Request for Proposal - Line of Communication Bridge

View the file

Other files

File Type Posted
W56HZV-18-R-0038_Amendment_0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

Offeror To Complete Block 12, 17, 23, 24, & 30

1. Requisition Number Page Of

2. Contract No. 3. Award/Effective Date 4. Order Number 5. Solicitation Number 6. Solicitation Issue Date

7. For Solicitation Information Call:

A. Name B. Telephone Number (No Collect Calls) 8. Offer Due Date/Local Time

9. Issued By Code 10. This Acquisition is Unrestricted OR Set Aside: % For:

Small Business Women-Owned Small Business (WOSB) Eligible Under the Women-Owned Small Business Program

Hubzone Small Business EDWOSB

Service-Disabled Veteran-Owned Small Business NAICS:

Email: 8(A) Size Standard:

11. Delivery For FOB Destination Unless Block Is Marked

12. Discount Terms 13a. This Contract Is A Rated Order Under DPAS (15 CFR 700) 13b. Rating

See Schedule 14. Method Of Solicitation RFQ IFB RFP

15. Deliver To Code 16. Administered By Code

Telephone No.

17a. Contractor/Offeror Code Facility 18a. Payment Will Be Made By Code

Telephone No.

17b. Check If Remittance Is Different And Put Such Address In Offer

18b. Submit Invoices To Address Shown In Block 18a Unless Block Below Is Checked See Addendum

19.

Item No.

20.

Schedule Of Supplies/Services

21.

Quantity

22.

Unit

23.

Unit Price

24.

Amount

(Use Reverse and/or Attach Additional Sheets As Necessary)

25. Accounting And Appropriation Data 26. Total Award Amount (For Govt. Use Only)

27a.Solicitation Incorporates By Reference FAR 52.212-1, 52.212-4. FAR 52.212-3 And 52.212-5 Are Attached. Addenda Are Are Not Attached.

27b.Contract/Purchase Order Incorporates By Reference FAR 52.212-4. FAR 52.212-5 Is Attached. Addenda Are Are Not Attached.

28. Contractor Is Required To Sign This Document And Return _________ 29. Award Of Contract: Ref. Offer Copies to Issuing Office. Contractor Agrees To Furnish And Deliver All Items Set Forth Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified.

Dated . Your Offer On Solicitation (Block 5), Including Any Additions Or Changes Which Are Set Forth Herein, Is Accepted As To Items:

30a. Signature Of Offeror/Contractor 31a. United States Of America (Signature Of Contracting Officer)

30b. Name And Title Of Signer (Type Or Print) 30c. Date Signed 31b. Name Of Contracting Officer (Type Or Print) 31c. Date Signed

Authorized For Local Reproduction Previous Edition Is Not Usable

Standard Form 1449 (Rev. 2/2012) Prescribed By GSA-FAR (48 CFR) 53.212

W56HZV-18-R-0038 2018MAY24

SHELIA A. COUCH (586)282-7678

SHELIA.A.COUCH.CIV@MAIL.MIL

2018JUN04 01:00pm

W56HZV

U.S. ARMY CONTRACTING COMMAND

WARREN, MICHIGAN 48397-5000

332312

X DOA4

X

SEE SCHEDULE

SEE SCHEDULE

X X

X 1

1 72

19.

Item No.

20.

Schedule Of Supplies/Services

21.

Quantity

22.

Unit

23.

Unit Price

24.

Amount

32a. Quantity In Column 21 Has Been

Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________

32b. Signature Of Authorized Government Representative 32c. Date 32d. Printed Name and Title of Authorized Government Representative

32e. Mailing Address of Authorized Government Representative 32f. Telephone Number of Authorized Government Representative

32g. E-Mail of Authorized Government Representative

33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number Correct For Partial Final Complete Partial Final

38. S/R Account No. 39. S/R Voucher Number 40. Paid By

41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer 41c. Date 42b. Received At (Location)

42c. Date Rec’d (YY/MM/DD) 42d. Total Containers

Standard Form 1449 (Rev. 2/2012) Back

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SUPPLEMENTAL INFORMATION

Buyer Name: SHELIA A. COUCH

Buyer Office Symbol/Telephone Number: CCTA-HCP-B/(586)282-7678

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

A.1 Electronic Contracting

(a) All Army Contracting Command Warren solicitations will be publicized on the Federal Business Opportunities website

(https://www.fbo.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.

