Solicitation_W25G1V18R0032_Digital_Xray.pdf
PDF 453 KB Posted
- Attached to
- DIGITAL X-RAY INSPECTION SYSTEM
- Solicitation number
- W25G1V18R0032
About this file
DIGITAL XRAY INSPECTION SYSTEM
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W25G1V18R0032 01-Aug-2018
b. TELEPHONE NUMBER
570-615-6125
8. OFFER DUE DATE/LOCAL TIME
04:00 PM 30 Aug 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W25G1V9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
JACQUELINE RAMSEY
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W25G1V813800G8
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
ACC-APG DIVISION E
11 HAP ARNOLD BLVD
TOBYHANNA PA 18466-5100
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W25G1V 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
SEE BELOW FOR SEPARATE SHIPPING INSTRUCT
XXX
XXX PA 00000
TEL: FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
1,000
NAICS:
334517
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF50
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
ADDENDUM
1. Solicitation is in accordance with FAR Part 12, Acquisition of Commercial Items and FAR Part 13, Simplified Acquisition Procedures. Therefore, simplified procedures will be utilized for soliciting competition, evaluation, award documentation and notification that comply with FAR 13.1.
2. The contractor is required to provide a standard two (2) year parts & labor warranty as a minimum requirement.
3. Parties interested in responding to Request For Proposal (RFP) shall complete a standard form (SF) 1449 http://www.forms.gov, blocks 12, 17a, 17b, 19 thru 24, 30a, and 30b; and 30c. The offer must be signed by a company official authorized to contractually bind the company.
4. Offeror shall fully complete the Certifications/Representations, Exceptions and Amendments. Unless offeror is currently registered with an active status in System For Award Management (SAM.GOV) and offeror indicates such in their proposal, parties interested in responding to this RFP shall complete the following Representations & Certifications if required in the applicable FAR clause:
FAR 52.212-3 ALT 1 (Offeror Representations and Certifications- Commercial Items)
5. Any resultant contract will be firm fixed-priced.
6. Any amendments issued to this solicitation will be synopsized in the same manner as this solicitation. All offerors are advised to acknowledge all amendments issued to the solicitation with their proposal by signing and including one copy of the amendment with their proposal.
7. BASIS OF AWARD – Award evaluation and basis for award will be in accordance with FAR 15.101-2, Lowest Price Technically Acceptable (LPTA).
8. The Government is not responsible for any costs incurred for contractor’s time or materials expended in preparing a proposal for this solicitation.
PROPOSAL SUBMISSION
The offeror’s proposal shall be submitted in electronic copy to FBO.gov. , the offeror's proposal must be submitted through the FBO.gov Electronic Response, Document Upload feature. Instructions on this feature can be found in the Vendor User Guide under the Getting Started tab on the FBO.gov website. Please allow ample time for the Government to receive the proposal by the response date specified in block 8 of the SF1449. Proposals may be submitted any date and time prior to the close of the solicitation, after which FBO.gov will no longer allow offerors to submit a proposal. Email, faxes, and hard copy proposals WILL NOT
BE ACCEPTED.
PROPOSAL SUBMITTALS/REQUIREMENTS
Proposal, along with all Deliverables noted below, must be submitted by RFP closing date/time in order to be considered.
1. Contractor Proposal
2. All Signed Amendments (see Addendum No 7)
3. Provide Statement of Acceptance of Offers for 90 days (see
Addendum No. 5)
4. Provide a standard 2 year parts & labor warranty (see Addendum No
2)
5. Provide FAR 52.212-3 clauses unless provided in SAM (see
Addendum No 4)
6. The vendor shall include the supply, install/setup, calibrate, test, validate and provide training for one (1) DR System.
7. The proposal shall specify all pertinent facilities requirements
(electrical, air, floor loading, etc.) required for installation of the DR System. The proposal shall state compliance with and/or deviation from each item in this specification. Where the specification requirements cannot be met, it shall be noted and alternatives suggested along with the specifications for those alternatives. The vendor shall submit Safety Data Sheets for all hazardous materials proposed for use and also perform a Radiation Safety Survey during the final DR System test/validation process.
8. The proposal shall include a description of all major system components along with individual pricing if available and all options, warranties and training included with the purchase, as well as any options available for purchase at a later date. The proposal shall also include recommendations for spare parts and preventative maintenance.
