Attachment 0001 Pratt PWS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FBOQA08302016.pdf | ||
| X-13.pdf | ||
| Acrylite_Satinice.pdf | ||
| FBOQA08182016.pdf | ||
| Q A_08032016.docx | DOCX document | |
| Combined_Synopsis-Solicitation_for_Fabrication _Install-Ft.Campbell_Amend_01.docx | DOCX document | |
| Pratt_Museum_Worksheet.xlsx | XLSX spreadsheet | |
| Combined_Synopsis-Solicitation_for_Fabrication _Install-Ft.Campbell_Final.docx | DOCX document | |
| WD_Fort_Campbell.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS) For Exhibit Fabrication and Installation
PART 1
GENERAL INFORMATION
1.1 Description of Services/Introduction:
The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and non-personal services necessary to perform Fabrication and Installation as defined in this Performance Work Statement except as Specified in section C-3 as government furnished property and services at Fort Campbell, Kentucky. The contractor shall perform to the standards in this contract.
1.2 Background:
The effort is in support of the US Army Center of Military History (CMH) mission to collect, preserve, interpret, and display historical military material, culture, or artifacts.
1.3 Objectives:
1.3.1 Fabricate – The contractor shall fabricate the exhibit components to the standards set forth in the design packaged provided by CMH.
1.3.2 Transport – The contractor shall transport all exhibit components to the exhibit space.
1.3.3 Fixture Install – The contractor shall install the exhibit components into the exhibit space prepared by the US Army to house the exhibit.
1.3.4 Object Install – The contractor shall install historic objects into the exhibition fixtures fabricated by the contractor.
1.3.5 Lighting – The contractor shall conduct a final focusing of exhibit lighting.
1.4 Scope:
CMH requires services necessary for the fabrication and installation of a new exhibit space at Fort Campbell, Kentucky. Work shall include creation of shop drawings and fabrication of all exhibit components. The contractor shall pack, ship and install exhibit fixtures, in the exhibit area and the installation of historic objects into those fixtures. Final focusing of lighting.
1.5 Period of Performance: Work shall be completed no later than 12 months from the start of the contract.
1.6 General Information
1.6.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. As a minimum, the contractor shall develop quality control procedures that address the areas identified in Technical Exhibit 1, “Performance Requirements Summary”. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.
1.6.2 Recognized Holidays
| New Year’s Day | Labor Day | ||
| Martin Luther King Jr.’s Birthday | Columbus Day | ||
| President’s Day | Veteran’s Day | ||
| Memorial Day | Thanksgiving Day | ||
| Independence Day | Christmas Day |
1.6.3 Hours of Operation: The contractor is responsible for conducting delivery between the hours of 8am to 5pm, Monday-Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. An onsite storage space will be provided for the exhibit fixtures and tools.
1.6.4 Place of performance is the Don F. Pratt Museum, Fort Campbell, Kentucky
1.6.5 Security Requirements: iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 14 calendar days of contract award and within 14 calendar days of new employees commencing performance with the results reported to the COR NLT 21 calendar days after contract award.
1.6.5.1 Access and General Protection/Security Policy and Procedures. This standard language text is for contractor employees with an area of performance within an Army controlled installation, facility or area.
Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by COR). The contractor shall also provide the full name, birth date, place of birth and social security number necessary to meet installation access requirements enforced by the Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.6.5.2 PHYSICAL Security. The contractor shall be responsible for safeguarding all government property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.6.5.3 Conservation of Utilities. The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.
1.6.6 Special Qualifications: Each of the contractor personnel performing the delivery and installation of the exhibit components are required to possess a valid government issued photo Identification for entry onto Ft Campbell, Kentucky. The contractor shall be prepared to provide information on personnel making the delivery to the Don F. Pratt Museum, Fort Campbell, Kentucky
1.6.7 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.6.8 Contract Manager: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
1.6.9 Identification of Contractor Employees: All contract personnel attending meetings, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contractor personnel will be required to obtain documentation authorizing entry to the base work site throughout the period of performance.
PART 2
DEFINITIONS & ACRONYMS
PWS – Performance Work Statement
Contracting Officer’s Representative (COR): A representative from the requiring activity assigned by the Contracting Officer to perform surveillance and to act as liaison to the contractor
Defective Service. A service output that does not meet the standard of performance associated with it in the Performance Work Statement.
Quality Assurance Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
Quality Control. Those actions taken by a contractor to control the performance of services so that they meet the requirements of the PWS.
Quality Assurance. Those actions taken by the government to assure services meet the requirements of the Performance Work Statement.
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3.1 The government shall provide exhibit design and production ready graphic files at the contract kick off meeting.
3.2 The Contractor shall provide all equipment needed for the completion of this contract.
3.3 Services:
3.3.1 Utilities. All utilities in the facility will be available for the contractor’s use in performance of duties outlined in this PWS. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities.
3.4 The Government will furnish the necessary workspace for the contractor staff to provide the support outlined in this PWS.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4.1 General: Except for those items specifically stated to be government furnished in Part 3, the contractor shall furnish everything required to perform this PWS.
PART 5
SPECIFIC TASKS
5.1 BASIC SERVICES. The contractor shall provide services for:
5.1.1 Project Schedule. Contractor shall prepare and present to COR a proposed project schedule complete with meeting and milestone dates for COR approval (IAW CDRL A001). Contractor shall, during the course of the project, track the project to see that the project remains on schedule.
