) supplements and definitizes requirements in the Statement of Work (SOW).

1. Provisioning/Maintenance/Publication Guidance Conference: Available Via Telephone

a. Location:

Selfridge Air National Guard Base, Harrison Township, MI Bldg 302

b. Date:

TBD

c. Time:

TBD

d. Estimated number of days: One

2. Provisioning Conferences(s): Are Required

a. Location: At the Selfridge Air National Guard Base, Bldg 302, 2nd Floor, 29661 George Avenue, Harrison Twp, MI 48045-4941

b. Date: IAW Integrated Master Schedule

c. Time: TBD

d. Estimated number of days: As Required (not to exceed 5 days per conference restrictions)

e. The Contractor is not required to have a sample of the component/end item at the conference.

3. The sample article will not be disassembled at the conference.

4. A Provisioning Preparedness Review Conference is not required.

5. Incremental submission of PTD (LMI Data & EDFP) is authorized.

6. Provisioning Screening is required.

7. A Resident Provisioning Team (RPT) will not be established.

8. Commercial Illustrations and LMI Illustration products media shall be:

a.

. Electronic Format

9. LMI EDFP Support will be sequenced by:

a. PLISN order for hard copy review at conference

b. Part Number order for electronic submission

10. Tools and Test Equipment will not be included as part of the LMI Data Products (PPL).

11. Repair Kits and Repair Part Sets will not be included in the LMI Data Products (PPL).

12. Special Purpose Kits will not be included in the LMI Data Products (PPL).

13. Basic Issue Items (BII) will not be included in the LMI Data Products (PPL).

14. Bulk material that is required to fabricate items that are coded “M” (make) will also be listed on the LMI Data Products (PPL).

�I don’t know what this means.

PAGE

File details come from the government source that posted it.