9. Radiation Source: The written proposal shall specify the following X- Ray system attributes:
-Tube Type (open or closed) -Target Design (with options) -Focal Spot Size & Range -High Voltage Range (kV) -Tube Current Range
-Maximum Tube Power (W) -Maximum Target Power (W) -X-Ray Beam Cone Angle -Inherent Filtration -Minimum Focus-Object-Distance -Duty Cycle -Expected product life time (years)
10. Digital Detector: The written proposal shall specify the following X- Ray digital FPD attributes:
-Detection Method (indirect or direct) -Material (amorphous silicon or selenium) -Scintillator (i.e. Cesium Iodide) -Pixel Pitch (um) -Resoluation (megapixels) -Dimensions (WxHxD) -Imaging Area (WxH) & Pixels -Maximum Frame Rate (fps) -AD Conversion (grey level bits) -Expected product life time (years)
11. Cabinet Enclosure: The written proposal shall specify the following cabinet enclosure attributes:
-Exterior Dimensions (WxHxD) & Weight -Access Door Size (WxH), Type & Safety (automated/manual, interlocks) -Viewing Window Size (WxH) -Radiation Leakage Rate (maximum in uSv/hr) -Radiation Safety and ESD Standards (list supported standards)
12. Additional System Attributes: The written proposal shall specify the following additional DR system attributes:
-Total System Footprint (W x H x D) & Weight -Operating Temperature & Humidity (degrees & percent) -Electrical Power Supply (AC voltage, current & phasing, typical power consumption) -Electrical Noise Filtering Features (provide a description) -Compressed Air Supply (type, pressure & quality) -Motion Control Sub-system Positioning Resolution & Accuracy (microns) -Minimum Focal Spot to Sample Distance
NOTE: Any capability limitations associated with the attributes above must be specified
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each Digital X-ray Inspection System
FFP
Digital Radiography (DR) system that will be used to examine/inspect various electronic, electrical and mehanical components/assemblies.
FOB: Destination
MILSTRIP: W25G1V813800G8
PURCHASE REQUEST NUMBER: W25G1V813800G8
PSC CD: 6635
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
STATEMENT OF WORK
Digital Radiography System Specification
1.0 Introduction
This specification defines the minimum requirements for a Digital Radiography (DR) system that will be used to examine/inspect various electronic, electrical and mechanical components/assemblies including but not limited to:
- Electronic Printed Circuit Boards (PCBs)
- Surface Mount Technology (SMT) components/devices
- Bottom Termination Components (BTC’s) such as Ball Grid Arrays (BGAs)
- Electrical interconnect components like PCB connectors
- Small mechanical/electrical assemblies including metal castings
Tobyhanna Army Depot (TYAD) requires one (1) DR system at this time for its facility located in Tobyhanna, PA. The DR system will be operated by trained electronic and mechanical engineers or technicians as well as certified radiographers.
2.0 Radiological Examination & Inspection
The primary use of the DR system will be for radiological examination and inspection of electronic component solder joints on PCBs to the requirements of:
- ASTM E 1161 Radiologic Examination of Semiconductors & Electronic
Components
- MlL-STD-883 Test Method Standard for Microcircuits
- MIL-STD-750 Test Methods for Semiconductor Devices
3.0 System Overview
The requirements herein are the minimum desired and not intended to limit any design advancements and/or concepts which will satisfy the listed capability requirements.
The DR system shall be a cabinet-based X-Ray system contained within a shielded enclosure that meets all Federal, State and Local requirements for the planned installation site in order to be identified/defined as a "Cabinet X-Ray System” such that a radiation safety certification equivalent to American Society for Nondestructive Testing (ASNT) Industrial Radiography & Radiation Safety Personnel program (IRRSP) is not required for the personnel operating the X-Ray system.
The DR system shall be equipped with a precision motion control sub-system that enables multi-axis movement of the X-Ray tube, detector and/or sample subject so that optimal positioning can be achieved to provide geometric magnification at various sample subject angles while acquiring and displaying both live and static X-Ray images.
The system shall be capable of performing real-time 2D X-Ray imaging from views above the sample subject as well as at oblique angles of +/- 70 degrees or greater for optimal viewing of SMT/BTC solder joints.
Imaging frame rates shall be 25 frames-per-second (fps) or greater.
Additionally, the system shall be equipped with analysis software to perform automated analysis of plated through-hole (PTH) and SMT, BGA and other BTC solder joints.
The system shall be capable of performing 3D Partial Computed Tomography (pCT) X-Ray imaging on all sample subjects anywhere within the specified inspection area. During the 3D pCT process, very high resolution/magnification 2D X-Ray images are acquired at oblique angles around a specified region-of-interest (ROI) on the subject.
Once the 2D X-Ray imaging sequence is complete, the acquired images are reconstructed offline using Digital Tomosynthesis (DT) to create a 3D model of the ROI. Using 3D pCT, the system shall provide high resolution/magnification CT functionality and analysis capabilities anywhere on the sample subject to support various examination/inspection applications including:
- Showing solder void position and size at joint interfaces of SMT/BTC components
- Identifying SMT/BTC Head-In-Pillow (Hip) and open joint defects
- Separating/isolating different layers within PCBs and SMT/BTC components
- Removing obscuring detail caused by multi-layer PCB features
- Investigating the quality and fill of PTH solder joints and vias
- Identifying tilted components and PCB board warpage
- Analyzing electrical connector defects and failures
- Performing virtual micro-sectioning of sample subjects
The system shall support optional onsite hardware and software upgrades including the ability to add full micro Computed Tomography (uCT) capabilities.
