Global ASNT Addition - Structural As-Built.pdf
PDF 184 KB Posted
- Attached to
- Update Building 5008 Scott AFB Federal contract opportunity
- Solicitation number
- W50S7S22Q0010
- Issued by
- Department of the Army National Guard
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit Sign-In Sheet_11 May 22 print_Redacted.pdf | ||
| Site Visit MFR_Global ASNT Update.pdf | ||
| Wage Rates.pdf | ||
| W50S7S22Q0010.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B
2 31
EA
18'-4"
'-0
4'-5 1/4" 12'-0"11 3/8" 11 3/8"
'-0
/8
1'
-0
/8
'-1
0" E
J2"
1' -4
7E6E
24'-4" ±
1'-0 3/4" ±6'-10" ± 16'-5 1/4"
/8
EMBED HORIZ WALL
REINFORCING INTO
(E) w/ADHESIVE
HSS5X5X5/16 GALV
BP2 (1.00, 98'-1")
F3636
T/F/EL 98'-0"
HSS5X5X5/16 GALV
BP1 (1.00, 98'-1")
F3636
T/F/EL 98'-0"
EMBED HORIZ WALL
REINFORCING INTO
(E) w/ADHESIVE
HSS5X5X5/16
BP2 (1.00, 98'-1")
F3636
T/F/EL 98'-0"
HSS5X5X5/16
BP1 (1.00, 98'-1")
F3636
T/F/EL 98'-0"
HSS5X5X5/16 GALV
BP1 (1.00, 98'-1")
F3636
T/F/EL 98'-0"
HSS5X5X5/16 GALV
BP2 (1.00, 98'-1")
F3636
T/F/EL 98'-0"
HD1
8A/S1.2.03
8C/S1.2.03
8C/S1.2.03
SIM
S P
S H
E A
R P
A N
E L
S H
E A
R P
A N
E L
S P
SHEAR PANEL SP1
8B/S1.2.03
C J
8C/S1.2.03
8C/S1.2.03
SIM
8B/S1.2.03
SEE ARCH
NEW OPNG
S3.1.01
S3.1.01
S3.1.01
S1.2.01
S3.1.01
TYP @
COLS
S3.1.01
REMOVE (E) FOUND WALL
BELOW DOOR OPNG TO
TOP OF SLAB-ON-GRADE,
SEE 15/S1.2.01
S3.1.01
@ DOOR
S3.1.01
SP2
SHEAR PANEL
HD2
8A/S1.2.03
A
B
2 31
EA
W
X
W
X
W14X22W14X22
W
X
W
X
W
X
W14X22W14X22
7E6E
18'-4"
'-0
4'-5 1/4" 12'-0"11 3/8" 11 3/8"
'-0
/8
'-1
0" E
J2"
1' -4
24'-4" ±
1'-0 3/4" ±6'-10" ± 16'-5 1/4"
1' -0
/8
/8
S4.1.01
S4.1.01
S4.1.01
S4.1.01
4'-0" 4'-0" 4'-0"4'-5 1/4"
S4.1.01
S4.1.01
DIAG BRACE,
TYP
H1
H
H1
A
B
2 31
EA
W12X26 GALV
W 8X
G
A
LV
W 8X
G
A
LV
W
X
G A
LV
W
X
G A
LV
W12X26 GALV
W 8X
G
A
LV
W 8X
G
A
LV
W12X26 GALV
W8X10 GALV
7E6E
18'-4"
'-0
4'-5 1/4" 12'-0"11 3/8" 11 3/8"
'-0
/8
'-1
0" E
J2"
1' -4
24'-4" ±
1'-0 3/4" ±6'-10" ± 16'-5 1/4"
/8
1' -0
/8
S4.1.01
S4.1.01
S4.1.01
S4.1.01
4'-5 1/4" 4'-6" 3'-0" 4'-6"
4'-0" 4'-0" 4'-0"
6' -0
3'
-0
3' -0
S4.1.01
S4.1.01
ANTENNA MOUNTING
PL 3/4"x36"x36" GALV., ANTENNA MOUNTING
HOLES TO BE PROVIDED
BY ANTENNA SUPPLIER
ALL EXPOSED STEEL SHALL
BE GALVANIZED
NOTE 6
FOOTING SCHEDULE
F3636 (6)-#4X2'-6"3'-0"X3'-0"X1'-3"
PLAN
MARK
(TOTAL) BOTT REINF
PLACE 1/2 EACH WAY
U.N.O.
