SOLICITATION 0000
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JA_-_W56HZV-15-C-0230.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W56HZV-15-R-0226
X
2015AUG12
2015SEP1112:00pm
DOA4
2015AUG12 SEE SCHEDULE
W56HZV
U.S. ARMY CONTRACTING COMMAND
WARREN, MICHIGAN 48397-5000
MICHAEL GROSS
(586)282-7483
CCTA-ADS-A
MICHAEL.E.GROSS28.CIV@MAIL.MIL
X 1 25
1 81
X 1
X 5 X 16
X 32 X 33 X 35
X 41
X 43
X 49
X 65
X 66
X 75
X 81
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: MICHAEL GROSS
Buyer Office Symbol/Telephone Number: CCTA-ADS-A/(586)282-7483
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
Weapon System: Infantry Remote Target System (IRETS)
*** End of Narrative A0000 ***
W56HZV-15-R-0226
A.1 ADMINISTRATIVE SUMMARY: _______________________
Under the authority of FAR 6.302-1, solicitation W56HZV-15-R-0226 is restricted to Meggitt Training Systems, Inc. (MTSI), 296 Brogdon
Road, Suwanee, GA 30024-1247. Under the authority of FAR 16.202, Firm-Fixed-Price Contracts, the U.S. Army Contracting Command-Warren
(ACC-WRN) intends to negotiate and award a Firm-Fixed-Price (FFP) contract for Radio Frequency (RF) targetry devices listed in paragraph
A.2 below.
A.2 REQUIREMENTS: _____________
ACC-WRN is issuing a Request for Proposal (RFP) to supply the following items:
Noun Qty ____ ___
1. Stationary Infantry Targets (SIT) Radio Frequency (RF) 50
2. Stationary Armor Targets (SAT) RF 105
3. Moving Armor Targets (MAT) RF 7
4. Hand Held Controllers (HHC) RF 5
A.3 UNIQUE ASPECTS OF THIS SOLICITATION: ____________________________________
Packaging: The Governments packaging requirement adheres to Commercial Packaging.__________
A.4 INCONSISTENCIES BETWEEN THE EXECUTIVE SUMMARY AND THE SOLICITATION: ___________________________________________________________________
This administrative summary has been prepared as an aid to you, the potential offeror. We have made every attempt to accurately reflect the requirements and information contained in the balance of this solicitation. However, if you find any inconsistency between this administrative summary and the solicitation, please contact the buyer identified in Block 10 of the SF 33.
*** END OF NARRATIVE A0001 ***
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
A-1 52.204-4016 WARREN ELECTRONIC CONTRACTING AUG/2015
(a) All Army Contracting Command Warren (DTA) solicitations will be publicized on the Federal Business Opportunities website
(https://www.fbo.gov). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
(b) As of 10 August 2015, unless directed to do otherwise in Section L of this solicitation, vendors are required to submit a quote or proposal via the Federal Business Opportunities (FBO) system. Proposals or quotes submitted after this date using any other mechanism, including the Army Single Face to Industry Bid Response System (ASFI BRS) may be deemed non-responsive.
(c) Requirements for the online FBO bid submission:
1. Vendors must log into the FBO System to be able to submit electronic responses for opportunities.
2. Vendors must be registered in the System for Award Management (SAM) at ../../../../Documents/SharePoint
Drafts/www.sam.gov (a Federal Government owned and operated free web site) and have a CAGE Code and CCR Marketing Partner
Identification Number (MPIN).
3. Once logged into the FBO System, vendors will be asked to enter basic information and directed to upload one or more files containing the proposal/quote and any additional information as outlined in the solicitation.
4. FBO will send an email to vendors registered email address confirming the electronic submission.
2 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
5. For additional information on submitting electronic bid responses via the FBO system see the FBO Vendor Guide
Section 4.3.1 Submitting an Electronic Response (https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf).
(d) Note to offerors:
Please pay close attention to the solicitation closing date and time as stated on the cover page of this solicitation, local time for the Army contracting Command - Warren, (DTA), Michigan. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the
Government infrastructure (in this case, received through FBO) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
Solicitations may remain posted on the FBO after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.
