This document provides specifications for roof insulation and repair for Building 210 at the Rock Island Arsenal in Rock Island, Illinois. The specifications call for a roofing system using polyisocyanurate board insulation in compliance with fire resistance standards. Fasteners must be approved for steel or concrete decks. Insulation thickness must provide the required thermal resistance. Tapered insulation is required to slope at a minimum of one in 48 inches per foot. Cover board options include glass mat gypsum roof board or high density wood fiber board. Installation requirements include surface preparation and inspection, moisture testing of concrete decks, protection of work, and quality control inspections.
View the file
Other files for this federal contract opportunity
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repair Roof - Building 210 20220353 July 15, 2022 July 15, 2022
SECTION 07 22 00
ROOF AND DECK INSULATION
02/ 16, CHG 3: 11/ 18
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C208 (2012; R 2017; E 2017; E 2019) Standard Specification for Cellulosic Fiber Insulating Board
ASTM C1177/C1177M (2017) Standard Specification for Glass Mat Gypsum Substrate for Use as Sheathing
ASTM C1289 (2021) Standard Specification for Faced Rigid Cellular Polyisocyanurate Thermal Insulation Board
ASTM D4263 (1983; R 2018) Standard Test Method for Indicating Moisture in Concrete by the Plastic Sheet Method
ASTM E84 (2020) Standard Test Method for Surface Burning Characteristics of Building Materials
FM GLOBAL (FM)
FM 4450 (1989) Approval Standard for Class 1 Insulated Steel Deck Roofs
FM 4470 (2016) Single-Ply, Polymer-Modified Bitumen Sheet, Built-up Roof (BUR), and Liquid Applied Roof Assemblies for Use in Class 1 and Noncombustible Roof Deck Construction
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2018) International Building Code
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
SECTION 07 22 00 Page 1
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Insulation Board Layout and Attachment; G
Verification of Existing Conditions; G
SD-03 Product Data
Insulation; G
Cover Board; G
Fasteners; G
SD-06 Test Reports
Flame Spread Rating; G
SD-07 Certificates
Installer Qualifications; G
SD-08 Manufacturer's Instructions
Nails and Fasteners; G
Roof Insulation; G
1.3 SHOP DRAWINGS
Submit insulation board layout and attachment indicating methods of attachment and spacing, transitions, tapered components, thicknesses of materials, and closure and termination conditions. Show locations of ridges, valleys, crickets, interface with, and slope to, roof drains.
Base shop drawings on verified field measurements and include verification of existing conditions.
1.4 PRODUCT DATA
Include data for material descriptions, recommendations for product shelf life, requirements for cover board or coatings, and precautions for flammability and toxicity. Include data to verify compatibility of sealants with insulation.
1.5 MANUFACTURER'S INSTRUCTIONS
Include field of roof and perimeter attachment requirements.
Provide a complete description of installation sequencing for each phase of the roofing system. Include weatherproofing procedures.
1.6 QUALITY CONTROL
Provide certification of installer qualifications from the insulation manufacturer confirming the specific installer has the required qualifications for installing the specific roof insulation system(s)
SECTION 07 22 00 Page 2 indicated.
1.7 FIRE PERFORMANCE REQUIREMENTS
1.7.1 Insulation in Roof Systems
Comply with the requirements of ICC IBC . Roof insulation to have a flame spread rating of 75 or less when tested in accordance with ASTM E84.
Additional documentation of compliance with flame spread rating is not required when insulation of the type used for this project as part of the specific roof assembly is listed and labeled as FM Class 1 approved
1.8 DELIVERY, STORAGE, AND HANDLING
1.8.1 Delivery
Deliver materials to the project site in manufacturer's unopened and undamaged standard commercial containers bearing the following legible information:
a. Name of manufacturer
b. Brand designation
c. Specification number, type, and class, as applicable, where materials are covered by a referenced specification
Deliver materials in sufficient quantity to allow continuity of the work.