(b) As of 10 August 2015, unless directed to do otherwise in Section L of this solicitation, vendors are required to submit a quote or proposal via the Federal Business Opportunities (FBO) system. Proposals or quotes submitted after this date using any other mechanism, including the Army Single Face to Industry Bid Response System (ASFI BRS) may be deemed non-responsive.

(c) Requirements for the online FBO bid submission:

(1) Vendors must log into the FBO System to be able to submit electronic responses for opportunities.

(2) Vendors must be registered in the System for Award Management (SAM) at "../../../../Documents/SharePoint%20Drafts/www.sam.gov"

(a Federal Government owned and operated free web site) and have a CAGE Code and CCR Marketing Partner Identification Number (MPIN).

(3) Once logged into the FBO System, vendors will be asked to enter basic information and directed to upload one or more files containing the proposal/quote and any additional information as outlined in the solicitation.

(4) FBO will send an email to vendors registered email address confirming the electronic submission.

(5) For additional information on submitting electronic bid responses via the FBO system see the FBO Vendor Guide Section 4.3.1

Submitting an Electronic Response (https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf ).

Note to offerors:

(d) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.

(e) It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the

Government infrastructure (in this case, received through FBO) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.

Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.

(f) Solicitations may remain posted on the FBO after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.

(g) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the

Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.

(h) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the

Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.

2 72

W56HZV-18-R-0038

REPRINT

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

A.2 ACKNOWLEDGEMENT OF AMENDMENTS

Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:

Amendment Number: Date: __________________ _____

A.3 ARMY CONTRACTING COMMAND WARREN (DTA) OMBUDSPERSON

Information regarding the Ombudsperson for this contract is located at the following website:

http://acc.army.mil/contractingcenters/acc-wrn/CompMgmtOffice.html

A.4 ALL OR NONE-COMMERCIAL ITEM ACQUISITION

(a) This provision serves as an addendum that modifies paragraph (h) of FAR 52.212-1, entitled INSTRUCTIONS TO OFFERORS--COMMERCIAL

ITEMS. Paragraph (h) is modified to say that the proposal or quote must offer to provide the total quantity of the items in this solicitation.

(b) Only one award will be made as a result of this solicitation. Offers submitted for less than the total quantities of all the items in this solicitation will NOT be considered for award.

A.5 NOTICE OF URGENT REQUIREMENT

U.S. Army TACOM considers this requirement to be urgent. Timely performance and delivery are essential. Deliveries ahead of schedule are encouraged whenever delivery can be offered without additional cost to the Government. The Contractor is requested to immediately contact the buyer or contracting officer identified on the cover page of this document to notify them of any pending or potential problems and/or suggestions for contract streamlining that would enable faster deliveries.

A.6 NOTICE OF ELEVATED THREAT LEVEL FORCE PROTECTION CONDITION (FPCON)

Contractor is hereby notified that there is a potential impact on contractor performance on during increased FPCON during periods of increased threat. During FPCONs Charlie and Delta, services may be discontinued / postponed due to higher threat. Services will resume when FPCON level is reduced to level Bravo or lower.

A.7 NOTICE OF RANDOM ANTITERRORISM MEASURES PROGRAM (RAMP)

In accordance with AR 525-13, Contractor personnel working on an Army installation, arsenal, base or other DoD facility (owned or leased by DoD/Department of the Army), are subject to participation in Installation RAMP security program (e.g. vehicles searches, wearing of

ID badges, etc).

End of Notice

3 72

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

*** END OF NARRATIVE A0001 ***

4 72

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SUPPLIES OR SERVICES AND PRICES/COSTS

0001 80 METER WET GAP BRIDGE SET

0001AA 80 METER WET GAP BRIDGE SET 1 EA $ $ ____________________________ ______________ __________________

COMMODITY NAME: 80 METER WET GAP BRIDGE SET

CLIN CONTRACT TYPE:

Firm Fixed Price

Ship-to Address and POC:

APS-4 Japan

UIC: W0ATAA

DODAAC: WT5F6D

Headquarters United States Japan

G34 Protect

ATTN: SFC Jose Castillo

BLDG 100

Camp Zama, Japan

SPO AP96343

DSN: 315-263-4213

(End of narrative B001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE SECTION D PACKAGING

LEVEL PRESERVATION: Commercial

LEVEL PACKING: Commercial

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 1 0075

FOB POINT: Destination

SHIP TO:

(WT5F6D) PBO HQ USA JAPAN

CP ZAMA

APO SF 96343

5 72

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0002 160 METER WET GAP BRIDGE SET

