PERFORMANCE WORK STATEMENT

View the file

Other files

File Type Posted
W56HZV-15-Q-0053.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Item No.DescriptionContractorCustomerComments
1.0Section 1: Overview
1.1Conduct Facility ReviewX
1.2Prepare project schedule and manage equipment delivery, installation and commissioning tasks.X
1.3Schedule project meetings at intervals necessary to keep project moving forward according to schedule.X
1.4Establish open issues list and track resolutions.X
1.5Coordinate start-up, commissioning and training of Contractor system(s).X
1.6All permits for the quoted project scope, if required.X
1.7City inspection coordination (Refer to sec. 1.6)X
1.8UL or CSA approval on authority mandated components, if required.This only relates to the Contractor portion of the scope. Assumes the Contractor and the Customer will have a representative present when inspection is taking place.
1.9(Temporary) Certificate of Occupancy coordinationThe Contractor understands that UL approval is not being requested by the Customer.
1.10Build or modify test cell to accommodate new Analytical System.XThe Contractor excludes this from their quotation
1.11All facility modifications and construction, including wall, floor, and roof penetrations.XThe Contractor will supply their equipment utility requirements following order placement. The Customer is responsible for making the utilities available, and if required, upgrading their utilities for the increased requirement resulting from the installation of the Contractor equipment. Water is not required for this project.
1.12Provide all utilities, Electrical, Compressed air, City Water supply/City Water return, Industrial Waste.XThe Contractor will provide lines from Benches to Facility exhaust system.
1.13Provide Monoxivent exhaust system, including all necessary wall penetrations, with exhaust ventilation header manifold.X
1.14Remove any existing system(s) and equipment from the test cell.X
1.15Span gases, Span gas bottle regulators, tubing from bottle room to test cells, gas distribution panel, and design and construction of gas bottle room.X
1.16Bottle room preparation.X
1.17Fire and Gas protection/detection systems.XNo allowance has been made to provide fire/gas protection or fire/gas detection system.
1.18Offload and store Analytical System and associated equipment.XAssumes facility has raised loading dock available. Customer to provide storage location for equipment until needed for installation
1.19Properly dispose of all crating and packing materials.XAssume that crating and packing materials can be disposed of in Customer's trash receptacles.
2.0Section 2: Engineering & Detail Design
2.1Supply ''red line' As Built drawingsXThe contractor will "redline" the relevant facility drawings pertaining to any contractor related additions to the building utilities or exhaust ducting changes
2.2Analytical System functional specificationsXAs specified in the quotation documentation
2.3Analytical System design and layoutXCustomer to provide facility/engineering drawings so that equipment, utility and wall/roof opening locations can be agreed upon. The contractor will submit a test cell drawing showing equipment locations for approval
2.4Analytical System utility requirementsXList of utility requirements will be provided with the drawing approvals. Actual locations to be agreed upon by all parties during design review
2.5Analytical System documentationXTo include system manuals, as -built drawings and acceptance documentation.
2.6UPS system to supply clean power for contractor analytical system computers, monitors and selected analytical componentsXThe contractor will provide UPS amperage requirements. UPS system configuration to be reviewed an established during the system approval process. UPS is not required by the contractor.
3.0Installation and Commissioning
3.1Wall penetrations to/from the test cell for wire way, span gas or heated line routing.XTo be reviewed an established during the system approval process.
3.2Set in place contractor equipmentX
3.3Set in place Zero Air GeneratorXInstallation and commissioning of the Zero Air Generator is the Customer responsibility.
3.4Equipment exhaust ventilation header manifoldX
3.5Flexible tubing and termination from equipment to exhaust header manifoldXAssumes facility exhaust header is available within 10ft. of equipment.
3.6Route electrical power to equipment locations from facility installed power distribution panelsX
3.7Terminate electrical power to contractor equipmentXAssumes facility power is available within 10ft. of equipment.
3.8Compressed air supply to contractor equipmentXProvide clean dry & oil free air supply complete with regulator and filter to be located within 10 ft. of equipment. Please refer to contractor shop air specifications.
3.9Terminate compressed air supply to contractor equipment.XAssumes compressed air supply is available within 10ft. of equipment.
3.10Cal/span/zero lines from gas distribution system to contractor equipment.XSee Item 1.15
3.11Terminate cal/span/zero gas lines to contractor equipmentXAssumes cal/span/zero gases are available within 10ft. of equipment.
3.12Facility drain for condensation collection from contractor supplied equipmentX
3.13Terminate drain lines to contractor equipmentXAssumes facility drain is available within 10ft. of equipment.
3.14Interconnecting signal and power cables between contractor supplied equipmentXRouting to be agreed with all parties prior to installation.
3.15Interconnecting gas and sample lines between contractor supplied equipmentX
3.16Install contractor supplied blower(s), starter(s), valve(s) as requiredXDoes not include enclosure for roof mounted blower(s).
3.17Provide and install Interconnect ducting between contractor supplied equipment and blower(s).XAssumes use of 304 stainless steel duct between ESU and blower, max. 30 ft.. See Item 1.11 regarding penetrations.
3.18Provide and install Interconnect ducting from contractor supplied blower(s) outlet to facility exhaust or exterior.XAssumes use of 16 - 18 ga. galvanized spiral duct to facility exhaust or to exterior, max. 25 ft.. See Item 1.11 regarding penetrations
3.19Start up and commission contractor equipmentXCommissioning will be conducted in accordance with the submitted and approved acceptance criteria documents
3.20Contractor Service will provide a heated bubbler and gas divider for acceptance.X
3.21Acceptance testing for contractor equipmentXCustomer to provide vehicle and driver
3.22Provide training for contractor equipmentXIf purchased, will be provided by Service representative.

