W56HZV17R0194.pdf
PDF 115 KB Posted
- Solicitation number
- W56HZV17R0194
About this file
Solicitation: Input Power Conditioner (IPC) Modification Kits-TOCNET
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W56HZV17R0194-0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W56HZV-17-R-0194
X
2017DEC04
2018JAN0403:00pm
DOA4
2017DEC04 SEE SCHEDULE
W56HZV
U.S. ARMY CONTRACTING COMMAND
WARREN, MICHIGAN 48397-5000
YULANDA BEE
(586)282-9039
CCTA-AIM-A
YULANDA.A.BEE.CIV@MAIL.MIL
X 1 25
1 48
X 1
X 5 X 9
X 13 X 15 X 16
X 18
X 20
X 30
X 31
X 38
X 47
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: YULANDA BEE
Buyer Office Symbol/Telephone Number: CCTA-AIM-A/(586)282-9039
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
A-1 52.204-4016 WARREN ELECTRONIC CONTRACTING AUG/2015
(a) All Army Contracting Command Warren (DTA) solicitations will be publicized on the Federal Business Opportunities website
(https://www.fbo.gov). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
(b) As of 10 August 2015, unless directed to do otherwise in Section L of this solicitation, vendors are required to submit a quote or proposal via the Federal Business Opportunities (FBO) system. Proposals or quotes submitted after this date using any other mechanism, including the Army Single Face to Industry Bid Response System (ASFI BRS) may be deemed non-responsive.
(c) Requirements for the online FBO bid submission:
1. Vendors must log into the FBO System to be able to submit electronic responses for opportunities.
2. Vendors must be registered in the System for Award Management (SAM) at www.sam.gov (a Federal Government owned and operated free web site) and have a CAGE Code and CCR Marketing Partner Identification Number (MPIN).
3. Once logged into the FBO System, vendors will be asked to enter basic information and directed to upload one or more files containing the proposal/quote and any additional information as outlined in the solicitation.
4. FBO will send an email to vendors registered email address confirming the electronic submission.
5. For additional information on submitting electronic bid responses via the FBO system see the FBO Vendor Guide
Section 4.3.1 Submitting an Electronic Response (https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf).
(d) Note to offerors:
Please pay close attention to the solicitation closing date and time as stated on the cover page of this solicitation, local time for the Army contracting Command - Warren, (DTA), Michigan. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the
Government infrastructure (in this case, received through FBO) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
Solicitations may remain posted on the FBO after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.
(e) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of our intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or
2 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Pricing data/information. If you object to such release in the base contract or contract modifications, and you intend to submit an offer, notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for your objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(f) Questions pertaining to this solicitation should be directed to the Contract Specialist identified in Block 10 on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
[End of Notice]
A-2 52.201-4000 ARMY CONTRACTING COMMAND-WARREN (DTA) OMBUDSPERSON APR/2011
Information regarding the Ombudsperson for this contract is located at the following website:
http://acc.army.mil/contractingcenters/acc-wrn/CompMgmtOffice.html
[End of Provision]
A-3 52.204-4023 NOTICE OF ELEVATED THREAT LEVEL FORCE PROTECTION CONDITION (FPCON) JUN/2014
Contractors are hereby notified that there is a potential impact on contractor performance during increased FPCON during periods of increased threat. During FPCONs Charlie and Delta, services may be discontinued / postponed due to higher threat. Services will resume when FPCON level is reduced to level Bravo or lower.
(End of Notice)
A-4 52.214-4000 ACKNOWLEDGMENT OF AMENDMENTS OCT/1993
Acknowledge all the amendments you've received from us by identifying the amendment number and its issue date in the box below:
: Amendment Number : Date : ________________________________________________
[End of Provision]
A-5 52.214-4003 ALL OR NONE MAR/1998
(TACOM)
Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION ARE INELIGIBLE FOR AWARD.
[End of Provision]
1. This Request for Proposal (RFP) is issued sole source to SCI Technology Inc.CAGE 2J622.
3 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
2. This solicitation is to procure the design, validation and delivery of 675 each Input Power Conditioner (IPC) Modification Kits to support United States Marine Corps (USMC) Program Manager Light Armored Vehicle (PM LAV) Tactical Operations Center Intercommunications
(TOCNET).