4.0 Radiation Source
The DR system radiation source shall be a micro-focus or nano-focus transmissive type X-Ray tube with a minimum output of 160 kilovolts (kV). The X-Ray system maximum tube power and target power shall be 20 W or greater. The system software shall provide the capability to monitor, record and report the total X-Ray ON-time for each examination/inspection operation performed using the system.
5.0 Digital Detector
The DR system detector shall be an indirect or direct digital flat panel detector (FPD) based on a thin-film transistor (TFT) array of amorphous silicon or selenium. The FPD shall be rated to handle the maximum output of the X-Ray system radiation source.
6.0 Computer Workstations
The DR system shall include two (2) separate computer workstations. The primary workstation shall provide operational control/monitoring and 2D X- Ray image acquisition, display, analysis and reporting functionality for the system. It shall be configured with dual monitors connected to an ergonomic swing-arm mounted to the system cabinet. The secondary workstation shall be utilized for offline reconstruction, visualization and analysis of 3D pCT models. The workstations shall be configured with the following minimum requirements:
- Microsoft Windows 10 (64-Bit) Operating System - Intel-based Quad-Core
CPU
- 24” Full High Definition (HD) Monitors (see above) - 8 GB RAM
- Solid State Drive (SSD) - BD/DVD/CD R/W Disk
Drive
- USB Keyboard & Mouse
The workstations shall be pre-configured with all the necessary hardware and software required to provide the functionality/capabilities outlined in this specification as a minimum.
7.0 Cabinet Enclosure
The DR system cabinet enclosure shall meet all Federal, State and Local codes and requirements to be classified as "Cabinet X-Ray System”. It shall be adequately shielded to pose no radiation hazard to operating personnel. The cabinet enclosure shall be equipped with a window such that the component or device under examination can be viewed while being manipulated and positioned with the cabinet door closed.
The cabinet enclosure and sample manipulation subsystem shall be grounded in such a manner to prevent Electrostatic Discharge (ESD) from damaging any ESD sensitive components/devices on the sample being examined/inspected.
8.0 Minimum System Requirements
Since a wide variety of components and assemblies ranging from tiny micro-electronic packages to larger military PCBs will be examined/inspected, the DR system shall meet the following minimum system requirements over the full range of capabilities:
- Provides real-time 2D and 3D pCT X-Ray imaging capabilities (per Section
4.0)
- Detects 0.99 micron features (or smaller) up to 20 Watts of target power
- Detects 0.35 micron features (or smaller) up to 10 Watts of target power
- Accommodates sample sizes up to 29 inches x 22 inches (or larger)
- Images/inspects sample areas up to 20 inches x 17 inches (or larger)
- Accommodates sample weights up to 10 pounds (or larger)
- Supports imaging frame rates of 25 frames-per-second (or greater)
- Supports geometric magnifications up to 2500X (or greater)
- Supports total magnifications up to 45000X (or greater)
- Supports oblique angle viewing of +/- 70 degrees (or larger) at full
10 of magnification
- Provides active image stabilization
- Provides two (2) Windows 10 (64-bit) computer workstations (per Section
7.0)
9.0 Delivery
Delivery will be made no later than twelve (12) weeks after contract award.
Tobyhanna Army Depot
ASARS RECEIVING
BLDG 1C-6
11 Hap Arnold Blvd Tobyhanna, PA 18466-5129
Each package will be marked to the ATTN: Mark Sgobba, ELTY-MEA-T (Building 1C, Bay 1)
Shipments being delivered by multi-axle vehicles must enter and exit via the TYAD Truck gate, located on Squire Street. Hours of operation for the Truck gate are M-F 0730 until 1530. The Truck gate is closed on Federal Holidays and weekends.
Shipments being delivered by standard sized vehicles not exceeding 10 feet in height can use the Main gate, but must obtain a visitors pass and vehicle pass from the Security Office, Building 20.
(In either instance, the driver of the vehicle must be in possession of valid vehicle insurance, registration, driver's license with proper endorsement for the size vehicle they are driving, bill of lading/purchase order that shows the contractor/vendor company name, telephone number, point of contact, type of goods and where the delivery is being made at TYAD.)
10.0 Warranty
At a minimum, contractor will provide a standard two (2) year parts & labor warranty.
CONTRACTOR SAFETY STANDARDS FOR TYAD
July 2018
Below are the contractor requirements for any work done on Tobyhanna Army Depot (TYAD). It is the responsibility of the contractor to enforce the below requirements.
