SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W56HZV-16-R-0099

X

DOA4

SEE SCHEDULE

W56HZV

U.S. ARMY CONTRACTING COMMAND

WARREN, MICHIGAN 48397-5000

RORY THELEN

(586)282-7862

CCTA-ASG-B

RORY.G.THELEN.CIV@MAIL.MIL

1 90

X 1

X 6 X 11

X 26 X 27 X 28

X 30

X 33

X 35

X 63

X 64

X 70

X 86

DRAFT

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: RORY THELEN

Buyer Office Symbol/Telephone Number: CCTA-ASG-B/(586)282-7862

Type of Contract 1: Cost Plus Fixed Fee

Kind of Contract: Research and Development Contracts

*** End of Narrative A0000 ***

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

A-1 52.204-4016 WARREN ELECTRONIC CONTRACTING AUG/2015

(a) All Army Contracting Command Warren (DTA) solicitations will be publicized on the Federal Business Opportunities website

(https://www.fbo.gov). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.

(b) As of 10 August 2015, unless directed to do otherwise in Section L of this solicitation, vendors are required to submit a quote or proposal via the Federal Business Opportunities (FBO) system. Proposals or quotes submitted after this date using any other mechanism, including the Army Single Face to Industry Bid Response System (ASFI BRS) may be deemed non-responsive.

(c) Requirements for the online FBO bid submission:

1. Vendors must log into the FBO System to be able to submit electronic responses for opportunities.

2. Vendors must be registered in the System for Award Management (SAM) at www.sam.gov (a Federal Government owned and operated free web site) and have a CAGE Code and CCR Marketing Partner Identification Number (MPIN).

3. Once logged into the FBO System, vendors will be asked to enter basic information and directed to upload one or more files containing the proposal/quote and any additional information as outlined in the solicitation.

4. FBO will send an email to vendor's registered email address confirming the electronic submission.

5. For additional information on submitting electronic bid responses via the FBO system see the FBO Vendor Guide

Section 4.3.1 Submitting an Electronic Response (https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf).

(d) Note to offerors:

Please pay close attention to the solicitation closing date and time as stated on the cover page of this solicitation, local time for the Army contracting Command - Warren, (DTA), Michigan. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.

It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the

Government infrastructure (in this case, received through FBO) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.

Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.

Solicitations may remain posted on the FBO after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.

(e) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of our intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or

2 90

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Pricing data/information. If you object to such release in the base contract or contract modifications, and you intend to submit an offer, notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for your objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.

(f) Questions pertaining to this solicitation should be directed to the Contract Specialist identified in Block 10 on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the

Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.

[End of Notice]

A-2 52.201-4000 ARMY CONTRACTING COMMAND-WARREN (DTA) OMBUDSPERSON APR/2011

Information regarding the Ombudsperson for this contract is located at the following website:

http://acc.army.mil/contractingcenters/acc-wrn/CompMgmtOffice.html

[End of Provision]

A-3 52.204-4023 NOTICE OF ELEVATED THREAT LEVEL FORCE PROTECTION CONDITION (FPCON) JUN/2014

Contractors are hereby notified that there is a potential impact on contractor performance during increased FPCON during periods of increased threat. During FPCONs Charlie and Delta, services may be discontinued / postponed due to higher threat. Services will resume when FPCON level is reduced to level Bravo or lower.

(End of Notice)

A-4 52.204-4024 NOTICE OF RANDOM ANTITERRORISM MEASURES PROGRAM (RAMP) JUN/2014

In accordance with AR 525-13, Contractor personnel working on an Army installation, arsenal, base or other DoD facility (owned or leased by DoD/Department of the Army), are subject to participation in Installation RAMP security program (e.g. vehicles searches, wearing of

ID badges, etc).

(End of Notice)

A-5 52.209-4025 NOTICE OF TRAINING OPPORTUNITIES AT THE DETROIT ARSENAL MAR/2013

The contractor is notified that in accordance with training requirements required in the performance of this solicitation, and subsequent contract, that the G2 Office of TACOM LCMC can provide the following training upon request to contracting personnel. This opportunity is extended to all contractor personnel performing at the Detroit Arsenal and TACOM LCMC Organizations, including Selfridge

Air National Guard Base.