3. Contract Type: Firm Fixed Price (FFP).
4. The contractor shall provide a breakdown of all costs associated with each Input Power Conditioner (IPC) Modification Kit to include packaging and transportation costs.
*** END OF NARRATIVE A0001 ***
4 48
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 TOCNET IPC MODIFICATION KIT
0001AA PROTOTYPE TOCNET IPC MODIFICATION KIT 5 EA $ $ _____________________________________ ______________ __________________
COMMODITY NAME: TOCNET IPC MODIFICATION KIT
CLIN CONTRACT TYPE:
Firm Fixed Price
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 5 0090
FOB POINT: Destination
SHIP TO:
(N65236) SPAWAR SYSTEMS CENTER ATLANTIC
CHARLESTON PO BOX 190022
NORTH CHARLESTON SC 29419-9022
NORTH CHARLESTON,SC,29419-9022
0002 TOCNET IPC MODIFICATION KIT
0002AA PRODUCTION TOCNET IPC MODIFICATION KIT 670 EA $ $ ______________________________________ ______________ __________________
COMMODITY NAME: TOCNET IPC MODIFICATION KIT
The 670 each shall be delivered in the following manner
Quantity Days After FAT approval__________________________________
150 120 after FAT approval
150 150 after FAT approval
150 180 after FAT approval
150 210 after FAT approval
70 240 after FAT approval
5 48
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 150 0120
002 150 0150
003 150 0180
004 150 0210
005 70 0240
FOB POINT: Destination
SHIP TO:
(N65236) SPAWAR SYSTEMS CENTER ATLANTIC
CHARLESTON PO BOX 190022
NORTH CHARLESTON SC 29419-9022
NORTH CHARLESTON,SC,29419-9022
0003 CONTRACT DATA REQUIREMENTS LIST (CDRL) ______________________________________
A001 PROGRAM PLAN 1 EA $ ** NSP ** $ ** NSP ** ____________ ______________ __________________
COMMODITY NAME: PROGRAM PLAN
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
6 48
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 1 SEE DD FORM 1423
FOB POINT: Destination
SHIP TO:
A002 START OF WORK MEETING AGENDA & MINUTES 1 EA $ ** NSP ** $ ** NSP ** ______________________________________ ______________ __________________
COMMODITY NAME: SOW MEETING AGENDA & MINUTES
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 1 SEE DD FORM 1423
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
A003 PROVISIONING PARTS LIST (PPL) 1 EA $ ** NSP ** $ ** NSP ** _____________________________ ______________ __________________
COMMODITY NAME: PPL
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
7 48
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
001 1 SEE DD FORM 1423
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
A004 TECHNICAL MANUALS 1 EA $ ** NSP ** $ ** NSP ** _________________ ______________ __________________
COMMODITY NAME: TM
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 1 SEE DD FORM 1423
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
8 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
C-1 52.211-4072 TECHNICAL DATA PACKAGE INFORMATION MAY/2014
The following Xd item applies to this solicitation:
[ X ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[ ] 2. The TDP for this solicitation resides within FedBizOpps (https://www.fbo.gov), associated with this solicitation number, and can be accessed via this URL:
n/a
To access the data through FBO:
a. Log on to the FBO web site.
b. Enter your Marketing Partner Identification Number (MPIN).
c. Search for the solicitation number.
d. If solicitation is Export Controlled, select Verify MPIN.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec
2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, vendors and contractors must have a current DD 2345, Militarily Critical Technical Data
Agreement on file with Defense Logistics Information Service (DLIS).\~ If you are currently certified, your MPIN will be verified and you may proceed to the next step.\~ To obtain certification, go to https://public.logisticsinformationservice.dla.mil/PublicHome/jcp/default.aspx
Click on documents and follow instructions provided. Processing time is estimated at six (6) to ten (10) weeks after receipt. FBO will allow you to access export controlled TDPs once certification is confirmed.
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the FBO system administrator at Army Contract Command - Warren (DTA) with all the information needed for them to grant you access. FBO will subsequently automatically generate an email stating when you have permission to view or download TDP items. Allow 2 3 working days to complete this FBO-TDP access/approval process through the FBO system.
f. If multiple individuals in your company need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the
TDP. Those same individuals MUST be registered in Federal Business Opportunities (FBO). Any individuals no longer with the company should be deleted. Questions related to registration in FBO should be directed to https://www.fbo.gov/index The FBO helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in FBO.
g. It is strongly suggested that you submit the explicit access request and provide the buyer with the completed Use and Non-
Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.
h. A user guide for FBO can be found at https://HYPERLINK - on the right is User Guides - click on Vendor.
