Optical Measurement Inspection System (OMIS) Statement of Work (004).pdf

PDF 24 KB Posted

Attached to
Optical Measurement & Inspection System (OMIS)
Solicitation number
W50S7U-20-Q-0006
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW) FOR

Optical Measurement & Inspection System (OMIS)

ILLINOIS AIR NATIONAL GUARD (ILANG) UNIT/DIRECTORATE

DATE: 18 August 2020

1. PURPOSE. Industrial 3D Metrology with High Speed Technology

2. SCOPE OF WORK. The Illinois Air National Guard has a requirement for an Optical

Measurement & Inspection System (OMIS) to inspect General Electric F-118 turbofan engine components. Most General Electric F-118 turbofan engine components dimensional inspections require measurements at least out to the thousandths decimal place to ensure engine components that are being inspected meet tolerances as specified in USAF Technical Order 2J-F110-6-11 WP

036 00.

3. DELIVERY LOCATION AND DELIVERY DATE. This equipment shall be delivered to the

Illinois Air National Guard Warehouse, Building P-15, located at 3101 J David Jones Parkway., Springfield, Illinois 62707-5001 not later than 1 October 2020.

4. QUANTITY REQUIRED: 1 each.

5. REQUIRTED CABABILITIES.

Requirement is for an Optical Measurement & Inspection System (OMIS). Products such as a prototype unit, pre-production model, or experimental unit do not qualify as meeting the requirements specified herein. Optical Measurement & Inspection System must be have wheels/castors, so it can me moved between inspection docks.

Motorized Portable Rotary Table capable of accommodating components up to 200lbs with a diameter of 24 inches (Minimum MM 609mm) to ensure proper and safe support of engine components.

Professional Metrology hardware and software.

Portable travel case so item can be mobilized for deployments with maintenance personnel.

Minimum of three days On-site training for end-users to cover the operation of hardware and software.

In accordance with T.O. 2J-F110-6-11 WP 036 00 System Must be accurate to half a thousand (0.0005) of an inch.

Submission of VDI 2634 Part 3 required to verify specifications stated accuracy.

END

File details come from the government source that posted it. Updated .