(e) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of our intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or
Pricing data/information. If you object to such release in the base contract or contract modifications, and you intend to submit an offer, notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for your objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(f) Questions pertaining to this solicitation should be directed to the Contract Specialist identified in Block 10 on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
[End of Notice]
A-2 52.201-4000 ARMY CONTRACTING COMMAND-WARREN (DTA) OMBUDSPERSON APR/2011
Information regarding the Ombudsperson for this contract is located at the following website:
http://contracting.tacom.army.mil/acqinfo/ombudsperson.htm
[End of Provision]
A-3 52.214-4000 ACKNOWLEDGMENT OF AMENDMENTS OCT/1993
Acknowledge all the amendments you've received from us by identifying the amendment number and its issue date in the box below:
: Amendment Number : Date : ________________________________________________
[End of Provision]
3 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
A-4 52.214-4003 ALL OR NONE MAR/1998
(TACOM)
Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION ARE INELIGIBLE FOR AWARD.
[End of Provision]
4 81
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 SIT RF
NSN: 9999-99-999-9999
0001AA STATIONARY INFANTRY TARGETS (SIT) RF 50 LO $ $ ____________________________________ ______________ __________________
COMMODITY NAME: SIT RF
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: 1E5J0021EH PRON AMD: 01
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
COMMERCIAL PACKAGING
LEVEL PRESERVATION: Commercial
LEVEL PACKING: Commercial
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W56HZV5203W776 W68EV4 L 2
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 50 0150
FOB POINT: Destination
SHIP TO:
(W68EV4) XR W12K JBLM LEWIS DOL YTC
YAKIMA TRAINING CENTER
YAKIMA,WA,98901-5000
5 81
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0001AB STATIONARY ARMOR TARGETS (SAT) RF 105 LO $ $ _________________________________ ______________ __________________
COMMODITY NAME: SAT RF
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: 1E5J0021EH PRON AMD: 01
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
COMMERCIAL PACKAGING
LEVEL PRESERVATION: Commercial
LEVEL PACKING: Commercial
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W56HZV5203W776 W68EV4 L 2
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 105 0150
FOB POINT: Destination
SHIP TO:
(W68EV4) XR W12K JBLM LEWIS DOL YTC
YAKIMA TRAINING CENTER
YAKIMA,WA,98901-5000
6 81
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0001AC RETS UPGRADE MOVING ARMOR TARGETS (MAT) RF 7 LO $ $ __________________________________________ ______________ __________________
COMMODITY NAME: RETS UPGRADE MAT RF
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: 1E5J0021EH PRON AMD: 01
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
COMMERCIAL PACKAGING
LEVEL PRESERVATION: Commercial
LEVEL PACKING: Commercial
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W56HZV5203W776 W68EV4 L 2
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 7 0150
FOB POINT: Destination
SHIP TO:
(W68EV4) XR W12K JBLM LEWIS DOL YTC
YAKIMA TRAINING CENTER
YAKIMA,WA,98901-5000
7 81
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0001AD HAND HELD CONTROLLERS (HHC) 5 LO $ $ ___________________________ ______________ __________________
COMMODITY NAME: HHC
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: 1E5J0021EH PRON AMD: 01
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
COMMERCIAL PACKAGING
LEVEL PRESERVATION: Commercial
LEVEL PACKING: Commercial
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W56HZV5203W776 W68EV4 L 2
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 5 0150
FOB POINT: Destination
SHIP TO:
(W68EV4) XR W12K JBLM LEWIS DOL YTC
YAKIMA TRAINING CENTER
YAKIMA,WA,98901-5000
8 81
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0001AE SHIPPING 1 LO $ $ ________ ______________ __________________
COMMODITY NAME: SHIPPING
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: 1E5J0021EH PRON AMD: 01
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W56HZV5203W776 W68EV4 L 2
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0120
FOB POINT: Destination
SHIP TO:
(W68EV4) XR W12K JBLM LEWIS DOL YTC
YAKIMA TRAINING CENTER
YAKIMA,WA,98901-5000
9 81
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0001AF TRAVEL 1 LO $ $ ______ ______________ __________________
COMMODITY NAME: TRAVEL
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: 1E5J0021EH PRON AMD: 01
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W56HZV5203W776 W68EV4 L 2
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0150
FOB POINT: Destination
SHIP TO:
(W68EV4) XR W12K JBLM LEWIS DOL YTC
YAKIMA TRAINING CENTER
YAKIMA,WA,98901-5000
10 81
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0001AG REFRESHER TRAINING 1 LO $ $ __________________ ______________ __________________
COMMODITY NAME: REFRESHER TRAINING
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: 1E5J0021EH PRON AMD: 01
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W56HZV5203W776 W68EV4 L 2
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0150
FOB POINT: Destination
SHIP TO:
(W68EV4) XR W12K JBLM LEWIS DOL YTC
YAKIMA TRAINING CENTER
YAKIMA,WA,98901-5000
11 81
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
9000 DATA ITEMS __________
A001 RADIO FREQUENCY EQUIPMENT APPROVALS 1 EA $ ** NSP ** $ ** NSP ** ___________________________________ ______________ __________________
COMMODITY NAME: CDRL A001
The contractor shall prepare and deliver data quantities and schedules set forth in the Contract
Data Requirements List (See Section J, Exhibit A: DD
Form 1423, Sequence Number A001).
