W56HZV17R0103-0001.pdf
PDF 15 KB Posted
- Attached to
- Strip Stok Rubber Material
- Solicitation number
- W56HZV-17-R-0103
About this file
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W56HZV17R0103-0007.pdf | ||
| W56HZV17R0103-0006.pdf | ||
| W56HZV17R0103-0005.pdf | ||
| W56HZV17R0103-0004.pdf | ||
| W56HZV17R0103-0003.pdf | ||
| W56HZV17R0103-0002.pdf | ||
| W56HZV17R0103.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0001 2017MAR02
W56HZV
U.S. ARMY CONTRACTING COMMAND
WARREN, MICHIGAN 48397-5000
JEFFREY WEISS
EMAIL: JEFFREY.L.WEISS10.CIV@MAIL.MIL
W56HZV-17-R-0103
2017FEB24
X
X
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 4
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: JEFFREY WEISS
Buyer Office Symbol/Telephone Number: CCTA-HDT-B/(586)282-3546
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
Solicitation: W56HZV-17-R-0103
Amendment: 0001
The purpose of Amendment 0001 to Solicitation W56HZV-17-R-0103 is to make the following change:
Added the Cure Time and Temperature to the testing parameters for Material 0158 in Narrative M0001 to: 340 F / 8 minutes
All other terms and conditions of the solicitation except those addressed by this amendment remain in full force and effect.
*** END OF NARRATIVE A0002 ***
2 4
W56HZV-17-R-0103 0001
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION M - EVALUATION FACTORS FOR AWARD
TEST SAMPLES____________
1. Red River Army Depot (RRAD) owns the formulas and desires to control access to the greatest extent possible. The formulations shall be released to prospective vendors only upon receipt of the signed RRAD Standard Nondisclosure Agreement.
2. Interested Firms shall submit bid samples as listed below. Samples shall be received at or prior to the date and time set for receipt of proposals. Sample testing shall conform to the test protocol listed below and the requirements of the MIL-DTL-11891G specification.
Internal Production Number: 10L/0158
National Stock Number Classification (NSN): 264000x088450
Quantity Required - 150 pounds
Internal Production Number: RR-11
National Stock Number Classification (NSN): tprpdss:67101
Quantity Required - 150 pounds
3. Strip Stock Size:
10L/0158: 2 1/2" +/- 4/32" X 3/8" +/- 2/32" thick
RR-11: 2 1/2" +/- 4/32" X 3/8" +/- 2/32" thick
4. Firms submitting samples for testing shall include their internal laboratory analytical testing results. This data will be compared with RRAD test results to insure accuracy. Cure time and temperature used by RRAD is 8 minutes at 340 degrees F.
5. Samples shall be sent to Building 493 ATTN: Ronny Williams, Red River Army Depot and clearly marked as FAT Samples with the
Solicitation number. Prior to shipment of the sample rubber the vender shall contact the Contracting Office Director, Don Kennedy (903)
334-2656 and provide a shipment date to insure proper receipt.
6. Standard commercial shipping is desired. Containers used shall be suitable for handling by forklift and be constructed to protect the contents against damage during shipment. The strips shall be coated with zinc stearate or equivalent to prevent adhesion between layers. Upon award of a contract, all shipments shall be delivered using a refrigerated truck.
7. Test Protocol
T-158 Track Shoe Rubber Compound Acceptance Parameters______________________________________________________
Cure Time and Temperature --- 340 F / 8 minutes_______________________________________________
TEST: ASTM:____ ACCEPTANCE:__________
Hardness, (Shore A) D2240 69-79
Tensile Strength, (PSI) D412 (Die C) 2500 minimum
Ultimate Elongation, (%) D412 (Die C) 200 minimum
Modulus, 200% D412 (Die C) 1500 minimum
Specific Gravity (SpG) D297 1.19 maximum
Ozone Resistance D518 no breaks (168 hrs)
Low Temperature Resistance D2137 no breaks (-40F)
Tear Resistance, lbs D624 (Die C) 280 minimum
After Aging: 70 hrs/212 F_________________________
Tensile Strength, (PSI) D412 (Die C) 2000 minimum
Ultimate Elongation, (%) D412 (Die C) 160 minimum
Adhesion_________
Rubber to Metal Bonding Minimum 60 lbs/inch of width pass/fail
RR-11 Rubber Compound Acceptance Parameters___________________________________________
Cure Time and Temperature --- 340 F / 8 minutes_______________________________________________
TEST: ASTM:____ ACCEPTANCE:__________
Hardness, (Shore A) D2240 69-74
Tensile Strength, (PSI) D412 (Die C) 3400 minimum
Ultimate Elongation, (%) D412 (Die C) 350 minimum
3 4
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Modulus, 300% D412 (Die C) 2000 minimum
Specific Gravity (SpG) D297 1.19 maximum
Ozone Resistance D518 no breaks (168 hrs)
Low Temperature Resistance D2137 no breaks (-40F)
Tear Resistance, lbs D624 (Die C) 370 minimum
After Aging: 70 hrs/212 F_________________________
Tensile Strength, (PSI) D412 (Die C) 2800 minimum
Ultimate Elongation, (%) D412 (Die C) 300 minimum
Adhesion_________
Rubber to Metal Bonding Minimum 60 lbs/inch of width pass/fail
*** END OF NARRATIVE M0001 ***
4 4
| SECTION A |
| SECTION M |
File details come from the government source that posted it. Updated .