18-R-5003-0004.pdf
PDF 135 KB Posted
- Attached to
- Repair Building 71 Federal contract opportunity
- Solicitation number
- W52P1J-18-R-5003
About this file
Amendment 0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 18-R-5003-0003.pdf | ||
| 18R5003-0002_Amendment.pdf | ||
| A21_Amendment_0001.pdf | ||
| A21_Attachment_0002_-_Davis_Bacon_Act_Wage_Determination.pdf | ||
| A21_W52P1J-18-R-5003.pdf | ||
| A21_Attachment_0003_ACC-RI_POC_List.xlsx | XLSX spreadsheet | |
| A21__SOW_2016-1224_REPAIR_BLDG_71_pdf.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2016-1224
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Amendment 0004 Narrative for details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Jun-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W52P1J-18-R-5003
X 9B. DATED (SEE ITEM 11)
02-May-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Jun-2018
CODE
GARRISON CONTRACTING BRANCH
CCRC-IG
BLDG 60, 3RD FLOOR
3055 RODMAN AVENUE
ROCK ISLAND IL 61299
W52P1J 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W52P1J-18-R-5003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0004
The purpose of Amendment 0004 is the following:
1. Questions and Answers (Questions; Q1-Q3 were previously answered on Amendment 0001):
Q4: Is any work being done to the railings around the backwash tanks?
A4: No work is required on the railings.
Q5: How much of the tanks must be accessible during the backwash cycle?
A5: See the Special Conditions and Coordination Notes on sheet G-005. See attached updated sheets for Attachment B.
Q6: The concrete curb is indicated to be 4'-4" wide and 12" tall. How thick is it to be?
A6: See amended sheet A-102, attached. Thickness is 12"
Q7: Do the new doors and frames require painting?
A7: The doors and frames are stainless steel and do not require painting.
Q8: M-003 shows a duct running midway between the peak of the building and the top of the door frame.
RG-800 shows light fixtures mounted at the peak of the building. This will cast a shadow over most of the walkway. Should these fixtures be mounted below the ductwork?
A8: Locate the lighting below the ductwork.
Q9: What mil thickness does the polyurea protective spray need to be?
A9: Install the coating to a thickness of 50 mils, see attached updated sheet A-102, Attachment B.
Q10: If the existing door frame for door A is 7'-6" tall, there are 3 courses of 8" CMU between the top of the frame and the top of the wall. That would put the top of the foundation wall at 5'-6" above the floor, not the 6'-6" shown on section C3 on sheet A-102. Please confirm height of the foundation wall.
A10: See amended sheet A-102. Wall height verified. Foundation wall height is 5'-6" above floor.
2. Amended Attachment B, sheets A-102 and G-005 dated 30 May 2018.
3. The final date for Contractors to submit questions is 10:00AM central time 08 June 2018.
4. The POC for this amendment is Jill Veloz, jill.c.veloz.civ@mail.mil, 309-782-2895.
(End of Summary of Changes)
W52P1J-18-R-5003
File details come from the government source that posted it.