SIGNED_W52P1J-17-C-5006.pdf
PDF 257 KB Posted
- Attached to
- BLDG 212 Chiller Federal contract opportunity
- Solicitation number
- W52P1J-17-R-5004
About this file
CONTRACT AWARD
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W52P1J-17-R-5004_AMENDMENT_001.pdf | ||
| ATTACH0003Nondisclosure.pdf | ||
| W52P1J-17-R-5004.pdf | ||
| DPW_SOW_-_PR_2009-3202_Chillers_212_-_15Dec16.pdf | ||
| ATTACH0002DBWageRates.pdf | ||
| ATTACH0004TechnicalEvaluation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0010974230-0002
This is a solicitation for Building 212 Chiller Replacement and Upgrade, PR 2009-3202
In accordance w ith FAR 36.204, the estimated magnitude of construction for this project is betw een $1,000,000 and $5,000,000.
This procurement is full and open w ith no set asides.
The draw ings referenced in this solicitation may be obtained by executing a Non-Disclosure Agreement, Attachment 0003, and returning it via email to Lynn Baker at lynn.d.baker8.civ@mail.mil.
The draw ings referenced in the solicitation are available through email instructions via w eb, Safe Access File Exchange (SAFE).
A pre-construction site visit is scheduled for 9:00am CT, 07 Feb 2017 in the Public Works Conference Room, Basement, Bldg 102, RESERVATIONS FOR THIS SITE VISIT ARE MANDATORY.
The completion date of this project must be completed by 10 March 2018.
LYNN BAKER 309-782-5885
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
30-Mar-2017
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______14 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________21 Feb 2017 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
W52P1J-17-C-5006
7. ISSUED BY CODE
ARMY CONTRACTING COMMAND ROCK ISLAND
ACC-RI
3055 RODMAN AVENUE
ROCK ISLAND IL 61299-8000
W52P1J
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
10:00 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W52P1J-17-R-5004-0002 22 molly.lewis Typewritten Text molly.lewis Typewritten Text molly.lewis Typewritten Text molly.lewis Typewritten Text
W52P1J-17-C-5006
Section SF 30 - Block 14 Continuation Page (SF 30)
AWARD NARRATIVE
1. This Firm Fixed Price contract W52P1J-17-C-5006 is issued to Ryan and Associates in support of Bldg
212 Chiller project on the Rock Island Arsenal, Rock Island, IL. This work will be done in accordance with the Scope of Work (SOW) dated 15 Dec 2016 and Appendices attached to the solicitation and this resulting contract.
2. A Notice to Proceed will be provided at the pre-construction conference to be scheduled at a later date.
Work is not to begin until the Notice to Proceed has been issued. The period of performance will begin upon receipt of the Notice to Proceed and the project must be completed by 10 March 2018 as stated in the
SOW.
3. A certification of insurance, as set forth in the contract, is required before work commences.
4. Please display all hot line posters at your work site per the safety requirement.
5. Ryan’s original proposal dated 21 Feb 2017 and verified as unchanged on 16 Mar 2017, is hereby incorporated into this contract.
6. The prevailing Service Contract Act wage determination is incorporated and will be in effect the entire performance period. The most recent wage determination can be found online at:
http://www.wdol.gov/sca.aspx
7. All other terms and conditions of Solicitation W52P1J-16-R-5004 and all of its amendments and attachments are hereby incorporated into this contract.