[End of clause]
9 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
C-2 52.223-4002 USE OF CLASS I OZONE-DEPLETING SUBSTANCES OCT/2008
(TACOM)
(a) Definitions.
(1) Class I and Class II Ozone-Depleting Substances (ODS) refers to the class of substances identified in Section 602(a) of the Clean Air Act, (42 U.S.C. 7671a(a)), complete list provided at: http://www.epa.gov/ozone/science/ods/index.html.
(2) Directly requires the use of Class I and Class II ODS means that the Government's specification or technical data package, at any tier, explicitly requires the use of any Class I ODS in performance of the contract.
(3) Indirectly requires the use of Class I or Class II ODS means that the Government's specification or technical data package, while not explicitly requiring the use of any Class I or Class II ODS, does require a feature that you can meet or produce only by the use of Class I or Class II ODS.
(b) Per Section 326 of Public Law 102-484, the Army cannot award any contract that directly or indirectly requires the use of Class I
ODS without the approval of the Senior Acquisition Official, per current Army Policy the approval authority is the Army Acquisition
Executive. Thus, no Class I ODS shall be used in meeting the requirements of this contract. If the use of Class I ODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.
(c) No Class II ODS shall be required in the performance of this contract without government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.
[End of Provision]
Section C. Scope of Work
C.1 Requirements
C.1.1 The contractor shall deliver an Input Power Conditioner (IPC) modification kit for use in the USMC Light Armored Vehicles, (LAV)
Tactical Operations Center Intercommunications System (TOCNET). The design of the modification kit shall enhance the functionality of the IPC unit so that it provides power conditioning as well as a visual indicator of the health and status of the batteries used within the IPC unit.
C.1.2 The contractor shall design, build, validate and deliver five First Article Test (FAT) IPC modification kits that meet all the technical requirements of the Performance Specification (Attachment 001).
C.1.3 Upon verification and acceptance by the Government, the contractor shall deliver the remaining 670 IPC production modification kits that meet the technical requirements in the Performance Specification (Attachment 001).
C.2 Program Plan. The contractor shall generate and provide a Program Plan in accordance with CDRL A001-Program Plan.
C.3 Meetings and Reviews
C.3.1 Start of Working Meeting. The contractor shall host a Start of Work (SOW) meeting via teleconference within 30 days after contract award. The contractor shall present its program plan to manage the contract including contract requirements, program risk assessment, Performance Specification and all other project requirements necessary to ensure contract compliance during the SOW meeting.
The contractor shall develop an agenda and deliver it to the Government in accordance with (IAW) CDRL A002 - Start of Work Meeting
Agenda and Minutes. The contractor shall take minutes and deliver them to the Government IAW CDRL A002-Start of Work Meeting Agenda and
Minutes.
C.3.2 System Engineering Technical Review (SETR) Events.
C.3.2.1 The contractor shall include dates to conduct the SETR events in the Program Plan.
C.3.2.2 Preliminary Design Review (PDR). The contractor shall conduct a PDR at its facility. with duration of not to exceed two eight hours work days.
C.3.2.2.1 PDR Entrance Criteria:
The contractor shall ensure that the following entrance criteria are addressed prior to conducting the PDR:
a. PDR technical products have been made available to the PDR participants prior to the review.
b. PDR programmatic products have been updated and have been made available prior to the review or will be reviewed at the PDR, including:
Program risk assessment
Updated logistics documentation
All submittals to applicable CDRLs are accepted.
10 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
C.3.2.2.2 PDR Review Elements
a. The preliminary design meets all the requirements of the Performance Specification, Attachment 001.
b. Producibility and Manufacturing Considerations
C.3.2.2.3 PDR Exit Criteria:
The PDR is considered closed when the event has been completed, and the Government has validated the design, cost, and schedule.
C.3.2.3 Critical Design Review (CDR). The contractor shall conduct a CDR at its facility with duration of not to exceed two eight hours work days.
C.3.2.3.1 CDR Entrance Criteria:
The contractor shall ensure that the following entrance criteria are addressed prior to conducting the CDR:
a. The following CDR programmatic products have been updated and will be reviewed at the CDR.