Training is available for AT/OPSEC requirements including but not limited to: iWatch Training, Annual Security Training, and OPSEC

Training as part of Annual Security training.

Contractors should make requests for training to the COR listed on this task order.

(End of Notice)

A-6 52.214-4000 ACKNOWLEDGMENT OF AMENDMENTS OCT/1993

Acknowledge all the amendments you've received from us by identifying the amendment number and its issue date in the box below:

: Amendment Number : Date : ________________________________________________

3 90

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

[End of Provision]

Simulation-based Reliability and Safety (SimBRS)

RFP: W56HZV-16-R-0099

*******************************PLEASE NOTE******************************

This is a DRAFT solicitation per FAR 52.215-3 "Solicitation for Information or Planning Purposes." No awards will result from the posting of this DRAFT solicitation. Please direct any questions you have to Mr. Jim Dusett (donald.j.dusett.civ@mail.mil) and Mr. Rory

G. Thelen (rory.g.thelen.civ@mail.mil). Any questions resulting from this DRAFT solicitation are due no later than 3:00 PM EST, 19

October 2016. The Government anticipates answering all questions received no later than 3:00 PM EST, 2 November 2016.

A. EXECUTIVE SUMMARY:____________________

1. SimBRS OVERVIEW: The objective of this procurement is detailed in paragraph C.2.1 of the scope of work in Section C of this solicitation, but in general the Government is looking for a contractor to design, enhance and deliver a family of computer simulation programs designed to predict the reliability and safety of Army ground vehicles from the design stage to the last stages of the vehicles' lives.

2. BUDGETARY ESTIMATE: The Government is soliciting for a one-year Indefinite Delivery/Indefinite Quantity contract, with four option years, under which individual projects will be scoped and funded by the issuance of Task Orders (TO) within the general contract scope.

Section C of this solicitation (see paragraph C.3 and following, in the Scope of Work) defines all of the capabilities desired of the winning contractor. The Government's maximum budgetary estimate over the five-year contract ordering period, if all options are exercised, is $79M, but the Government does not guarantee that this dollar amount, or any specific dollar amount, will be ordered over the course of the contract.

3. ACQUISITION STRATEGY: A full and open competition utilizing best value trade-off procedures will be used for the award of a single cost-reimburseable contract. All proposal submission requirements are located in Section L. All proposals shall clearly identify why acceptance of the proposal would be advantageous to the Government. Any proposed deviations from or exceptions to the requirements, terms, and conditions of the solicitation shall be clearly identified and explicitly defined and justified. Offerors are cautioned to consult the Contracting Officer IN WRITING before submitting an offer that proposes any deviations or exceptions to any of the requirements, terms, and conditions of the solicitation because it may be cause for rejection of the proposal.

B. NOTICE REGARDING SUBCONTRACTING: Offerors other than Small Businesses shall submit a Small Business Subcontracting Plan in accordance__________________________________ with FAR 52.219-9 (DEV) in Section I of this solicitation. The Small Business Subcontracting Plan must be a separate stand-alone file and be clearly labeled as the Small Business Subcontracting Plan. THIS SHALL NOT BE EMBEDDED IN ANY OTHER PROPOSAL VOLUME.

C. NOTICE REGARDING FILL-INS: Offerors shall note that this solicitation contains several clauses and provisions requiring a fill-in or____________________________ representation. Offerors shall note that there is an attachment in Section J (Attachment 0006) related to clause 252.227-7017 that must be completed and submitted as an attachment to your offer in accordance with said clause. Since a failure to complete these fill-ins may cause your offer to be determined ineligible for award, offerors shall carefully read and complete each such clause and provision.

D. PRICING INFORMATION: This solicitation includes a sample Task Order(TO) 001, which is listed as Attachment 0007 in Section J hereof.______________________

As part of its proposal in response to this solicitation, each offeror is required to submit a proposed price to perform TO 001, and in addition is required to submit labor pricing information covering all five years of potential contract performance. While the

Government is not obliged to award TO 001 either at the time of contract award or subsequently, the Government reserves the right to do so at the price proposed by the winning offeror. Accordingly, offerors are asked to include prices for the various cost elements of TO

001 in Section B of this solicitation. Note that pricing information entered in Section B applies only to pricing for TO 001.