8. Attachment X is added to list Government Point of Contacts incorporated as Attachment X.
http://www.wdol.gov/sca.aspx
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job $1,220,800.00 $1,220,800.00
REPLACE AND UPGRADE CHILLER SYSTEM
FFP
Replace and upgrade BLDG 212 Chiller System in accordance with the Scope of
Work for this project, PR 2009-3202
FOB: Destination
PURCHASE REQUEST NUMBER: 0010974230-0002
NET AMT $1,220,800.00
ACRN AA
CIN: GFEBS001097423000001
$1,220,800.00
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Job $1,500.00 $1,500.00 Manpower Reporting
FFP
Manpower Reporting
PURCHASE REQUEST NUMBER: 0010974230-0002
NET AMT $1,500.00
ACRN AA
CIN: GFEBS001097423000002
$1,500.00
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
0001 POP 31-MAR-2017 TO
12-MAR-2018
N/A GARRISON - ROCK ISLAND ARSENAL
JOSEPH GUMPERT
IMNE-RIA-PWB
BLDG 102, 1ST FLOOR
1 ROCK ISLAND ARSENAL
ROCK ISLAND IL 61299
309-782-1389
W91QFD
0002 POP 31-MAR-2017 TO
12-MAR-2018
N/A (SAME AS PREVIOUS LOCATION)
ACCOUNTING AND APPROPRIATION DATA
AA: 0212017201720200000113132254 M.0061055.1 6100.9000021001
COST CODE: A2ACV
AMOUNT: $1,222,300.00
CIN GFEBS001097423000001: $1,220,800.00
CIN GFEBS001097423000002: $1,500.00
Section 00 21 00 - Instructions
CLAUSES INCORPORATED BY FULL TEXT
52.0000-4001 CLAUSES/SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
(FAR 52.252-1/52.252-2)
This solicitation incorporates one or more clauses and/or solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at these addresses:
http://farsite.hill.af.mil/; http://www.arnet.gov/far/; http://akss.dau.mil/jsp/default.jsp;
(End of clause/provision)
52.0000-4003 DISCLOSURE OF UNIT PRICE INFORMATION (JUN 2005)
This constitutes notification pursuant to Executive Order 12600, Pre-Disclosure Notification Procedures for
Confidential Commercial Information (June 23,1987), of our intention to release unit prices of the awardee in response to any request under the Freedom of Information Act, 5 USC 552. Unit price is defined as the contract price per unit or item purchased. We consider any objection to be waived unless the Contracting Officer is notified of your objection to such release prior to submission of initial proposals.
(End of clause)
52.0000-4035 ROCK ISLAND ARSENAL SITE CLAUSE (JUN 2015)
ROCK ISLAND ARSENAL SECURITY, LAW ENFORCMENT, FIRE PREVENTION, AND SAFETY
REQUIREMENTS. Any contractor personnel entering Rock Island Arsenal (RIA) as the result of this order/contract are required to adhere to all regulations governing safety, law enforcement, security, and fire prevention in effect at the time of entrance. Failure to comply with said regulations may result in immediate removal from RIA. The contractor shall bear full responsibility of the consequences of said removal. Further clarifications of RIA regulations are available from the Contracting Officer for this order/contract.
Emergency Phone Number for Rock Island Arsenal. Dial 9-1-1 FOR POLICE, FIRE, AMBULANCE. State your name, location, nature of emergency and answer any questions the dispatcher may have. Stay on the line with the dispatcher until you are told you can hang up. If calling from a cell phone, tell the dispatcher that you are calling from the Rock Island Arsenal.
1. Operations Security (OPSEC) Review:
a. All contractor/sub-contractor employees will insure an OPSEC review is conducted through coordination with the COR, by a (level II) certified, Operations Security Officer by the originating command and/or organization prior to the release of any of the following products; (a reviewed product may be, but is not limited to), picture, map, blue print, memorandum, letter, article, academic paper, video, briefing, contract, news release, technical document, proposal, plan, order, response to Privacy Act requests, or other visual or electronic media. The obligation for prior
OPSEC review applies to releases occurring both during and after completion of the contract. If the http://farsite.hill.af.mil/ http://www.arnet.gov/far/ http://akss.dau.mil/jsp/default.jsp command/organization does not have a Level II certified OPSEC officer the review will be sent to the next higher headquarters.
b. The contractor/sub-contractor will be responsible for establishing and maintaining an OPSEC program to adequately manage, protect and control critical, sensitive and classified information that has been provided or generated under the contract.