0002AA 160 METER WET GAP BRIDGE SET 1 EA $ $ _____________________________ ______________ __________________

COMMODITY NAME: 160 METER WET GAP BRIDGE SET

CLIN CONTRACT TYPE:

Firm Fixed Price

Ship-to Address and POC:

APS-4 Japan

UIC: W0ATAA

DODAAC: WT5F6D

Headquarters United States Japan

G34 Protect

ATTN: SFC Jose Castillo

BLDG 100

Camp Zama, Japan

SPO AP96343

DSN: 315-263-4213

(End of narrative B001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE SECTION D PACKAGING

LEVEL PRESERVATION: Commercial

LEVEL PACKING: Commercial

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 1 0075

FOB POINT: Destination

SHIP TO:

(WT5F6D) PBO HQ USA JAPAN

CP ZAMA

APO SF 96343

6 72

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0003 320 METER WET GAP BRIDGE SET

0003AA 320 METER WET GAP BRIDGE SET 1 EA $ $ _____________________________ ______________ __________________

COMMODITY NAME: 320 METER WET GAP BRIDGE SET

CLIN CONTRACT TYPE:

Firm Fixed Price

Ship-to Address and POC:

APS-4 Japan

UIC: W0ATAA

DODAAC: WT5F6D

Headquarters United States Japan

G34 Protect

ATTN: SFC Jose Castillo

BLDG 100

Camp Zama, Japan

SPO AP96343

DSN: 315-263-4213

(End of narrative B001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE SECTION D PACKAGING

LEVEL PRESERVATION: Commercial

LEVEL PACKING: Commercial

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 1 0075

FOB POINT: Destination

SHIP TO:

(WT5F6D) PBO HQ USA JAPAN

CP ZAMA

APO SF 96343

7 72

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0004 FSR SUPPORT 80 METER BRIDGE

0004AA FSR - 80 METER WET GAP BRIDGE (OPTION) 1 LO $ ______________________________________ __________________

SERVICE REQUESTED: FSR SUPPORT 80 METER BRIDGE

CLIN CONTRACT TYPE:

Firm Fixed Price

OPTION QUANTITY, PURSUANT TO THE CLAUSE

ENTITLED OPTION FOR INCREASED QUANTITY---

SEPARATELY PRICED LINE ITEM (52.217-4001).

The quantity stated for the option CLIN DOES

NOT Form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the

Government.

1 LOT(LO) equals six each of 30-day FSR support totaling up to 180 days for the full option.

The dates for FSR performance will be provided to the contractor by the COR under separate cover.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 1 0180

8 72

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0005 FSR SUPPORT 160 METER BRIDGE

0005AA FSR - 160 METER WET GAP BRIDGE (OPTION) 1 LO $ _______________________________________ __________________

SERVICE REQUESTED: FSR SUPPORT 160 METER BRIDGE

CLIN CONTRACT TYPE:

Firm Fixed Price

OPTION QUANTITY, PURSUANT TO THE CLAUSE

ENTITLED OPTION FOR INCREASED QUANTITY---

SEPARATELY PRICED LINE ITEM (52.217-4001).

The quantity stated for the option CLIN DOES

NOT Form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the

Government.

1 LOT(LO) equals six each of 30-day FSR support totaling up to 180 days for the full option.

The dates for FSR performance will be provided to the contractor by the COR under separate cover.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 1 0180

9 72

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0006 FSR SUPPORT 320 METER BRIDGE

0006AA FSR - 320 METER WET GAP BRIDGE (OPTION) 1 LO $ _______________________________________ __________________

SERVICE REQUESTED: FSR SUPPORT 320 METER BRIDGE

CLIN CONTRACT TYPE:

Firm Fixed Price

OPTION QUANTITY, PURSUANT TO THE CLAUSE

ENTITLED OPTION FOR INCREASED QUANTITY---

SEPARATELY PRICED LINE ITEM (52.217-4001).

The quantity stated for the option CLIN DOES

NOT Form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the

Government.

1 LOT(LO) equals six each 30-day FSR support totaling up to

180 days for the full option.

