BLDG 12 Questions

BLDG 12

1.) Can you please clarify the square footage. On page 16 of the SOW, 5.2.1 says to remove 1100 SF of carpet and 2200 SF of tile, for a total of 3300 SF of flowing to be removed, But 5.2.13 says there's only 2200 SF of new flooring going back. Is there an 1100 SF are that is to remain bare concrete, or should there be 3300 SF of commercial grade raised rubber dot tile to be installed?

There is 1100sf of carpet overlay to the existing 2200sf of vinyl flooring to be removed. Total area for new flooring is 2200sf.

2.) Please clarify regarding need to replace electrical wall plates for outlets.

All receptacles, switches and cover plates to be replaced with new.

White in color

3.) Clarify route for 400 amp service from transformer #7 (correct number) to capped 200 subpanel in Bldg 12 and annotate location on drawing. Is there a recommend path for boring?

5.2.8 and 5.2.9 have been removed from the project and are no longer required.

DELETED

5.2.8 The contractor shall remove and replace existing wire from transformer to the meter and install service to support 400 amp power.

5.2.9 The contractor shall source and install 200 amp subpanel for potential future use to support any restaurant equipment that may be added.

4.) Will adding the new 400 amp service require a new meter and who will provide it.

METER IS NO LONGER REQUIRED