Attach_02_-_Certified_Material_Test_Report.pdf
PDF 87 KB Posted
- Attached to
- Fiber Drums, Lock-Rim
- Solicitation number
- W52P1J-19-T-FDRM
About this file
Certified Material Test Report
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach_03_-_Price_Evaluation_Spreadsheet.xlsx | XLSX spreadsheet | |
| Attach_01_-_Description_of_Requirement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CERTIFIED MATERIAL TEST REPORT
For those material(s) identified below, a Certificate of Analysis (C of A) test report shall be provided to the government at time of delivery to CAAA (Crane Army Ammunition Activity).
The test results contained on the Certificate of Analysis report(s) shall be adequate to determine compliance with all applicable requirements of the material specification(s) listed below. Availability of the Certificate of Analysis may be in addition to other Purchase requirements and does not reduce or prejudice the Government’s right to inspect supplies under other provisions of this contract.
The test report(s) shall contain the following:
a. Name and address of Manufacturer and Supplier when *applicable.
(*If not manufactured by the Supplier.)
b. Purchase order number.
c. Identification of material by specification, revision, amendment and dates, together with type, grade, size etc. number.
d. Quantity of material.
e. Material testing results shall address purchasing request specification.
Material: Lock-Rim Fiber Drums
Material Specification: Lock-rim fiber drums must meet a minimum 600 LB weight classification
Material shall be in accordance with above Specification and Documentation to support this should accompany shipment when received.
Components cannot be accepted without documentation to support the required material was used to produce.
f. Quantity tested, sample size, and specimen type as applicable.
g. Date, signature, and title of the authorized representative of the contractor that is attesting to the accuracy of test report content.
Component Lock-Rim Fiber Drums
Requirements For Demil D563
File details come from the government source that posted it.