The dates for FSR performance will be provided to the contractor by the COR under separate cover.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 1 0180

10 72

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0007 FSR TRAVEL (OPTION)

0007AA FSR - 80 METER BRIDGE SUPPORT TRAVEL (OPTION) 1 LO $ _____________________________________________ __________________

SERVICE REQUESTED: FSR TRAVEL (OPTION)

CLIN CONTRACT TYPE:

Firm Fixed Price

To be performed IAW C.5.4 in the event the Government exercises the FSR option at C.5

1 LOT(LO) equals FSR travel for support on option

CLIN 0004AA.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 1 0180

11 72

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0008 FSR TRAVEL (OPTION)

0008AA FSR-160 METER BRIDGE SUPPORT TRAVEL (OPTION) 1 LO $ ____________________________________________ __________________

SERVICE REQUESTED: FSR TRAVEL (OPTION)

CLIN CONTRACT TYPE:

Firm Fixed Price

To be performed IAW C.5.4 in the event the Government exercises the FSR option at C.5

1 LOT(LO) equals FSR travel for support on option

CLIN 0005AA.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 1 0180

12 72

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0009 FSR TRAVEL (OPTION)

0009AA FSR- 320 METER BRIDGE SUPPORT TRAVEL (OPTION) 1 LO $ _____________________________________________ __________________

SERVICE REQUESTED: FSR TRAVEL (OPTION)

CLIN CONTRACT TYPE:

Firm Fixed Price

To be performed IAW C.5.4 in the event the Government exercises the FSR option at C.5

1 LOT(LO) equals FSR travel for support on option

CLIN 0006AA.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 1 0180

13 72

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0010 CONTRACTOR MANPOWER REPORTING

0010AA CONTRACTOR MANPOWER REPORTING (CMR) $ ** NSP ** ___________________________________ __________________

SERVICE REQUESTED: CONTRACTOR MANPOWER REPORTING

To be performed IAW C.7

(End of narrative B001)

14 72

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0100 DATA ITEMS __________

A001 PACKAGING REQUIREMENTS $ ** NSP ** ______________________ __________________

SERVICE REQUESTED: PACKAGING REQUIREMENTS

To be performed IAW C.3

(End of narrative B001)

Deliveries or Performance _________________________

15 72

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

A002 SAFETY ASSESSMENT REPORT (SAR) $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: SAFETY ASSESSMENT REPORT

To be performed IAW C.4

(End of narrative B001)

Deliveries or Performance _________________________

16 72

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

A003 FIELD SERVICE REPRESENTATIVE (FSR) STATUS REPORT $ ** NSP ** _________________________________________________ __________________

SERVICE REQUESTED: FSR WEEKLY STATUS REPORT

To be performed IAW C.5 and C.5.6

(End of narrative B001)

Deliveries or Performance _________________________

17 72

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

18 72

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

PERFORMANCE WORK STATEMENT- LINE OF COMMUNICATION BRIDGE SYSTEM

C.1. DESCRIPTION. This acquisition is for the procurement and delivery of a 80 meter (m) Wet Gap Line of Communication Bridge (LOCB)

System, a 160m Wet Gap LOCB, and a 320m Wet Gap LOCB, along with three options for up to 180 calendar man-days each of field service representative (FSR) services supporting emerging requirements of the United States Pacific Command (US PACOM).

C.2 HARDWARE REQUIREMENTS. The contractor shall manufacture and deliver a 80 meter (m) LOCB Wet Gap Float System, a 160m LOCB Wet Gap

Float System, and a 320m LOCB Wet Gap Float System to the meet the requirements of this contract. All structural components of the bridge and pier assembly shall be manufactured and delivered new. Bridge components shall be fabricated from hot dip galvanized steel.

Small components (i.e. pins, clips, bolts, fasteners) that cannot be hot dip galvanized, shall be spun galvanized or plated. Each LOCB system shall include the manufacturer's recommended quantity of common consumable parts for the initial build and installation of the bridge.

C.2.1 The Wet Gap LOCB Systems are comprised of a 80m or 160m or 320m Wet Gap Bridge and Floating Barge Piers. The Wet Gap LOCB System shall provide a roadway width of at least 4.2 meters, and support wet gap crossings rated Military Load Classification (MLC) 80 Tracked

(normal)/110 Wheeled (caution).

C.2.1.1 The Wet Gap Bridge shall include all standard panel bridge components, launching equipment, ramp components, multi-span components, bearing components, jacking equipment, pier & abutment grillages, conventional kedge anchorage / winch assemblies, and hand tools necessary to construct, launch, and emplace a multi-span bridge, with at least 12m approach ramps, for wet gap crossings supported on floating pier structures.

C.2.1.2 The Floating Barge Piers shall be comprised of steel sectional barges and pin connectors. The Floating Barge Piers shall be capable of supporting employment and operational use of the Wet Gap Bridge (80m, 160m, or 320m length) at water depths no greater than 3 meters with directional flow rates up to 2.5 meters per second, and at water depths no greater than 1.2 meters with directional flow rates up to 1.8 meters per second.

