16-T-0023-0001BoilerRetubeServiceSolAmend.pdf

PDF 31 KB Posted

Attached to
BOILER REPAIR / RETUBE SERVICE
Solicitation number
W44W9M16T0023
Issued by

About this file

Scope of Work Change

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTING OFFICE/KWH

KENT W. HACKETT

918-420-6177/MCALESTER CONTRACTING

1 C TREE ROAD

MCALESTER OK 74501-9002

W44W9M527902C6

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to revise the Scope of Work.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Nov-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W44W9M-16-T-0023

X 9B. DATED (SEE ITEM 11)

22-Oct-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Nov-2015

CODE

CONTRACTING OFFICE

MCALESTER CONTRACTING OFFICE

1 C TREE ROAD

MCALESTER OK 74501-9002

W44W9M 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W44W9M

FACILITY CODECODE

EMAIL:TEL:

W44W9M-16-T-0023

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

SCOPE OF WORK

Scope of Work General Information There are two York-Shipley brand packaged fire-tube type boiler at building 229B, and two York-Shipley brand packaged fire- tube boiler at 105B that has been in service since 1973. Over the years, these boilers have developed small tube leaks that have been repaired by rolling the leaking tubes, unfortunately, the tube ends have developed cracks, are leaking and can no longer be rolled; resulting in loss of steam production. We believe the answer to this problem is to re-tube these boilers to restore them to like new condition. The work consists of the in-place field replacement of all 2 ½” boiler tubes in the second pass according to the ASME Code, NBIC Code and the Manufacturer’s Data Report.

Since Army Regulation 420-49, 6.1c. Requires the “Operation, maintenance and repair of these facilities will be in accordance with the manufacturer’s instructions for specific equipment.” There can be no deviation from the above listed codes and specifications unless indicated by revision etc…..The specific equipment to be repaired is as follows.

1. York-Shipley packaged fire-tube boiler, Model no. 82-14868 H84954, National Board no. 22010. This boiler is also known as boiler #1 and is located in Building 229B.

2. York-Shipley packaged fire-tube boiler, Model no. 82-14873 H84959, National Board no. 22016. This boiler is also known as boiler #2 and is located in Building 229B

3. York-Shipley packaged fire-tube boiler, Model no. 748165 H58656, National Board no. 14071. This boiler is also known as boiler #2 and is located in Building 105B.

4. York-Shipley packaged fire-tube boiler, Model no. 74-8155 H58656, National Board no. 14070. This boiler is known as boiler #1 and is located in building 105B

Prior to the start of the work, the McAAP Boiler Shop personnel will have all of the boiler hand holes’’, doors and furnace covers on these boilers opened to allow access to internal/external surfaces for inspection.

The Location of Building 105B is about 3 miles, 229B is about 6 miles from the Main Gate entrance to the McAlester Army Ammunition Plant, McAlester ok. These Buildings are located in the restricted access area and will obligate the successful bidder to meet certain safety, fire and security requirements to accomplish work in this area. Briefly, this includes about a 4-hour training and orientation session by safety, fire and security personnel for each worker as well as adhering to McAAP plant regulations, OSHA etc….Be aware, that access to the restricted area is limited and not all of these personnel mentioned above are available for assistance outside the normal plant work week of Monday through Thursday, and the normal hours of operation of 0600- 1630. Work outside these days and hours may require special permission.

Technical Information

General

During several stages of the repairs to the boilers, McAAP Boiler Shop personnel will observe the work in progress to verify that the manufacturer’s instructions as defined in this contract are complied with.

Boiler Shell

The contractor will remove all scale from the boiler and dispose of it prior to installing the new tubes.

Tubes

When removing the old tubes, the seal- weld on the front and rear pass must be removed by grinding or appropriate seal weld tube-end cutting tool. Care must be exercised to not gouge the tube sheet during this operation. Note: The tubes will be rolled beaded and seal welded in the new installation.

1. Boiler # 1 229B has 94 boiler tubes that are in the second pass and are 2 ½” Outside diameter, ASTM A178, Grade A, (ERW, HR & normalized) 0.105 wall thickness and are 142” in length according to the Form P-2 Manufacturer’s Data Report. This for estimating purposes, should be about 1128 linear feet of boiler tube per boiler with no waste.

2. Boiler # 2 229B has 94 boiler tubes that are in the second pass and are 2 ½” Outside diameter, ASTM A178, Grade A, (ERW, HR & normalized) 0.105 wall thickness and are 142” in length according to the Form P-2 Manufacturer’s Data Report. This for estimating purposes, should be about 1128 linear feet of boiler tube per boiler with no waste.

