AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Cost No Fee
P00013 2016SEP29
W56HZV
U.S. ARMY CONTRACTING COMMAND
WARREN, MICHIGAN 48397-5000
DARLA TREMBLAY
EMAIL: DARLAMAE.D.TREMBLAY.CIV@MAIL.MIL
S3605A
DCMA DAYTON
AREA C, BUILDING 30
1725 VAN PATTON DRIVE
WRIGHT-PATTERSON AFB, OH 45433-5302
73342
ALLISON TRANSMISSION, INC.
ONE ALLISON WAY
INDIANAPOLIS, IN 46222-3271
W56HZV-12-C-0067
2012MAR15
ACRN: AG NET INCREASE: $12,951,705.06
X 43.103(a)(3)
X
SEE SECOND PAGE FOR DESCRIPTION
/SIGNED/ 2016SEP29
LISA BEHNKE
LISA.M.BEHNKE.CIV@MAIL.MIL (586)282-7148
1 12
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: DARLA TREMBLAY
Buyer Office Symbol/Telephone Number: CCTA-AHP-B/(586)282-8082
Type of Contract 1: Cost No Fee
Kind of Contract: Service Contracts
Kind of Modification: G
Type of Business: Large Business Performing in U.S.
Surveillance Criticality Designator: B
Weapon System: Tank, M1 Abrams Family of Vehicles
Contract Expiration Date: 2017MAR15
Paying Office: HQ0337
DFAS-CO/NORTH ENTITLEMENT OPERATION
P.O. BOX 182266
COLUMBUS OH 43218-2266
*** End of Narrative A0000 ***
The purpose of this modification P00013 is as follows:
1. Authorize the following GWOs as follows (see Attachment 0002 for details):
CLIN 0001AJ is established in the amount of $1,188,299.07 for GWO 2015-02. GWO 2015-02 is to fund the purchase of a new Universal Grinder, the in-house labor to install it, and the labor to surplus two old Grinders.
CLIN 0001AK is established in the amount of $684,731.87 for GWO 2015-03. GWO 2015-03 is to fund the purchase of two
Retrofit Kits and related materials and to fund the in-house labor to install the kits to perform mechanical repairs to two CNC Shapers.
CLIN 0001AL is established in the amount of $1,490,461.79 for GWO 2015-04. GWO 2015-04 is to fund the purchase of two new ID Grinders, the in-house labor to install them, and the labor to surplus two old Grinders.
CLIN 0001AM is established in the amount of $787,469.91 for GWO 2015-05. GWO 2015-05 is to fund the purchase of a new
Horizontal Lathe, the in-house labor and materials to install it, and the labor to surplus the old Lathe.
CLIN 0001AN is established in the amount of $1,542,563.48 for GWO 2015-06. GWO 2015-06 is to fund the purchase of five Retrofit Kits and related materials, the in-house labor to install the kits, and the labor to perform minor mechanical repairs to five CNC Shapers.
CLIN 0001AP is established in the amount of $1,820,115.47 for GWO 2016-02. GWO 2016-02 is to fund the purchase of 2 new Grinders, the in-house labor to install them, and to fund the surplus of two old Springfield Vertical Grinders.
CLIN 0001AQ is established in the amount of $730,425.73 for GWO 2016-03. GWO 2016-03 is to fund the purchase of a new
Vertical Machining Center, the in-house labor to install it, and the labor to surplus two old Monarch Horizontal
Machining Centers.
CLIN 0001AR is established in the amount of $1,171,897.55 for GWO 2016-04. GWO 2016-04 is to fund the purchase of two new grinders, the in-house labor to install them, and the costs to surplus two old external grinders.
CLIN 0001AS is established in the amount of $2,593,466.27 for GWO 2016-05. GWO 2016-05 is to fund the purchase of two new CNC Gear Hobs, the in-house labor to install them, and the costs to surplus two old Gleason Hobs.
CLIN 0001AT is established in the amount of $942,273.92 for GWO 2016-06. GWO 2016-06 is to fund the purchase of 2 new
Balancers, the in-house labor to install them, and the costs to surplus two old balancers.
2. As a result of these actions, the value of this contract is increased by $12,951,705.06 from $2,155,830.87 to $15,107,535.93.
3. All other terms and conditions of this contract remain in full force and effect.
*** END OF NARRATIVE A0014 ***
2 12
W56HZV-12-C-0067 P00013
ALLISON TRANSMISSION, INC.
