AMENDMENT.pdf

PDF 300 KB Posted

Attached to
BOILERS
Solicitation number
W44W9M-18-T-0148
Issued by

About this file

AMENDMENT

View the file

Other files

File Type Posted
JUSTIFICATION.pdf PDF
SOLICITATION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTING OFFICE/DAL

DARLA LOTT

918-420-6577/MCALESTER CONTRACTING

1 C TREE ROAD

MCALESTER OK 74501-9002

SEE SCHEDULE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

the reason for this amendment is to include to the build to spec of PBX-PS-07 Replaces (PBX-PS-06) 3/12

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W44W9M18T0148

X 9B. DATED (SEE ITEM 11)

30-Jul-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Aug-2018

CODE

CONTRACTING OFFICE

MCALESTER ARMY AMMUNITION PLANT

1 C TREE ROAD

MCALESTER OK 74501-9002

W44W9M 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W44W9M

FACILITY CODECODE

EMAIL:TEL:

W44W9M18T0148

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 07-Aug-2018 04:00 PM to 15-Aug-2018 04:00 PM.

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

500,000BTU/H INPUT, 425,000BTU/H OUTPUT, 7" VENT SIZE, UP TO 87% THERMAL EFFICIENCY

TWO (2) POWER-FIN'S TURNKEY INSTALLED IN BUILDING 2, (2) PBN0502-F9, POWER-FIN,

500,000BTU/H INPUT, 425,000BTU/H OUTPUT, 7" VENT SIZE, UP TO 87% THERMAL EFFICIENCY.

ON/OFF. ASME COPPER-FINNED TUBE HEAT EXCHANGER TEMPERATURE AND PRESSURE GAUGE

ASME PRESSURE RELIEF VALVE ADJUSTABLE HIGH LIMIT W/ MANUAL RESET FLOW SWITCH,

SMART SYSTEM CONTROL CONTACTS ON ANY FAILURE ALARM AND RUN CONTACTS LOW-NOX

COMPLIANT LOCHINVAR (2) CSD-1 / FM / GE-GAP HIGH AND LOW GPS LOCHINVR (2) BACNET

MSTP COMMUNICATION METAL-FAB LOT FLUE MATERIAL FROM COMMON BREECHING TO

EXISTING VERTICAL STACK CHASE, LABOR TO REMOVE AND DISPOSE OF OLD, INSTALL NEW

BOILERS AND START UP INCLUDED. LOCHINVAR PART PBN0502-F9 AND ///NO SUBSTITUTE///FIRM

DELIVERY DATE_____________

To:

500,000BTU/H INPUT, 425,000BTU/H OUTPUT, 7" VENT SIZE, UP TO 87% THERMAL EFFICIENCY

TWO (2) POWER-FIN'S TURNKEY INSTALLED IN BUILDING 2, (2) PBN0502-F9, POWER-FIN,

500,000BTU/H INPUT, 425,000BTU/H OUTPUT, 7" VENT SIZE, UP TO 87% THERMAL EFFICIENCY.

ON/OFF. ASME COPPER-FINNED TUBE HEAT EXCHANGER TEMPERATURE AND PRESSURE GAUGE

ASME PRESSURE RELIEF VALVE ADJUSTABLE HIGH LIMIT W/ MANUAL RESET FLOW SWITCH,

SMART SYSTEM CONTROL CONTACTS ON ANY FAILURE ALARM AND RUN CONTACTS LOW-NOX

COMPLIANT LOCHINVAR (2) CSD-1 / FM / GE-GAP HIGH AND LOW GPS LOCHINVR (2) BACNET

MSTP COMMUNICATION METAL-FAB LOT FLUE MATERIAL FROM COMMON BREECHING TO

EXISTING VERTICAL STACK CHASE, LABOR TO REMOVE AND DISPOSE OF OLD, INSTALL NEW

BOILERS AND START UP INCLUDED. LOCHINVAR PART PBN0502-F9 AND ///NO SUBSTITUTE///

MUST TO BUILT TO SPEC PBX-PS REPLACES (PBX-PS-06) 3/12FIRM DELIVERY DATE_____________

CLIN 0002

The CLIN extended description has changed from:

500,000BTU/H INPUT, 425,000BTU/H OUTPUT, 7" VENT SIZE, UP TO 87% THERMAL EFFICIENCY

TWO (2) POWER-FIN'S TURNKEY INSTALLED IN BUILDING 2, (2) PBN0502-F9, POWER-FIN,

500,000BTU/H INPUT, 425,000BTU/H OUTPUT, 7" VENT SIZE, UP TO 87% THERMAL EFFICIENCY.

ON/OFF. ASME COPPER-FINNED TUBE HEAT EXCHANGER TEMPERATURE AND PRESSURE GAUGE

ASME PRESSURE RELIEF VALVE ADJUSTABLE HIGH LIMIT W/ MANUAL RESET FLOW SWITCH,

W44W9M18T0148

SMART SYSTEM CONTROL CONTACTS ON ANY FAILURE ALARM AND RUN CONTACTS LOW-NOX

COMPLIANT LOCHINVAR (2) CSD-1 / FM / GE-GAP HIGH AND LOW GPS LOCHINVR (2) BACNET

MSTP COMMUNICATION METAL-FAB LOT FLUE MATERIAL FROM COMMON BREECHING TO

EXISTING VERTICAL STACK CHASE, LABOR TO REMOVE AND DISPOSE OF OLD, INSTALL NEW

BOILERS AND START UP INCLUDED. LOCHINVAR PART PBN0502-F9 AND ///NO SUBSTITUTE///FIRM

DELIVERY DATE_____________

To:

500,000BTU/H INPUT, 425,000BTU/H OUTPUT, 7" VENT SIZE, UP TO 87% THERMAL EFFICIENCY

TWO (2) POWER-FIN'S TURNKEY INSTALLED IN BUILDING 2, (2) PBN0502-F9, POWER-FIN,

500,000BTU/H INPUT, 425,000BTU/H OUTPUT, 7" VENT SIZE, UP TO 87% THERMAL EFFICIENCY.

ON/OFF. ASME COPPER-FINNED TUBE HEAT EXCHANGER TEMPERATURE AND PRESSURE GAUGE

ASME PRESSURE RELIEF VALVE ADJUSTABLE HIGH LIMIT W/ MANUAL RESET FLOW SWITCH,

SMART SYSTEM CONTROL CONTACTS ON ANY FAILURE ALARM AND RUN CONTACTS LOW-NOX

COMPLIANT LOCHINVAR (2) CSD-1 / FM / GE-GAP HIGH AND LOW GPS LOCHINVR (2) BACNET

MSTP COMMUNICATION METAL-FAB LOT FLUE MATERIAL FROM COMMON BREECHING TO

EXISTING VERTICAL STACK CHASE, LABOR TO REMOVE AND DISPOSE OF OLD, INSTALL NEW

BOILERS AND START UP INCLUDED. LOCHINVAR PART PBN0502-F9 AND ///NO SUBSTITUTE///

MUST TO BUILT TO SPEC PBX-PS REPLACES (PBX-PS-06) 3/12FIRM DELIVERY DATE_____________

(End of Summary of Changes)

File details come from the government source that posted it.