Sheet2

ItemAcceptance Criteria
1.00Facility Review
1.01Facility UtilitiesValidate facility utilities vs. contractor requirements / specifications (i.e., power, water, air).
1.02Span / Calibration Gas SystemVerify type and quantity of span/calibration gases, including utility gases, meet specification.
1.03Bench Ventilation (Monoxivent) / DrainageVerify bench ventilation is in place and maximum depression is less that 0.5 inch of water. Verify gravity drain available if needed.
1.04Test Cell Layout and Equipment LocationsVerify equipment layout is consistent with customer agreement.
1.05Test Cell ConfigurationVerify that all test cell equipment is configured according to the customer quotation & previously approved functional specification.
1.06Check Facility GroundingVerify the facility grounding & the proper grounding of contractor equipment.
1.07Uninterruptable Power SupplyVerify UPS is connected if called for in the system design.
1.08Safety RequirementsInsure all safety interlocks are incorporated in the system design such as Dyno E-Stop, equipment contamination monitor, personnel gas safety alarm, if called for in the system design.
1.09Remote Mix Tee Heater Safety WiringEnsure that the heater overtemp switch is connected to a facility alarm system to provide audio or visual warning of overtemp condition. The overtemp switch cable must contain a WARNING label.
2.00MEXA-7100HEGR
2.01MEXA Test ReportVerify that The MEXA Test Report is in the documentation book.
2.02MEXA Bench Gas System Pressure CheckVerify span/calibration gasses pressure within MEXA bench spec. 100 +/- 10 kPa
2.03Gas Line Leak CheckClose the cylinder valves for all gases feeding the MEXA. Observe any decay in the primary bottle pressure. Limit is 20 +/- 1 psi over 8 hours
2.04Bench and Analyzer Set-UpSet all sample flows, pressures, and TCS settings. Validate refrigeration operation, MCU functions, and responses. Perform amp zeros and amp gains on analyzers as necessary. Ensure MCU parameters are entered properly.
2.05Analyzer LinearizationAccuracy = The lesser of 2% of Point or 1% Full-scale Mid-span accuracy is the same.
2.06NOx Efficiency TestRun one successful NOx Eff. Test on each bench with NOx range < 1000 ppm.

Limits:

- Modal Bench >95%

- Bag Bench >95%

- All benches NO2 limit -1 to +5% of label.