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 1 SEE DD FORM 1423
FOB POINT: Destination
SHIP TO:
(Y00003) SEE NARRATIVE ON DD 1423
A002 SUSTAINMENT TRAINING PACKAGE 1 EA $ ** NSP ** $ ** NSP ** ____________________________ ______________ __________________
COMMODITY NAME: CDRL A002
The contractor shall prepare and deliver data quantities and schedules set forth in the Contract
Data Requirements List (See Section J, Exhibit A: DD
Form 1423, Sequence Number A002).
(End of narrative B001)
Packaging and Marking _____________________
12 81
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 1 SEE DD FORM 1423
FOB POINT: Destination
SHIP TO:
(Y00003) SEE NARRATIVE ON DD 1423
A003 TECHNICAL MANUALS 1 EA $ ** NSP ** $ ** NSP ** _________________ ______________ __________________
COMMODITY NAME: CDRL A003
The contractor shall prepare and deliver data quantities and schedules set forth in the Contract
Data Requirements List (See Section J, Exhibit A: DD
Form 1423, Sequence Number A003).
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 1 SEE DD FORM 1423
FOB POINT: Destination
SHIP TO:
(Y00003) SEE NARRATIVE ON DD 1423
A004 INVENTORY LISTS 1 EA $ ** NSP ** $ ** NSP ** _______________ ______________ __________________
13 81
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
COMMODITY NAME: CDRL A004
The contractor shall prepare and deliver data quantities and schedules set forth in the Contract
Data Requirements List (See Section J, Exhibit A: DD
Form 1423, Sequence Number A004).
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 1 SEE DD FORM 1423
FOB POINT: Destination
SHIP TO:
(Y00003) SEE NARRATIVE ON DD 1423
A005 GOVERNMENT ACCEPTANCE TESTING (GAT) 1 EA $ ** NSP ** $ ** NSP ** ___________________________________ ______________ __________________
COMMODITY NAME: GAT
In accordance with C.3.10, Government Acceptance
Testing (GAT) will be completed within 14 days after installation completion, and no later than 164 days after contract award.
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
14 81
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
001 1 0164
FOB POINT: Destination
SHIP TO:
15 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
June 2015
Performance Description (PD)for
Yakima Radio Frequency (RF) Targetry
SECTION 1 - Scope
C.1.1 Description. The United States Government has a requirement to procure live fire RF Targetry to interface with and support existing ranges at Yakima Training Center (YTC).
C.1.2. Objective. The objective of this performance description is to describe requirements for RF Targetry that interfaces with existing Targetry and controllers provided by Meggitt Training Systems, Inc. (MTSI).
C.1.3. Scope. This performance description establishes the requirement for the manufacture, delivery, installation, and support of new hardware for YTC. The hardware required is as follows:
>50 Stationary Infantry Targets (SITs)
>105 Stationary Armor Targets (SATs)
>7 Moving Armor Targets (MATs) without track (will use existing)
>5 Hand Held Controllers (HHCs)
>1 Shipping to YTC
>1 Training Operator, Maintenance, and Scenario for YTC personnel
>1 Associated travel for training
SECTION 2 - APPLICABLE REFERENCE DOCUMENTS
C.2.1. General. The documents listed in this section are referenced in Section 3 of this performance description. This section does not include documents cited in other sections of this PD or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned they must meet all specified requirements as cited in
Sections 3 of this document, whether or not they are listed in section 2.
C.2.2. Government Documents. The following specifications, drawings and standards to the revision level in effect at the solicitation issue date form a part of this PD to the extent specified herein.
>Specifications:
>NSN 5180-01-483-0249 General Mechanics Tool Kit (GMTK): Automotive
>29 CFR 1910.1200(g) Occupational Safety & Health Administration Safety Data Sheets
>Drawings:
11829332 3-D Infantry Target Drawing, NSN 6920-01-164-9625
SECTION 3 - Requirements
C.3.1. Item Description. The training system shall consist of SITs, SATs, MATs, and HHCs. This hardware shall be controlled by existing
Range Control Stations and the HHCs required for this procurement.