C.3 PACKAGING: The contractor shall provide packaging in accordance with (IAW) Section D requirements. The contractor shall submit

CDRL A001 IAW Section D requirements.

C.4 COMMERCIAL PUBLICATIONS AND SAFETY ASSESSMENT REPORT (SAR): The contractor shall provide current commercial publications (in

English) for the each Wet Gap LOCB System IAW CDRL A002. The commercial publications shall include all operator procedures, maintenance instructions, and training materials necessary to construct, launch, and maintain the Wet Gap LOCB System. In addition, the commercial publications shall include a SAR to identify and mitigate critical safety issues, inherent hazards, and precautionary risks.

C.5 FIELD SERVICE REPRESENTATIVE (FSR). This section, and any Security and Antiterrorism requirements, only apply if a FSR option is exercised.

C.5.1 Period of Performance. The contractor shall provide up to 180 calendar man-days of FSR support per otion for technical assistance on the build and launching scheme for each planned installation to be received within seven days of receiving all necessary site reconnaissance data and training services for the launch and retrieval of each bridge type.

C.5.2 Place of Performance. The FSR shall provide all technical assistance and training services within the PACOM Area of

Responsibility (AOR).

C.5.3 Field Service Representative (FSR) duties. The FSR shall assist with bridge reconnaissance, site selection, site prep coordination, construction coordination, maintenance, and repairs on the LOCB. The FSR shall also provide operator and maintainer training to units responsible for constructing, emplacing, maintaining, and repairing. The FSR shall resolve technical issues that arise during construction of the LOCB. The Contractor shall comply with 12 duty hours and six days per week for OCONUS, unless otherwise identified by the Contracting Officer or the designated representative. The Contracting Officer or designated representative may modify the work schedule to ensure the Government's ability to continue to execute its mission at no additional cost to the

Government. The contractor shall, at all times, maintain an adequate workforce for the uninterrupted performance of all tasks defined within this Performance Work Statement (PWS).

C.5.4 Contractor Travel. The Contractor will be authorized travel expenses consistent with the provisions of the Joint Travel

Regulation (JTR) and the USFK Regulation 700-19.

C.5.5 Deployment. The contractor must process entry requirements for the FSR IAW the Department of Defense (DoD) Foreign Clearance

Guide for Republic of Korea (ROK), to include passports, visas, Status of Forces Agreement (SOFA) designation, and Mandatory Pre-travel

Training and Documentation.

C.5.6 Reporting. The contractor shall provide a weekly status report of training services and technical assistance IAW CDRL A003.

C.6 SECURITY REQUIREMENTS. The contractor shall follow the guidance provided below when handling Controlled Unclassified Information.

19 72

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

C.6.1 Controlled Unclassified Information (CUI). The types of information considered CUI for the program are technical data and information marked Unclassified//For Official Use Only (U//FOUO) by the Government. Examples of technical data consist of research and engineering data, engineering drawings, and associated lists, specifications, standards, process sheets, manuals, technical reports, catalog-item identifications, and related information, and computer software documentation. The contractor shall adhere to the below guidelines for handling U//FOUO information accompanied by DoDI 5230.24, Distribution Statements on Technical Documents, DoDM 5200.01-

V4, DoD Information Security Program: Controlled Unclassified Information (CUI), Army Regulation (AR) 25-55, The Department of the Army

Freedom of Information Act Program, AR 25-2, Information Assurance and AR 25-1, Army Information Technology.

C.6.1.1 Identification and Protection of U//FOUO Information. When conducting the following activities with U//FOUO information, the contractor shall adhere to the guidance provided in DoDM 5200.01-V4 and AR 25-1:

- Marking U//FOUO Information

- Dissemination and Transmission of U//FOUO Information

- Transporting U//FOUO Information

- Phone Discussions of U//FOUO Information

- Storage of U//FOUO Information During Duty Hours and Non Duty Hours

- Termination

- Disposal

- Unauthorized Disclosure

- Electronic Transmission of U//FOUO Information

C.6.2 DISTRIBUTION STATEMENTS. When marking all technical data and information which is FOUO, the contractor shall adhere to DoDI

5230.24 governing such data. If the contents of the technical document require more than one Distribution Statement, apply the most restrictive statement. This does not preclude additional mandated markings required by the contract.