2.07CO2 Interference TestRun one successful interference test on lowest CO(L) or CO(LE) range. Use low concentration CO2 (1-3%) for bag bench and high concentration CO2 (15-20%) for modal bench. The target concentrations should be set to approximately 0.5 ppm.
2.08CLA Quench Check - CO2 QuenchApplicable to diesel regulations. Executing this function from the MCU measures the response of the NOx analyzer to CO2. Set the gas divider so that the CO2 concentration of the CO2/NOx mixture is approximately 10%. Select from two different calculations; On-Road or Off-Road. Maximum allowable result is 2% of full scale.
2.09CLA Quench Check - H2O QuenchApplicable to diesel regulations. Executing this function from the MCU measures the response of the NOx analyzer to wet NO span gas. Maximum allowable result is 3%.
2.10HC Hang-up CheckApplicable to diesel regulations. Execute this function from Checks/Tests. Zero Gas is overflowed through the probe to the THC analyzer. The maximum analyzer response is 2%.
2.11FIA Analyzer ResponseThe FIA analyzer response data is documented in the MEXA test report. FID response to various hydrocarbons can be measured by executing the HC Relative Resp. function under Checks/Tests. The HC gases are specifiable but typical examples would be methane, hexane, toluene, and ethylene. The high and low limit for relative response should be set to 0.95 - 1.15.
2.12FIA O2 Interference CheckApplicable to diesel regulations. Execute this function from Checks/Tests. Three different propane/O2/N2 blends (typical O2 concentrations are 5%, 10% & 21%). The maximum measured interference from the O2 is 3%.
2.13NMC Efficiency CheckApplicable to methane cutters. Execute this function from Checks/Tests. Ethane gas is fed to the methane cutter. Minimum strip percentage is 98%.
2.14MEXA modal leak check / confirmation / time delay determinationUsing the Line Response Time Check program in the DMC and the MEXA leak checker, introduce a known concentration gas to each modal analyzer in order to check for leaks (2% limit) and to measure rise/fall times and modal delay times.
2.15MCU Software Back-UpOnce all settings and parameters are entered and confirmed, create customer back-up copy of operating software. Document SW version & control device S/N.
3.00MEXA-6000FT
3.01System set-up, calibration gas connections liquid nitrogen fill.Suggested span gases: 200 ppm CO/N2, 200 ppm NO/N2, 500 ppm CH4/N2, 5 % CO2/N2. Utility Gases: N2, clean dry shop air.
3.02Temperature Setting ValuesSet all temperature settings (Cell Temp, Int.H.Line, Ext.H.Line, H.Filter, & H.Pump) to listed standard temperatures. Verify proper control to ± 3° C.
3.03Flow-rate Setting ValuesSet the Optical Path Purge and Interferometer Purge flow-rates to 2.5 L/min ± 0.5 L/min. Set the Bypass and Sample flow-rates to 4.0 L/min ± 0.5 L/min.
3.04Analyzer Performance
ChecksRun performance check for CO2 and CO. Collect data for zero gas for 90 sec., span gas for 90 sec. Repeat 10 times. Accuracy within ± 2.5% of full scale. Noise < 1% of full scale. Repeatability within ± 1% of full scale for zero and within ± 1% of reading for span.
3.05Analyzer Interference ChecksCheck CO interference on CO2 measurement, N2O interference on CO measurement, and CO2 interference on CO measurement. Limit for each is 1% of full scale.
3.06Analyzer Response Time CheckOverflow CO span gas to sample line inlet. Response time (T90) must be within 5 sec.
3.07Ambient Air CheckMeasure ambient. Verify that H2O concentration is within ±10% to that measured by a test cell weather station (note if customer weather station questionable other humidity sensor may be used). Also verify that the CO2 concentration is reasonable (400 - 600 ppm).
3.08System CheckChecking performance of sample pump, sensitivity of analyzer and user knowledge of operation. Check out any system errors on help screen.
3.09BackupGenerate system backup CD for customer and another backup for storage at contractor service.
4.00Documentation
4.01DocumentationOrganize, review and submit a completed package of relevant documentation to the customer as a part of the final signoff procedure. Includes all product manuals and a Commissioning/Acceptance Book to be indexed similar to the list below: