179AW Electrical Components & Concrete Delivery Questions and Answers
1. Will labor need to be used when pouring the concrete, or are they dumping it only?
Answer: Just dumping; no labor required
2. How long will the trucks need to be onsite?
Answer: We are pouring 20’ wide lanes, trucks will be able to travel down the lane and back out while dumping. Long enough to do this.
3. Line item 10 – what is the dimension of the box?
Answer: 18”x24”x18d”
4. Line item 12 – if Pole Breaker Model Square D/ Tupe QD is not available would Siemens or Eaton be acceptable?
Answer: It must be a Square D QO Panel breaker.
5. Line items 15 & 16 – What manufacturers would be acceptable?
Answer: Any that meets the specifications and are compatible with each other.