5.1.2. The contractor shall provide shop drawings (IAW CDRL A002), necessary for the fabrication of the exhibit.
5.1.3 Status Report: contractor shall submit to the COR for review and approval information relevant to the current level of project progress (IAW CDRL A003). Information is defined as drawings, files, and any other material relevant to the project at that given moment.
5.1.4 Provide samples of all materials, colors and finishes to be used in the project prior to the start of fabrication. Acceptance or rejection of the samples shall be submitted to the contractor by the COR. (IAW CDRL A004). If needed, contractor shall fabricate prototypes and mockups prior to the start of fabrication. Acceptance or rejection shall be submitted to the contractor by the COR.
5.1.5 Provide PDF copies of the final graphic production files (IAW CDRL A005) for final review and approval by CMH prior to the fabrication of graphics.
5.1.6 Fabricate all components of the exhibit as specified in the CMH design package.
5.1.7 The contractor shall provide the opportunity for two field visits of Army personnel to the fabricator’s shop by (costs to be incurred by the CMH).
5.1.8 Fabricator shall be responsible for packing, transporting, unloading and unpacking all of the fixtures either produced by the fabricator or purchased by the contractor. The contractor is responsible for all items during transportation. Coordinate delivery of fixtures, unloading, unpacking of fixtures
5.1.9 Contractor shall be responsible for installation of all exhibit components into the exhibit space.
5.1.10 Contractor shall be responsible for maintaining the exhibit space for cleanliness for the duration of the installation.
5.1.11 Contractor shall install all objects contained within the exhibit space under the supervision of Army personnel.
5.1.12 Contractor shall be responsible for final focusing of lighting.
PART 6
APPLICABLE PUBLICATIONS
6.1 None
TECHNICAL EXHIBIT 1
Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective
| Standard |
| Performance Threshold |
| Method of Surveillance |
PRS # 1. Contractor shall track the project progress.
IAW paragraph 5.1.1, 5.1.3 of the PWS.
| Contractor shall track project status using agreed upon schedule. |
| Zero deviation from standard |
| 100% inspection |
PRS #2. Contractor personnel shall produce shop drawings
IAW paragraph 5.1.2 of the PWS.
| Contractor shall produce detail drawing for the fabrication of the exhibit. |
| Zero deviation from standard |
| 100% |
inspection
PRS# 3 Contractor shall provide satisfactory exhibit component for the project.
IAW paragraph 5.1.4, 5.1.5, 5.1.6, 5.1.7 of the PWS
| Contractor shall fabricate exhibits based on design plans. |
| Zero deviation from standard |
| 100% |
inspection
PRS #4. Contractor personnel shall provide satisfactory exhibit installation for the project.
IAW paragraph 5.1.9, 5.1.10, 5.1.12 of the PWS
| Contractor shall meet all installation. All exhibits shall match designs. Contractor shall leave building in a clean condition. |
| No more than 5 % deviation from standard. Deviations shall be reported to and approved by the COR. |
| 100% |
inspection
PRS #5 Contractor personnel shall provide satisfactory object installation for the project.
IAW paragraph 5.1.11 of the PWS
| Contractor shall meet all installation deadlines. All installations shall match designs as shown in the CMH design package. |
| Zero deviation from standard |
| 100% |
inspection
PRS #6 Packing and transporting of fabricated exhibit.
IAW paragraph 5.1.8 of the PWS
| Contractor shall meets all delivery deadlines |
| Contractor shall meet 95% of the delivery deadlines, any deviation from this must be reported to the COR. |
| 100% inspection |
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE
| Deliverable |
| Frequency |
| # of Copies |
| Medium/Format |
| Submit To |
Contractor shall provide document-showing the proposed schedule for the project.
IAW paragraph of 5.1.1 of the PWS and CDRL A001
| 1 |
| 1 |
| Word document supplied as electronic file. |
| COR |
Contractor shall provide shop drawings for the fabrication of the project.
IAW paragraph of 5.1.2 of the PWS and CDRL A002.
| 1 |
| 1 |
| PDF document. |
| COR |
Contractor shall provide document showing project progress for the project.
IAW paragraph of 5.13 of the PWS and CDRL A003.
| Bi monthly, first day of the month. |
| 1 |
| Word document supplied as electronic file. |
| COR |
Contractor shall provide samples.
IAW paragraph of 5.14 of the PWS and CDRL A004.
| 1 |
| 1 |
| Word document supplied as electronic file. |
| COR |
Contractor shall provide hardcopies of the final graphic production files.
IAW paragraph of 5.1.5 of the PWS and CDRL A005.
| 1 |
| 1 |
| Electronic PDF files. |
| COR |
Fabrication and Install all Exhibit components into the exhibit galleries.
IAW paragraph 5.1.6, 5.1.7, 5.1.8, 5.1.9, 5.1.10, 5.1.13 of the PWS
| 1 |
| 1 |
| Product as specified in the exhibit design package. |
COR
Install Historic Objects into the exhibit space.
IAW paragraph 5.1.15 of the PWS
| 1 |
| 1 |
| Product as specified in the exhibit design package. |