Program Risk Assessment and Final Drawings
b. Updated logistics documentation
c. Updated Program Plan
d. All submittals to applicable CDRLs are accepted.
C.3.2.3.2 CDR Review Elements
The following elements shall be included in the CDR:
a. Detailed engineering drawings for the hardware
c. Installation Drawings
f. Initial Manufacturing Readiness
C.3.2.3.3 CDR Exit Criteria:
The CDR is considered closed when the event has been completed, and the following exit criteria have been met:
a. Does the detailed design satisfy the requirements of the Performance Specification?
b. Has the initial product baseline been established and documented to enable hardware fabrication?
c. Are the known risks manageable?
d. Is the program executable with the existing budget and the approved initial product baseline?
e. Is the detailed design producible?
C.3.2.4 Production Readiness Review (PRR). The PRR shall be performed to formally evaluate the Contractor's production readiness. The
PRR shall include the following:
a. The Contractor shall show that the system design has included those key production factors (e.g., least cost, minimum time, manufacturing simplicity, flexibility, resource availability) necessary to assure the IPC can be acquired on schedule at minimum cost.
b. A status review of all production efforts for cost and schedule considerations.
c. A status review of manufacturing technology and other previously recommended actions to reduce cost, manufacturing risk,
d. The status of long lead items for production, if any.
C.4.3 Provisioning Meeting. The contractor shall host a Provisioning Meeting in accordance with CDRL A003-Provisioning Meeting. The contractor shall perform the following provisioning tasks.
Review provisioning drawings
Screen the system for comparable National Stock Numbers (NSNs)
The contractor shall provide the government with the drawings for the following new items as part of the provisioning process.
IPC Face plate
IPC switch
IPC LED light
IPC Circuit Card
PMO LAV and contractor shall jointly conduct a provisioning screening to preclude the duplication of NSNs. The contractor shall identify NSNs for all provisioned items by screening the Defense Logistics Service Center database.
C.5 Technical manuals. The contractor shall develop and deliver technical publication change pages in accordance with CDRL A004-
Technical Manuals. The contractor shall develop and deliver Modification Instructions (MI) in accordance with CDRL A004-Technical
Manuals.
C.6 Security
C.6.1. Protection of (U//FOUO): PMO LAV anticipates that the work to be performed under this effort will primarily involve access to
Controlled Unclassified Information (CUI) and/or Unclassified//For Official Use Only (U//FOUO) data. (U//FOUO) is a designation that is applied to unclassified information that may be exempt from mandatory release to the public under the Freedom of Information Act (FOIA).
Materials may include, but is not limited to, drawings, information or other data that may be restricted under ITAR. The contractor
11 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
shall not release to anyone outside their organization any classified or (U//FOUO) program related information, regardless of medium, pertaining to any part of this effort without permission from PMO LAV. Both parties of this agreement shall mark, store and transmit all documents and correspondence written under this effort IAW with DoD Instruction 5320.24 and DoD Manual 5200.1 Volumes 1-4.
C.6.2 Security Classification Guides: Various Security Classification Guides (SCGs) may be used in the execution of this effort, however, the primary security classification guide applicable to this contract: Family of Light Armored Vehicles (FOLAV SCG), dated 19
June 2012; Additional Security Classification Guides will be made available as needed.
C.6.3 Encryption: The contractor shall NOT receive or transmit any PMO LAV (U//FOUO) information electronically over the Internet unless it is encrypted by Federal Information Processing Standard (FIPS) 140-2 standard. (U//FOUO) information may be disseminated within the vendors internal computer network if it is protected with a firewall and individual access is controlled by using IDs and passwords.
C.6.4 OPSEC: All information pertaining to this contract which is being considered for public release will undergo an OPSEC review using the OPSEC review process (STA Form 7114, copy contained in PMO LAV OPSEC Plan) prior to release. The contractor is NOT required to produce their own OPSEC Plan, as a copy of the PM LAVs OPSEC Plan will be provided as Government Furnished Information upon contract award.
C.6.5 INFOSEC/MARKING OF DOCUMENTS: All technical documents containing critical technology generated in connection with this contract will be marked IAW Department of Defense Instruction 5230.24 Distribution Statements on Technical Documents, dated August 23, 2012 (DoDI
5230.24), Enclosure 4, Paragraph 2d, on page 18.