C.6.3 OPERATIONS SECURITY (OPSEC). If the contractor generates unclassified OPSEC information, this information will be protected at the same level as U//FOUO information. The contractor shall be responsible for adhering to Attachment 0001 PEO CS&CSS OPSEC Plan IAW

DoDM 5202.02-M and AR 530-1, with specific features based on command or unit approved OPSEC requirements.

C.6.3.1 Because of antiterrorism, force protection, OPSEC, and counterintelligence concerns, the contractor will not release any diagrams, maps, floor plans, schematics, or digital pictures of the installation to outside organizations or companies without the approval of the Contracting Officer Representative (COR) and G-2, TACOM. All information proposed for public release in any form

(video, pictures, article, brochure, web site, etc.) will undergo a PEO CS&CSS OPSEC Review using the most current and approved PEO

CS&CSS STA Form 7114, OPSEC Certification.

C.6.3.2 OPSEC information consists of the following: Equipment capabilities, limitations, and vulnerabilities; Detailed mission statements; Operation schedules; Readiness and vulnerability assessments; Test locations and dates; Inventory charts and reports;

Detailed budget data; Photographs of components; Detailed organizational charts (with phones and e-mail listings); Technical and scientific data; Unclassified technical data with military applications; Critical maintenance information; Information extracted from a

DoD Intranet web site; Lessons learned that could reveal sensitive military operations, exercises, or vulnerabilities; Logistics support

(munitions, weapons, movement); Specific real time support to current or on-going military operations; Delivery schedules; and

Manufacturing methods.

C.6.3.3 OPSEC review requests should be sent via encrypted e-mail to the respective PM FP Security Manager. Contact information can be requested from the COR. If emails cannot be encrypted, please send OPSEC review requests to:

PEO CS&CSS

ATTN: PM FP Security Manager

6501 E. 11 Mile Rd

AMSTA-CSS/MS 105

Warren, MI 48397-5000

C.6.4 TRAINING. All Contractor personnel performing services in the execution of this contract shall complete the following training

IAW respective security clauses as referenced in this contract: iWATCH (only applicable for FSRs on an installation), OPSEC Level I, and

Antiterrorism Level I (only applicable for FSRs on an installation). The Government reserves the right to request completion notification(s) from the Contractor.

C.7 CONTRACTOR MANPOWER REPORTING (CMR). This section only applies if a FSR option is exercised

(a) The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via secure data collection site. The contractor is required to completely fill in all required data fields in the format using the following web address: https://armycmra.dmdc.osd.mil/ . The required information includes the following:

(1) Contracting Office, Contracting Officer, Contracting Officer's Technical Representative;

20 72

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(2) Contract number, including task and delivery order number;

(3) Beginning and ending dates covered by reporting period;

(4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data;

(5) Direct labor hours (including sub-contractors);

(6) Direct labor dollars paid this reporting period (including sub-contractors);

(7) Total payments (including sub-contractors);

(8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different);

(9) Data collection cost;

(10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring

Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information);

(11) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website);

(12) Presence of deployment or contingency contract language; and

(13) Number of contractor and sub-contractor employees deployed in theater this reporting period (by country).

(b) Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September30. While inputs may be reported any time during the FY, all data shall be reported no later than

October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at:

"https://armycmra.dmdc.osd.mil/default.aspx?ReturnUrl=%2f " and clicking on the Send an Email link which is located under the Help

Resources ribbon on the right hand side of the login page.

C.8 ANTI-TERRORISM (AT) LEVEL I TRAINING REQUIREMENT. This section only applies if a FSR option is exercised.

All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete AT Level I awareness training within 60 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The contractor shall submit certificates of completion for each contractor employee and subcontractor employee requiring access to Army installations, facilities, or controlled access areas to the COR (or to the contracting officer, if a COR is not assigned) within 30 calendar days after completion of training. AT Level I awareness training is available at <"https://jkodirect.jten.mil "> Course #JS-US007-14.

C.9 ANTI-TERRORISM (AT) AWARENESS TRAINING REQUIREMENT FOR CONTRACTOR PERSONNEL TRAVELING OVERSEAS. This section only applies if a FSR option is exercised.

Contractor employees and associated subcontractor employees shall receive government-provided Anti-Terrorism (AT) awareness training specific to the AOR as directed by AR 525-13. Specific AOR training content is to be directed by the combatant commander, with the unit

Anti-Terrorism Officer (ATO) being the local point of contact.

C.10 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES

(a) The contractor and all associated subcontractors employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9 Personal Identity Verification of Contractor Personnel) as directed by

DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the

Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

(b) For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army

Directive 2014-05, The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD

21 72

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial CAC may be issued on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personal

Management.

