Attachment II Questions and Answers.pdf
PDF 80 KB Posted
- Attached to
- 146 AW Automatic Transfer Switch and Generator Federal contract opportunity
- Solicitation number
- W50S7522R0003
- Issued by
- Department of the Army National Guard
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 3.docx | DOCX document | |
| W50S7522R0003 Rev 2 - 146 AW ATS.pdf | ||
| W50S7522R0003 Amendment 2 - 146 AW ATS.pdf | ||
| Attachment I - Requirement Description.pdf | ||
| W50S7522R0003 - 146 AW ATS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI No. Question / Comment SME Response
R0001 Is a tier 3 generator acceptable. No.
R0002
During the job walk it was said that most if not all the conduit and would be installed by the government. Could you clarify what that means. What footages and sizes are we responsible to provide and install.
At building 1204 you will be responsible for providing, connecting and running the cabling from generator to ATS/ATS to Disconnect. Rough estimates are 30 feet from generator to ATS & 5 feet from ATS to Disconnect.
R0003 What is the contractor responsible for to mount the new generator in place like a concrete pad?
Place and secure generator on provided concrete pad.
R0004
Can we get a refined SOW that spells out what the government is providing and what the contractor is responsible for.
See RFI for cabling needs, Connectors and Hardware required to mount the new
ATS (2) & Generator (1) is industry standard for creating a complete list.
R0005
BLDG. 602 Will a backup emergency generator need to be onsite in case of power outage until work and commissioning of ATS is complete or will base be providing backup generator?
Backup Emergency Generator will be available if it is deemed necessary.
R0006
BLDG. 1203 It was stated at site visit that the conduit raceways and generator pad would be provided by the government and the contractor is to only make final tie-ins to ATS and generator with conduit once equipment is set. Contractor is also to provide cable and terminations into equipment.
During the site visit it was uncertain where the generator and ATS would be placed, therefore a footage for cable to be provided and installed is not known. Is there an estimated footage that should be used for bidding purposes for cabling to be provided and installed?
See RFI 0002
R0007
BLDG. 1203 Will the Air Quality Permit for the new Tier 4 generator to be installed be procured by the government or will contractor be providing with generator?
The permiting will be handled by the 146thAW
R0008
Please confirm if you need 600V for both the Automatic Transfer Switch and the generator. Or are these units for separate sites?
See PWS.
RFQ W50S7522R0003 Generator ATS's
REQUEST FOR INFORMATION (RFI) LOG
R0009
There is no such thing as a stationary “Tier 4 final” diesel generator. That sort of engine only comes on a mobile/prime power package. Is that what you are looking for?
There are a wide range of EPA Tier 4-certified stationary and mobile prime generator sets to provide critical protection in virtually any power generation application. With power nodes ranging from 60 to 2,750 kW.
R0010 When do you need deployment for this equipment?
See solicitation for Period of Performance
R0011
Are there as-built drawings, single line, and/or pictures for each building?
Single lines are not available
R0012
For Building 602, can the new ATS use the existing feeders for primary, secondary and load side?
Yes
R0013
For Building 1203, will this new ATS and generator replace an existing system?
None existing
R0014
For Building 1203, if this is an existing system, can the new ATS use the existing feeders for primary, secondary and load side?
See RFI 0002
R0015
Describe the ATS use in each building; including if this for an elevator or other motor control. Please provide secondary load information: motor, elevator or other critical devices.
Communications equipment
R0016
Will an equipment pad be required for the new diesel generator? If so, please provide specs. Pad supplied organically
R0017
R0018
File details come from the government source that posted it. Updated .