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
3 12
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 GOODS AND SERVICES UNDER GWO'S ______________________________
0001AJ SERVICES - GWO 2015-02 1 LO Estimated ______________________
Cost $ 1,188,299.07 __________________
Not to Exceed
(Funding) $ 1,188,299.07 __________________
SERVICE REQUESTED: EQUIPMENT MAINT PLANT 14
CLIN CONTRACT TYPE:
Cost No Fee
PRON: 476PTM6747 PRON AMD: 02 ACRN: AG
PSC: N049
Equipment Description: Purchase of new Universal
Grinder, the in-house labor to install it, and the labor to surplus two old Grinders, Tag No's 301135&
301136, IAW GWO 2015-02, included in Attachment 0002.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
Period of Performance
Start Date: 29-SEP-2016
End Date: 21-JAN-2019
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 21-JAN-2019
$ 1,188,299.07
0001AK SERVICES - GWO 2015-03 1 LO Estimated ______________________
Cost $ 684,731.87 __________________
Not to Exceed
(Funding) $ 684,731.87 __________________
SERVICE REQUESTED: EQUIPMENT MAINT PLANT 14
CLIN CONTRACT TYPE:
Cost No Fee
PRON: 476PTM6747 PRON AMD: 02 ACRN: AG
PSC: N049
Equipment Description: Purchase of two Retrofit Kits and related materials; the in-house labor to install the kits; and labor to perform minor mechanical repairs to two CNC Shapers, IAW GWO 2015-03, included
4 12
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
in Attachment 0002.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
Period of Performance
Start Date: 29-SEP-2016
End Date: 21-DEC-2017
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 21-DEC-2017
$ 684,731.87
0001AL SERVICES - GWO 2015-04 1 LO Estimated ______________________
Cost $ 1,490,461.79 __________________
Not to Exceed
(Funding) $ 1,490,461.79 __________________
SERVICE REQUESTED: EQUIPMENT MAINT PLANT 14
CLIN CONTRACT TYPE:
Cost No Fee
PRON: 476PTM6747 PRON AMD: 02 ACRN: AG
PSC: N049
Equipment Description: Purchase of two new ID
Grinders, the in-house labor to install them, and the labor to surplus two old Grinders, IAW GWO 2015-04, included in Attachment 0002.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
Period of Performance
Start Date: 29-SEP-2016
End Date: 21-NOV-2018
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 21-NOV-2018
$ 1,490,461.79
0001AM SERVICES - GWO-2015-05 1 LO Estimated ______________________
5 12
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Cost $ 787,469.91 __________________
Not to Exceed
(Funding) $ 787,469.91 __________________
SERVICE REQUESTED: EQUIPMENT MAINT PLANT 14
CLIN CONTRACT TYPE:
Cost No Fee
PRON: 476PTM6747 PRON AMD: 02 ACRN: AG
PSC: N049
Equipment Description: Fund the purchase of a
Horizontal Lathe, the in-house labor and materials to insall it, and the labor to surplus the old Lathe, IAW GWO 2015-05, included in Attachment 0002.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
Period of Performance
Start Date: 29-SEP-2016
End Date: 21-SEP-2018
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 21-SEP-2018
$ 787,469.91
0001AN SERVICES - GWO 2015-06 1 LO Estimated ______________________
Cost $ 1,542,563.48 __________________
Not to Exceed
(Funding) $ 1,542,563.48 __________________
SERVICE REQUESTED: EQUIPMENT MAINT PLANT 14
CLIN CONTRACT TYPE:
Cost No Fee
PRON: 476PTM6747 PRON AMD: 02 ACRN: AG
PSC: N049
Equipment Description: Purchase of five Retrofit Kits and related materials; the in-house labor to install the kits; and labor to perform minor mechanical repairs to five CNC Shapers, IAW GWO 2015-06, included in Attachment 0002.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
6 12
