B7 - Q and A 07 July 2020.docx
DOCX document 13 KB Posted
- Attached to
- Fire Alarm System Repair Federal contract opportunity
- Solicitation number
- W50S7G20B0002
- Issued by
- Department of the Army National Guard
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C4 - Abstract 1419 - Construction.pdf | ||
| Bid Opening Location Map.pdf | ||
| B8 - Q and A 09 July 2020.docx | DOCX document | |
| B7- Pre-Bid Conference PP.pptx | PPTX presentation | |
| B7 - Pre Bid-Proposal SIGN IN SHEET.doc | DOC document | |
| B8 - W50S7G20B0002 Fire Alarm Solicitation Amendment 2 Final.pdf | ||
| B7 - Pre-bid Conference Minutes.pdf | ||
| B8 - W50S7G20B0002 Fire Alarm Solicitation Amendment 1 Released.pdf | ||
| B8 - W50S7G20B0002 Fire Alarm Solicitation 20200612.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| Fire Alarm Repair Question and Answer’s | 07 July 2020 | |
| 1. | Q: Real Property worksheet required as specified in the pre-bid slides? | |
| A: No Real Property Worksheet will be needed for this project. | ||
| 2. | Q: Is any other color of strobe required besides red? | |
| A: No, only strobes for Fire Alarm required. | ||
| 3. | Q: Is there a preferred panel? | |
| A: No preferred Mass Notification Panel. | ||
| 4. | Q: Can you repair the panel as opposed to replace. | |
| A: No, requirement is to replace the current panel in Building 3. | ||
| 5. | Q: Does new conduit and all existing used need to be red? | |
| A: Only new conduit run to the projects purpose needs to be red, if existing conduit is used then leave as is. | ||
| 6. | Q: If we have to schedule around Hangar openings, will we still be required to get the project done in the period of Performance specified? | |
| A: If accomplishing the project within the POP specified is delayed due to the Government the awarded contractor will be allowed more time. | ||
| 7. | Q: Do the MUA’s 1, 2 and 3 in the Weld shop require detectors? | |
| A: | ||
| 8. | Q: How many air handlers are there over 200 cfm in the project locations? | |
| A: |