C.6.6 Threat Awareness Reporting Program (TARP): All contractor employees with security clearances working on any Army contract must receive annual TARP training by a Counterintelligence (CI) agent, or other authorized designated training method, per Army Regulation
381-12, para. 2-4b. Once training is complete Contractor shall provide certificates/proof of completion of training to the Contracting
Officer's Representative (COR), if assigned to the contract, or to the Procurement Contracting Officer (PCO) within (10) days of completion.
*** END OF NARRATIVE C0001 ***
12 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
D-1 52.211-4514 PACKAGING REQUIREMENTS (SPECIFICATIONS/STANDARDS) DEC/2014
(TACOM)
(a) The preservation, packing, and marking requirements for this contract/order shall be accomplished in accordance with the requirements in the specification/standard defined below.
(b) The following requirements shall apply:
(1) LEVEL OF PRESERVATION: Best Commmercial
(2) LEVEL OF PACKING: Best Commercial
(3) QUANTITY PER UNIT PACKAGE: 9 each
(4) SPECIFICATION/STANDARD: n/a
(c) The specification/standard cited is intended to give a clear and accurate description of the technical packaging requirements for the item being procured, including the procedure by which it can be determined that the requirements have been met. Specific instructions and/or tailoring of the specification/standard is detailed in the supplemental instructions below. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing and without affecting the serviceability of the item will be considered and responded to within 10 days of submission to PCO with copies to the ACO.
The government reserves the right to require testing to validate alternate industrial preservation methods, materials, blocking, bracing, cushioning, and packing.
(d) Marking:
(1) In addition to any special markings called out by the specification/standard above, all unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive material will not identify the nature of the material. NOTE: Passive
RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html (best viewed with Internet Explorer 11 or higher) for the current DoD Suppliers Passive RFID
Information Guide and Supplier Implementation Plan. When an item has Unique Item Identifier (UII) markings as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at http://dodprocurementtoolbox.com/page/unique-id/tools) for development of the UII and MIL-STD-129 for UII package marking requirements.
Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.
(e) Heat Treatment and Marking of Wood Packaging Materials (WPM):
(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15
(ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood
Packaging Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.
(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging
Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:
http://www.alsc.org). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.
(3) Marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention
Standard. The ALSC approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens.
Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be
13 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
marked with an ALSC approved DUNNAGE stamp.
(f) Hazardous Materials (As applicable):
(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.
(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
(2) When applicable, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).
(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
(g) SUPPLEMENTAL INSTRUCTIONS: n/a
[End of Clause]
14 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/ or https://www.acquisition.gov/
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-3 52.209-4012 NOTICE REGARDING FIRST ARTICLE APR/2000
(TACOM)
(a) Notwithstanding the provisions for waiver of first article, an additional first article sample (or portion thereof) may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of one year, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply.
(b) When any of the conditions above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample (or portion thereof), and instructions can be provided concerning the submission, inspection, and notification of results.
(c) Costs of any additional testing and inspection resulting from conditions specified above shall be borne by the Contractor, unless the change was directed by the Government. Further, any production delays caused by additional testing and inspection will not be the basis for an excusable delay as defined in the default clause of this contract. Such delays shall not form the basis for adjustment in contract price or delivery schedule.