Information on labor rates proposed for each year of potential contract performance shall be included in the Pricing volume of your proposal. See Section L of this solicitation, provision L.4

E. FORMAL COMMUNICATION: All questions regarding this solicitation shall be submitted IN WRITING ONLY to the Contract Specialist, via e-_______________________ mail at rory.g.thelen.civ@mail.mil. All questions and correspondence related to this solicitation shall reference the solicitation number W56HZV-16-R-0099 in the e-mail subject line.

The deadline for Government receipt of pre-proposal questions is X Date, 1:00 PM EDT. Any questions received after this date and time ___________________

4 90

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

may not be addressed before the solicitation closing date, and shall not be a cause for extension thereof. Therefore, offerors are advised to submit questions as soon as possible.

The solicitation and synopsis are posted on the FEDBIZOPPS website. The Government will post amendments to the solicitation on that website. The Government will post answers to industry-generated questions at the following website:

https://contracting.tacom.army.mil/research/researchproc.htm.

Offerors shall note that questions submitted containing proprietary information shall be considered a waiver of any protection of that information and the Government response will be posted to the above-referenced website. Responses to industry-generated questions are not considered changes to the solicitation. The only way the solicitation can be changed is through an amendment.

Offerors are responsible for periodically reviewing the aforementioned websites for the most current information pertaining to this solicitation. If an offeror experiences connectivity issues with the website https://contracting.tacom.army.mil/research/researchproc.htm, the offeror shall submit a request via e-mail to the Contract Specialist for the most recent information published on the site.

*** END OF NARRATIVE A0001 ***

5 90

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

1000 CONTRACTOR LABOR ________________

1001 CONTRACTOR LABOR TO 001

1001AA CONTRACTOR LABOR FOR TO 001 REV 0 1 LO $ _________________________________ __________________

SERVICE REQUESTED: CONTRACTOR LABOR TO 001

CLIN CONTRACT TYPE:

Cost Plus Fixed Fee

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 UNDEFINITIZED

2000 SUBCONTRACTOR LABOR ___________________

2001 SUBKTR LABOR TO 001

2001AA SUBKTR LABOR TO 001 REV 0 1 LO $ _________________________ __________________

SERVICE REQUESTED: SUBKTR LABOR TO 001

CLIN CONTRACT TYPE:

Cost Plus Fixed Fee

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 UNDEFINITIZED

6 90

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

3000 MATERIALS _________

3001 MATERIALS TO 001

3001AA MATERIALS FOR TO 001 REV 0 1 LO $ __________________________ __________________

SERVICE REQUESTED: MATERIALS TO 001

CLIN CONTRACT TYPE:

Cost Plus Fixed Fee

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 UNDEFINITIZED

4000 TRAVEL ______

4001 TRAVEL FOR TO 001

4001AA TRAVEL FOR TO 001 REV 0 1 LO $ _______________________ __________________

SERVICE REQUESTED: TRAVEL FOR TO 001

CLIN CONTRACT TYPE:

Cost No Fee

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 UNDEFINITIZED

5000 CDRLS _____

7 90

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

5001 CDRLS

5001AA CONTRACT DATA REQUIREMENTS LIST 1 LO $ ** NSP ** _______________________________ __________________

SERVICE REQUESTED: CDRLS

Technical Data as set forth in Contract Data

Requirements List (CDRL) DD Form 1423, hereinafter referred to as Exhibit A.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 UNDEFINITIZED

6000 CONTRACTOR MANPOWER REPORTING

6000AA CONTRACTOR MANPOWER REPORTING 1 LO $ ** NSP ** ______________________________ __________________

SERVICE REQUESTED: CONTRACTOR MANPOWER REPORTING

The contractor shall provide the information required per contract clause 52.237-4000, entitled "Contractor

Manpower Reporting."

Unit Identification Code (UIC): W4GHAA

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 UNDEFINITIZED

8 90

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

B.1 ESTIMATED COST AND PAYMENT __________________________

B.1.1 The amount obligated to cover the cost of all currently issued Task Orders for performance of the work under this contract is set forth in Section G. In consideration of performance of the work specified under each CLIN and per FAR 52.216-7, for cost reimbursement contracts, the contractor is paid for those recorded costs that, at the time for request for reimbursement, the contractor has paid for items or services purchased directely for the contract. Direct Labor CLIN amounts shown in Section B are for all hours added to date by partial exercise of option. From time to time, these CLIN amounts may be revised by the Government, as appropriate, to incorporate additional hours added subsequently for future Task Orders or Task Order revisions, by partial exercise of option. The estimated cost of each CLIN shall constitute the estimated cost for the purpose of the Contract Clause entitled "Limitation of Cost;"

however, neither the Government nor the contractor guarantee the accuracy of said estimates.

