Exhibit_A_-_CDRLS.pdf

PDF 310 KB Posted

Attached to
Industrial Base Study - T&E Enterprise
Solicitation number
W56HZV15A0007_0005
Issued by

About this file

Exhibit A - CDRLS

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

0001 A TDP TM OTHER x

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Army T&E W56HZV-15-A-0007, 0005 A.T. Kearney

1, DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A001

Technical Report – Study/Services

4, AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE

C.4.7

18. ESTIMATED

TOTAL PRICE

DI-MISC-80508B Army T&E

7. DD 250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT STATEMENT

REQUIRED

ONE/R 23 WAS

b. COPIES

8. APP CODE

B 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Final

AD

(see block 16) (see Block 16) 26 WAS Draft Reg Repro

16. COR

DUSA-TE

Block 4:

Submit in accordance with the guidelines of DI-MGMT-80508B, using the DoD Product Support

Business Case Analysis Guidebook (April 11) as a guideline for format and methodology for development of the Business Case and recommendations under the Statement of Work.

Block 9: The Government requires a distribution statement on this data.

DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government agencies only for

Administrative or Operational Use. Date of determination is date product is generated. Other requests for this document shall be referred to Deputy Under Secretary of the Army for Test and

Evaluation, 102 ARMY PENTAGON WASHINGTON, DC 20310-0102

Contractors will also apply the following at the bottom of the cover/title page (if applicable), the first page, and the outside of the back cover (if applicable), and at the top of each page/chart:

‘FOR OFFICIAL USE ONLY” (The lettering must be larger than other letters on the page, and in bold font).

Block 10, 11, 12 and 13. The Government shall have ten (10) business days to review and comment on data submissions; the contractor shall then provide an update five (5) business days after receiving the Government’s review comments.

Block 14: The submission shall be sent electronically to the COR and DUSA-TE. The submission shall be prepared and delivered in current Microsoft Office Software Suite (MS Word, MS Excel, MS PowerPoint).

Documents shall be provided as a written report and as a deck of briefing charts.

WAS: Weeks after Start of Work (Kickoff) Meeting

Repro = electronic copy

15. TOTAL 2 2 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Cary Grindle 31 Jan 2017 LTC Marcus Grimes

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

0001 A TDP TM OTHER x

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Army T&E W56HZV-15-A-0007, 0005 A.T. Kearney

1, DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A002

Status Report

4, AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 18. ESTIMATED

TOTAL PRICE

DI-MGMT-80368A C.4.6 Army T&E

7. DD 250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO STATEMENT

REQUIRED Weekly 2 WAS

B 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Final

NA

(see block 16) Weekly Draft Reg Repro

16. COR 1

Block 9: The Government requires a distribution statement on this data.

DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government agencies only for

Administrative or Operational Use. Date of determination is date product is generated. Other

Contractors will also apply the following at the bottom of the cover/title page (if applicable), the first

“FOR OFFICIAL USE ONLY” (The lettering must be larger than other letters on the page, and in

Block 10 The Contractor shall deliver the status report 24 hours prior to the weekly meeting with representatives of DUSA-TE Team. First submission shall commence following the start of work meeting.

shall be prepared and delivered in current Microsoft Office Software Suite (MS Word, MS

Excel, MS Powerpoint).

DUSA-TE 1

15. TOTAL 0 2 0

Cary Grindle 31 Jan 2017 LTC Marcus Grimes

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

0001 A TDP TM OTHER x

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Army T&E W56HZV-15-A-0007, 0005 A.T. Kearney

1, DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A003

Briefing Material

4, AUTHORITY (Data Acquisition Document No.)

5. CONTRACT REFERENCE C.4.1,

C.4.2, , C.4.4, C.4.5. C.4.7, C.4.8

6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MGMT-81605 Army T&E

7. DD 250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT STATEMENT

REQUIRED (see block

16)

See Block 16

B

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Final

AD N/A (see block 16) Draft Reg Repro

16. COR 1 1 0

Block 9: The Government requires a distribution statement on this data.

DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government agencies only for

Administrative or Operational Use. Date of determination is date product is generated. Other

Contractors will also apply the following marking at the bottom of the cover/title page (if applicable), the first page, and the outside of the back cover (if applicable), and at the top of each page/chart:

Block 10, 12, and 13: The contractor shall present briefing materials to the COR NLT Close of Business on Friday of the week:

PWS Para. Draft due Govt Review due Final due

C.4.1 12 WAS 13 WAS 14 WAS

C.4.2 16 WAS 17 WAS 18 WAS

C.4.3 17 WAS 18 WAS 19 WAS

C.4.4 17 WAS 18 WAS 19 WAS

C.4.5 19 WAS 21 WAS 22 WAS

C.4.7* 23 WAS 24 WAS 25 WAS

Contractor shall provide briefing material according to the schedule outlined above. Government will provide comments within ten (10) calendar days following draft receipt. Contractor shall update

Final within five (5) calendar days following Government review.