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Period of Performance
Start Date: 29-SEP-2016
End Date: 21-JUN-2018
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 21-JUN-2018
$ 1,542,563.48
0001AP SERVICES - GWO 2016-02 1 LO Estimated ______________________
Cost $ 1,820,115.47 __________________
Not to Exceed
(Funding) $ 1,820,115.47 __________________
SERVICE REQUESTED: EQUIPMENT MAINT PLANT 14
CLIN CONTRACT TYPE:
Cost No Fee
PRON: 476PTM6747 PRON AMD: 02 ACRN: AG
PSC: N049
Equipment Description: Purchase of two new Grinders, the in-house labor to install them, and the costs to surplus two old Springfield Vertical Grinders, IAW
GWO 2016-02, included in Attachment 0002.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
Period of Performance
Start Date: 29-SEP-2016
End Date: 21-JAN-2019
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 21-JAN-2019
$ 1,820,115.47
0001AQ SERVICES - GWO 2016-03 1 LO Estimated ______________________
Cost $ 730,425.73 __________________
Not to Exceed
(Funding) $ 730,425.73 __________________
SERVICE REQUESTED: EQUIPMENT MAINT PLANT 14
CLIN CONTRACT TYPE:
Cost No Fee
PRON: 476PTM6747 PRON AMD: 02 ACRN: AG
PSC: N049
Equipment Description: Purchase of a new Vertical
7 12
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Machining Center, the in-house labor to install it, and the labor to surplus two old Moncarach Horizontal
Machining Centeers, IAW GWO 2016-03, included in
Attachment 0002.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
Period of Performance
Start Date: 29-SEP-2016
End Date: 21-JAN-2019
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 21-JAN-2019
$ 730,425.73
0001AR SERVICES - GWO 2016-04 1 LO Estimated ______________________
Cost $ 1,171,897.55 __________________
Not to Exceed
(Funding) $ 1,171,897.55 __________________
SERVICE REQUESTED: EQUIPMENT MAINT PLANT 14
CLIN CONTRACT TYPE:
Cost No Fee
PRON: 476PTM6747 PRON AMD: 02 ACRN: AG
PSC: N049
Equipment Description: Purchase of two new Grinders, the in-house labor to install them, and the costs to surplus two old Warner & Swasey External Grinders, IAW GWO 2016-04, included in Attachment 0002.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
Period of Performance
Start Date: 29-SEP-2016
End Date: 21-NOV-2018
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 21-NOV-2018
$ 1,171,897.55
8 12
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0001AS SERVICES - GWO 2016-05 1 LO Estimated ______________________
Cost $ 2,593,466.27 __________________
Not to Exceed
(Funding) $ 2,593,466.27 __________________
SERVICE REQUESTED: EQUIPMENT MAINT PLANT 14
CLIN CONTRACT TYPE:
Cost No Fee
PRON: 476PTM6747 PRON AMD: 02 ACRN: AG
PSC: N049
Equipment Description: Purchase of two new CNC Gear
Hobs, the in-house labor to install them, and the costs to surplus two old Gleason Hobs, IAW GWO 2016-
05, included in Attachment 0002.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
Period of Performance
Start Date: 29-SEP-2016
End Date: 21-MAR-2019
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 21-MAR-2019
$ 2,593,466.27
0001AT SERVICES - GWO 2016-06 1 LO Estimated ______________________
Cost $ 942,273.92 __________________
Not to Exceed
(Funding) $ 942,273.92 __________________
SERVICE REQUESTED: EQUIPMENT MAINT PLANT 14
CLIN CONTRACT TYPE:
Cost No Fee
PRON: 476PTM6747 PRON AMD: 02 ACRN: AG
PSC: N049
Equipment Description: Purchase of two new Balancers, the in-house labor to install them, and the costs to surplus two old balancers, IAW GWO 2016-06, included in Attachment 0002.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
9 12