1.8.2 Storage and Handling
Store and handle materials in accordance with manufacturer's printed instructions. Protect from damage, exposure to open flame or other ignition sources, wetting, condensation, and moisture absorption. Keep materials wrapped and separated from off-gassing materials (such as drying paints and adhesives). Do not use materials that have visible moisture or biological growth. Store in an enclosed building or trailer that provides a dry, adequately ventilated environment. Replace damaged material with new material.
1.9 ENVIRONMENTAL CONDITIONS
Do not install roof insulation during inclement weather or when air temperature is below 40 degrees F and interior humidity is 45 percent or greater, or when there is visible ice, frost, or moisture on the roof deck.
1.10 PROTECTION
1.10.1 Special Protection
Provide special protection as approved by the insulation manufacturer.
1.10.2 Completed Work
Cover completed work with cover board for the duration of construction.
Avoid traffic on completed work particularly when ambient temperature is above 80 degrees F. Replace crushed or damaged insulation prior to roof surface installation.
SECTION 07 22 00 Page 3
PART 2 PRODUCTS
2.1 INSULATION
2.1.1 Insulation Types
Provide one, or an assembly of a maximum of three, of the following roof insulation materials. Provide roof insulation that is compatible with attachment methods for the specified insulation and roof membrane.
a. Polyisocyanurate Board: Provide in accordance with ASTM C1289 REV A Type II, fibrous felt or glass mat membrane both sides, except minimum compressive strength of 25 pounds per square inch (psi).
2.1.2 Recycled Materials
Provide thermal insulation materials containing recycled content. Unless specified otherwise, the minimum required recycled content for listed materials are:
Perlite Composition Board: 75 percent postconsumer paper
Polyisocyanurate/polyurethane: 9 percent recovered material
Wood Fiberboard: 100 percent recovered material
Cellular Glass Insulation: 75 percent recovered content
Structural Fiberboard: 100 percent recovered content
Fiberglass Insulation: 25 percent recovered content
Fiber (felt) or Fiber composite: 75 percent recovered content
Rubber: 90 percent recovered content
Plastic or Plastic/Rubber composite: 90 percent recovered content
Wood/Plastic Composite: 90 percent total recovered content
Provide data identifying percentage of recycled content for insulation.
2.1.3 Insulation Thickness
As necessary to provide the thermal resistance (R-value) indicated for average thickness of tapered system. Base calculation on the R-value for aged insulation.
2.1.4 Tapered Roof Insulation
One layer of the tapered roof insulation assembly must be factory tapered to a slope of not less than one in 48 1/4 inch per foot. Factory fabricate mitered joints from two diagonally cut boards or one board shaped to provide required slopes.
SECTION 07 22 00 Page 4
2.2 COVER BOARD
For use as a thermal barrier (underlayment), fire barrier (overlayment), or cover board for hot-mopped, torched-down, or adhesive-applied roofing membrane over roof insulation.
2.2.1 Glass Mat Gypsum Roof Board
ASTM C1177/C1177M , 0 Flame Spread and 0 Smoke Developed when tested in accordance with ASTM E84, 500 psi, Class A, non-combustible, 1/2 inch thick, 4 by 8 feet board size.
2.2.2 High Density Wood Fiber
Contractor's Option: Provide high density fiber board, Grade 2 in accordance with ASTM C208 with a transverse load of 12 lbf.
2.3 FASTENERS
Provide flush-driven fasteners through flat round or hexagonal steel or plastic plates. Provide zinc-coated steel plates, flat round not less than 1 3/8 inch diameter, hexagonal not less than 28 gage. Provide high-density plastic plates, molded thermoplastic with smooth top surface, reinforcing ribs and not less than 3 inches in diameter. Fully recess fastener head into plastic plate after it is driven. Form plates to prevent dishing. Do not use bell or cup shaped plates. Provide fasteners for steel or concrete decks in accordance with FM APP GUIDE ( http://www.approvalguide.com/ ) for Class I roof deck construction.
2.3.1 Fasteners for Steel Decks
Approved hardened penetrating fasteners or screws in accordance with FM 4450 and listed in FM APP GUIDE for Class I roof deck construction.