FOOTING SIZE
F4242
F4848
F5454
F6060
F6666
F7272
F7878
F8484
F9090
F9696
F102102
3'-6"X3'-6"X1'-3"
4'-0"X4'-0"X1'-3"
4'-6"X4'-6"X1'-3"
5'-0"X5'-0"X1'-3"
5'-6"X5'-6"X1'-3"
6'-0"X6'-0"X1'-3"
6'-6"X6'-6"X1'-3"
7'-0"X7'-0"X1'-4"
7'-6"X7'-6"X1'-5"
8'-0"X8'-0"X1'-6"
8'-6"X8'-6"x1'-8"
(8)-#4X3'-0"
(10)-#4X3'-6"
(14)-#4X4'-0"
(18)-#4X4'-6"
(24)-#4X5'-0"
(28)-#4X5'-6"
(34)-#4X6'-0"
(38)-#4X6'-6"
(30)-#5X7'-0"
(32)-#5X7'-6"
(36)-#5X8'-0"
NOTE: SOME FOOTING SIZES LISTED MAY NOT BE USED.
F108108 9'-0"X9'-0"x1'-10" (40)-#5X8'-6"
F114114 9'-6"X9'-6"x1'-11" (42)-#5X9'-0"
F120120 10'-0"X10'-0"x2'-0" (44)-#5X9'-6"
F126126 10'-6"X10'-6"x2'-2" (46)-#5X10'-0"
HSS5X5X5/16 (1-R)
BP1 (1.00) (98'-1")
CC1 (98'-0")
F3636
T/F EL 98'-0"
B/LC EL 94'-0"
BASE PLATE TYPE (BP1)
SEE BASE PLATE DETAILS ON
SHEET S2.1.01
BASE PLATE THICKNESS (INCHES),
BOTTOM OF PLATE ELEVATION
(1.00, 98'-1") TYPICAL, UNLESS NOTED OTHERWISE
CONCRETE COLUMN DETAIL (CC1)
SEE CONC COLUMN DETAILS ON SHEET S2.1.01
TOP OF CONC COLUMN ELEVATION
(98'-0") TYPICAL, UNLESS NOTED OTHERWISE
ON PLAN AND SECTS
FOOTING DESGINATION (F3636)
(FOOTING SIZE - INCHES)
SEE FOOTING SCHEDULE THIS SHEET
TOP OF FOOTING ELEVATION
SEE PLAN NOTES AND PLAN
BOTTOM LEAN CONCRETE FILL ELEVATION
(WHERE REQUIRED) - SEE PLAN
STEEL COLUMN SIZE,
SEE PLAN
KEYNOTE LEGEND
NO SCALE
NOTE: ITEMS ONLY LISTED WHERE APPLICABLE
OR NOT TYPICAL.
STORY RANGE
ANCHOR
DIA.
MIN.
EMBED.
C O
N T
R A
C T
O R
A N
C H
O R
P R
O J.
