W50S7623Q00150001 - HVAC Control Upgrade_Amendment 1.pdf

PDF 138 KB Posted

Attached to
HVAC Control Systems (replacement) Federal contract opportunity
Solicitation number
W50S7623Q0015
Issued by
Department of the Army National Guard

About this file

This is an amendment to a solicitation for an HVAC control system replacement project for the Department of the Army National Guard. The amendment incorporates additional drawings and responses to requests for information. The drawings and RFI responses are included as part of the solicitation. The work shall conform to the statement of work, drawings, and RFI responses provided. No other changes are made to the terms of the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to HVAC Control Systems (replacement), newest first.
File Type Posted
B1672-MEC_1.pdf PDF
B1672-MEC_2.pdf PDF
RFIs - HVAC Controls.pdf PDF
B1672-HVAC-R1-B1672-MEC_2S.pdf PDF
B1672-HVAC-R1-B1672-MEC_2.pdf PDF
B1672-HVAC-R1-B1672-MEC_1S.pdf PDF
Statement of Work (4 SEP 2023).pdf PDF
W50S7623Q0015 - HVAC Control Upgrade.pdf PDF
Statement of Work (4 SEP 2023).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F 6J3CE3193AW01 DDPM232014

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as p rovid ed herein, all terms and cond itions o f th e document referenced in Item 9A o r 10 A, as hereto fore chang ed , remains un ch an ged and in full force and effect.

15A. NAME AND T IT LE OF SIGNER (T ype or print )

30-105-04EXCEP TION T O SF 30

AP PROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) P rescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to incorporate additional draw ings and respond to received requests f or inf ormation (RFI). The draw ings and RFI response(s) are hereby incorporated and shall be considered part of any resultant contract--see DFARS 252.236-7001.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Sep-2023

16B. UNITED STAT ES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signa ture of Cont ract ing Officer)(Signat ure of person aut horized t o sign)

8. NAME AND ADDRESS OF CONT RACT OR (No., St reet , County, Sta te and Zip Code) X W50S7623Q0015

X 9B. DATED (SEE IT EM 11)

04-Sep-2023

10B. DATED (SEE IT EM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS IT EM ONLY AP PLIES TO AMENDMENT S OF SOLICITAT IONS

X Th e ab ove n umbered solicitation is amend ed as set forth in Item 1 4. Th e hou r and date sp ecified for receipt o f Offer is extend ed , X is not extended.

Offer mu st ackn owled ge receipt of this amen dment p rior to the h our an d d ate specified in the solicitation or as amen ded b y o ne of the following method s:

(a) By completing Items 8 and 15 , and returnin g 1 co pies of the amen dment; (b ) By ackn owled ging receipt of this amen dment o n each copy of the o ffer sub mitted ;

o r (c) By separate letter o r teleg ram wh ich includ es a reference to th e so licitation and amend men t nu mbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtu e of this amen dment y ou desire to change an offer already su bmitted, su ch change may be made by teleg ram or letter, p rovid ed each telegram o r letter mak es reference to th e so licitation and this amen dment, an d is receiv ed prio r to the op en ing hou r and date sp ecified.

12. ACCOUNTING AND AP PROP RIATION DATA (If required)

13. THIS ITEM AP PLIES ONLY T O MODIFICATIONS OF CONT RACT S/ORDERS.

IT MODIFIES T HE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED P URSUANT T O: (Specify aut horit y) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN T HE

CONT RACT ORDER NO. IN ITEM 10A.

B. T HE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office , appropria tion dat e, et c.) SET FORT H IN ITEM 14, P URSUANT TO T HE AUT HORITY OF FAR 43.103(B).

C. T HIS SUPP LEMENTAL AGREEMENT IS ENT ERED INTO PURSUANT TO AUT HORITY OF:

D. OT HER (Specify type of modificat ion and aut horit y)

E. IMP ORTANT: Contrac tor is not, is required t o sign this document and re turn copies to t he issuing office.

14. DESCRIP TION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, inc luding solic ita tion/contrac t subject mat t er where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If app licable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Sep-2023

CODE

USPFO T X 136 MISSION SUPPORT CONTRACT ING

200 HENSLEY AVE BLDG 1672

FORT WORTH T X 76127-1672

W50S76 7 . ADMINISTERED BY (If o ther than item 6)

4 . REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W50S7623Q0015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00600 - REPRESENTATIONS & CERTIFICATIONS

The following have been modified:

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Title Date Statement of Work 4 September 2023 B1672-MEC_1 (Drawings) N/A B1672-MEC_2 (Drawings) N/A B1672-HVAC-R1-B1672-MEC_1S (Drawings) N/A B1672-HVAC-R1-B1672-MEC_2 (Drawings) N/A B1672-HVAC-R1-B1672-MEC_2S (Drawings) N/A RFIs - HVAC Controls N/A

(End of clause)

W50S7623Q0015

(End of Summary of Changes)

File details come from the government source that posted it. Updated .