2. SECURITY REQUIREMENTS:
a. Physical Security. The contractor shall be responsible for proper security and safeguarding of all property within designated work areas, to include all vehicles and storage areas. Loss or theft of property/equipment will be reported to RIA Police immediately upon discovery.
b. Installation Access. All personnel requesting access to Rock Island Arsenal will only enter through a manned and operational Access Control Point and present a United States National or State issued identification that is capable of being scanned for valid entry. All contractor and contractor employees' vehicles, equipment, and packages are subject to inspection or examination (search) at entry/exit of the Arsenal. Security personnel/police will conduct the inspection deemed necessary to enforce security requirements. The contractor shall comply with all installation and other applicable security regulations, requirements, and instructions.
c. Restricted Areas.
(1) Contractor personnel requiring access to a restricted area are required to obtain proper identification and authorization. Access or escort with the owner/occupant of the restricted area shall be coordinated through the
Contracting Officer’s Representative (COR).
(2) Government Administrative Office Areas. Government personnel will be working in office areas during normal working hours. Contractor employees shall cooperate with personnel in the immediate area where any service or maintenance work is being performed. Work performed after normal duty hours shall be coordinated with the Contracting Officer or his designated representative.
d. Photographic Equipment Restrictions:
(1) There are restrictions on the use of photographic devices in all non-public areas of Arsenal Island. This includes, but is not limited to, digital cameras, cell phones, and personal data assistants (PDAs) with cameras. Per
U.S. Army Regulation 360-1, taking or producing ground or aerial photographs, sketches, or graphic representations of classified military equipment or installations designated as restricted areas is punishable by law (18 United States
Code 795). Reproducing, publishing, or selling this type of material is also punishable by law unless the photograph, sketch, or graphic representation indicates it has been reviewed and cleared for release by proper authority (18 USC 797). Video, still photos, digital photos, sketches, and graphic representations are for official use only and are not authorized for public release. The contractor must get permission from the Physical Security
Office, Bldg 225, to use any type of photographic device at the Access Control Points or in any Restricted Area.
(2) Upon completion of this contract, all critical and sensitive information (video, still photos, digital photos, sketches, graphic representations, etc.) that is no longer needed, must be destroyed (burned, shredded, etc.) to prevent the inadvertent disclosure and reconstruction of this material.
e. Electronic Access. The COR must coordinate, request, and issue electronic access keys for contractor personnel. Contractor personnel must report the loss of electronic keys immediately to the COR.
f. Key Control. The Director, Public Works key custodian, thru the COR, is responsible for issuing keys to the contractor. The contractor shall establish a key control system IAW AR 190-11, Physical Security of Arms
Ammunition and Explosives, and AR 190-51, Security of Unclassified Army Property (Sensitive and Non-sensitive), to ensure that none of the keys issued to the contractor are lost, misplaced, or used by unauthorized persons. Government keys shall not be duplicated by the contractor.
(1) Replacement. The contractor shall be responsible for all costs incurred as a result of the contractor losing any key. The contractor shall reimburse the government for replacement of locks or keys required as a result of the contractor losing any key(s).
(2) Entrance to Locked Areas. The contractor shall not permit entrance to locked areas to any person (other than employees of the contractors engaged in the performance of work in those areas) without authorization by the
COR.
(3) Lock Combinations. The contractor shall ensure that no lock combinations are made available to unauthorized persons.
g. Industrial Security:
(1) Contractor personnel requiring issuance of a government Common Access Card (CAC) and/or require access to any government Automated Information System (AIS), must obtain a favorable National Agency Check with Inquiries (NACI) or equivalent personnel security investigation, initiated by the Garrison Security &
Intelligence Division.
(2) Foreign Nationals must be escorted by a US Citizen at all times. This person must be a cleared government employee or a contractor employed on RIA.
(3) Access to the installation may be denied during increased readiness or Force Protection Conditions
(FPCONs).
3. GENERAL SAFETY AND OCCUPATIONAL HEALTH GUIDANCE:
a. The Army has an overall goal of ensuring that contracted work is performed using procedures and risk controls that ensure workers, the public and the environment are not endangered.
b. Contractors must comply with applicable Federal, State, and local codes and standards, including Safety and
Occupational Health (SOH) requirements, as well as any additional specific requirements invoked by the contract.