C.3.2. General Requirements. The application of the requirements as listed in this paragraph and succeeding subparagraphs shall be applied mandatory on all the subsystems of the RF targetry except as noted in this document.
C.3.2.1. Frequency. All transmitters and receivers shall operate in the 138 to 160 MHz band. The setting of the desired frequency shall utilize selectable tuners to switch between channels within the selected band. The HHC and all RF down range receivers/transmitters shall be tunable through each band by range support personnel without changing internal components to select tunable frequency ranges.
All radios shall be preset to 148.70 MHz. All radio transmitters and receivers shall utilize narrow bandwidth technology, and have a bandwidth of 12.5 kHz or less for all transceivers. Contractor shall ensure the RF transmitters/receivers meet all Federal
Communications Commission (FCC) requirements. All devices shall have J/F-12 numbers already assigned IAW CDRL A001. If additional equipment is required to tune the transmitters/receivers, this shall be provided with the installation of the range. The range must operate using a single frequency for any range with up to 512 independently identified target mechanisms (see C.3.2.16) and communication distances of up to five (5) km. A single frequency design must be available.
C.3.2.2. Communication Distance. HHCs shall communicate with all target devices on the range. Power output of the transmitters shall be adjustable from 1 to 5 Km. The contractor is responsible for ensuring communication to all target lifters and simulation devices on the
16 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
range. After the initial installation of the range, the tuning of the transmitter to accommodate the length of the range shall be accomplished as required by range personnel.
C.3.2.3. Status. All down range target devices shall provide operational status feedback to the RCS. The actual status presented on screen shall be updated in less than 5 seconds after a requested status change is accomplished by a target mechanism. An example of a status change is when the mechanism achieves an up position. (i.e., a lifting mechanism receives an up command, and within 5 seconds after the mechanism reaches and activates the up limit switch, a signal is received by the RCS causing the status change to appear on the screen). Status changes normally will be limited to targets within the active scenario, but if a target mechanism should undergo an unanticipated change in status; the unanticipated change shall be displayed on the RCS screen within 5 seconds of the completion of the status action. After a command is given by any RCS, its display shall immediately show an in-transit state, which may be actual status received from the target or it can be RCS software generated. The maximum number of targets required to show a status update within 5 seconds will not exceed 100.
C.3.2.4. Kill Response Time. When the required number of hits to kill the target is achieved, the target mechanism shall begin to lower the target (unless commanded to hold the target in the up position) and actuate the attached simulator devices as appropriate in less than 3 seconds for armor targets and less than 1 second for infantry targets.
C.3.2.5. N/A.
C.3.2.6. Safety Interrupt. Each target position shall have a mechanism to interrupt the activation of the device, stop motion, and isolate hazardous voltages. This is to prevent accidental activation while the target device is being serviced.
C.3.2.7. N/A.
C.3.2.8. Availability. The equipment shall be designed to provide 98 percent availability for continuous operation on military ranges operating 24 hours per day, seven (7) days per week.
C.3.2.8.1. Ready for Training. When all preventive maintenance checks and services (PMCS) have been completed and the range personnel arrive at the range to begin a training day, at least 98% of all the equipment on the range shall be operational for use that day. Each targetry device shall be designed so that it will be operational 98% of the time it is called on to operate during the year.
C.3.2.9. N/A.
C.3.2.10. Ground. All equipment shall be installed and grounded IAW applicable local and national electrical codes (i.e. NFPA 70, etc).
C.3.2.11. N/A.
C.3.2.12. Reverse Polarity. All equipment shall be protected from damage if reverse polarity voltage is applied, as may occur if battery leads are reversed at the battery or between the battery and device. Power cables shall be designed to prevent reverse polarity connection.
C.3.2.13. N/A.
C.3.2.14. N/A.
C.3.2.15. Operability Test. A testing capability at each down range target device to check operability is required. The minimum testing shall raise and lower the target mechanism and move the carrier on the MAT forward and reverse.
C.3.2.16. Addresses. As a minimum, the RCS shall have the capability of controlling up to 512 independently identified target mechanisms. If the targets have distinct addresses, the capability to set the address without special tools is required.
C.3.2.17. Special Tools. Special tool(s) or test equipment required to perform maintenance or set up of the equipment shall be included as part of the range installation. A special tool is any tool not found in the NSN 5180-01-483-0249 General Mechanics Tool Kit (GMTK):
Automotive, plus a torque wrench (30-90 inch-pounds), multimeter, wire strippers, crimper tool, wire brush, rubber gloves, heat gun, grounding wrist strap and soldering/desoldering set.