T O
B E
D E
T E
R M
IN
E
D B
Y M
IN
. E
M B
E D
T H
R E
A D
1/
2" M
IN
HEAVY HEX
NUT WELDED
TO ROD
TOP OF CONCRETE
ANCHOR ROD, SEE COLUMN SCHED,
PLANS OR OTHER SECTIONS
WASHER PL
3/4" 9" 2"x2"x1/4"
7/8" 12" 3"x3"x3/8"
1/2" 9" 2"x2"x1/4"
1" 12" 3"x3"x3/8"
1/
2"
1/ 2"
1"± GROUT
BASE PL 13"x13"
SEE PLAN FOR
THICKNESS
(4)-1"Ø ANCHOR RODS
T/F EL
SEE PLAN
1/4
PROVIDE 3" (MIN)
CONCR COVER
@ COLUMN AND
BASE PLATE
4 1/2" 4 1/2"
2" 2"
2" 2"
1"± GROUT
BASE PL 13"x13"
SEE PLAN FOR
THICKNESS
(4)-1"Ø ANCHOR RODS
T/F EL
SEE PLAN
1/4
PROVIDE 3" (MIN)
CONCR COVER
@ COLUMN AND
BASE PLATE
8"
1"
2" 2"
ROOF FRAMING PLAN NOTES;
1. ROOF CONSTRUCTION TO BE AS FOLLOWS:
@ TYPICAL ROOF:
1 1/2"x22 GA GALVANIZED WIDE RIB METAL DECK OVER STRUCTURAL STEEL FRAMING U.N.O.
2. BOTTOM OF METAL DECK ELEVATION (B/MD EL) VARIES, SEE PLAN(S) AND SECTIONS.
3. TOP OF STEEL BEAM = B/MD (EXCEPT WHERE OTHERWISE NOTED ON PLAN OR SECTIONS).
4. PROVIDE ANGLE FRAME PER 4/S1.2.02 AT ALL ROOF PENETRATIONS. SEE ARCHITECTURAL AND
MECHANICAL DRAWINGS FOR ADDITIONAL LOCATIONS NOT SHOWN.
5. SEE SHEET S1.2.02 FOR TYPICAL FRAMING DETAILS.
6. ROOF DECK ATTACHMENT TO BE AS NOTED IN THE GENERAL NOTES, UNLESS NOTED OTHERWISE.
7. SC"X" ON PLAN INDICATES LOCATION OF A FULL HEIGHT BUILT-UP STUD COLUMN, SEE 2/S1.2.03 AND 3/S1.2.03. THE NUMBER FOLLOWING SC INDICATES QUANITITY OF STUDS REQUIRED. STUD SIZE TO MATCH THAT OF THE WALL WHERE THE STUD COLUMN IS LOCATED.
LOCATIONS INDICATED ON PLAN ARE GENERAL AND ARE INTENDED TO BE AT ENDS OW WALLS, AT SIDES OF OPENINGS, AT HOLD-DOWN LOCATIONS, BELOW HEADER AND BEAM BEARING CONDITIONS, AND /OR BELOW STUD COLUMNS INDICATED ON THE FRAMING ABOVE. PROVIDE A MINIMUM OF TWO STUDS (SC2) AT THESE LOCATIONS THAT ARE NOT SPECIFICALLY NOTED ON PLAN. SEE DETAIL 9/S1.2.03 FOR RELATIVE PLACEMENT AT HOLD-DOWN LOCATIONS.
8. SEE SHEET S1.2.03 FOR TYPICAL CFMF WALL CONSTRUCTION.
9. H"X" INDICATES HEADER DESIGNATION (EX. "H1"), SEE SCHEDULE AND DETAILS ON THIS SHEET.
HEADER SCHEDULE
LOCATION REMARKSHEADER SIZE
H1 (2)-800S162-54 (1)-JACK STUD w/(2)-FULL HEIGHT JAMB STUD EACH SIDE
NOTES
NOTES:
1. OCCURS WHERE NOTED ON PLAN.
FIRST FLOOR AND FOUNDATION PLAN NOTES;
1. FINISH ACCESS FLOOR ELEVATION = 100'-0". (TO MATCH EXISTING) UNLESS NOTED OTHERWISE.
FINISH SLAB-ON-GRADE ELEVATION = 99'-0". UNLESS NOTED OTHERWISE.
