Attachment_0007_Provisioning_Requirements_Statement.doc
DOC document 38 KB Posted
- Attached to
- Fire Suppression Refill System (FSRS) Tool Load
- Solicitation number
- W56HZV18R0045
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W56HZV18R0045-0004.pdf | ||
| question_and_answer_log-_FSRS_Tool_Load_W56HZV-18-R-0045_2018JUN22.pdf | ||
| W56HZV18R0045-0003.pdf | ||
| 11B4550120.pdf | ||
| 11B4540010.pdf | ||
| question_and_answer_log-_FSRS_Tool_Load_W56HZV-18-R-0045_2018JUN19_20.pdf | ||
| FSRS_Tool_Load_BOM_-_11_June.xlsx | XLSX spreadsheet | |
| Air_Storage_Tank_-_11JUN2018.pdf | ||
| W56HZV18R0045-0002.pdf | ||
| W56HZV18R0045-0001.pdf | ||
| 11B4550092.pdf | ||
| FSRS_Tool_Load_BOM.XLSX | XLSX spreadsheet | |
| Attachment_0009_LMI_Data_Spreadsheet_example.xlsx | XLSX spreadsheet | |
| Attachment_0008_LMI_data_requirements.doc | DOC document | |
| att0002_W56HZV18R0045xlsx.xlsx | XLSX spreadsheet | |
| FSRS_Tool_Load.pdf | ||
| Attachment_0006_Provisioning_Data_Requirements.doc | DOC document | |
| FSRS_Att_0005_Tool_Component_List.xlsx | XLSX spreadsheet | |
| W56HZV18R0045.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 0006
PROVISIONING REQUIREMENTS STATEMENT
(GEIA-STD-0007-A)
Attachment 009
Solicitation No. W56HZV-09-R-0056
This Provisioning Requirements Statement (PRS) supplements and definitizes requirements in the Statement of Work (SOW).
1. Provisioning/Maintenance/Publication Guidance Conference: Available Via Telephone
a. Location:
Selfridge Air National Guard Base, Harrison Township, MI Bldg 302
b. Date:
TBD
c. Time:
TBD
d. Estimated number of days: One
2. Provisioning Conferences(s): Are Required
a. Location: At the Selfridge Air National Guard Base, Bldg 302, 2nd Floor, 29661 George Avenue, Harrison Twp, MI 48045-4941
b. Date: IAW Integrated Master Schedule
c. Time: TBD
d. Estimated number of days: As Required (not to exceed 5 days per conference restrictions)
e. The Contractor is not required to have a sample of the component/end item at the conference.
3. The sample article will not be disassembled at the conference.
4. A Provisioning Preparedness Review Conference is not required.
5. Incremental submission of PTD (LMI Data & EDFP) is authorized.
6. Provisioning Screening is required.
7. A Resident Provisioning Team (RPT) will not be established.
8. Commercial Illustrations and LMI Illustration products media shall be:
a.
. Electronic Format
9. LMI EDFP Support will be sequenced by:
a. PLISN order for hard copy review at conference
b. Part Number order for electronic submission
10. Tools and Test Equipment will not be included as part of the LMI Data Products (PPL).
11. Repair Kits and Repair Part Sets will not be included in the LMI Data Products (PPL).
12. Special Purpose Kits will not be included in the LMI Data Products (PPL).
13. Basic Issue Items (BII) will not be included in the LMI Data Products (PPL).
14. Bulk material that is required to fabricate items that are coded “M” (make) will also be listed on the LMI Data Products (PPL).
�I don’t know what this means.
PAGE
File details come from the government source that posted it.