Request for Information 1.pdf
PDF 71 KB Posted
- Attached to
- Fluorescent Inspection System Federal contract opportunity
- Solicitation number
- W50S8E20Q0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Request for Information 6 and 7.pdf | ||
| Request for Information 4 and 5.pdf | ||
| SOLICITATION - PROVISIONS.pdf | ||
| MIL-PRF-32531.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information 1-3
Q1: Which type of system do they need from belowMIL-PRF-32531 Options?
1.2.1 Types.
The types of FPI units are as follow:
Type I
- Water washable (self emulsified) with dry developer.
Type II - Post-emulsified with aqueous developer.
Type III - Post-emulsified with dry developer.
Type IV - Solvent-removable (inspection station only).
A1. Type II- Post-emulsified with aqueous developer.
Q2. What class of tank Calss A or Class B
1.2.3 Classes.
FPI units are in the following classes:
Class A - unpowered tanks.
Class B - pneumatically-powered tank lifts.
NOTE: Class A units are often used with an overhead hoist/conveyor.
A2. Class A - unpowered tanks.
Q3: Which form from below
1.2.4 Forms.
The FPI units will be in two forms:
Standard Form – Left-to-right processing, beginning with the penetrant tank.
Reverse Form – Right-to-left processing, beginning with the penetrant tank.
A3. Standard Form – Left-to-right processing, beginning with the penetrant tank
File details come from the government source that posted it. Updated .