Sources_Sought_Rwanda_Bridge_RFI.xls
XLS spreadsheet 31 KB Posted
- Attached to
- Medium Girder Style Bridge
- Solicitation number
- W56HZV16R0202
About this file
Attachment - RFI Table to be completed
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI_FMS_BRIDGING_Rwanda.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI
| Contractor Request For Information (RFI) | |||||||
| The U.S. Army Contracting Command-Warren (ACC-WRN) is looking for a medium girder style bridge to cross various rivers | |||||||
| Minimum Bridge Specifications: | |||||||
| Length: Reconfigurable for either one 31 meter length bridge or three 9.8 meter bridges | |||||||
| Width: 4.0 meters | |||||||
| MLC 70 rating for track and wheel | |||||||
| Three sets of Near and far shore ramps | |||||||
| Abutments and piers shall not be required | |||||||
| Bridge shall have less than 10 major components | |||||||
| At least 2/3 of bridge components shall be hand carried easily by four men (under 200 kg) | |||||||
| The remaining bridge components shall be hand carried easily by six men (under 273 kg) | |||||||
| Part I - General | |||||||
| Model | Recommended Brand and Model/Nameplate Solution | Contractor Name | Bridge manufacturer location | Bridge components built in what country(ies) | Contractor CAGE Code | Business Size: Small or Large? | Expected bridge delivery lead-time (days after receipt of order)? |
| Medium Girder Bridge | |||||||
| *NOTE: Please provide bridge brochure(s) | |||||||
| Part II - Bridge Specific | |||||||
| How many major components does the bridge have? | Is bridge rated for MLC 70 for track and wheel? | Approximate far shore ramp length | Approximate near shore ramp length | Is the bridge reconfigurable for either one 31 meter or three 9.8 meter bridges? | Does the bridge NOT require piers or abutments? | How much does each of the major bridge components weigh? | Bridge width? |
| Are at least 2/3 of the major bridge components easily hand carried by four men? | Is the remainder easily hand carried by six men? |