Attach_13_ W50S8B21B0005 RFIs.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- PTFL 212104 Replace HVAC Federal contract opportunity
- Solicitation number
- W50S8B21B0005
- Issued by
- Department of the Army National Guard
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OF 1419 Abstract for Replace HVAC.pdf | ||
| W50S8B21B0005 MOD 2.pdf | ||
| Attach_12_PreBid Conf Sign-in.pdf | ||
| W50S8B21B0005 MOD 1.pdf | ||
| Attach_01_Attachment_Schedule_Updated.xlsx | XLSX spreadsheet | |
| Attach_13_ W50S8B21B0005 RFIs.xlsx | XLSX spreadsheet | |
| Attach_11_PreBid Conference Slides.pdf | ||
| W50S8B21B0005.pdf | ||
| Attach_01_Attachment_Schedule_Updated.xlsx | XLSX spreadsheet | |
| Attach_08_InsuranceRequirements.docx | DOCX document | |
| Attach_07_Appendix_4_to_Annex_C_Contractor_Appendix.DOCX | DOCX document | |
| Attach_04 SOW_ PTFL 212104 Repair HVAC Condensing Unit 3333 v3.pdf | ||
| Attach_02_Section_00010_Notes.docx | DOCX document | |
| W50S8B21B0005.pdf | ||
| Attach_06 Wage Determination 7_23_21.pdf | ||
| Attach_03_Instructions_to_Offerors.docx | DOCX document | |
| Attach_09_AT_Statement.pdf | ||
| Attach_05 NJ HVAC Mech Plans.pdf | ||
| Attach_10_JB_MDL_Antiterrorism Awareness for Contractors.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| 108 Wing |
| Pre-Bid Questions & Clarifications |
| Solicitation #: | W50S8B-21-B-0005 |
| Project Name & Number: | PTFL212104 |
| Updated: | Thursday, September 09, 2021 |
| RFI # | Submitted | Answered | Question | Response | Response By |
| 1 | 31-Aug-21 | 07-Sep-21 | Sect. 4.4.4, “Replace 2 filters in driers.” These are R22 components. R410A and R22 don’t mix. We can provide new removable filter driers or will an approved solvent be sufficient to clean the driers before new filters are installed? | New filter driers should be installed. | 108 CES |
| 1 | 31-Aug-21 | 07-Sep-21 | The DX Evap coils in the air handler are presently R22 DX coils. Are they sufficient to handle the additional pressures that are present in a 410A system? | Yes they are sufficient to hold a higher pressure like 410A, but per response to question below, evap coils and line set shall be replaced. | 108 CES |
| 1 | 31-Aug-21 | 07-Sep-21 | The existing DX Evap coils in the air handler, will have a residue from the existing R22 refrigerant. Refrigerant 410A is a compound that does not mix with R22. How will the residue be removed? Should the DX Evap coils in the air handler be replaced as most manufacturers will not warranty a mixed refrigerant system. | Yes coil and line set shall be replaced to prevent mixing of refrigerant. | 108 CES |
| 1 | 31-Aug-21 | 07-Sep-21 | Excising R22 charge in system is to be recovered and given to the government.” Will the government be suppling the recovery tanks or do we include them in the base bid? | Recovery tanks shall be included in base bid for project. | 108 CES |
| 1 | 31-Aug-21 | 07-Sep-21 | Will there be the need for BACNET capability in the new condenser? Is there on present in the existing equipment? Is this a standalone system? If so, who is the present controls system provider? | Yes there will be a need for bacnet compatibility. The HVAC unit controls need to be upgraded and tied into our existing DDC system to allow us to monitor the HVAC unit status. In addition, this building is not a standalone unit it is on our current ddc hub in building 3301 but we can’t see controls for building 3333. | 108 CES |
| 2 | 08-Sep-21 | 02-Sep-21 | 1. Please provide current servicing controls contractor and /or system used in bldg. 3333 as so we may get a quote from them for this project. | Current DDC system is based on Johnson Controls. Devices used may be from other manufacturers. Devices used are Johnson Controls compatible. | 108 CES |
| 3 | 08-Sep-21 | 02-Sep-21 | 1. To provide BACnet compatibility the AHU and CU will need to be retrofitted with the following control. Is below the intent of the scope of work? | Per the project Scope of Work, section 4, the new condensing unit at building 3333 will be a "stand alone" unit at this time. There are no DDC controls or devices specified within the project Scope of Work. Only devices required for stand alone unit are required. Condensing unit should be capable for future upgrade to DDC controls. | 108 CES |
| 3 | 08-Sep-21 | 08-Sep-21 | 2. Will AHU damper actuators be re-used or replaced with new? | AHU damper actuators will be re-used as they are not mentioned within the project Scope of Work, section 4. | 108 CES |
| 3 | 08-Sep-21 | 08-Sep-21 | 3. Will AHU HW valve and actuator be re-used or replaced with new? | AHU HW valve will be re-used as they are not mentioned within the project Scope of Work, section 4. | 108 CES |
| 3 | 08-Sep-21 | 08-Sep-21 | 4. Is a new JACE required for building 3333? | A new JACE will not be required for building 3333, as it is not mentioned within the project Scope of Work. | 108 CES |