These requirements are listed in, but not limited to: (1) DoD Instruction 6055.1, "DoD Occupational Safety and
Health Program," (2) Army Regulation 385–10, "The Army Safety Program," (3) Department of the Army Pamphlet
385–10, "Army Safety Program," (4) Occupational Safety and Health Administration, General Industry Standards, CFR 1910, (5) Occupational Safety and Health Administration, Construction Standards, CFR 1926, (6) U.S. Army
Corps of Engineers Safety and Health Requirements Manual, EM 385–1–1, (7) Local Installation Safety and Health
Regulations.
c. Army contractors will be required to have a Safety and Occupational Health Program implemented that is tailored to meet the safety requirements of each contract and the associated tasks and products of that contract. This program will be documented in the contractor’s safety plan.
d. Contract activities will be conducted in a safe and healthful manner that minimizes accidents as well as impacts on Army operations and members of the public.
e. Contractors are responsible for the safety and health of their employees and protection of the public at contractor plants and work sites.
4. Automated Information Systems (AIS) Access:
a. The contractor will ensure that all automation systems are operated, used, maintained and disposed of IAW AR
380-5, AR 380-67, AR 25-1, DOD Directives 5200.1, 5200.1-R, 5200-40, and 5200-40M, and all other RIA and higher headquarters regulations.
b. Government Computer Access. The contractor will be responsible for the following items for personnel accessing government systems:
- No contractor computer accessing a government system will be allowed to access a non-government system through any means.
- The contractor will support compliance with all Information Assurance Vulnerability Alerts (IAVA), Information Assurance Vulnerability Bulletins, and Tech. Tips.
- The contractor will ensure that all computers and devices are accredited prior to connection to any government network.
- The contractor will report information assurance (computer) incidents immediately to their Information
Assurance Support Officer.
- The contractor will ensure that only approved virus detection software is installed on computers.
- The contractor will scan all media utilizing approved virus detection software before it is introduced into computers.
- Contractors will ensure that individuals accessing government computer systems sign and comply with the
Acceptable Use Policy (AUP) and complete initial and annual information assurance awareness training.
- The contractor will not process classified data on computers that are not accredited for classified processing.
- The contractor will not share personally assigned accounts, passwords, or PINs with anyone.
- The contractor will use Command Access Card (CAC) as the primary system access credential.
- The contractor will not allow anyone else to operate the computer while they are logged on.
- The contractor will not use unapproved accounts (such as Hotmail or Yahoo mail) for official army business.
The use of a commercial Internet Service Provider (ISP) or email accounts for official purposes is prohibited.
- The contractor will not install their personally owned software, Shareware, Freeware, Public Domain or software downloaded from the INTERNET on a government system.
- The contractor will not be simultaneously connected to a local area network and an active dial-up modem.
- The contractor will not be allowed remote management capabilities in the defense perimeter of the RIA.
5. PARKING:
a. Parking is on a first-come, first served basis, provided the parking space is not posted with a reserved, visitor or handicapped parking sign. Parking is allowed in “marked” spaces only. At no time will a contractor park within
40 feet of an inhabited building. Violator’s vehicle may be subject to ticket, or towed at contractor expense.
b. All valid spaces are clearly marked with white lines on both sides of the parking space. Vehicles parked in other than valid spaces are subject to being issued a parking ticket.
6. SMOKING POLICY: All contractor personnel must comply with local smoking policy. See COR for local policy.
7. GOVERNMENT INSPECTIONS AND INVESTIGATIONS: The government reserves the right to conduct announced or unannounced inspections and investigations at any time, pertaining to government information, equipment and/or facilities. This includes, but is not limited to, security, safety, fire prevention, and environmental inspections. The contractor shall cooperate with government officials in the conduct of all investigations.