(c) For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated subcontractors employees shall comply with adjudication standards, and procedures using the National Crime Information Center Interstate

Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures elsewhere in Section C titled as paragraph - Access to the Detroit Arsenal; Identifying Contractor Employees; Non-disclosure Statement; for OCONUS locations, refer to the Status of Forces Agreement and other theater regulations.

C.11 TRUSTED ASSOCIATE SPONSORSHIP SYSTEM (TASS) PROGRAM

(a) The contractor is responsible for processing applications for CACs for every contractor employee who deploys with the military force, OR who has need to access any government computer network in accordance with FAR 52.204-9, Personal Identity Verification of

Contractor Personnel.

(b) The contractor is responsible for managing requests for new or renewal of a CAC in sufficient time to ensure that all contractor employees have them when needed to perform work under this contract. Unless there are extenuating circumstances that have been approved by the Contracting Officer Representative(COR) or Contracting Officer, the trusted associate (TA) shall be given no less than ten calendar days advance notice of the need for CAC renewal or issue of a new CAC. *The COR will be the TA for this contract. A COR will be appointed if a FSR Option is exercised.

(c) The contractor shall obtain an Army Knowledge Online (AKO) email address for each applicant, including subcontractors, who may be deployed or require logical access to a government computer network. This can be done by going to <"http://www.us.army.mil "> and register as an Army Guest with the sponsor being the COR. Note: If a contractor employee loses the privilege to access AKO, they lose the ability to renew their CAC, therefore, it is critical that contractor employees maintain their AKO accounts.

(d) It is recommended that a Corporate Facility Security Officer (FSO) be appointed to serve as the firm's single point of contact for the Trusted Associate Sponsorship System (TASS). If a FSO is not appointed, each contractor employee requiring a CAC will be required to process their own applications.

(e) CAC applications must be processed through the DODs TASS. The contractors FSO or contractor employee shall submit requests for a

CAC via email to the TASS Trusted Agent (TA). If the FSR option is exercised, the email address for the TA will be provided by the

Government before the contractor accesses the TASS website.

(f) The government will establish a TASS application account for each CAC request and will provide each contractor employee a USER ID and Password via email to the FSO. The FSO or contractor employee shall access the TASS account and complete the CAC application

(entering/editing contractor information as applicable) at <"https://tass.dmdc.osd.mil/tass ">.

(g) The FSO or contractor employee will submit completed applications in TASS, and will follow up to ensure that the TA is processing the request.

(h) The government will inform the contractor's applicant via email of one of the following:

- Approved*. Upon approval, the information is transferred to the Defense Enrollment Eligibility Reporting System (DEERS) database and an email notification is sent to the contractor with instructions on obtaining their CAC. The contractor proceeds to a Real-Time

Automated Personnel Identification System (RAPIDS) station (<"https://www.dmdc.osd.mil/rsl/ "> provides RAPIDS locations).

- Rejected*. Government in separate correspondence will provide reason(s) for rejection.

- Returned. Additional information, or correction to the application, required by the contractor employee.

*The contractor will maintain records of all approved and rejected applications.

(i) At the RAPIDS station, the RAPIDS Verification Officer will verify the contractor by SSN, and two forms of identification, one of which must be a picture ID. The Verification Officer will capture primary and alternate fingerprints and picture, and updates to DEERS and will then issue a CAC.

(j) Issued CACs shall be for a period of performance not longer than three (3) years or the individual's contract end date (inclusive of any options) whichever is earlier.

(k) The contractor shall return issued CACs to the DEERS office upon return from deployment, departure, or dismissal of each contractor employee. A receipt for each card must be obtained and provided to the TA/COR.

22 72

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(l) A CAC cannot be issued without evidence that a National Agency Check with Written Inquires (NACI) has at least been initiated by the

FSO. TASS will be linked to the Joint Personnel Adjudication System (JPAS) in the near future. The TA will have to verify via JPAS that the NACI has been initiated by the FSO before he/she can approve a contractor request for a CAC.

(m) Details and training on TASS are available on AKO at <"https://www.us.army.mil/suite/portal/index.jsp "> or by contacting the CAC

Helpdesk at cacsupport@mail.mil or 866-738-3222.

C.12 iWATCH TRAINING. This section only applies if a FSR option is exercised.

The contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Anti-Terrorism Officer (ATO)). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR, if assigned, or the Contracting Officer. This training shall be completed within 60 calendar days of contract award and within 30 calendar days of new employees commencing performance, with the results reported to the COR, or Contracting Officer, no later than 30 calendar days after contract award.