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Deliveries or Performance _________________________
Period of Performance
Start Date: 29-SEP-2016
End Date: 20-JUL-2018
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 20-JUL-2018
$ 942,273.92
10 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION G - CONTRACT ADMINISTRATION DATA
PRON/ PRON/
AMS CD/ AMS CD/
LINE MIPR/ OBLG JO NO/ INCREASE/ CUMULATIVELINE MIPR/ OBLG JO NO/ INCREASE/ CUMULATIVE
ITEM GFEBS ATA STAT ACCT ASSIGN ACRN PRIOR AMOUNT DECREASE AMOUNTITEM GFEBS ATA STAT ACCT ASSIGN ACRN PRIOR AMOUNT DECREASE AMOUNT_____ _________ _____ ___________ ____ ____________ __________ ________________ _________ _____ ___________ ____ ____________ __________ ___________
0001AJ 476PTM6747 2 A.0008737.3.7.12.2 AG $ 0.00 $ 1,188,299.07 $ 1,188,299.07
0001AK 476PTM6747 2 A.0008737.3.7.12.2 AG $ 0.00 $ 684,731.87 $ 684,731.87
0001AL 476PTM6747 2 A.0008737.3.7.12.2 AG $ 0.00 $ 1,490,461.79 $ 1,490,461.79
0001AM 476PTM6747 2 A.0008737.3.7.12.2 AG $ 0.00 $ 787,469.91 $ 787,469.91
0001AN 476PTM6747 2 A.0008737.3.7.12.2 AG $ 0.00 $ 1,542,563.48 $ 1,542,563.48
0001AP 476PTM6747 2 A.0008737.3.7.12.2 AG $ 0.00 $ 1,820,115.47 $ 1,820,115.47
0001AQ 476PTM6747 2 A.0008737.3.7.12.2 AG $ 0.00 $ 730,425.73 $ 730,425.73
0001AR 476PTM6747 2 A.0008737.3.7.12.2 AG $ 0.00 $ 1,171,897.55 $ 1,171,897.55
0001AS 476PTM6747 2 A.0008737.3.7.12.2 AG $ 0.00 $ 2,593,466.27 $ 2,593,466.27
0001AT 476PTM6747 2 A.0008737.3.7.12.2 AG $ 0.00 $ 942,273.92 $ 942,273.92
NET CHANGE $ 12,951,705.06
INCREASE/ INCREASE/
ACRN ACCOUNTING CLASSIFICATION DECREASEACRN ACCOUNTING CLASSIFICATION DECREASE____ _________________________ ______________ _________________________ __________
AG 021 201620182033 A5XGT GA0700ARU01 3109 L045982249 A.0008737.3.7.12.2 021001 $ 12,951,705.06 __________________
NET CHANGE $ 12,951,705.06
PRIOR AMOUNT INCREASE/DECREASE CUMULATIVE PRIOR AMOUNT INCREASE/DECREASE CUMULATIVE
OF AWARD AMOUNT OBLIG AMT OF AWARD AMOUNT OBLIG AMT _____________ __________________ ___________ _____________ __________________ ___________
NET CHANGE FOR AWARD: $ 2,155,830.87 $ 12,951,705.06 $ 15,107,535.93
LINELINE
ITEM ACRN EDI/SFIS ACCOUNTING CLASSIFICATIONITEM ACRN EDI/SFIS ACCOUNTING CLASSIFICATION_____ ____ _______________________________________ ____ __________________________________
0001AJ AG 021 201620182033 A5XGT GA0700ARU01 3109 L045982249 A.0008737.3.7.12.2 021001
0001AK AG 021 201620182033 A5XGT GA0700ARU01 3109 L045982249 A.0008737.3.7.12.2 021001
0001AL AG 021 201620182033 A5XGT GA0700ARU01 3109 L045982249 A.0008737.3.7.12.2 021001
0001AM AG 021 201620182033 A5XGT GA0700ARU01 3109 L045982249 A.0008737.3.7.12.2 021001
0001AN AG 021 201620182033 A5XGT GA0700ARU01 3109 L045982249 A.0008737.3.7.12.2 021001
0001AP AG 021 201620182033 A5XGT GA0700ARU01 3109 L045982249 A.0008737.3.7.12.2 021001
0001AQ AG 021 201620182033 A5XGT GA0700ARU01 3109 L045982249 A.0008737.3.7.12.2 021001
0001AR AG 021 201620182033 A5XGT GA0700ARU01 3109 L045982249 A.0008737.3.7.12.2 021001
0001AS AG 021 201620182033 A5XGT GA0700ARU01 3109 L045982249 A.0008737.3.7.12.2 021001
0001AT AG 021 201620182033 A5XGT GA0700ARU01 3109 L045982249 A.0008737.3.7.12.2 021001
11 12
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION J - LIST OF ATTACHMENTS
List of Number List of Number
Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________
Attachment 0001 SUBCONTRACTING PLAN 08-AUG-2016 001 EMAIL
Attachment 0002 GOVERNMENT WORK ORDERS 2015-02 THROUGH 2015-06; 2016-02 08-AUG-2016 035 EMAIL
THROUGH 2016-06
12 12
| SECTION A |
| SECTION B |
| SECTION G |
| SECTION J |
File details come from the government source that posted it. Updated .