[End of Clause]
15 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
F-1 52.211-17 DELIVERY OF EXCESS QUANTITIES SEP/1989
F-2 52.242-17 GOVERNMENT DELAY OF WORK APR/1984
F-3 52.247-34 F.O.B. DESTINATION NOV/1991
F-4 52.211-8 TIME OF DELIVERY JUN/1997
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS
AFTER DATE OF
CONTRACT
0001AA 05 90
0002AA 150 120 days after FAT approval
150 150 days after FAT approval
150 180 days after FAT approval
150 210 days after FAT approval
70 240 days after FAT approval
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFERORS PROPOSED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS
AFTER DATE OF
CONTRACT
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the
Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the
Contractors date of receipt of the contract or notice of award by adding
(1) five calendar days for delivery of the award through the ordinary mails, or
(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term working day excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
(End of Clause)
F-5 52.247-4017 DEPOT ADDRESS FOR THE APPLICABLE MODE OF SHIPMENTS: IN-THE-CLEAR OCT/2015
(TACOM) ADDRESSES
Rail/ MILSTRIP
16 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Motor Address Rail Motor Parcel Post
SPLC* Code Ship To: Ship To: Mail To:______ ________ ________ ________ ___________
206721/ W25G1U Transportation Officer Transportation Officer Transportation Officer
209405 Defense Dist Depot Defense Dist Depot Defense Dist Depot
Susquehanna Susquehanna Susquehanna
New Cumberland, PA New Cumberland, PA New Cumberland, PA
17070-5001
NOTE: All deliveries to New Cumberland MUST be scheduled at least 10 days prior to the delivery date. The carrier or contractor must call the New Cumberland DDSP customer service number, 800-307-8496 and provide the following information: contract number, item name, National Stock Number, total weight and cube, and vendor. All shipments to this MILSTRIP address code (W25G1U) are for mission stock and they will need to know that as well, but if you have instructions from the Contracting Officer to use MILSTRIP address code W25N14 instead, you must inform the appointment-taker that the delivery is for Consolidation and Containerization Point (CCP) stock.
Appointments for FOB Origin shipments should be coordinated with DCMA Transportation.
875670/ W62G2T Transportation Officer Transportation Officer Transportation Officer
875675 XU Def Dist Depot XU Def Dist Depot Dist Depot San Joaquin
San Joaquin San Joaquin P O Box 96001
25600 S Chrisman Rd 25600 S Chrisman Rd Stockton, CA 95296-0130
Rec Whse 10 Rec Whse 10
Tracy, Ca 95376-5000 Tracy, Ca 95376-5000
471995/ W31G1Z Transportation Officer Transportation Officer Transportation Officer
471996 Anniston Army Depot, Anniston Army Depot, Anniston Army Depot, Bynum, AL Bynum, AL Anniston, AL 36201-5021
209741/ W25G1R Transportation Officer Transportation Officer Transportation Officer
209770 Letterkenny Army Depot, Letterkenny Army Depot, Letterkenny Army Depot, Culbertson, PA Chambersburg, PA Chambersburg, PA 17201-4150
661136/ W45G19 Transportation Officer Transportation Officer Transportation Officer
661157 W56R2M Red River Army Depot, Red River Army Depot, Red River Army Depot, Defense, TX Texarkana, TX Texarkana, TX 75507-5000
764538/ W67G23 Transportation Officer Transportation Officer Transportation Officer
764535 Tooele Army Depot, Tooele Army Depot, Tooele Army Depot, Warner, UT Tooele, UT Tooele, UT 84074-5003
***SPLC indicates Standard Point Locator Code. _ _ _ _
NOTE: The following is applicable only when so specified in an individual order or delivery increment:_____ ____
This requirement is a depot replenishment buy, a portion of which is or may be required to fill Direct Support System (DSS) requisitions. Shipment shall be made, as specified, to one or more of:
New Cumberland Army Depot
Red River Army Depot
Sharpe Army Depot prior to shipments to any other depots as may be designated. When more than one depot is designated for DSS shipments, priority shipments will be made equally to each of the designated destinations.
[End of Clause]
17 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION G - CONTRACT ADMINISTRATION DATA
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
G-1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS MAY/2013
(a) Definitions. As used in this clause--
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this
Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the
WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer
Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
-1-
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
-2-
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in
WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC -3-
Issue By DoDAAC -4-
Admin DoDAAC -5-
Inspect By DoDAAC -6-
Ship To Code -7-
Ship From Code -8-
Mark For Code -9-
Service Approver (DoDAAC) -10-
Service Acceptor (DoDAAC) -11-
Accept at Other DoDAAC -12-
LPO DoDAAC -13-
DCAA Auditor DoDAAC -14-
Other DoDAAC(s) -15-
18 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the "Send Additional Email
Notifications" field of WAWF once a document is submitted in the system.
-16-
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
-17-
(2) For technical WAWF help, contact the WAWF helpdesk at 866-
618-5988.
(End of clause)
19 48
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION I - CONTRACT CLAUSES
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/ or https://www.acquisition.gov/
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
I-1 52.202-1 DEFINITIONS NOV/2013
I-2 52.203-3 GRATUITIES APR/1984
I-3 52.203-5 COVENANT AGAINST CONTINGENT FEES MAY/2014
I-4 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT SEP/2006
I-5 52.203-7…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.