Amended AGE Secondary Containment Cover Specs.docx
DOCX document 309 KB Posted
- Attached to
- Containment Pad Carport
- Solicitation number
- W50S70-20-R-0013
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solcitation W50S70-20-R-0013-0001 Carport.docx | DOCX document | |
| RFI_Template.doc | DOC document | |
| Solcitation W50S70-20-R-0013 Carport.docx | DOCX document | |
| AGE Secondary Containment Cover Specs.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
COMBAT READINESS TRAINING CENTER SAVANNAH (ACC)
1401 ROBERT B. MILLER JR. DRIVE
GARDEN CITY GEORGIA 31408
Contractor will provide two (2) custom length metal roof carport with a Gable or A-Frame style roof with a minimum of 12 gauge metal.
The following specs are:
1. Rain/Sunscreen Carport 19’W x 96’L x 12’H
2. 2” X 4” tube steel framing
3. Truss bracing on all interior trusses
4. Header openings on both side walls
a. 24’Wide x 10’Height
5. 26-gauge R-panel sheet metal package
6. Concrete anchors
7. Top color has to be green.
8. Center Beam 12’Height
9. Front & Back 10’ Height
Comments:
Each canopy will be a 96’ continuous run with 4 – 24’ wide openings running down the sides. This should shed water away from all equipment stored under them. Contractor is required to install according to the following standards and provide certification of the following from a licensed/certified engineer in the state of Georgia. Sheds shall be anchored to the CONCRETE and must ensure structures remain anchored for wind of (3 second) peak gust speeds up to and including 120 mph as measured at 10 meters above ground (reference ASCE 7-10).Test at the loads required by Garden City which are to be able to withstand 120 mph. These need to be designed to anchor directly to the concrete using a wedge type anchor. Carport cannot have subgrade foundations poured and vertical load transfer elements below subgrade. Dig permit is required from 165CES Work Control before breaking surface of the ground including drilling bolts into ground or any subsurface digging/coring is undertaken.
This is the type of design that we are looking for.
image4.png image1.png image2.png image3.png image5.png image50.png
File details come from the government source that posted it. Updated .