Tooele Army Depot Building 1002 Re-roof Solicitation W52P1J-17-R-3011 Amendment 0002
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W67G22631901EW
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See page 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Mar-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W52P1J-17-R-3011
X 9B. DATED (SEE ITEM 11)
15-Feb-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Mar-2017
CODE
ARMY CONTRACTING COMMAND ROCK ISLAND
3055 RODMAN AVENUE
ROCK ISLAND IL 61299-8000
W52P1J 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W52P1J-17-R-3011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGE
1. The purpose of this modification is to:
A. Incorporate the requirement for the offeror to certify, at proposal submission, that it has provided all required documents to the Woman-Owned Small Business Program Repository consistent with solicitation FAR clause 52.219-30, Notice of Set-Aside for, or Sole Source Award To, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program.
B. Provide the following responses to questions submitted following the site visit, as follows:
1. The drawings call for the addition of R38 insulation in the Gym. Is this insulation intended to be in the form of roof insulation above the roof deck or Batt insulation below the roof deck? Is this insulation to be installed to the roof joists or laid on the gym Ceiling?
Answer: The existing rigid foam insulation above the deck shall be removed and replaced with new rigid insulation with similar R value. To make up the additional R value required by the SOW, additional batts insulation should be fastened to the underside of the deck. Contractor may propose a different/better solution as deemed necessary.
2. There are several satellite dishes attached to the fascia. Are these to be removed and reinstalled by the contractor?
Answer: If it is necessary to remove the satellite dishes, coordination must be made beforehand with the building director, Russ Lee at 435-833-2222. Disruption in data service to the building must be kept at a minimum.
3. The roofs are ballasted. Does the government want the ballast rock or is it to be disposed of?
Answer: The rock is to be removed and disposed. The contractor may propose to have the rock removed and placed in a pile on-site to be picked up and hauled away by the government. However, the rock must be clean WITHOUT any roof material debris mixed in.
4. Please clarify that dumpsters are to be provided by the government.
Answers: All trash and recycle dumpsters shall be provided by the government.
5. Is there a quantity of decking replacement that should be included in our pricing?
No. During construction, if it is found that parts of the decking has rotted and will need to be replaced, contractor shall submit a cost to perform the repair. After agreement from the contracting officer, contractor may replace those areas.
6. The details state new soffit and fascia. Is all soffit and fascia to be replaced? The existing fascia is painted. If only areas are to be repaired, please specify a color for the replacement material.
Answer: Only soffit and fascia that shows obvious signs of needing replacement should be replaced with new material that matches as close as possible to the existing material or should be painted to match.
7. What color Drip edge is required for this project?
Answer: Dark Brown
8. The drip Edge detail calls for a New Rake Flashing. Is this to be installed on all areas of this project?
Answer: Yes
9. What materials make-up the existing roofs?
Answer: According to the asbestos report and some core sampling, the following sections are approximate:
Roof 1: wood deck, felt paper, gypsum board, rigid insulation, single-ply membrane Roof 2: wood deck, felt paper, gypsum board, rigid insulation, single-ply membrane Roof 3: wood deck, felt paper, gypsum board, rigid insulation, single-ply membrane Roof 4: wood deck, felt paper, gypsum board, rigid insulation, single-ply membrane Roof 5: concrete deck, felt paper, gypsum board, rigid insulation, single-ply membrane Roof 6: wood deck, felt paper, gypsum board, rigid insulation, single-ply membrane Roof 7: wood deck, felt paper, gypsum board, rigid insulation, single-ply membrane
10. The plans call for additional R38 in the Gym area. The questions was, is this to be put on the roof or in the attic space?
Answer: See Number 1 above.
11. Is there any additional insulation required on the other areas ? if so how much?
Answer: Other than replacing the existing rigid board insulation per the SOW, there is none specified.
12. Are we to go back with the same assembly as the existing roof ½” gypsum board, 2” ISCO?
Answer: Yes, the existing gypsum should be replaced with like material to provide the 1 hour fire rating.
13. Section 01110 Scope of work; Indicates that the existing roof deck is wood. During the pre-bid site visit it was observed that the building has wood joist with gypsum plank decking over the top. This type of decking won’t allow for the specified mechanical attachment of the new roof system.
Answer: The contractor should propose a system in his/her bid that will give the intended results and the
20 year no-dollar warranty.
14. Can the contractor access the rear of the building (North Side) for loading and unloading the roof through the access gate in the fencing.
Answer: Yes, coordination will be made during the time of construction.
15. If any dust or debris from the roof demo gets in to the pool will the contractor be required to pay for the cost to drain and clean it.
Answer: Contractor should make every effort to keep debris from blowing off of the roof and is responsible to keep the worksite clean. Incidental dust and debris that lands in the pool might be cleaned by the government, however, coordination is required from the contracting officer, his/her representative, the building employees, and contractor. The pool is planning to open the last week of May.
16. Will any Friday or Saturday work be allowed, especially if weather doesn’t allow for work on any of the days Monday thru Thursday.
Answer: Additional days may be allowed. Contractor shall coordinate with the contracting officer or contracting officer’s representative beforehand.
17. Construction note #13 on sheet 2 of 4 indicates that R-38 insulation be added to the Gymnasium area. Does this insulation get added above the roof deck or in the attic space. Will BLOWN-IN insulation be an option?
Answer: See Number 1 above.
2. As a result of the preceding, the date/time for receipt of proposals is extended to 23 March 2017 at 10:00 a.m.
CT.
3. All other terms and conditions remain unchanged.
4. The points of contact for the preceding are LaMark Combs, email: lamark.j.combs.civ@mail.mil AND Vicki Ahlgrim, email: vicki.l.ahlgrim.civ@mail.mil.