*See CDRL A0001 **Contractor shall submit Final within fourteen (14) calendar days following final report submission.

MS Powerpoint).

DUSA-TE 1 1 0

15. TOTAL 2 2 0

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

0001 A TDP TM OTHER x

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Army T&E W56HZV-15-A-0007, 0005 A.T. Kearney

1, DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A004

OPSEC Training Report

C.9, C.18.1.1, C.18.2,C.18.4, C.18.5.2

6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-81356A Army T&E

7. DD 250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO STATEMENT

REQUIRED Annually See Block 16

N/A

SUBMISSION

a. ADDRESSEE Final

NA See Block 13 Annually Draft Reg Repro

16. COR 1 0

Block 12: The Contractor shall provide training to all contractor and subcontractor personnel to ensure awareness of the OPSEC Plan within

30 calendar days after call order award. The Contractor shall provide a

Certificate of Training within 60 calendar days after completion of training.

Block 13: The Contractor shall provide refresher annual training for all personnel on the OPSEC Plan. A certificate of compliance, in accordance with DID DI-MISC-81356A, shall be submitted validating 100% completion to the Government Contracting Officer Representative (COR) ten (10) days prior to the end of the contract.

Omit g, h, and i from the certificate of compliance.

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

0001 A TDP TM OTHER x

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Army T&E W56HZV-15-A-0007, 0005 A.T. Kearney

1, DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A005

Instruction Booklet

6. REQUIRING OFFICE 18. ESTIMATED

DI-MGMT-81605 C.4.3.1 Army T&E

7. DD 250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO STATEMENT

REQUIRED See block 16 See block 16

SUBMISSION

a. ADDRESSEE Final

NA NA See block 16 Draft Reg Repro

16. COR 1 1

Block 9: The Government requires a distribution statement on this data.

DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government agencies only for

Administrative or Operational Use. Date of determination is date product is generated. Other

Contractors will also apply the following at the bottom of the cover/title page (if applicable), the first

Block 10, 12 and 13: The briefing material instruction booklet shall be provided at 21 weeks after contract award. The Government will review and provide comments on the data submission within ten (10) calendar days of receipt of the materials. The Contractor shall address the Government comments and deliver the final draft within (ten) calendar days of receipt.

DUSA-TE 1 1

15. TOTAL 0 2 2

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

0001 A TDP TM OTHER x

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Army T&E W56HZV-15-A-0007, 0005 A.T. Kearney

1, DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A006

Update of GFI Model

DI- MGMT-81605 C.4.3.1 Army T&E

7. DD 250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO STATEMENT

REQUIRED See Block 16 See Block 16

SUBMISSION

a. ADDRESSEE Final

NA NA See Block 16 Draft Reg Repro

16. COR 1

Block 9: The Government requires a distribution statement on this data.

DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government agencies only for

Administrative or Operational Use. Date of determination is date product is generated. Other

Contractors will also apply the following at the bottom of the cover/title page (if applicable), the first

Block 10, 12 and 13: The briefing material instruction booklet shall be provided no later than 23

Weeks after Start of Work (Kickoff) Meeting. The Government will review and provide comments on the data submission within ten (10) calendar days of receipt of the materials. The contractor shall address the Government comments and deliver the final draft within (ten) business days of receipt.

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

0001 A TDP TM OTHER x

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Army T&E W56HZV-15-A-0007, 0005 A.T. Kearney

1, DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A007

Meeting Minutes

DI-ADMIN-81250A C.6.3 Army T&E

7. DD 250 REQ 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO STATEMENT

REQUIRED See Block 16 See Block 16

SUBMISSION

a. ADDRESSEE Final

NA NA See Block 16 Draft Reg Repro

16. COR 1 0

Block 9: The Government requires a distribution statement on this data.

DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government agencies only for

Administrative or Operational Use. Date of determination is date product is generated. Other

Contractors will also apply the following at the bottom of the cover/title page (if applicable), the first

Block 10, 12 and 13: The Contractor shall deliver the meeting minutes 24 hours after any meetings with representatives of Army-TE.

File details come from the government source that posted it. Updated .