8. REMOVAL OF CONTRACTOR OR GOVERMENT-FURNISHED PROPERTY: The following procedures are prescribed for the issuance of passes for removing contractor owned material and equipment which has been brought onto the Rock Island Arsenal by authorized contractors for use in accomplishing work under a contract, or government-furnished property which, under the terms of a contract, may properly be removed by the contractor.
a. It will be the responsibility of the contracting officer, or designated inspector, to determine that property being removed by a contractor is property of the contractor, or government-furnished property being removed under the terms of the applicable contract. In case government-furnished property is involved, it will be the responsibility of the individuals designated above to insure that all accounting papers prescribed by the contract or other regulations have been completed before the contractor is permitted to remove the property.
b. All contractor owned property will be labeled with the contractor’s name for quick identification.
9. EQUAL EMPLOYMENT OPPORTUNITY (EEO) SERVICES: EEO does not service contractors. However, if a government employee allegedly discriminates against a contractor employee, the RIA Garrison EEO office should be contacted.
52.0000-4036 REQUIRED INSURANCE
Dec 2010
Pursuant to paragraph (a) of FAR Clause 52.228-5, ”Insurance – Work on a Government Installation”, or
FAR Clause 52.228-7, “Insurance – Liability to Third Persons”, the Contractor shall procure and maintain the following insurance during the entire period of performance under this contract:
TYPE AMOUNT
Worker’s Compensation As required by Law
Employer’s Liability Minimum liability limit $100,000
General Liability Minimum bodily injury limits, $500,000 per occurrence
Automobile Liability Minimum liability of $200,000 per person, $500,000 per occurrence for bodily injury, and
$20,000 per occurrence for property damage
Aircraft Public and Passenger Coverage required when contract performance
Liability involves use of aircraft:
Minimum liability of $200,000 per person, $500,000 per occurrence for bodily injury, other than passenger liability, and $200,000 per occurrence for property damage. Passenger liability shall be at least $200,000 multiplied by the number of seats or number of passengers, whichever is greater.
Vessel Collision Liability Coverage required when contract performance involves use of vessels:
Minimum liability of $5,000,000 or the market value of the property being shipped by vessel, whichever is greater
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be __20%______ percent of the bid price or $__3M______, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of provision)
Section 00 45 00 - Representations and Certifications
CLAUSES INCORPORATED BY REFERENCE
52.204-13 System for Award Management Maintenance OCT 2016
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of
Terrorism
OCT 2015
52.232-18 AVAILABILITY OF FUNDS (APR 1984)
Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting
Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
Section 00 70 00 - Conditions of the Contract
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government
0002 N/A N/A N/A Government
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions NOV 2013
52.203-3 Gratuities APR 1984
52.203-5 Covenant Against Contingent Fees MAY 2014
52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006
52.203-7 Anti-Kickback Procedures MAY 2014
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014
52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.204-2 Alt II Security Requirements (Aug 1996) - Alternate II APR 1984
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011
52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
OCT 2016
52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for
Debarment
OCT 2015
52.209-9 Updates of Publicly Available Information Regarding
Responsibility Matters
JUL 2013
52.209-10 Prohibition on Contracting With Inverted Domestic
Corporations
NOV 2015
52.215-2 Audit and Records--Negotiation OCT 2010
52.216-5 Price Redetermination--Prospective OCT 1997
52.219-8 Utilization of Small Business Concerns NOV 2016
52.219-9 Small Business Subcontracting Plan NOV 2016
52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013
52.222-3 Convict Labor JUN 2003
52.222-4 Contract Work Hours and Safety Standards- Overtime
Compensation
MAY 2014
52.222-6 Construction Wage Rate Requirements MAY 2014
52.222-7 Withholding of Funds MAY 2014
52.222-8 Payrolls and Basic Records MAY 2014
52.222-9 Apprentices and Trainees JUL 2005
52.222-10 Compliance with Copeland Act Requirements FEB 1988
52.222-11 Subcontracts (Labor Standards) MAY 2014
52.222-12 Contract Termination-Debarment MAY 2014
52.222-13 Compliance With Construction Wage Rate Requirements and
Related Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988
52.222-15 Certification of Eligibility MAY 2014
52.222-21 Prohibition Of Segregated Facilities APR 2015
52.222-26 Equal Opportunity SEP 2016
52.222-27 Affirmative Action Compliance Requirements for
Construction
APR 2015
52.222-35 Equal Opportunity for Veterans OCT 2015
52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014
52.222-37 Employment Reports on Veterans FEB 2016
52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-50 Combating Trafficking in Persons MAR 2015
52.222-54 Employment Eligibility Verification OCT 2015
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011
52.223-6 Drug-Free Workplace MAY 2001
52.223-11 Ozone-Depleting Substances and High Global Warming
Potential Hydrofluorocarbons.