B.1.2 Because of the uncertainty regarding the exact number of hours to be used per labor category over the contract term, it is not possible to specify the entire Fixed-Fee amount (if awarded to a for profit entity) for the entire contract on a per-hour allocation by labor category. The Fixed-Fee will be allocated for: (i) each labor category's number of hours expended; (ii) subcontractor effort; and

(iii) material expended per Task Order. No Fixed-Fee is payable in respect to contractor travel costs. The Fixed-Fee will be paid in accordance with the terms of the Contract Clause entitled "Fixed Fee." The fixed fee together with the reimbursement of costs shall constitute full and complete consideration for the contractor's service in connection with the work required and performed under this contract.

B.1.3 Allowable costs shall be determined, and payment thereof shall be provided, in accordance with the Contract Clause entitled

"Allowable Cost and Payment."

B.2 FUNDING _______

B.2.1 The contractor shall notify the Government in accordance with FAR clause 52.232-22 entitled "Limitation of Funds," whenever there is reason to believe that the funds allotted to this contract are either insufficient or excessive for the performance of the work required.

B.3. OPTION HOURS AND RATE SCHEDULE ______________________________

B.3.1 As specified in clause H.1 (Option for Additional Level of Effort) of this contract, the Government may exercise a maximum of

508,785 prime-contractor direct labor hours, over the potential five-year performance period of the contract. The estimated subcontracted labor hours are not included in the 508,785 total hours. Yearly prime-contractor hourly rates per labor category, and estimated allocations of hours per labor category, are as follows:

Year 1 (Option 1) Hours Est. Cost per hour_________________ _____ ___________________

Labor Category A 33,919 $X/hour

Labor Category B 33,919 $X/hour

Labor Category C 33,919 $X/hour ______

101,757

Year 2 (Option 2) Hours Est. Cost per hour_________________ _____ ___________________

Labor Category A 33,919 $X/hour

Labor Category B 33,919 $X/hour

Labor Category C 33,919 $X/hour ______

101,757

Year 3 (Option 3) Hours Est. Cost per hour_________________ _____ ___________________

Labor Category A 33,919 $X/hour

Labor Category B 33,919 $X/hour

Labor Category C 33,919 $X/hour ______

101,757

Year 4 (Option 4) Hours Est. Cost per hour_________________ _____ ___________________

Labor Category A 33,919 $X/hour

Labor Category B 33,919 $X/hour

Labor Category C 33,919 $X/hour ______

101,757

Year 5 (Option 5) Hours Est. Cost per hour_________________ _____ ___________________

9 90

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Labor Category A 33,919 $X/hour

Labor Category B 33,919 $X/hour

Labor Category C 33,919 $X/hour ______

101,757

B.3.2 The hours per labor category per year listed above are only an estimate; more or fewer hours per labor category may be exercised, provided the aggregate total of all labor hours exercised does not exceed the total given in B.3.1 above. If fewer hours per labor category than those listed above are used in any given year, the unused hours remain available for use on other labor categories in subsequent years. If more hours per labor category than listed above are used in any given year, this simply reduces the remaining hours available for use elsewhere on the contract, since the total aggregate hours specified in B.3.1, above, does not change. It is understood and agreed that the level of effort for each labor and cost category may vary and that personnel and other costs will be utilized only to the extent necessary to perform the required work. Funds, in an amount on which the Government and contractor have agreed, shall be allotted for each Task Order awarded. The Government shall not be obligated to pay the contractor in excess of established fund allotment (funding ceiling) for work performed under each Task Order, and the contractor shall not be obligated to continue performance under a Task Order or incur costs in excess of the ceiling, unless and until the Contracting Officer notifies the contractor by written modification to each Task Order that the funds available for order performance have been increased and specifies a revised amount allotted to such Task Order.