C.3.2.18. N/A.
C.3.2.19. N/A.
C.3.2.20. ID Plate. Each mechanism must contain a data plate that, as a minimum, includes:
>Nomenclature
>Manufacturer
>Control/Serial Number
>Date Manufactured
17 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
>Manufacturer Part Number
C.3.2.21. Natural Damage. Exterior wires and cables shall be armored and sealed to prevent damage by non-human living organisms found on ranges.
C.3.2.22. Environmental Considerations. No components that include contaminants or toxins capable of being released into the environments shall be used. Hydraulic fluids, if used, shall be environmentally safe or contained to prevent accidental release into the environment.
C.3.2.23. Size. Downrange targetry devices and other support devices (except for the Solar panels, Ifantry Lifting Shield (ILS), Armor
Lifing Shield (ALS), Iron Maiden Silhouette (IMS), Iron Maided Kill Zone Target (IMKZT), and (MSDH)) shall be sized to fit inside and be protected from rounds fired from designated firing positions by the governments standard pit design for that piece of equipment IAW
CEHNC 1110-1-23. Fully protected is defined by all portions of the TMs, simulation devices, and other support devices being installed below an imaginary 15 degree angle that extends rearward from the back edge of the top of the concrete emplacement to the ground.
C.3.2.24 Synchronization of Simulators. Each target lifting mechanism shall be capable of simultaneously interfacing with and synchronizing each applicable simulation device listed below within 0.5 seconds of receipt of a control signal from the RCS or associated target mechanism:
>Muzzle Flash Simulator (MFS) for SIT
>Battle Effects Simulator (BES) for SAT and MAT
C.3.2.25. Polarity Marking. All battery connecting cables shall be permanently identified and marked as positive or negative.
C.3.2.26. Target Hit Count. The target mechanism shall have a minimum of two hit count modes (single shot and burst). Single shot counts every hit on the target. In burst mode, a string of hits with less than 250 ms +/- 10% between hits shall count as only one hit.
C.3.2.27. N/A.
C.3.2.28. N/A.
C.3.2.29. Container Labels. All containers containing fluids or fuels shall be properly labeled IAW 29 CFR 1910.1200(g).
C.3.2.30. Battle Effects Simulator (BES) Interface/Control. BES interfaces are not required on the SITs. The BES shall be fired via commands passed from the HHCs through the associated Targetry Mechanism (TM). The female connector: ITT Cannon CA3100E20-27S-B-F97, shall be provided on all SATs and MATs required for this range.
C.3.2.31. Low Battery Indicator. All equipment that uses a battery shall have an indicator that alerts the operator when the battery is low and needs charging or replacement. The low battery indicator shall be activated when 20-30% of the full battery capacity is left.
The low battery indication shall be displayed on the screen of the HHC for each targetry device.
C.3.2.32. N/A.
C.3.2.33. N/A.
C.3.3. Target Mechanisms.
C.3.3.1. Stationary Infantry Target Mechanism (SIT). Each SIT shall be provided with and powered by a 34 amp hour (AH) battery.
C.3.3.1.1. Target Lifting. As a minimum, the lifting device shall be capable of raising or lowering full and half sized 3-D, E, and F targets in one (1) second or less with no wind. The lifting device shall raise or lower a target in less than two (2) seconds against a
35 mph wind.
C.3.3.1.2. Target Command. As a minimum, the SIT shall perform the following presentations (as directed by the RCS):
>Target up on command
>Target down on command
>Target up then down when hit N times (N=1-10 selectable)
>The target bob when hit (up, down when hit, then up)
C.3.3.1.3. Operational Status. The SIT shall transmit information to allow the HHC to determine the operational status of the lifter.
Target status shall include, but not be limited to:
>The target has reached the up position (target up)
>The target has reached the down position (target down)
>The target has failed to reach the position as commanded (target failure)
This information shall be provided to the RCS and displayed on the screen IAW paragraph 3.2.3. The mechanism shall not respond in any
18 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
manner if commanded to any position that it is already in.
C.3.3.1.4. Weight. The SIT shall weigh less than 85 pounds without a power regeneration device or power source.
C.3.3.1.5. Storage and Lifting. The SIT shall be stackable a minimum of 4 high and easily lifted into a standard cargo truck.