Failure to enforce safety requirements on the depot can result in termination of the contract.
11 of
Important Phone Numbers
Emergency: 911 Security: 570-615-7550 Fire Department – (Non-Emergency): 570-615-7300 Safety: 570-615-7027
S.10.0 THE CONTRACTOR IS SOLELY RESPONSIBLE AND LIABLE FOR THE
SAFETY OF THEIR EMPLOYEES.
Review of the safety plans and other documents by the Tobyhanna Safety Office does not constitute an acceptance of Federal responsibility or liability for the adequacy of the safety measures identified for the job or for the Contractor's compliance with OSHA rules and regulations. The Contractor remains solely responsible and liable for safety at all times during the term of the contract.
Contractors shall comply with the following:
Red card program - Tobyhanna Army Depot utilizes a program to allow employees to stop an action which is considered unsafe. Employees carry small red cards that can be thrown down when the employee sees an action they consider unsafe. Work ceases until TYAD management can decide if it is safe or not. Contractors are required to comply with this. If a Tobyhanna employee presents his red card to a contractor, the contractor must stop working until the COR and the safety office can determine if there is a safety hazard or not.
12 of
S. 10.1 CODE COMPLIANCE
Tobyhanna Army Depot requires full contractor compliance with all safety regulations and standards. The Contractor is responsible for maintaining, monitoring and enforcing all rules, regulations and codes, by ALL personnel working for the contractor including all subcontractors.
S.10.2 IF AN INCIDENT HAPPENS
1. Any serious injury or medical emergency:
a. Dial 911 and give accurate location and nature of emergency. Make sure to tell the operator that you are calling from Tobyhanna Army Depot.
b. Send someone to the nearest exit to assist responders.
c. Treat victims to the best of your ability.
d. Call the work order desk at 570-615-7805 if there is any blood or body fluids that must be cleaned up.
2. In the event of the smell of natural gas:
a. Call dial 911.
b. Have all personnel evacuate the area if the smell is significant.
c. Assist the fire company to determine the leak as appropriate.
3. In the case of a fire:
a. If the fire is small, use a fire extinguisher and call 911.
b. Otherwise, dial 911 and pull the fire alarm.
c. Evacuate the building.
IN ANY CONFLICT BETWEEN STANDARDS, THE STRICTER OF THE TWO SHALL
APPLY. IF UNSURE CONTACT THE TYAD SOHO AT 570-615-7027
Standard Specifications for Projects Under the National Environmental Policy Act in Accordance with 32 CFR 651 Proponent ELTY-ISR-E
1. Air Pollution Control The contractor must control fugitive emissions, including dust, during the course of their contract. The contractor must obtain approval from the Environmental Branch (EB) prior to exhausting equipment to the outside. The contractor must not allow any pollutant or particulate matter to be released to the atmosphere at levels that are visible from outside of Tobyhanna Army Depot (TYAD). The contractor must not perform work that will release pollutants or particulate matter to the atmosphere when the wind speed exceeds ten miles per hour and will result in adverse effects to the surrounding areas. TYAD will monitor the wind speed; it is the contractor’s responsibility to obtain wind speed information through the Contracting Officer Representative (COR).
2. Asbestos The contractor must ensure that all materials used in the performance of this contract are asbestos-free.
Unless specified in the contract, the contractor must not disturb any existing Asbestos- Containing Material (ACM) in the performance of this contract. If ACM, or suspect ACM might be disturbed in performance of this contract, the contractor must avoid coming in contact with the material and immediately notify the COR and the Contract Administrator in writing. The COR must coordinate with EB to have the material tested to determine if there is ACM. If the material is determined to be ACM and the contractor cannot avoid disturbing the material, the COR will notify the Contracting Officer. The Contracting Officer will direct a change pursuant to the contract clauses entitled “Changes” and “Differing Site Conditions.” If ACM, or suspect ACM has been disturbed, the contractor must immediately notify the COR and call the EB. The
****Spill Response Procedures 1-2-3****
1. Stop work
2. Call 911
3. Evacuate Area
*********Damaged Asbestos?********* Call Environmental Branch (EB) at 615-
*******Environmental Questions?******
Call EB 615-7098 contractor will shut down and not move any equipment or supplies near the damaged ACM. The contractor will evacuate all non-contaminated contractor personnel from the immediate vicinity.
Any contractor personnel thought to be contaminated with asbestos must remain in the area until the EB responds. If the damaged material is determined to be ACM and there is potential for further damage, the Contracting Officer will direct a change pursuant to the clauses of the contract clauses entitled “Changes” and “Differing Site Conditions.”
