This pricing worksheet attachment for solicitation number W51AA124Q0040 requests pricing for sanitary drain and grease trap maintenance services for the Department of the Army over one base year and two option years. Offerors must provide firm fixed prices for semi-annual preventative maintenance in each period, as well as fully burdened hourly rates for labor, jetting, camera use, vacuum truck usage, and pipe relining services. Pricing is also required for grease and wastewater pumping. The services required include clearing blockages from catch basins, storm sewers and sanitary sewers using various equipment, as well as catch basin cleaning and grease trap maintenance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W51AA124Q0040 0001.pdf | ||
| 2ND UPDATED QUESTIONS AND ANSWERS FOR W51AA124Q0040 _.xlsx | XLSX spreadsheet | |
| UPDATED QUESTIONS AND ANSWERS FOR W51AA124Q0040 .xlsx | XLSX spreadsheet | |
| QUESTIONS AND ANSWERS FOR W51AA124Q0040 .xlsx | XLSX spreadsheet | |
| Attachment 1 Bid Sheet.xlsx | XLSX spreadsheet | |
| W51AA124Q0040.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Worksheet
| Attachment 3 - Pricing Table |
| **This attachment shall be submitted as part of the offerors proposal. |
| BASE YEAR LINE ITEM 001 FIRM FIXED PRICE (FFP) | ||||||||
| Item | Description | UoM | Price | Note | ||||
| PM/FFP | Semi Annual (6 Months) Preventative Maintenance | 2 | Lot | Total Cost Per Lot.$___________ | ||||
| Total Cost for 2 Lots$_________ | Enter a Firm Fixed Price for Preventative Maintenance to be performed In Accordance With (IAW) the Performance Work Statement (PWS) See part 5-5.18. | |||||||
| BASE YEAR LINE ITEM 002 (NTE) TIME AND MATERIAL | Estimated | |||||||
| Item | Description | UoM | Price | Hours/year | ||||
| Laborer | Fully burdened rate including travel and all expense for requirement excluding other separately priced line items. | 1 | Hour | $ | LINE ITEM NOT PRICED SEPARATELY | |||
| Enter the fully burdened rate for each hour of labor utilized in performing the laborer services for the BASE YEAR and 2 Option Years. Do not include direct labor to operate the machinery in the fully burdened rates proposed for the jetting, cable machine, picote, camera, pump truck, Jet vac truck. See Performance Work Statement (PWS) Part 5.19-5.21 | 30 | |||||||
| Jetting | Used to clean sand, stone, grease, sludge and other materials from catch basins, storm sewers, and sanitary sewers. | 1 | Hour | 30 | ||||
| Cable machine | Flexible auger used to dislodge clogs in plumbing. | 1 | Hour | $ | 5 | |||
| Picote | Tools for cutting through clogs, but removing the scale that can build up on the sides of your pipes. | 1 | Hour | $ | 15 | |||
| Camera | Camera technology is often used for plumbing inspections | 1 | Hour | $ | 30 | |||
| Jet-Vac truck | Specialized pieces of equipment that are used for cleaning and flushing sewer and storm drain pipelines. | 1 | Hour | $ | 1 | |||
| Pump truck | Vacuum pump trucks are equipped with high-powered pumps that have the capability to suction large quantities of liquid waste in a short amount of time. | 1 | Per 1,000 Gal | |||||
| Sanitary | $ | Not Available | ||||||
| Pump truck | Vacuum pump trucks are equipped with high-powered pumps that have the capability to suction large quantities of liquid waste in a short amount of time. | 1 | Per 1,000 Gal | |||||
| Grease | $ | Not Available | ||||||
| Pipe Lining | 3'' pipe relining | 1 | Per ft. | $ | Not Available | |||
| Pipe Lining | 4'' pipe relining | 1 | Per ft. | $ | Not Available | |||
| Pipe Lining | 5'' pipe relining | 1 | Per ft. | $ | Not Available | |||
| Pipe Lining | 6'' pipe relining | 1 | Per ft. | $ | Not Available | |||
| Pipe Lining | 8'' pipe relining | 1 | Per ft. | $ | Not Available | |||
| OPTION YEAR 1 LINE ITEM 003 FIRM FIXED PRICE (FFP) | ||||||||
| Item | Description | UoM | Price | Note | ||||
| PM/FFP | Semi Annual (6 Months) Preventative Maintenance | 2 | Lot | Total Cost Per Lot.$___________ | ||||
| Total Cost for 2 Lots$_________ | Enter a Firm Fixed Price for Preventative Maintenance to be performed In Accordance With (IAW) the Performance Work Statement (PWS) See part 5-5.18. | |||||||
| OPTION YEAR 1 LINE ITEM 004 (NTE) TIME AND MATERIAL | Estimated | |||||||
| Item | Description | UoM | Price | Hours/year | ||||
| Laborer | Fully burdened rate including travel and all expense for requirement excluding other separately priced line items. | 1 | Hour | $ | LINE ITEM NOT PRICED SEPARATELY | |||
| Enter the fully burdened rate for each hour of labor utilized in performing the laborer services for the BASE YEAR and 2 Option Years. Do not include direct labor to operate the machinery in the fully burdened rates proposed for the jetting, cable machine, picote, camera, pump truck, Jet vac truck. See Performance Work Statement (PWS) Part 5.19-5.21 | 30 | |||||||
| Jetting | Used to clean sand, stone, grease, sludge and other materials from catch basins, storm sewers, and sanitary sewers. | 1 | Hour | 30 | ||||
| Cable machine | Flexible auger used to dislodge clogs in plumbing. | 1 | Hour | $ | 5 | |||
| Picote | Tools for cutting through clogs, but removing the scale that can build up on the sides of your pipes. | 1 | Hour | $ | 15 | |||
| Camera | Camera technology is often used for plumbing inspections | 1 | Hour | $ | 30 | |||
| Jet-Vac truck | Specialized pieces of equipment that are used for cleaning and flushing sewer and storm drain pipelines. | 1 | Hour | $ | 1 | |||
| Pump truck | Vacuum pump trucks are equipped with high-powered pumps that have the capability to suction large quantities of liquid waste in a short amount of time. | 1 | Per 1,000 Gal | |||||
| Sanitary | $ | Not Available | ||||||
| Pump truck | Vacuum pump trucks are equipped with high-powered pumps that have the capability to suction large quantities of liquid waste in a short amount of time. | 1 | Per 1,000 Gal | |||||
| Grease | $ | Not Available | ||||||
| Pipe Lining | 3'' pipe relining | 1 | Per ft. | $ | Not Available | |||
| Pipe Lining | 4'' pipe relining | 1 | Per ft. | $ | Not Available | |||
| Pipe Lining | 5'' pipe relining | 1 | Per ft. | $ | Not Available | |||
| Pipe Lining | 6'' pipe relining | 1 | Per ft. | $ | Not Available | |||
| Pipe Lining | 8'' pipe relining | 1 | Per ft. | $ | Not Available | |||
| OPTION YEAR 2 LINE ITEM 005 FIRM FIXED PRICE (FFP) | ||||||||
| Item | Description | UoM | Price | Note | ||||
| PM/FFP | Semi Annual (6 Months) Preventative Maintenance | 2 | Lot | Total Cost Per Lot.$___________ | ||||
| Total Cost for 2 Lots$_________ | Enter a Firm Fixed Price for Preventative Maintenance to be performed In Accordance With (IAW) the Performance Work Statement (PWS) See part 5-5.18. | |||||||
| OPTION YEAR 2 LINE ITEM 006 (NTE) TIME AND MATERIAL | Estimated | |||||||
| Item | Description | UoM | Price | Hours/year | ||||
| Laborer | Fully burdened rate including travel and all expense for requirement excluding other separately priced line items. | 1 | Hour | $ | LINE ITEM NOT PRICED SEPARATELY | |||
| Enter the fully burdened rate for each hour of labor utilized in performing the laborer services for the BASE YEAR and 2 Option Years. Do not include direct labor to operate the machinery in the fully burdened rates proposed for the jetting, cable machine, picote, camera, pump truck, Jet vac truck. See Performance Work Statement (PWS) Part 5.19-5.21 | 30 | |||||||
| Jetting | Used to clean sand, stone, grease, sludge and other materials from catch basins, storm sewers, and sanitary sewers. | 1 | Hour | 30 | ||||
| Cable machine | Flexible auger used to dislodge clogs in plumbing. | 1 | Hour | $ | 5 | |||
| Picote | Tools for cutting through clogs, but removing the scale that can build up on the sides of your pipes. | 1 | Hour | $ | 15 | |||
| Camera | Camera technology is often used for plumbing inspections | 1 | Hour | $ | 30 | |||
| Jet-Vac truck | Specialized pieces of equipment that are used for cleaning and flushing sewer and storm drain pipelines. | 1 | Hour | $ | 1 | |||
| Pump truck | Vacuum pump trucks are equipped with high-powered pumps that have the capability to suction large quantities of liquid waste in a short amount of time. | 1 | Per 1,000 Gal | |||||
| Sanitary | $ | Not Available | ||||||
| Pump truck | Vacuum pump trucks are equipped with high-powered pumps that have the capability to suction large quantities of liquid waste in a short amount of time. | 1 | Per 1,000 Gal | |||||
| Grease | $ | Not Available | ||||||
| Pipe Lining | 3'' pipe relining | 1 | Per ft. | $ | Not Available | |||
| Pipe Lining | 4'' pipe relining | 1 | Per ft. | $ | Not Available | |||
| Pipe Lining | 5'' pipe relining | 1 | Per ft. | $ | Not Available | |||
| Pipe Lining | 6'' pipe relining | 1 | Per ft. | $ | Not Available | |||
| Pipe Lining | 8'' pipe relining | 1 | Per ft. | $ | Not Available | |||
| FAR 52.217-8 | Offerors shall not submit a price for the potential one-half year extension of service period in clause FAR 52.217-8. As part of the price evaluation, the government will evaluate the option hourly rates by using the hourly rate from Option Year 2. The Government will evaluate the Preventative Maintenance by using 1 semi-annual maintenance PM cost from option year 2. The Government is under no obligation to exercise this option. | |||||||
| REMINDER: Service Contract Labor Standards. FAR 37.107 and 41 USC Chapter 67, Service Contract Labor Standards, provides for minimum wages and fringe benefits as well as other conditions of work under certain types of service contracts. Service Contract Labor Standards are applicable to laborers in this acquisition. |