C.3.3.1.6. Operation Capability. The lifting mechanism shall be designed to have a minimum mean time between failures of 100,000 cycles and include its own power source. The SIT shall have sufficient energy storage capacity to perform 30 operational cycles (raise and lower the target) per hour, up to 600 cycles per 24-hour operational day without regenerating the power supply. After a night training exercise with 300 operational cycles, the SIT must have sufficient energy storage and regeneration capability to support 300 operational cycles per day and 300 per night on a continuous basis. The SIT shall be designed such that it will operate for at least a week at the stated cyclic rates without any maintenance actions to keep the SIT operational. The SIT shall hold the target in the up position and remain stable in winds up to 35 mph. In both wind and calm conditions the lifting device shall not allow the target to creep beyond a point where the target is able to respond to a command to change the target position due to the weight of the target.
C.3.3.1.7. N/A.
C.3.3.1.8. N/A.
C.3.3.1.9. Presentation. Berm height and pit dimensions are described in CEHNC 1110-1-23, USACE Design Manual for Ranges. Some variations from these dimensions can occur and the vendor is responsible for elevating the target as necessary. The target-lifting device shall be capable of presenting at least 90% (height) of a full sized 3D target (P/N 11829332) above the berm with no part of the lifting device exposed to direct fire.
C.3.3.1.10. Obstacle Encounter. If motion is impeded, the SIT shall fail-safe with no permanent damage to the mechanism.
C.3.3.1.11. Hit Sensor. A hit sensor or set of multiple hit sensors shall be provided with each target lifting mechanism:
>The hit sensor shall minimally detect and record the presence of a hit at any rate up to 600 rounds per minute
>The SIT shall detect hits using the Standard Army E, F, and 3-D targets
>Projectile hits which penetrate the target shall be indicated as hits.
>The sensor system shall not indicate hits under adverse weather conditions including rain and \'bc inch or smaller hail at up to 35 mph.
>Mechanical vibration caused by the mechanism shall not cause false hit indications.
>The sensor system shall collect and report hits to the HHC
>The SIT shall be able to detect and score a hit any time a portion of the target is exposed to any designated firing position on the range, including aerial Gunnery.
C.3.3.1.12. Target Hit Response.
>The SIT shall respond to both subsonic and supersonic bullet strikes (as a minimum between 5.56mm and 50 caliber rounds).
>The HHC scenario shall determine the number of hits to kill the target and the SIT shall be capable of responding to the requirements of the scenario.
>Hit detection shall be scored so that 97% or more of the rounds that penetrate the target will be scored as a hit.
>If hit detection sensitivity adjustment is required on the range, this must be addressed as a PMCS requirement.
>The range target mechanisms must be able to receive a hit from any type small arms ammunition and score hits from all calibers of ammunition without requiring that the sensitivity be preset to a specific caliber of ammunition.
>The hit detection system shall be capable of sensing and recording hits from varied sizes of small caliber rounds fired at a target during a single training exercise.
C.3.3.2. N/A.
C.3.3.3. N/A.
C.3.3.4. Stationary Armor Target Mechanism (SAT). Each SAT shall be provided with and powered by a 100 AH battery. The SAT shall meet the following requirements:
C.3.3.4.1. N/A.
C.3.3.4.2. Target Commands. As a minimum, the SAT shall perform the following presentations as directed by the HHC:
>Target up on command
>Target down on command
>Target down when hit
>Target up then down when hit N times (N=1-10 selectable)
>The target bob (up, down, then up) when hit
C.3.3.4.3. Weight. The SAT shall weigh 300 lbs. or less, not including any battery, interface box, or cables.
19 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
C.3.3.4.4. Lifting Ability. As a minimum, the SAT shall be capable of lifting a 150 lb. target of the T-72 tank frontal configuration
(installed so the target base is at least 6 above the maximum berm heights in CEHNC 1110-1-23) in seven (7) to ten (10) seconds and lower it within eight (8) seconds against any wind up to 35 mph and shall remain stable without tipping in winds blowing from any direction. Deceleration of target motion shall not cause damage to the target supports. An adjustment is required to allow maintenance personnel to independently adjust the target up position from 75 to 90 degrees and the down position from 0 to +15 degrees. The SAT shall operate without damage to the mechanism under wind loads up to 35 mph, and not sustain permanent damage in higher wind gusts.
C.3.3.4.5. N/A.
C.3.3.4.6. Portability/Stackability. The SAT shall be stackable and have carrying handles for four (4) persons to carry and load into a cargo truck. The SAT shall be stable when stacked (using suitable lifting equipment) four (4) high on a level surface.