Asbestos abatement required under the contract as originally awarded must be in accordance with United Facilities Guide Specification 02 83 14 00 10 and as otherwise required in the contract. Asbestos abatement not required under the contract as originally awarded, can be incorporated into the existing contract via contract modification, or by the Government taking responsibility for the asbestos abatement. The method of acquiring the abatement is at the discretion of the Government. The contractor must have an asbestos abatement work plan that has been approved by EB prior to beginning any asbestos abatement work.
3. Backflow The contractor shall have a backflow prevention device installed on all contractor equipment that is connected to Tobyhanna Army Depot’s (TYAD) water distribution system. The contractor shall have a water meter installed to monitor water consumption during all phases of the contract.
Water use will be reported monthly to the Environmental Branch.
4. Burning The contractor must not burn refuse and debris anywhere on TYAD.
5. Buy Recycled-Content Materials The Contractor must comply with Resource Conservation and Recovery Act (RCRA) Section 6002 (42 U.S.C. 6962, Federal Procurement) in the acquisition of materials with recycled content to meet the standards of Executive Order 13693, Planning for Federal Sustainability in the Next Decade; March 19, 2015. Specific designated items in this contract for which recycled content standards have been established have been set forth in the specification (e.g., insulation, roofing materials, carpet, carpet pad, paint, floor tiles, shower and restroom dividers). Recovered Material Certification: As required by the RCRA, the contractor must certify that the percentage of recovered materials to be used in the performance of the contract will be at least the amount required by the applicable contract specifications (see Federal Acquisition Regulation (FAR) Provision 52.223-4, Recovered Material Certification). Prior to application for final payment, the contractor must provide a report in accordance with FAR Clause 52.223-9, Estimate of Percentage of Recovered Material Content for Environmental Protection Agency (EPA) Designated Items, to the Contracting Office. Compliance with this program does not relieve the contractor from meeting all other specification requirements.
6. Cultural Resources The contractor must not adversely affect any property listed on the National Register of Historic Places (NRHP) or properties eligible for inclusion on the NRHP without consultation and approval from the EB through the COR. If there is a discovery of any historic properties, including archeological sites and graveyards, work will cease immediately until requirements of National Historic Preservation Act, as amended, have been met. All archaeological artifacts found at TYAD or TYAD-controlled properties are U. S. Government property until a determination is made otherwise.
7. Demolition Notification If a project involves the demolition of any load-bearing structural members, whether or not asbestos is present, 25 days prior to the demolition, the Commonwealth of Pennsylvania Asbestos Abatement and Demolition/Renovation Notification Form 2700-FM-BAQ0021 must be submitted to EB as specified in the Unified Facilities Guide Specification 02 82 13.00 10. The contractor may obtain a copy of the form from the EB.
8. Drinking Water The contractor must not perform any work on the TYAD potable water system prior to obtaining approval from the EB and the Installation Planning and Maintenance Division certified operator through the COR. If a permit is required due to construction or proposed chemical feed changes, it will be the responsibility of the contractor to obtain all permits associated with the project.
Permit applications will first be reviewed and approved by the Environmental Branch before being submitted to regulatory authorities. Any piping or additions added to the TYAD water system must be disinfected following American Water Works Association circular C651-14 "Disinfecting Water Mains." Construction will be kept outside of drinking water wellhead protection zones when feasible. All new buildings and remodeled buildings will be equipped with a water meter that can easily be read from the exterior of the building.
9. Endangered Species The contractor is responsible for meeting requirements of the Endangered Species Act of 1973.
The contractor must not disturb any endangered species, their habitat or offspring during the implementation of this contract.
10. Emergency/Spills All emergencies and spills must be reported to the TYAD Fire Department by calling 911 from a TYAD phone or (570) 615-7300. If a 911 call is placed on a cell phone, the call will go to the Monroe County Emergency Office. Notify the Monroe County Emergency Office that you are at TYAD and the call will be forwarded to TYADs Fire Department. The contractor must ensure all personnel working on site are trained in the proper procedure according to 29 CFR 1910.120 (if applicable) to initiate a spill response to handle the hazardous substances they are working with. The contractor will take the necessary actions to prevent and contain spills of hazardous materials.
11. Energy Efficiency The Energy Policy Act of 2005 section 109 and the Energy Independence and Security Act of 2007 require all new construction at federal facilities to be 30% better than ASHRAE 90.1.
Energy Policy Act of 2005 section 104 and the Energy Independence and Security Act of 2007 require all new equipment to be Energy Star qualified when available. This is applicable to heating, ventilation and air conditioning equipment, plumbing, building materials, lighting, commercial food service equipment and appliances.
12. Environmental Automation and Control Systems The contractor will not alter, modify, remove or tamper with any environmental automation or control system unless previous arrangement have been made with EB. This includes sensors, programmable logic controllers, equipment housing, power supplies, meters or other hardware/sensor technology.
