B08 Attachment 0005 Appendix D Non Hazardous Construction and Demolition Debris Submittal.pdf
PDF 14 KB Posted
- Attached to
- Replace Roofing - Building 210 Federal contract opportunity
- Solicitation number
- W52P1J-22-R-5004
About this file
This document contains a template for submitting non-hazardous construction and demolition debris data from a project. The template requires contractors to estimate the total weight of various construction materials generated from a project and the estimated percentages of materials to be landfilled, recycled, or otherwise diverted. Material categories include civil materials like asphalt and concrete, architectural materials like brick and drywall, electrical materials like ballasts and light fixtures, and mechanical materials like cast iron pipe and HVAC equipment. Contractors must also track the actual weight tickets received from landfills, recyclers, or other diversion vendors and indicate whether all required documentation was received.
View the file
Other files for this federal contract opportunity
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Estimated Weight Estimated Percent to be Landfilled
Estimated Percent to be Recycled
Estimated Percent to be Diverted TOTAL Weight Weight landfilled Landfill Weight recycled Recycler Weight
Diverted Diversion Weight tickets received
(pounds) (%) (%) (%) (pounds) (pounds) (vendor/ company name) (pounds) (vendor/ company name) (pounds) (vendor/ company name) Y or N
CIVIL
Asphalt Concrete Gravel Soil Structural Steel Structural Wood Other Wood Other Steel/Metal Top Soil Sub Soil Trees Crushed Stone/Base
ARCHITECTURAL
Aluminum Brick Carpet Ceiling Tile
CMU
Copper Doors Drywall Glass Insulation Materials Iron Metal Studs Misc Metal Paper Plastic Roofing Materials Sheet Metal Stone Vinyl Base Vinyl Flooring Windows Wood Studs
ELECTRICAL
Ballasts Light Fixtures Transformers Wire Conduit
MECHANICAL
Cast Iron Pipe Copper Pipe Steel Pipe HVAC Equipment White Goods Plumbing Fixtures
RPZ/DCD
Insulation
PHASE II:C&D Report Data
Material
Non-Hazardous Construction and Demolition Debris Submittal Project Title:
Project Number:
Contractor Name:
Contracting Officer's Representative:
PHASE I:C&D Plan Data
File details come from the government source that posted it. Updated .