C.3.3.4.7. Operational Status. The SAT shall transmit information to allow the HHC to determine the operational status of the lifter.
Target status shall include:
>The target has reached the up position (target up)
>The target has reached the down position (target down)
>The target has failed to reach the position as commanded (target failure)
This information shall be presented to the HHC and displayed on the screen IAW paragraph 3.2.3. The mechanism shall not respond in any manner if commanded to any position that it is already in.
C.3.3.4.8. Operational Capability. The SAT shall have sufficient energy storage capacity to perform up to 150 operational cycles (raise and lower the target) per 24-hour operational day without requiring downtime to regenerate the power supply. After a night training exercise with 75 operational cycles, the SAT must have sufficient energy storage and regeneration capability to support 75 operational cycles per day and 75 per night on a continuous basis at a maximum rate of 20 cycles per hour. The SAT shall be designed such that it willoperate a week or more at the stated rate without any maintenance actions to keep the SAT operational. The SAT shall hold the frontal armor target in the up position and remain stable in winds up to 35 mph. In both wind and calm conditions the lifting device shall not allow the target to creep beyond a point where the target is able to respond to a command to change the target position due to the weight of the target or wind load.
C.3.3.4.9. N/A.
C.3.3.4.10. Presentation. Berm height and pit dimensions are described in CEHNC 1110-1-23, USACE Design Manual for Ranges (including the concrete overhang of figures C-09 and C-10). The SAT shall be installed such that the TM is protected by the berm and 100 percent of the target exposed for the listed berm heights.
C.3.3.4.11. Lifting Arms. The target lifting arms shall include brackets which can be located along the length of the arms and provide adjustments to securely clamp a target support with a maximum 4 x 4 cross-section. The lifting arms shall be able to mount and lift each of the frontal armor targets listed in TC 25-8.
C.3.3.4.12. Hit Detection. The SAT shall be capable of:
>Detecting hits using a contact hit sensor able to record the presence of a hit at any rate up to 600 rounds per minute for all frontal targets listed in Training Circular TC-25-8.
>Sensing and recording hits from varied sizes of small and large caliber rounds fired at a target during a single training exercise
>Indicating projectile hits which penetrate the target as hits.
>Discriminating between actual hits and the effects of adverse weather conditions including rain and \'bc inch or smaller hail at up to 35 mph such that they are not indicated as hits.
>Ignoring mechanical vibration caused by the mechanism so that false hit indications are not scored as hits.
>Collecting and reporting hits to the HHC.
>Allowing the adjustment of hit sensitivity so that only impacts from a projectile above an established threshold are counted as a hit. The thresholds are intended to represent hits by specified caliber ammunition. The minimum thresholds acceptable are small
(personnel weapons), medium (machine gun and light armor), and large caliber (armored tank) ammunition. The discrimination must be accurate to 97%.
>Scoring 97% or more of the rounds that penetrate the target as a hit.
>Detecting and scoring a hit at any time a portion of the target is exposed to any designated firing position on the range, including aerial gunnery.
C.3.3.4.13. Obstacle Encounters. If motion is impeded, the SAT shall fail-safe.
C.3.3.5. Moving Armor Target Mechanism (MAT). Each MAT shall be provided with and powered by a gas powered generator. The contractor is allowed to use the MAT generator to regenerate the power of the MAT onboard batteries. This device shall meet the following requirements:
20 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
C.3.3.5.1. Control/Power. Control for the MAT shall be through the HHC. Communication to the MAT from the HHC will be by RF transmitters and receivers, and power shall be self-contained.
C.3.3.5.2. Target Commands. As a minimum, the target mechanism shall perform the following actions upon command from the HHC:
>Target up on command
>Target down on command
>Target down when hit
>Target up then down when hit N times (N=1-10 selectable)
>The target bob (up, down, then up) when hit
>Target move forward
>Target move reverse
>Target pause with target up
>Target stop
>Thermal outlet on
>Thermal outlet off
C.3.3.5.3. Movement. As a minimum, the MAT shall be:
>Designed to accelerate from a stop to 25-32 Kph and decelerate to 0 within a total distance of 100 meters on flat terrain.