3. Boiler # 2 105B has 94 boiler tubes that are in the second pass and are 2 ½” Outside diameter, ASTM A178, Grade A, (ERW, HR & normalized) 0.105 wall thickness and are 142” in length according to the Form P-2 Manufacturer’s Data Report. This for estimating purposes, should be about 1128 linear feet of boiler tube per boiler with no waste.

4. Boiler # 1 105 has 94 boiler tubes that are in the second pass and are 2 ½” Outside diameter, ASTM A178, Grade A, (ERW, HR & normalized) 0.105 wall thickness and are 186.5” in length according to the Form P-2 Manufacturer’s Data Report. This for estimating purposes, should be about 1128 linear feet of boiler tube per boiler with no waste.

The tube ends shall be polished with abrasive sanding wheels prior to installation to remove any mill-scale, rust or other debris a distance about 1 ½” from each tube end and wiped clean with solvent prior to insertion. Tube end projection should be about 3/8 “past the tube sheet prior to rolling /flaring/beading operation. The beading operation to be acceptable must bring the bead in contact with the tube sheet and must not allow a 0.001” feeler gauge to pass under the bead. Care must be exercised to prevent over-rolling of the boiler tube beyond the wall reduction necessary for 100% mechanical joint.

Tube Sheet

Prior to the new installation of the tubes into the tube sheet, the tube sheet shall be wire brushed and checked for ligament cracks using dye penetrant, Any cracks will be repaired using the Manufacturer’s Standard Welding Procedure or its equivalent, the procedure used shall be approved by the contractor supplied Authorized Inspector before the repair is started and shall comply with the requirements of the ASME Code, the national Board Inspection Code R-300 “General Requirements For Repair’s And Alterations” sand R-400 “Repairs To Boilers And Pressure Vessels”. Ensure all tubes holes are not scored by tube removal

And repair or ream as necessary. Tube holes should not be over 2.525” I.D. and should be abrasive polished and solvent washed prior to the installation.

Welded Repairs

These repairs to the boilers will require the organization making the repairs to possess the appropriate ASME Code Symbol or National Board “R” Stamp authorizing them to prepare and furnish copies of the National Board Form R-

1. “Report of Welded Repair”. This report or a statement from the contractor stating no welded repairs were performed. Shall be furnished to McAAP prior to the final payment.

Send to

Owner

Commander McAlester Army Ammunition Plant Attn: SJMMC-DEO-P (Mr. John Mcnully) 1 C Tree Road, Bldg. 14-A McAlester, Ok 74501-9002

Phone No: 918-420-7671 Fax No: 918-420-7662

Boil out The contractor shall boil out all re-tubed boilers upon completion of the boiler re-tube to remove any oil or other residue from the internal heating surfaces. This will be witnessed by McAAP Boiler Shop Personnel as a Quality control check.

Pressure Tests Pressure test will be performed by the contractor as required by the manufacturer’s instructions and by the ASME and National Board Inspection Code. All tests will be witnessed by McAAP Boiler Shop Personnel as a Quality control check.

Warranty Repairs shall be warranted for a period one hundred twenty (120) days after work is completed. Repairs during the warranty period shall be made at no cost to the Government if failure occurs due to improper or deficient materials or workmanship provided under this contract. Contractor bears no responsibility for failures occurring due to improper operation or maintenance by Government Personnel or to equipment or material failure caused by conditions other than deficient contractor performance.

Materials and Labor

Contractor shall provide all material, labor, and incidentals required for a complete and proper repair, even if not specifically described in the contract. If major internal problems become evident after removal of the tubes which will involve considerable more expense to the contractor than specified herein, the additional work will require a written modification to the contract, and the Contracting Officer shall authorize same before the contractor proceeds with the unspecified work.

Owner

Commander McAlester Army Ammunition Plant Attn: SJMMC-DEO-P (Mr. David Burnett) 1 C Tree Road, Bldg. 9 McAlester, Ok 74501-9002

Phone No: 918-420-7658 Fax No: 918-420-7662 Email: David.D.Burnett.civ@mail.mil

Completion of Work

At job end, the contractor will be responsible for cleanup of all material and debris generated on the work-sites. This will include the disposal of the boiler tubes that are removed from the boiler, scale removed and other generated debris.

All repairs, tests and documentation shall be complete and the boilers made available for operation within 30 days of the award of the contract.

(End of Summary of Changes)