2. FLOOR CONSTRUCTION TO BE AS FOLLOWS:
@ SLAB-ON-GRADE:
5" CONCRETE SLAB ON VAPOR BARRIER (PER SPECS) ON 6" GRANULAR FILL. REINFORCE SLAB w/ 6"x6"-W2.1xW2.1 WWF.
@ ACCESS FLOOR:
FLOOR PANEL AND PEDESTAL SYSTEM U.N.O. ON ARCHITECTURAL DRAWINGS.
3. TOP OF EXTERIOR FOOTING ELEVATION (T/F EL) = SEE PLAN.
4. TOP OF INTERIOR FOOTING ELEVATION (T/F EL) = SEE PLAN.
5. SEE SHEET S1.2.01 FOR TYPICAL FOUNDATION DETAILS.
6. SEE ARCHITECTURAL AND MECHANICAL DRAWINGS FOR ADDITIONAL FLOOR PENETRATIONS (IF ANY) NOT SHOWN ON THESE PLANS.
REPORT ALL OCCURRENCES TO STRUCTURAL ENGINEER.
7. SEE ARCHITECTURAL AND MECHANICAL DRAWINGS FOR ADDITIONAL SLAB DEPRESSIONS AND EMBEDDED ITEMS (IF ANY) NOT SHOWN ON
THESE PLANS. REPORT ALL OCCURRENCES TO STRUCTURAL ENGINEER.
8. SEE 5/S1.2.01 FOR REINFORCING AT TYPICAL ELECTRICAL FLOOR BOX IN SLAB-ON-GRADE. SEE ELECTRICAL AND ARCHITECTURAL
DRAWINGS FOR LOCATIONS.
9. SC"X" ON PLAN INDICATES LOCATION OF A FULL HEIGHT BUILT-UP STUD COLUMN, SEE 2/S1.2.03 AND 3/S1.2.03 THE NUMBER FOLLOWING SC INDICATES QUANITITY OF STUDS REQUIRED. STUD SIZE TO MATCH THAT OF THE WALL WHERE THE STUD COLUMN IS LOCATED.
LOCATIONS INDICATED ON PLAN ARE GENERAL AND ARE INTENDED TO BE AT ENDS OW WALLS, AT SIDES OF OPENINGS, AT HOLD-DOWN LOCATIONS, BELOW HEADER AND BEAM BEARING CONDITIONS, AND /OR BELOW STUD COLUMNS INDICATED ON THE FRAMING ABOVE. PROVIDE A MINIMUM OF TWO STUDS (SC2) AT THESE LOCATIONS THAT ARE NOT SPECIFICALLY NOTED ON PLAN. SEE DETAIL 9/S1.2.03 FOR RELATIVE PLACEMENT AT HOLD-DOWN LOCATIONS.
10. SEE SHEET S1.2.03 FOR TYPICAL CFMF WALL CONSTRUCTION.
11. SP"X" INDICATES EXTENT OF SHEET METAL SHEAR PANEL. SEE SHEET S1.2.03 FOR INFORMATION.
12. SEE 14/S1.2.01 FOR TYPICAL FROST BLOCK AT ALL EXTERIOR DOOR(S).
13. HD INDICATES SHEAR PANEL HOLD DOWN ANCHOR.
PLATFORM FRAMING PLAN NOTES;
1. PLATFORM CONSTRUCTION TO BE AS FOLLOWS:
@ TYPICAL PLATFORM:
1" GALVANIZED METAL BAR GRATE OVER STRUCTURAL STEEL FRAMING U.N.O.
2. BOTTOM OF METAL DECK ELEVATION (B/MD EL) VARIES, SEE PLAN(S) AND SECTIONS.
3. TOP OF STEEL BEAM = B/MD (EXCEPT WHERE OTHERWISE NOTED ON PLAN OR SECTIONS).
4. SEE SHEET S1.2.02 FOR TYPICAL FRAMING DETAILS.
5. PLATFORM DECK ATTACHMENT TO BE AS NOTED IN THE GENERAL NOTES, UNLESS NOTED OTHERWISE.
6. ATTACH ANTENNA MOUNTING PLATE TO STEEL BEAMS WITH 1/4" FILLET WELD, 2" LONG AT 8"o.c., ON FOUR SIDES OF PLATE. REPAIR GALVANIZED FINISH AT WELD LOCATIONS PER SPECIFICATIONS.