*** END OF NARRATIVE B0001 ***

10 90

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

C-1 52.204-4003 START OF WORK MEETING SEP/2013

(TACOM)

The contractor shall hold a start of work meeting at its facility, unless some other location is designated in the contract, within 30 days after contract award. The Start of Work Meeting is to assure a clear and mutual understanding of the contract terms, conditions, line items, technical requirements and sequence of events needed for successful execution of the subject contract effort. The contractor shall participate with Government to arrange a schedule and agenda for the meeting.

The contractor shall at a minimum invite the Government contracting personnel (PCO/Contract Specialist). At the discretion of the PCO, other Government technical personnel (Contracting Officer's Representative (COR) identified in Section G or in an appointment letter, Quality Assurance personnel, DCMA, etc.) may also be invited to the meeting. All Government invitees shall be given at least 14 days advance notice of the time, date, and location of the start of work meeting. The preferred method of notification is by email. The contractor shall provide the Government with minutes of the Start of Work Meeting within 7 days after the meeting is held.

[End of Clause]

C-2 52.209-4020 ANTI-TERRORISM (AT) LEVEL I TRAINING REQUIREMENT JUL/2014

(TACOM)

All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete AT Level I awareness training within 60 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The contractor shall submit certificates of completion for each contractor employee and subcontractor employee requiring access to Army installations, facilities, or controlled access areas to the COR (or to the contracting officer, if a COR is not assigned) within 60 calendar days after completion of training AT Level I awareness training is available at https:jkodirect.jten.mil Course# JS-UA007-14.

C-3 52.204-4020 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES MAR/2015

(TACOM)

a. The contractor and all associated subcontractors employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9 Personal Identity Verification of Contractor Personnel) as directed by

DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force

Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

b. For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army

Directive 2014-05, The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial CAC may be issued on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personal

Management (see clause 52.204-4600 Trusted Associate Sponsorship System (TASS) Program).

c. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards, and procedures using the National Crime Information Center Interstate

Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (see provision (TACOM) 52.215-4405

Access to the Detroit Arsenal; Identifying Contractor Employees; Non-disclosure Statement), or at OCONUS locations, in accordance with

Status of Forces Agreement and other theater regulations.

(End of Clause)

11 90

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

C-4 52.204-4021 CONTRACTOR EMPLOYEES WHO REQUIRE ACCESS TO GOVERNMENT INFORMATION JUN/2012

(TACOM) SYSTEMS

All contractor employees shall be registered in the ATCTS (Army Training Certification Tracking System) at commencement of services and must successfully complete the DoD Information Assurance Awareness training prior to access to the information system, and annually thereafter.

(End of Clause)

C-5 52.204-4022 REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN JAN/2014

(TACOM)

a. The contractor is subject to provisions of the TACOM LCMC OPSEC Standing Operating Procedures (SOP/Plan), or other U.S. Government

OPSEC plan, per AR 530-1, Operations Security. This SOP/Plan specifies the governments critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.

b. The contractor will receive a copy of the SOP/Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by G2, TACOM LCMC or individual organizations supporting OPSEC Officers.

c. The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is

OPSEC Level I.

(End of Clause)

C-6 52.209-4021 ANTI-TERRORISM (AT) AWARENESS TRAINING REQUIREMENT FOR CONTRACTOR JUN/2012

(TACOM) PERSONNEL TRAVELING OVERSEAS

Contractor employees and associated subcontractor employees shall receive government-provided Anti-Terrorism (AT) awareness training specific to the area of responsibility (AOR) as directed by AR 525-13. Specific AOR training content is to be directed by the combatant commander, with the unit Anti-Terrorism Officer (ATO) being the local point of contact.

(End of Clause)

C-7 52.209-4023 OPSEC TRAINING REQUIREMENT APR/2015

(TACOM)

Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at:

http://cdsetrain.dtic.mil/opsec/index.htm. Within 10 days of completing the training, the Contractor shall provide certificates/proof of completion to the Contracting Officers Representative (COR), if assigned to the contract, or the Procuring Contracting Officer (PCO).

(End of Clause)

C-8 52.209-4024 INFORMATION ASSURANCE (IA)/INFORMATION TECHNOLOGY (IT) TRAINING APR/2015

(TACOM)

All contractor employees and associated subcontractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in

DoDD 8570.01, DoD 8570.01-M, and AR 25-2 within six months of employment. Within 10 days of completing the training, the Contractor shall provide certificates/proof of completion to the Contracting Officers Representative (COR), if assigned to the contract, or the

Procuring Contracting Officer (PCO).