13. Erosion and Sedimentation Control The contractor shall protect streams, lakes and wetlands from sediment discharges caused by the contractor's activities. The contractor shall also provide (where applicable) an erosion and sedimentation control plan in compliance with state and local laws and regulations, to the COR for approval prior to executing any soil-disturbing activities. The contractor must submit a National Pollutant Discharge Elimination System Permit to the Pennsylvania Department of Environmental Protection (PADEP) prior to any construction activity that encompasses more than one acre. All permits must be reviewed and approved by the EB prior to being sent to any regulatory authority. The contractor shall not disturb any wetlands. Contractor will remove all silt fencing and other temporary control measures once the site is stabilized. Contractor will remove all spoils from TYAD unless a previously approved disposal site has been established.
The contract COR will be responsible for management and control of the spoils disposal site.
14. Fluorescent and Mercury-Bearing Lamps The contractor is to collect, containerize, manage and recycle fluorescent and mercury-bearing lamps in accordance with 40 CFR 273, Standards for Universal Waste Management. A copy of the manifest/Bill of Lading must be given to the EB through the COR five days in advance of shipment by the contractor so that it can be reviewed for accuracy and completeness. The contractor must install low mercury bulbs when available.
15. Hazardous Materials Stored and Labeled The contractor must ensure all hazardous materials (HM) at the work site are properly stored and labeled. The contractor must not leave any HM behind at the completion of the job for any reason. HM must not be stored outside without adequate secondary containment and shelter.
16. Hazardous Waste The contractor must ensure that all hazardous wastes (HW) at the work site are properly stored and labeled in a pre-approved location designated by the EB. The contractor must provide copies of any shipping documents for HW/Universal Waste/Toxic Substances Control Act waste.
If the TYAD EPA number is being used for shipping purposes, only EB is authorized to sign a manifest and the manifest (or copy) must be supplied prior to the day of shipment for review.
The EB will keep originals. If HW or waste requiring special handling (e.g., asbestos) is being turned over to the government for disposal, the contactor must notify the EB through the COR when the waste is ready to be moved.
17. ISO 14001
TYAD is an ISO 14001 certified facility. All contractor and subcontractor employees on site must comply with TYAD Regulation 200-5, “Environmental Management System (EMS).” The contractor may obtain these regulations through the project COR.
18. Limit of Disturbance The contractor must confine the limit of disturbance of the project to the smallest area possible.
19. Mercury-Bearing Equipment The contractor must not install any equipment, switches, or devices (including thermostats) that contain mercury or lead.
20. Safety Data Sheets (SDSs) The contractor must submit SDSs for all hazardous materials proposed for use, including paints, solvents, adhesives, etc., to the EB through the COR five working days prior to material being brought on post. The contractor must keep a copy of all SDSs required for the project at the jobsite.
21. Migratory Bird Protection The contractor is responsible for meeting requirements of the Migratory Bird Treaty Act of 1918 (as amended). The contractor must not disturb any migratory bird, their nesting area or offspring during the implementation of this contract.
22. National Pollutant Discharge Elimination System (NPDES) Permits The contractor must not perform any work on existing NPDES structures or treatment units unless previously approved in writing by the Installation Planning and Maintenance Division certified operators and the Environmental Branch. This includes work within the sewage treatment plant, sewage lift stations, sewage conveyance pipes, Industrial Operations Facility pretreatment plant, and storm water sewer systems. If a permit is required, it will be the responsibility of the contractor to obtain all permits prior to work being performed. All permit application packages must first be reviewed by the Environmental Branch prior to being sent to any regulatory authority.
23. Net Zero Water The contractor will minimize the use of potable water during the construction project. Water used during the construction project will be monitored and measured using portable water meters if possible. Installed restroom equipment will consist of high-efficiency fixtures that use reduced volumes of water. Employ strategies that in aggregate use 20% less water than the water use baseline calculated for the building after meeting the Energy Policy Act of 1992 fixture performance requirements. Automatic hands-free flushometers will not be used. Water-free urinals will not be used. Flushometers will be the piston variety that fail in the closed position.
New building construction and renovations will include installation of a water meter that is capable of being read from the outside of the building.
24. Noise The contractor must not allow the noise level to exceed 65 decibels at any point outside TYAD property. If noise levels exceed 65 decibels, a plan must be prepared by the contractor to mitigate the noise levels and submit to the EB for approval through the COR. The contractor will monitor the fence line to confirm this limit.
25. Ozone Depleting Substances (ODS) The contractor must be responsible for ensuring that all personnel who perform maintenance and repair activities on refrigeration equipment have been trained and certified by an EPA-approved Section 608 program. The contractor must not use Class I or Class II ODS or install equipment that contains Class I or II ODS.
25. Paints The contractor must not use paints containing zinc chromate or strontium chromate pigments and paints containing lead in excess of 0.06 percent by weight of the total nonvolatile content (calculated as lead metal).