JUN 2016
52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration
Equipment and Air Conditioners.
JUN 2016
52.223-15 Energy Efficiency in Energy-Consuming Products DEC 2007
52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
MAY 2008
52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
AUG 2011
52.223-20 Aerosols JUN 2016
52.223-21 Foams JUN 2016
52.225-9 Buy American--Construction Materials MAY 2014
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008
52.227-1 Authorization and Consent DEC 2007
52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
DEC 2007
52.227-4 Patent Indemnity-Construction Contracts DEC 2007
52.228-2 Additional Bond Security OCT 1997
52.228-11 Pledges Of Assets JAN 2012
52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014
52.228-14 Irrevocable Letter of Credit NOV 2014
52.228-15 Performance and Payment Bonds--Construction OCT 2010
52.229-3 Federal, State And Local Taxes FEB 2013
52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014
52.232-17 Interest MAY 2014
52.232-23 Assignment Of Claims MAY 2014
52.232-27 Prompt Payment for Construction Contracts MAY 2014
52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-1 Disputes MAY 2014
52.233-3 Protest After Award AUG 1996
52.233-4 Applicable Law for Breach of Contract Claim OCT 2004
52.236-2 Differing Site Conditions APR 1984
52.236-3 Site Investigation and Conditions Affecting the Work APR 1984
52.236-4 Physical Data APR 1984
52.236-5 Material and Workmanship APR 1984
52.236-6 Superintendence by the Contractor APR 1984
52.236-7 Permits and Responsibilities NOV 1991
52.236-8 Other Contracts APR 1984
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984
52.236-11 Use and Possession Prior to Completion APR 1984
52.236-12 Cleaning Up APR 1984
52.236-13 Accident Prevention NOV 1991
52.236-14 Availability and Use of Utility Services APR 1984
52.236-15 Schedules for Construction Contracts APR 1984
52.236-16 Quantity Surveys APR 1984
52.236-17 Layout of Work APR 1984
52.242-13 Bankruptcy JUL 1995
52.242-14 Suspension of Work APR 1984
52.243-1 Changes--Fixed Price AUG 1987
52.244-6 Subcontracts for Commercial Items JUN 2016
52.246-12 Inspection of Construction AUG 1996
52.246-21 Warranty of Construction MAR 1994
52.248-3 Value Engineering-Construction OCT 2015
52.249-2 Alt I Termination for Convenience of the Government (Fixed-
Price) (Apr 2012) - Alternate I
SEP 1996
52.249-10 Default (Fixed-Price Construction) APR 1984
52.253-1 Computer Generated Forms JAN 1991
252.201-7000 Contracting Officer's Representative DEC 1991
252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-
Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013
252.204-7003 Control Of Government Personnel Work Product APR 1992
252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or
Hazardous Materials
SEP 2014
252.225-7001 Buy American And Balance Of Payments Program-- Basic
(Nov 2014)
NOV 2014
252.225-7012 Preference For Certain Domestic Commodities FEB 2013
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006
252.236-7000 Modification Proposals-Price Breakdown DEC 1991
252.236-7008 Contract Prices-Bidding Schedules DEC 1991
252.243-7001 Pricing Of Contract Modifications DEC 1991
252.247-7023 Transportation of Supplies by Sea APR 2014
252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000
52.0000-4037 U.S. DEPARTMENT OF LABOR WAGE DETERMINATIONS (MAY 1993)
ONLY THOSE ITEMS MARKED WITH AN 'X' APPLY:
[ ] (a) The following United States Department of Labor Wage Rates Decision Number is applicable to this procurement: [ENTER DECISION NO., DATE AND MODS, IF APPLICABLE]
[X] (b) Wage determinations of the Secretary of Labor are attached.