12 90

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(End of Clause)

C-9 52.237-4000 CONTRACTOR MANPOWER REPORTING (CMR) FEB/2013

(TACOM)

The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via secure data collection site. The contractor is required to completely fill in all required data fields in the format using the following web address: https://cmra.army.mil . The required information includes the following:

(1) Contracting Office, Contracting Officer, Contracting Officer's Technical Representative;

(2) Contract number, including task and delivery order number;

(3) Beginning and ending dates covered by reporting period;

(4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data;

(5) Direct labor hours (including sub-contractors);

(6) Direct labor dollars paid this reporting period (including sub-contractors);

(7) Total payments (including sub-contractors);

(8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different);

(9) Data collection cost;

(10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army

Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information);

(11) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website);

(12) Presence of deployment or contingency contract language; and

(13) Number of contractor and sub-contractor employees deployed in theater this reporting period (by country).

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September30. While inputs may be reported any time during the FY, all data shall be reported no later than

October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at : https://cmra.army.mil.

End of Clause]

C.1 SCOPE OF WORK for SIMULATION BASED RELIABILITY AND SAFETY (SimBRS) PROGRAM

C.1.1 The contractor, as an independent contractor and not as an agent of the Government shall furnish the supplies and services for the level of effort (LOE) specified in individual Task Orders and funded in section B of this contract to accomplish engineering and other related technical services required for the Simulation Based Reliability and Safety (SIMBRS) Program. The activities performed by the contractor may be in support of any aspect of the U.S. Army Research, Development and Engineering Command (RDECOM) - Tank Automotive

Research, Development and Engineering Centers (TARDEC) mission to create a broad range of multi-scale modeling, simulation, and validation tools and methodologies addressing reliability and safety, soldier-environment interface, biomechanics, and simulation-based design optimization. These methodologies will include multi-scale experiments to optimize the robustness and reliability of the ground vehicle systems (tactical and combat) with the consideration of the human interaction.

C.1.2 TASK ORDER REQUIREMENTS

C.1.2.1 All work shall be performed in accordance with Task Orders issued by the Procuring Contracting Officer (PCO). No work shall commence until the contractor has received a signed copy of a Task Order. All work shall be performed in sequential order as awarded unless otherwise stated. Each Task Order shall include the following information at a minimum:

13 90

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(1) Task Order number and title

(2) Reference to the applicable paragraph in section C

(3) Objective of the Task Order

(4) Number of hours necessary to perform the work

(5) Detailed description of work to be performed

(6) Estimated completion date(s)

(7) Identification of applicable contract number, contractor's name and address

(8) Identification of software, data and/or hardware to be delivered to TARDEC

(9) PCO's Signature

C.1.2.2 The contractor shall immediately notify the PCO by telephone and e-mail if the delivery dates specified in any active Task

Order will not be met and shall follow up with a written or electronic notification to the PCO and Contracting Officer's

Representative (COR).

C.1.2.3 The Government has the unilateral right to increase, decrease or prioritize the work to be performed by the issuance of

Task Orders signed by the PCO. It is understood and agreed that such adjustments shall be made within the general scope of work and level of effort of the contract. The PCO and COR have the right to prioritize the work being performed under this contract.

C.1.2.4 If, at any time, the contractor has reason to believe the amount (hours, other direct costs of material, and travel) which it expects to incur in the performance of a Task Order are insufficient to complete the remaining work, the contractor shall provide written notification to the COR for appropriate action. As part of this written notification, the contractor shall furnish a revised statement of total hours needed to complete the remaining work. The Government does not authorize the contractor to expend dollars or hours for any Task Order in excess of the amount obligated on contract to fund such Task Order.

C.1.3 When generating deliverable documents and reports hereunder, the contractor shall use computer software compatible with

Microsoft Windows, Microsoft Office and Pro-E versions being used at TARDEC in order to facilitate transfer of information.

Currently, TARDEC uses Microsoft XP, Microsoft Office 2003, and Pro-E Wildfire 2.0. TARDEC reserves the right to update the software versions to be used over the period of the contract.

