B08 Attachment 0005 Appendix D Non Hazardous Construction and Demolition Debris Submittal.pdf

PDF 14 KB Posted

Attached to
Replace Roofing - Building 210 Federal contract opportunity
Solicitation number
W52P1J-22-R-5004
Issued by
Department of the Army Materiel Command Joint Munitions Command

About this file

This document contains a template for submitting non-hazardous construction and demolition debris data from a project. The template requires contractors to estimate the total weight of various construction materials generated from a project and the estimated percentages of materials to be landfilled, recycled, or otherwise diverted. Material categories include civil materials like asphalt and concrete, architectural materials like brick and drywall, electrical materials like ballasts and light fixtures, and mechanical materials like cast iron pipe and HVAC equipment. Contractors must also track the actual weight tickets received from landfills, recyclers, or other diversion vendors and indicate whether all required documentation was received.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Estimated Weight Estimated Percent to be Landfilled

Estimated Percent to be Recycled

Estimated Percent to be Diverted TOTAL Weight Weight landfilled Landfill Weight recycled Recycler Weight

Diverted Diversion Weight tickets received

(pounds) (%) (%) (%) (pounds) (pounds) (vendor/ company name) (pounds) (vendor/ company name) (pounds) (vendor/ company name) Y or N

CIVIL

Asphalt Concrete Gravel Soil Structural Steel Structural Wood Other Wood Other Steel/Metal Top Soil Sub Soil Trees Crushed Stone/Base

ARCHITECTURAL

Aluminum Brick Carpet Ceiling Tile

CMU

Copper Doors Drywall Glass Insulation Materials Iron Metal Studs Misc Metal Paper Plastic Roofing Materials Sheet Metal Stone Vinyl Base Vinyl Flooring Windows Wood Studs

ELECTRICAL

Ballasts Light Fixtures Transformers Wire Conduit

MECHANICAL

Cast Iron Pipe Copper Pipe Steel Pipe HVAC Equipment White Goods Plumbing Fixtures

RPZ/DCD

Insulation

PHASE II:C&D Report Data

Material

Non-Hazardous Construction and Demolition Debris Submittal Project Title:

Project Number:

Contractor Name:

Contracting Officer's Representative:

PHASE I:C&D Plan Data

File details come from the government source that posted it. Updated .