26. Pest Management At no time during the execution of this contract must the contractor provide a food source or harborage for any pests. The contractor must coordinate through the COR to the EB prior to application any pesticide usage. Pesticides are required to be approved by the EB. The contractor must report all usage of pesticides through the COR to the EB. After completion of the contract, the contractor must ensure there is no passage for pests to enter facilities or structures related to work performed by the contractor.
27. Polychlorinated Biphenyls (PCBs) The contractor must not bring items containing PCBs onto TYAD. Light ballasts that are clearly marked "Contains no PCBs," or that are marked with a manufacture date after 1978 must be disposed of by the contractor as construction demolition debris. Any light ballast that is not marked as containing no PCBs that has a manufacture date prior to 1978, or that cannot be determined whether it contains PCBs, must be disposed of by the contractor at an approved and licensed facility for PCBs. The contractor must submit a shipping manifest and certificate of disposal of the PCB-containing items to the EB through the COR.
28. Recycling The contractor must comply with TYADs general recycling plan for recyclable materials such as aluminum, steel, cardboard, paper, plastic and wood. The contractor should contact the EB for additional information on the recycling of materials through the COR. The COR will coordinate with EB to have the contractor recycle metals, cardboard, etc., through TYADs recycling program. All Construction and Demolition (C&D) material transferred from a construction project into the TYAD recycling program must be segregated and material type and weights submitted to the project COR for consolidation. Any material entering the TYAD recycling program that is not documented and properly reported will be absorbed into the TYAD recycling program and not count towards the C&D requirement of the project. Clean wood shall be recycled by the contractor off TYAD property.
29. Refuse and Construction Demolition Debris Removal and Disposal During the performance of all construction, renovation and demolition projects, a minimum of 60 percent of all non-hazardous construction demolition debris shall be diverted from the landfill for reuse or recycling. The contractor shall provide written certification to the COR of the type and tonnage of debris reused or recycled from the contract. All refuse and the construction demolition debris not recovered for reuse or recycling shall be disposed of at a PADEP permitted
W25G1V18R0032 and Monroe County Municipal Waste Management Authority authorized facility.
The contractor shall comply with the Monroe County Solid Waste Management Plan and PA Act 90, including all licensing requirements. Monroe County has specific landfills that is must be transported to per Monroe County guidance which is available on the county website (http://www.thewasteauthority.com) and any contractors can call the Monroe County Municipal Waste Management Authority at (570) 643-6100. The contractor shall provide a disposal certificate or landfill weight slip to the COR for all solid waste disposed of during the performance of this contract. The COR will then provide copies of the disposal certificate or landfill weight slips with the quarterly consolidated C&D report from The Installation Planning and Maintenance Division to EB.
30. Removal Materials The contractor must remove from the site prior to the acceptance of work by the Government, all materials not identified to remain in place, including excess paints, building materials and equipment purchased by the contractor for the execution of this project.
31. Site Preservation and Restoration The contractor must ensure that the land resources associated under this contract be preserved in their present condition, or be restored to a like condition after completion of construction. This post construction appearance will appear to be natural and not detract from the appearance of the project.
32. Trees and Shrubs Protection The contractor must be responsible for the protection of all trees and shrubs on site. The contractor must not allow any heavy equipment, vehicular traffic or stockpiling of materials within ten feet from the drip line of any tree. The contractor must not allow any toxic materials to be stored within 100 feet (35.5 meters) of the drip line of any tree. The contractor must not nail protective devices, signs, utility boxes or other objects to trees to be retained on the site.
33. Unexploded Ordnance (UXO) All work that is done in the UXO area must include the support and clearance by a UXO technician. In addition, all personnel entering the UXO area must have UXO recognition training. The COR will escort the contractor to the EB for UXO recognition training. The COR will provide a map of the UXO area to the contractor.
34. Water Quality The contractor shall not pollute streams, lakes or reservoirs. All work under this contract shall be performed in such a manner that pollution will not be created in streams, surface waters or underground water located within, or adjacent to the project area. The contractor shall not spill, emit, dump or otherwise discharge any hazardous, toxic, harmful or unauthorized pollutant, substance or material, including petroleum products, cleaning agents or paints, onto the ground, into the air or into any waters or nearby storm drain. The contractor shall execute any preventative measures required to prevent any hazardous, toxic or harmful material stored or used on the project site from entering any stormwater drain. Nothing shall be allowed to spill, emit, dump or otherwise discharge any hazardous, toxic or harmful material or pollutant into any sink, toilet, drain, utility or receptacle without written permission from the EB through the COR. The contractor shall protect streams, lakes and wetlands from sediment discharges caused by his activities.