Quantity and placement to withstand a minimum uplift pressure of in accordance with FM APP GUIDE.
2.3.2 Fasteners for Poured Concrete Decks
Approved hardened fasteners or screws to penetrate deck at least 1 inch but not more than 1 1/2 inches, in accordance with FM 4470 , and listed in FM APP GUIDE for Class I roof deck construction. Quantity and placement to withstand an uplift pressure in accordance with FM APP GUIDE.
PART 3 EXECUTION
3.1 EXAMINATION AND PREPARATION
3.1.1 Surface Inspection
Ensure surfaces are clean, smooth, and dry prior to application. Check roof deck surfaces, including surfaces sloped to roof drains and outlets, for defects before starting work.
The Contracting Officer will inspect and approve the surfaces immediately before starting installation. Prior to installing insulation, perform the following:
a. Prior to installing any roof system on a concrete deck, moisture test the deck in accordance with ASTM D4263. The deck is acceptable for
SECTION 07 22 00 Page 5 roof system application when there is no visible moisture on underside of plastic sheet after 24 hours.
3.1.2 Surface Preparation
Correct defects and inaccuracies in roof deck surface to eliminate poor drainage from hollow or low spots.
3.2 INSULATION INSTALLATION
Apply insulation in two layers with staggered joints when total required thickness of insulation exceeds 1/2 inch. When using multiple layers of insulation, provide joints of each succeeding layer that are parallel and offset in both directions with respect to the layer below. Keep insulation 1/2 inch clear of vertical surfaces penetrating and projecting from roof surface. Verify required slopes to each roof drain.
3.2.1 Special Precautions for Installation of Foam Insulation
3.2.1.1 Polyisocyanurate Insulation
Where polyisocyanurate foam board insulation is provided, install 1/2 inch thick wood fiberboard, glass mat gypsum roof board, or 3/4 inch thick expanded perlite board insulation over top surface of foam board insulation. Stagger joints of insulation with respect to foam board insulation below.
3.3 PROTECTION
3.3.1 Protection of Applied Insulation
Completely cover each day's installation of insulation with finished roofing specified on same day. Phased construction is not permitted.
Protect open spaces between insulation and parapets or other walls and spaces at curbs, scuttles, and expansion joints, until permanent roofing and flashing are applied. Storing, walking, wheeling, or trucking directly on insulation or on roofed surfaces is not permitted. Provide smooth, clean board or plank walkways, runways, and platforms near supports, as necessary, to distribute weight. Protect exposed edges of insulation with cutoffs at the end of each work day or whenever precipitation is imminent. Cutoffs must be two layers of bituminous-saturated felt set in plastic bituminous cement or EPDM membrane set in roof cement. Fill all profile voids in cutoffs to prevent trapping moisture below the membrane. Remove cutoffs when work resumes.
3.3.2 Damaged Work and Materials
Restore work and materials that become damaged during construction to original condition or replace with new materials.
3.4 INSPECTION
Establish and maintain inspection procedures to assure compliance of the installed roof insulation with contract requirements. Remove, replace, correct in an approved manner, any work found not in compliance. Quality control must include, but is not limited to, the following:
a. Observation of environmental conditions; number and skill level of insulation workers; start and end time of work.
SECTION 07 22 00 Page 6
b. Verification of certification, listing or label compliance with FM Data Sheets. ( https://www.fmglobal.com/fmglobalregistration/Downloads.aspx )
c. Verification of proper storage and handling of insulation and vapor retarder materials before, during, and after installation .
d. Inspection of vapor retarder application, including edge envelopes and mechanical fastening.
e. Inspection of mechanical fasteners; type, number, length, and spacing.
f. Coordination with other materials, cants, sleepers, and nailing strips.
g. Inspection of insulation joint orientation and laps between layers, joint width and bearing of edges of insulation on deck.
h. Installation of cutoffs and proper joining of work on subsequent days.
i. Continuation of complete roofing system installation to cover insulation installed same day.
j. Verification of required slope to each roof drain.
-- End of Section --