Attach_13_ W50S8B21B0005 RFIs.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
PTFL 212104 Replace HVAC Federal contract opportunity
Solicitation number
W50S8B21B0005
Issued by
Department of the Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to PTFL 212104 Replace HVAC, newest first.
File Type Posted
OF 1419 Abstract for Replace HVAC.pdf PDF
W50S8B21B0005 MOD 2.pdf PDF
Attach_12_PreBid Conf Sign-in.pdf PDF
W50S8B21B0005 MOD 1.pdf PDF
Attach_01_Attachment_Schedule_Updated.xlsx XLSX spreadsheet
Attach_13_ W50S8B21B0005 RFIs.xlsx XLSX spreadsheet
Attach_11_PreBid Conference Slides.pdf PDF
W50S8B21B0005.pdf PDF
Attach_01_Attachment_Schedule_Updated.xlsx XLSX spreadsheet
Attach_08_InsuranceRequirements.docx DOCX document
Attach_07_Appendix_4_to_Annex_C_Contractor_Appendix.DOCX DOCX document
Attach_04 SOW_ PTFL 212104 Repair HVAC Condensing Unit 3333 v3.pdf PDF
Attach_02_Section_00010_Notes.docx DOCX document
W50S8B21B0005.pdf PDF
Attach_06 Wage Determination 7_23_21.pdf PDF
Attach_03_Instructions_to_Offerors.docx DOCX document
Attach_09_AT_Statement.pdf PDF
Attach_05 NJ HVAC Mech Plans.pdf PDF
Attach_10_JB_MDL_Antiterrorism Awareness for Contractors.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

108 Wing
Pre-Bid Questions & Clarifications
Solicitation #:W50S8B-21-B-0005
Project Name & Number:PTFL212104
Updated:Thursday, September 09, 2021
RFI #SubmittedAnsweredQuestionResponseResponse By
131-Aug-2107-Sep-21Sect. 4.4.4, “Replace 2 filters in driers.” These are R22 components. R410A and R22 don’t mix. We can provide new removable filter driers or will an approved solvent be sufficient to clean the driers before new filters are installed?New filter driers should be installed.108 CES
131-Aug-2107-Sep-21The DX Evap coils in the air handler are presently R22 DX coils. Are they sufficient to handle the additional pressures that are present in a 410A system?Yes they are sufficient to hold a higher pressure like 410A, but per response to question below, evap coils and line set shall be replaced.108 CES
131-Aug-2107-Sep-21The existing DX Evap coils in the air handler, will have a residue from the existing R22 refrigerant. Refrigerant 410A is a compound that does not mix with R22. How will the residue be removed? Should the DX Evap coils in the air handler be replaced as most manufacturers will not warranty a mixed refrigerant system.Yes coil and line set shall be replaced to prevent mixing of refrigerant.108 CES
131-Aug-2107-Sep-21Excising R22 charge in system is to be recovered and given to the government.” Will the government be suppling the recovery tanks or do we include them in the base bid?Recovery tanks shall be included in base bid for project.108 CES
131-Aug-2107-Sep-21Will there be the need for BACNET capability in the new condenser? Is there on present in the existing equipment? Is this a standalone system? If so, who is the present controls system provider?Yes there will be a need for bacnet compatibility. The HVAC unit controls need to be upgraded and tied into our existing DDC system to allow us to monitor the HVAC unit status. In addition, this building is not a standalone unit it is on our current ddc hub in building 3301 but we can’t see controls for building 3333.108 CES
208-Sep-2102-Sep-211. Please provide current servicing controls contractor and /or system used in bldg. 3333 as so we may get a quote from them for this project.Current DDC system is based on Johnson Controls. Devices used may be from other manufacturers. Devices used are Johnson Controls compatible.108 CES
308-Sep-2102-Sep-211. To provide BACnet compatibility the AHU and CU will need to be retrofitted with the following control. Is below the intent of the scope of work?Per the project Scope of Work, section 4, the new condensing unit at building 3333 will be a "stand alone" unit at this time. There are no DDC controls or devices specified within the project Scope of Work. Only devices required for stand alone unit are required. Condensing unit should be capable for future upgrade to DDC controls.108 CES
308-Sep-2108-Sep-212. Will AHU damper actuators be re-used or replaced with new?AHU damper actuators will be re-used as they are not mentioned within the project Scope of Work, section 4.108 CES
308-Sep-2108-Sep-213. Will AHU HW valve and actuator be re-used or replaced with new?AHU HW valve will be re-used as they are not mentioned within the project Scope of Work, section 4.108 CES
308-Sep-2108-Sep-214. Is a new JACE required for building 3333?A new JACE will not be required for building 3333, as it is not mentioned within the project Scope of Work.108 CES