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 12 wks. ADC 1 SEE BELOW FOR SEPARATE SHIPPING
INSTRUCT
XXX
XXX PA 00000
FOB: Destination
W25G1V
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2016 52.209-10 Prohibition on Contracting With Inverted Domestic
Corporations
NOV 2015
52.212-1 Instructions to Offerors--Commercial Items JAN 2017 52.212-4 Contract Terms and Conditions--Commercial Items JAN 2017 52.222-50 Combating Trafficking in Persons MAR 2015 52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
AUG 2011
52.225-1 Buy American--Supplies MAY 2014 52.225-25 Prohibition on Contracting with Entities Engaging in Certain
Activities or Transactions Relating to Iran-- Representation and Certifications.
OCT 2015
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.243-1 Changes--Fixed Price AUG 1987 52.246-2 Inspection Of Supplies--Fixed Price AUG 1996 52.249-1 Termination For Convenience Of The Government (Fixed
Price) (Short Form)
APR 1984
52.249-8 Default (Fixed-Price Supply & Service) APR 1984
52.252-5 Authorized Deviations In Provisions APR 1984 52.252-6 Authorized Deviations In Clauses APR 1984 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7006 Billing Instructions OCT 2005 252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
OCT 2016
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
OCT 2016
252.213-7000 Notice to Prospective Suppliers on Use of Supplier Performance Risk System in Past Performance Evaluations
MAR 2018
252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor
Personnel
JUN 2013
252.243-7001 Pricing Of Contract Modifications DEC 1991 252.246-7005 Notice of Warranty Tracking of Serialized Items MAR 2016 252.246-7006 Warranty Tracking of Serialized Items MAR 2016 252.247-7023 Transportation of Supplies by Sea APR 2014
CLAUSES INCORPORATED BY FULL TEXT
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC
2014)
The Contractor's representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.
(End of clause)
CLAUSES INCORPORATED BY FULL TEXT
52.211-11 LIQUIDATED DAMAGES--SUPPLIES, SERVICES, OR RESEARCH AND DEVELOPMENT (SEP 2000)
(a) If the Contractor fails to deliver the supplies or perform the services within the time specified in this contract, the Contractor shall, in place of actual damages, pay to the Government liquidated damages using the standard I=PRT formula in which I=Interest, P=the CLIN price of delinquent item, R=the current Federal Interest Rate, T=days late per calendar day of delay.
(b) If the Government terminates this contract in whole or in part under the Default--Fixed-Price Supply and Service clause, the Contractor is liable for liquidated damages accruing until the Government reasonably obtains delivery or performance of similar supplies or services. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(c) The Contractor will not be charged with liquidated damages when the delay in delivery or performance is beyond the control and without the fault or negligence of the Contractor as defined in the Default--Fixed-Price Supply and Service clause in this contract.
(End of clause)
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
(1) Price. Offerors are advised to provide the most competitive pricing they can with the initial proposal submission.
(2) Technical. The supply offered will be evaluated as providing or complying with all the requirments set forth in the Statement of Work. This evalution will result in a determination of technical acceptability or unacceptablity. Exceeding the technical requirements will not result in a more favorable evaluation since the overall technical evaluation will be Pass/Fail.
(b) Evaluation and award will based on the Lowest Price Technically Acceptable (LPTA) offer meeting or exceeding the acceptability standards for non-cost factors, i.e. Technical and Acceptable Past Performance. Offerors are advised to provide the most competitive pricing they can with the initial proposal submission as it is anticipated that award may be made without discussions with offerors.
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL ITEMS (NOV 2017)
ALTERNATE I (OCT 2014)
The offeror shall complete only paragraphs (b) of this provision if the Offeror has completed the annual representations and certification electronically via the System for Award Management (SAM) Web site located at https://www.sam.gov/portal . If the Offeror has not completed the annual representations and certifications electronically, the Offeror shall complete only paragraphs (c) through (u) of this provision.
(a) Definitions. As used in this provision--
“Economically disadvantaged women-owned small business (EDWOSB) concern” means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States and who are economically disadvantaged in accordance with 13 CFR part 127. It automatically qualifies as a women-owned small business eligible under the WOSB Program.
“Forced or indentured child labor” means all work or service—
(1) Exacted from any person under the age of 18 under the menace of any penalty for its nonperformance and for which the worker does not offer himself voluntarily; or
(2) Performed by any person under the age of 18 pursuant to a contract the enforcement of which can be accomplished by process or penalties.
“Highest-level owner” means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.
“Immediate owner” means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: Ownership or interlocking management, identity of interests among family members, shared facilities and equipment, and the common use of employees.
“Inverted domestic corporation,” means a foreign incorporated entity that meets the definition of an inverted domestic corporation under 6 U.S.C. 395(b), applied in accordance with the rules and definitions of 6 U.S.C. 395(c).
“Manufactured end product” means any…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.