C.1.4 Generality Statement: This scope of work is intended to be general in nature and is representative of the types of efforts that may be authorized by individual Task Orders.

C.2 GOALS

C.2.1 The goals are for the contractor to develop experimentally validated cradle-to-grave modeling and simulation capabilities to optimize reliability in vehicular components and systems with consideration of uncertainties in input loads, manufacturing, operations and maintenance, and material properties to decrease weight and cost, and yet increase the performance, durability, and safety as required by Task Order.

C.2.2 The contractor shall utilize the multi-scale modeling approach to quantify the microstructure-property relations by evaluating various length scales starting at the atomic level for each step of the manufacturing process for vehicles. While insufficient data exists to develop the human model according to this approach, the contractor shall adopt this same multi-scale approach at every stage of any human model development effort as specified per individual Task Order.

C.2.3 As required by Task Orders, the contractor shall integrate sensor technology with modeling of diagnosis and prognosis.

C.2.4 As required by Task Orders, the contractor shall develop and validate modeling, simulation, and performance evaluation tools by evaluating factors that impact the combat capability of the soldier. The contractor shall produce human models and study their use and effectiveness in modeling and evaluating Soldier-centered activities in both mounted and dismounted configurations. The contractor shall research, model, and conduct experiments in safe mobility operations, including soldier multi-tasking.

C.3 GENERAL TASKS/EFFORTS: The following are the tasks/efforts that may be required of the contractor under this Level of Effort (LOE) contract:

(C.3.1) Multi-Scale Metal Component Reliability and Safety

(C.3.2) Multi-scale Biomechanics Reliability Model Development

(C.3.3) Structural Composite Design and Reliability and Safety

(C.3.4) Joint and Fastener and Systems Reliability

(C.3.5) Simulation-Based Design Optimization for Component Reliability

(C.3.6) Simulation-Based Design Optimization for System Level Reliability

(C.3.7) High Performance Computing Incorporating Physics-Based Reliability and Safety

Models

(C.3.8) Cyberinfrastructure

14 90

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(C.3.9) Reliability Networking and Sensory-Based Health Monitoring for Field Applications

(C.3.10) Human Factors Development and Evaluation

(C.3.11) Computer Aided Engineering Tools for System-Level Reliability

(C.3.12) Occupant Safety and Crashworthiness Research, Development and Testing

(C.3.13) Blast and Fragmentation

(C.3.14) Hybrid Vehicle System and Component application and reliability

(C.3.15) Simulation Integration

(C.3.16) Verification and Validation

(C.3.17) Supercomputing Processes

(C.3.18) Electronic Systems and Network reliability

(C.3.19) Vehicle and Terrain Modeling

C.3.1 Multi-scale Metal Component Reliability and Safety: Develop a multi-scale internal state variable model that includes statistical variations from the material microstructure of lightweight alloys, which will also incorporate studies of fatigue and fracture. The types of effort the contractor may be required to conduct are:

C.3.1.1 Fatigue Tasks:

C.3.1.1.1 Quantify structure-property relations with consideration of uncertainty during alloy processing.

C.3.1.1.2 Quantify structure-property relationships with consideration for uncertainty of material composition for various alloys.

C.3.1.1.3 Develop or correlate structure-property relationships with multi-scale internal- state variable model.

C.3.1.1.4 Perform experiments to validate the results of development efforts.

C.3.1.1.5 Develop stochastic models for random microstructure and mesostructure of various metallic alloys.

C.3.1.1.6 Develop cohesive force law for particle debonding including temperature effects.

C.3.1.1.7 Develop cohesive force law for grain boundary decohesion via molecular dynamics simulation.

C.3.1.1.8 Perform mesoscale fracture simulation at grain boundaries.

C.3.1.1.9 Conduct mesoscale and coupled microscale-nanoscale fracture simulation inside grains.

C.3.1.1.10 Conduct macroscale fracture simulation and total fatigue life.

C.3.1.1.11 Develop dimensional decomposition models for stochastic durability performance and reliability.

C.3.1.2 Fracture Tasks:

C.3.1.2.1 Model plasticity and fracture behavior during crash impact and vehicle rollover, including the internal state variable (ISV) history models from stamping, thermo-mechanical processing, to crash impact.

C.3.1.2.2 Develop ISV models of spot-welds for metals.