JOB NO.
SHEET NO.
R
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
P
O
N
M
L
K
J
H
G
F
E
D
C
B
A
21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 1814 15 16 17 19 20 21 22 23 24
© 2019 FGM Architects Inc.
C o p y ri g h t
F G
M A
R C
H
IT
E C
TS
IN
C
1009 LINCOLN HWY,
FAIRVIEW HEIGHTS, IL 62208
618.628.0887 (O)
IL STATE CERTIFICATE OF AUTHORITY
NO. 184-003843
ASDG, LLC
STRUCTURAL
The professional engineer seal affixed to this sheet applies only to the material and items shown on this sheet. All drawings, instruments or other documents not exhibiting this seal shall not be considered prepared by this engineer, and this architect expressly disclaims any and all responsibility for such plan, drawings or documents not exhibiting this seal.
LEE COOPER - ENGINEER
ST #081-005676
DATE 10/15/2020
R
E G
E N
C Y
P A
R K
S U
IT
E
O
FA
LL
O
N
IL
.6
.3
O
.6
.3
(F
IL
LI
N O
IS
P
R O
FE
S S
IO
N A
L D
E S
IG
N F
IR
M
-0
FG
M
A R
C H
I T
E C
T S
100 EAST WASHINGTON, SUITE 200
BELLEVILLE, IL 62223
618.277.5200 (O)
IL STATE CERTIFICATE OF AUTHORITY
NO. 062-063142
BRIC PARTNERSHIP, LLC
MECHANICAL
P.O. BOX 215
BRIGHTON, IL 62012
219.742.7489 (O)
SEI CONTRACTING, INC.
FIRE PROTECTION
1935 ARSENAL STREET
ST. LOUIS, MO 63118
314.664.3382 (O)
IL STATE CERTIFICATE OF AUTHORITY
NO. 184-005110
303rd ENGR. GROUP LLC
ELECTRICAL
/3
/2
:1 :5
A
M
C
A S D
G R e v it P ro je c ts
.0
S c o tt A
F B
B G lo b a l A
S N
T\ .0
S c o tt A
F B
G lo b a l A S N
T (L o c a l)
R S tr u c t.
rv t
S2.1.01
19-2789.01
C O
N S
TR
U C
T G
LO
B
A L
A S N
T B
U
IL
D
IN
G th
A R
W S c o tt
A F B
G lo b a l S tr ik e
F a c ili ty
P
LA
N S A
N D
D E
TA
IL
S
G o lf C o u rs e
D ri v e
S c o tt
A ir fo rc e
B a se Ill in o is
1/4" = 1'-0"1 First Floor and Foundation Plan 1/4" = 1'-0"2 Roof Framing Plan
1/4" = 1'-0"3 Platform Framing Plan
Footing Schedule - TypicalFooting and Column Keynote Legend
NTS4 TYPICAL ANCHOR ROD U.N.O.
1" = 1'-0"
BASE PLATE BP1
1" = 1'-0"
BASE PLATE BP2
Header Schedule
IS
S U
A N
C E
N O
D A
TE
D
E S C
R
IP
TI
O
N
.3
.2
D E S
IG
N S
U B
M
IT
TA
L
.1
.2
D
E S
IG
N S
U B
M
IT
TA
L
.1
.2
D E S
IG
N S
U B
M
IT
TA
L
.2
.2
R e v is io n
.3 .2
D
E S
IG
N S
U B
M
IT
TA
L
(A S -B
U
IL
T)
File details come from the government source that posted it. Updated .