Training may be obtained at <"http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx. ">

C.13 CONTRACTOR EMPLOYEES WHO REQUIRE ACCESS TO GOVERNMENT INFORMATION SYSTEMS

All contractor employees shall be registered in the ATCTS (Army Training Certification Tracking System) at commencement of services and must successfully complete the DoD Information Assurance Awareness training prior to access to the information system, and annually thereafter.

C.14 ARMY INFORMATION SYSTEM (IS) SECURITY REQUIREMENT CONTRACTOR INVESTIGATION/CLEARANCE

Reference AR25-2, AR 380-67, DoD 5200.2-R and Final Credentialing Standards for Issuing Personal Identity Verification Cards under HSPD-

12 (31 Jul 2008). All contractors and consultants that access government owned or operated automated information systems, networks, or databases and to safeguard controlled unclassified information shall have a favorable background investigation as required above references positions designated as IT-I, IT-II or IT-III to perform functions stipulated in contract scope of work. The minimum investigative requirements are as follows: IT-I (Privileged Access) = Single Scope Background Investigation (SSBI); IT-II (Limited

Privileged Access) = National Agency Check with Law and Credit Check (NACLC); IT-III (Non-Privileged Access) = National Agency Check with Inquiries (NACI). An investigation in-process is acceptable if the 7th Signal Command Designated Approval Authority (DAA) has granted an IT Waiver. Investigations will be coordinated with the G2, TACOM LCMC (AMSTA-CSS / 586-282-6262) and investigations will be through the Personnel Security Investigations Portal Center of Excellence (PSIP COE). Non-U.S. citizens shall be Permanent Resident

Aliens with requisite investigation. All personnel shall receive and certify to an Information Systems Security Briefing.

C.15 INFORMATION ASSURANCE (IA)/INFORMATION TECHNOLOGY (IT) TRAINING

All contractor employees and associated subcontractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in

DoD 8570.01, DoD 8570.01-M, and AR 25-2 within six months of employment. Within 10 days of completing the training, the Contractor shall provide certificates/proof of completion to the Contracting Officers Representative (COR), if assigned to the contract, or the

Procuring Contracting Officer (PCO).

C.16 OPSEC TRAINING REQUIREMENT

Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at:

https://securityawareness.usalearning.gov/opsec/index.htm .

Within 10 days of completing the training, the Contractor shall provide certificates/proof of completion to the Contracting Officers

Representative (COR), if assigned to the contract, or the Procuring Contracting Officer (PCO).

C.17 REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN

(a) The contractor is subject to provisions of the TACOM LCMC OPSEC Standing Operating Procedures (SOP/Plan), or other U.S. Government

OPSEC plan, per AR 530-1, Operations Security. This SOP/Plan specifies the Governments critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.

(b) The contractor will receive a copy of the SOP/Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by G2, TACOM LCMC or individual organizations supporting OPSEC Officers.

(c) The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is

OPSEC Level I.

C.18 Contract employees will be required to maintain U//FOUO or CUI at their contractor location (AR 380-5)

23 72

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

C.19 Contract documents are properly marked (classification markings and distribution statements) as applicable (AR 380-5).

C.20 Fielding Support in Republic of Korea

The contractor shall provide FSRs, upon Option exercise, for support in the Republic of Korea (ROK). The option effort will include travel (travel time included in the 180 calendar man-days). The Government will provide the contractor with transportation services within the Republic of Korea. Contracted employees are limited to those individuals that have received U.S.-ROK Status of Forces

Agreement (SOFA) designations implemented by United States Forces Korea (USFK) Reg 700-19. The contractor shall comply with Theater

(Combatant Command) and Country (Embassy) clearances as described in the Foreign Clearance Guide (FCG).

*** END OF NARRATIVE C0001 ***

24 72

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

PACKAGING AND MARKING

D.1 PACKAGING: The contractor shall containerize and deliver all components of the LOCB Wet Gap system in seaworthy certified ISO containers, each weighing no more than 20 metric tons. A container packing list shall be included within each container in accordance with (IAW) Exhibit A - Contract Data Requirements List (CDRL) A001.

D.2 HEAT TREATMENT AND MARKING OF WOOD PACKAGING MATERIALS

D.2.1 In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging

Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.

D.2.2 Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging

Material Policy and Wood Packaging Material Enforcement Regulations (see URL: < http://www.alsc.org >). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.