[ ] (c) Wage determinations are not attached:
[ ] are not applicable to this solicitation.
[ ] are pending decision by Department of Labor and may be added by amendment.
52.0000-4919 CONTRACTOR PERFORMANCE INFORMATION (DEC 2005)
The successful offeror/bidder under this solicitation is advised that after contract award its performance under this contract will be subject to an assessment(s) in accordance with FAR 42.15 and AFARS 5142.1503-90. The
Department of Defense (DoD) Contractors Performance Assessment Reporting System (CPARS) will be used to maintain the performance report(s) generated on this contract. The rating system to be used in this assessment shall be as follows:
Exceptional (Dark Blue) – Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good (Purple) – Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory (Green) – Performance meets contractual requirements. The contractual performance of the element or sub element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal (Yellow) – Performance does not meet some contractual requirements. The contractual performance of the element or sub element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory (Red) – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
The evaluation procedures to be used in this assessment, which include coordination with the contractor, are detailed in AFARS 5142.1503-90.
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 14 calendar days after the date the
Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 10 March 2018. The time stated for completion shall include final cleanup of the premises.
52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
(a) The Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required in the Schedule or elsewhere in the contract.
(b) Before commencing work under this contract, the Contractor shall notify the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective (1) for such period as the laws of the State in which this contract is to be performed prescribe, or (2) until
30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.
(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors' proofs of required insurance, and shall make copies available to the Contracting Officer upon request.
52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)
(a) The Contractor shall keep on the work site a copy of the drawings and specifications and shall at all times give the Contracting Officer access thereto. Anything mentioned in the specifications and not shown on the drawings, or shown on the drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both. In case of difference between drawings and specifications, the specifications shall govern. In case of discrepancy in the figures, in the drawings, or in the specifications, the matter shall be promptly submitted to the
Contracting Officer, who shall promptly make a determination in writing. Any adjustment by the Contractor without such a determination shall be at its own risk and expense. The Contracting Officer shall furnish from time to time such detailed drawings and other information as considered necessary, unless otherwise provided.
(b) Wherever in the specifications or upon the drawings the words "directed", "required", "ordered", "designated", "prescribed", or words of like import are used, it shall be understood that the "direction", "requirement", "order", "designation", or "prescription", of the Contracting Officer is intended and similarly the words "approved", "acceptable", "satisfactory", or words of like import shall mean "approved by," or "acceptable to", or "satisfactory to" the Contracting Officer, unless otherwise expressly stated.
(c) Where "as shown," as indicated", "as detailed", or words of similar import are used, it shall be understood that the reference is made to the drawings accompanying this contract unless stated otherwise. The word "provided" as used herein shall be understood to mean "provide complete in place," that is "furnished and installed".
(d) Shop drawings means drawings, submitted to the Government by the Contractor, subcontractor, or any lower tier subcontractor pursuant to a construction contract, showing in detail (1) the proposed fabrication and assembly of structural elements, and (2) the installation (i.e., fit, and attachment details) of materials or equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the contractor to explain in detail specific portions of the work required by the contract. The Government may duplicate, use, and disclose in any manner and for any purpose shop drawings delivered under this contract.
(e) If this contract requires shop drawings, the Contractor shall coordinate all such drawings, and review them for accuracy, completeness, and compliance with contract requirements and shall indicate its approval thereon as evidence of such coordination and review. Shop drawings submitted to the Contracting Officer without evidence of the Contractor's approval may be returned for resubmission. The Contracting Officer will indicate an approval or disapproval of the shop drawings and if not approved as submitted shall indicate the Government's reasons therefor.
Any work done before such approval shall be at the Contractor's risk. Approval by the Contracting Officer shall not relieve the Contractor from responsibility for any errors or omissions in such drawings, nor from responsibility for complying with the requirements of this contract, except with respect to variations described and approved in accordance with (f) below.