C.3.1.2.3 Incorporate ISVs along with microstructure uncertainties of various materials into crash-impact simulations.

C.3.1.2.4 Develop multi-objective optimization for crash and rollover to address absorption and impact scenarios.

C.3.1.2.5 Derive a physics-based multiple-length and time-scale method in which shock wave propagation and heat transfer between different scales can be properly described.

C.3.1.2.6 Investigate safety of metal components subject to mechanical and thermal shock loading.

C.3.1.2.7 Investigate and develop improved occupant safety countermeasures specific to the vehicle structure.

C.3.1.3 All software deliverables for C.3.1.1 and C.3.1.2 and their subdivisions shall be in accordance with CDRL A006, unless otherwise specified per individual Task Order.

C.3.2 Multi-scale Biomechanics Reliability Model Development: Develop a whole-human-body finite element mesh, including internal organs.

Each organ shall be independently meshed in order to integrate the biological systems together. The effort shall not only bridge the various physiological (anatomical) systems, but the multi-scale aspects (biological function) of each system as well. As required by a

Task Order, the contractor shall input the results into a finite element code for analysis of high impact and implement the results into

15 90

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

the development of biologically inspired engineering materials. The whole human body finite element mesh shall represent a 5th percentile female, or 50th or 95th percentile male (as specified in the individual Task Order) with the ability to be scalable to various anthropometric dimensions. The whole-human-body finite element mesh shall be able to assess injury risk in frontal, side, rear or rollover type of vehicle crash conditions. The whole-human body-finite element mesh shall be able to represent different age groups of human subjects. The types of effort the contractor may be required to conduct are:

C.3.2.1 Develop human model and finite-element mesh.

C.3.2.2 Conduct simulations of the tendon, muscle, brain, cartilage, skin, and bone systems individually or in specified combinations.

C.3.2.3 Conduct simulations of the whole-human-body finite element mesh.

C.3.2.4 Conduct multi-scale tendon and ligament experiments.

C.3.2.5 Conduct multi-scale muscle experiments.

C.3.2.6 Conduct multi-scale brain experiments.

C.3.2.7 Conduct multi-scale cartilage experiments.

C.3.2.8 Conduct multi-scale skin experiments.

C.3.2.9 Conduct multi-scale bone experiments.

C.3.2.10 Conduct cadaver-based experiments.

C.3.2.11 Conduct human volunteer studies, adhering to: Army Regulation (AR) 70-25 "Use of Volunteers as Subjects of Research"; DOD

Directive 3216 "Protection of Human Subjects and Adherence to Ethical Standards in DOD supported Research"; 10 U.S.C. 980 "Limitation on

Use of Humans as Experimental Subjects"; the Code of Federal Regulations, Title 32--National Defense, Chapter 1-Office of the Secretary of Defense, Part 219 "Protection of Human Subjects"; and the University Industrial Review Board ethical guidelines and regulations.

C.3.2.12 Conduct sub-system model validation.

C.3.2.13 Conduct full scale human validation (simulation-based) experiments.

C.3.2.14 Conduct multi-scale experiments to collect data on bio-inspired design solutions to problems of occupant protection.

C.3.2.15 Perform analyses to determine injury mechanism and causation.

C.3.2.16 Perform analyses to determine injury risk assessment values.

C.3.2.17 Investigate and develop improved occupant safety countermeasures.

C.3.2.18 Develop a software interface to manipulate human model orientation and configuration and integrate the software interface into crash safety software applications used within the safety discipline (as specified per individual Task Order).

C.3.2.19 All software deliverables for C.3.2 and its subdivisions shall be in accordance with CDRL A006 unless otherwise specified per individual Task Orders.

C.3.3 Structural Composite Design and Reliability and Safety: As required by individual Task Order, the contractor shall design nanoparticle and nanofiber-reinforced composite systems for structural and electrical applications. Key areas of emphasis are expected to be power electronics and low-weight and high-load handling materials. The types of effort the contractor may be required to conduct are:

C.3.3.1 Determine appropriate composite systems and identify first-order choice for evaluation of nanoparticle inclusion.

C.3.3.2 Investigate the effects of different mixtures of reinforced fibers and polymer matrices with nanoparticles from the perspective of manufacturing and life cycle.

C.3.3.3 Quantify the structure-property…