>Capable of changing speeds under HHC control
>Capable of evasive movement, which shall include the ability to start, stop, lower the target, raise the target, change speeds and change direction while traversing between the two ends of the course as commanded by the HHC
>Responsive to hit/kill commands and react to the kill in accordance with the programmed scenario
>Capable of a minimum of four (4) distinct speeds not less than 3 kph apart. The speeds shall be in the ranges of 8-13 kph, 14-
18 kph, 19-24 kph and 25-32 kph. The 14-18 kph speed shall be such that the target on a MAT traveling at this speed on a track in the standard 350 meter emplacement will be fully exposed for a minimum of 50 seconds during a MAT movement cycle.
>Capable of climbing, descending, stopping and restarting movement in either direction on a grade up to ten percent (10%). On a ten percent (10%) slope, the mover shall be able to climb from a dead stop and accelerate to 20 kph within 100 meters. The mover shall maintain the selectable speeds within ten percent (10%) when climbing or descending a grade of five percent (5%)
>Able to stop within 40 meters after receiving a stop command from the HHC, from a safety feature, from a limit switch, loss of communication, or loss of power to the mover.
>Capable of controlling the vehicle within one (1) meter of a designated course.
C.3.3.5.4. Lifting Ability. As a minimum, the MAT shall capable of lifting a 300 lb. target of the T-72 tank flank configuration
(installed so the target base is at least 6 above the maximum berm heights in CEHNC 1110-1-23) in less than twelve (12) seconds and lower it within ten (10) seconds against 35 mph winds and shall remain stable without tipping in winds blowing from any direction.
Deceleration of target motion shall not cause damage to the target supports. An adjustment is required to allow maintenance personnel to independently adjust the target up position from 75 to 90 degrees and the down position from 0 to +15 degrees. The MAT shall operate without damage to the mechanism under wind loads up to 35 mph, and not sustain permanent damage in higher wind gusts.
C.3.3.5.5. N/A.
C.3.3.5.6. Portability. The MAT shall be constructed so that personnel using a lifting device (crane or forklift) can relocate the mover to a different track within twelve (12) man-hours, not counting travel time.
C.3.3.5.7. Operational Status. The MAT shall transmit information to allow the HHC to determine the operational status of the lifter.
Target status shall include:
>The target has reached the up position (target up)
>The target has reached the down position (target down)
>The target is moving forward
>The target is moving reverse
>The target has reached the reverse end of track
>The target has reached the forward end of track
>The target is stopped
>The target failed to respond as commanded (mover failure)
>The MAT drive motors/generators are not operating
This information shall be presented to the HHC and displayed on the screen IAW paragraph 3.2.3. The mechanism shall not respond in any manner if commanded to any position that it is already in.
C.3.3.5.8. N/A.
C.3.3.5.9. MAT Operation.
C.3.3.5.9.1. Continuous Operation. The MAT shall be capable of operating at least one cycle every seven (7) minutes. A cycle is defined as a target performing all of the following:
21 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
>Raising the target
>Travel at any speed from one end of the course to the other
>Lowering the target
>Return at any selected speed to the starting position
Attempts to operate more frequently shall not cause damage to the equipment.
C.3.3.5.9.2. Operational Capability. The MAT shall be capable of performing 100 cycles in a 24-hour operational day without any required downtime for regeneration of the power supply. After a night training exercise with 50 cycles, the MAT shall have sufficient storage and regeneration capacity to support 50 cycles during the day and 50 cycles at night on a continuous basis. The MAT shall be designed such that it will operate a week or more at the stated rate without requiring any maintenance actions to keep the MAT operational, except for refueling, if required, which is allowed every 48 hours. The MAT shall hold all flank armor targets upright in winds up to 35 mph, and the target shall not creep beyond a point where the target is able to respond to a command to change the target position due to the weight of the target or wind load.
C.3.3.5.10. N/A.
C.3.3.5.11. Target Presentation. Berm height is dimensioned in CEHNC 1110-1-23 USACE Design Manual for Ranges. Some variations from these dimensions can occur. The MAT shall present the target with the target mechanism totally protected and 100 percent of the target exposed for the berm heights listed.
C.3.3.5.12. Lifting Arms. The target lifting arms shall provide a minimum of four (4) brackets which can be located along the length of the arms and provide adjustments to securely clamp a target support with a maximum 4x 4 cross-section. The lifting arms shall be able to mount and lift each of the flank armor targets listed in TC 25-8.
C.3.3.5.13. Hit Detection. The MAT shall be capable of:
>Detecting hits using a contact hit sensor able to record the presence of a hit at any rate up to 600 rounds per minute for all flank targets listed in TC-25-8.
>Sensing and recording hits from varied sizes of small and large caliber rounds fired at…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .