B132 Furniture QA.pdf
PDF 244 KB Posted
- Attached to
- Bldg 132 Furniture Package
- Solicitation number
- W50S98-23-Q-0021
About this file
This document contains questions and answers regarding furniture installation requirements for a federal building. The solicitation seeks to furnish and install furniture for Building 132 including systems furniture, a map table, and related installation services. Delivery and installation must occur during standard business hours between 8AM and 5PM Monday through Friday or on weekends if approved in advance. The building entry point without stairs is provided in an attached image. Power and data are pre-installed but the contractor must provide whips to connect furniture to building power. Door widths are 36 inches and doors can be removed and reinstalled by the contractor if needed for installation. Alternate pricing may be proposed for a high pressure laminate map table top in an approved finish.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FFE Layout.pdf | ||
| Option 1 - MAP TABLE.pdf | ||
| Base Bid - TANG COMM POST FFE SPECIFICATIONS JUN 16 2023.pdf | ||
| Attachment 1-Price Sheet.xlsx | XLSX spreadsheet | |
| Option 1 - TANG INTEL FFE SPECIFICATIONS JUNE 16 2023.pdf | ||
| W50S98-23-Q-0021 Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B132 Command Post Furniture Q&A
1. Does the building have a loading dock?
A: The building has a loading dock, but it is not the most accessible entrance to the spaces in which the furniture is to be installed. Images are attached of the ground level entrance that would be best to use for access to the building. The entrance door is on the right under the awning.
2. If no loading dock, where will we load/offload the truck?
A: See answer to Item 1.
3. Approximately how far is it from the truck parking location to the install location?
A: The image is taken at the ground level entry door shown above. The hallway is approximately 75’ to the entry of the space (on the right side of the corridor) in which furniture is to be installed. The freestanding furniture in the corridor will be cleared at time of delivery and installation.
4. Are there any stairs that the product will need to go up or down to reach the truck location? If so how many?
A: There are no stairs between the unloading area and installation location.
5. Do we have access to a passenger or a freight elevator to use for delivery to the installation location (if applicable)?
A: Access to an elevator should not be necessary, but one is available in the building.
6. Are any electrical or data cabling services required?
A: Power and data are currently installed in the required locations.
7. Do we need to provide an electrician to attach the systems furniture to building power? If so, do we need to pull new circuits from the electrical panel or will we attach to existing power junction boxes at walls/columns?
A: Contractor will provide services to hard wire furniture to building power. Whips are to be provided by the furniture contractor.
8. Can we deliver and install the product during business hours?
A: Yes, deliveries and installation would be best to occur during business hours, M-F 8AM-5PM. Work can be performed on weekends and after hours but needs to be approved prior to execution.
9. Would you accept a map table constructed from High Pressure Laminate in a cherry finish?
A: It is acceptable to provide alternate pricing for high pressure laminate in an approved finish in addition to a price for solid wood.
It should also be noted that the map table will need to be assembled in place. The top and leg panels will need to be separate components with leg panels attached and secured within the space the table is to occupy. The doorways will not allow the map table to be shipped as one complete unit because of the height of the table. With this information, the construction of the table may need to be modified for assembly.
Please include recommended modifications in the bid proposal.
General comment: Door widths are 36.” Doors can be removed and reinstall by the Contractor, if needed, during installation.