(f) If shop drawings show variations from the contract requirements, the Contractor shall describe such variations in writing, separate from the drawings, at the time of submission. If the Contracting Officer approves any such variation, the Contracting Officer shall issue an appropriate contract modification, except that, if the variation is minor or does not involve a change in price or in time of performance, a modification need not be issued.
(g) The Contractor shall submit to the Contracting Officer for approval four copies (unless otherwise indicated) of all shop drawings as called for under the various headings of these specifications. Three sets (unless otherwise indicated) of all shop drawings, will be retained by the Contracting Officer and one set will be returned to the
Contractor.
52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)
If the Contracting Officer decides to conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officer's notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.
52.243-4 CHANGES (JUN 2007)
(a) The Contracting Officer may, at any time, without notice to the sureties, if any, by written order designated or indicated to be a change order, make changes in the work within the general scope of the contract, including changes--
(1) In the specifications (including drawings and designs);
(2) In the method or manner of performance of the work;
(3) In the Government-furnished property or services; or
(4) Directing acceleration in the performance of the work.
(b) Any other written or oral order (which, as used in this paragraph (b), includes direction, instruction, interpretation, or determination) from the Contracting Officer that causes a change shall be treated as a change order under this clause; provided, that the Contractor gives the Contracting Officer written notice stating
(1) the date, circumstances, and source of the order and
(2) that the Contractor regards the order as a change order.
(c) Except as provided in this clause, no order, statement, or conduct of the Contracting Officer shall be treated as a change under this clause or entitle the Contractor to an equitable adjustment.
(d) If any change under this clause causes an increase or decrease in the Contractor's cost of, or the time required for, the performance of any part of the work under this contract, whether or not changed by any such order, the
Contracting Officer shall make an equitable adjustment and modify the contract in writing. However, except for an adjustment based on defective specifications, no adjustment for any change under paragraph (b) of this clause shall be made for any costs incurred more than 20 days before the Contractor gives written notice as required. In the case of defective specifications for which the Government is responsible, the equitable adjustment shall include any increased cost reasonably incurred by the Contractor in attempting to comply with the defective specifications.
(e) The Contractor must assert its right to an adjustment under this clause within 30 days after
(1) receipt of a written change order under paragraph (a) of this clause or (2) the furnishing of a written notice under paragraph (b) of this clause, by submitting to the Contracting Officer a written statement describing the general nature and amount of the proposal, unless this period is extended by the Government. The statement of proposal for adjustment may be included in the notice under paragraph (b) above.
(f) No proposal by the Contractor for an equitable adjustment shall be allowed if asserted after final payment under this contract.
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area
WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training
Course and use the Practice Training Site before submitting payment requests through
WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data
Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
Construction
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in
WAWF, as specified by the contracting officer.
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC HQ0490
Issue By DoDAAC W52P1J
Admin DoDAAC W52P1J
Inspect By DoDAAC W91QFD
Ship To Code W91QFD
Ship From Code N/A
Mark For Code N/A
Service Approver (DoDAAC) W91QFD
Service Acceptor (DoDAAC) W91QFD
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send
Additional Email Notifications” field of WAWF once a document is submitted in the system.
Joseph.e.gumpert.civ@mail.mil
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Lynn.d.baker8.civ@mail.mil
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
See provided drawings and SOW
Section 01 00 00 - General Requirements
LIST OF ATTACHMENTS
ATTACHMENTS
0001 SCOPE OF WORK
0002 DAVIS BACON WAGE DETERMINATION
0003 NON-DISCLOSURE
0004 TECHNICAL EVALUATION
0005 APPENDICES
- APPENDIX A - SPECIFICATIONS
- APPENDIX B - DRAWINGS
- APPENDIX C - SUBMITTALS
- APPENDIX D - ENGINEERING STANDARDS
- APPENDIX E - DEBRIS SUBMITTALS
- APPENDIX F - STRUCTURAL DRAWINGS (3 PARTS)
- APPENDIX G – ASBESTOS REPORT
- APPENDIX H – SITE PICTURES
-ATTACHMENT X – POC LISTING
File details come from the government source that posted it. Updated .