W25G1V-18-R-0003 Atch 1

STATEMENT OF WORK (SOW)

for Deicing Treatments

1. Introduction: This requirement is for a firm fixed-price, five (5) year Indefinite Delivery Indefinite Quantity (IDIQ) supply contract with the option of extending six months, if required, for the acquisition of pre-snow event liquid road treatment, road deicing treatment and sidewalk deicing bag salt treatment. Primary delivery requirement is during the winter season months.

2. Description of Supplies/Introduction: The Contractor shall furnish qualified personnel, supervision, equipment, and transportation to provide and deliver the required deicers to Tobyhanna Army Depot (TYAD).

A Material Safety Data Sheet (MSDS) is required for all deicing treatments. Material data sheets will indicate the performance characteristics to include temperatures at which the product will effectively melt snow and ice, expected endurance of materials, rates of application necessary to meet described performance.

3. Scope: This is a five (5) year IDIQ contract with the option of extending six months, if required, for guaranteed minimum quantities and maximum allowable quantities (see each item for guaranteed minimum and allowable maximum quantities). Delivery Orders for additional quantities may be made throughout the life of the contract up to the maximum allowable quantities. An order for the minimum quantity of each item will be placed at time of award. The Government reserves the right to defer any shipment(s) to accommodate for storage capacity limitations. However, subsequent Delivery Orders beyond the minimum quantities of each deicer are not guaranteed. The Government is not responsible for any costs incurred for contractor’s time or materials expended in preparing a proposal for this solicitation.

4. Deicing Treatments: The following deicing treatments are required:

a. Pre-snow event liquid road deicer: GEOBLEND M36 liquid roadway deicer or equal brand made up of 90% magnesium chloride and 10% Agricultural-based derived corrosion inhibitor and that performs in temperatures down to at least -10 degrees Fahrenheit and endure for a minimum of 36 hours. Delivery would need to be received per tanker.

b. Road deicing treatment: Product must contain Sodium Chloride, Type 1, Grade 1 that meets the American Association of State Highway and Transportation Officials (AASHTO) M143 and American Society for Testing and Materials (ASTM) D632 standards and that performs in temperatures down to at least -10 degrees Fahrenheit.

Sodium Chloride with Liquid Magnesium Chloride / Organic Based Performance Enhancer. Anti-Cake, Storite Compound shall be introduced uniformly throughout the Sodium Chloride at such a rate that a minimum of 20-PPM of the anti-caking compound shall be present. Delivered salt required to be pre-mixed with Molasses.

NOTE: All deliveries must be made by a tandem or tri-axle dump truck. Frameless trailers are prohibited.

c. Sidewalk bag salt: Product contains less than 50% sodium chloride. May contain calcium chloride, magnesium chloride, calcium magnesium acetate or a combination of these. It melts ice at a practical temperature -10 Degree Fahrenheit or less. 40 pounds per bag.

Preferably, all types of the deicing materials shall be environmentally friendly materials but use of industry solvent mix standards is acceptable.

5. Deliverables: The minimum/maximum quantities for the contract duration is as follows:

1. Pre-Snow Event Liquid Road Deicer: minimum quantity: 4,500 gallons; maximum quantity: 440,000 gallons

2. Road Deicing Treatment: minimum quantity: 700 ton; maximum quantity: 44,000 ton

3. Sidewalk Bag Salt: minimum quantity: 500 each (40 LB bags); maximum quantity: 13,476 each

6. Schedule: Delivery to the locations listed in this SOW will be on an as needed basis dependent upon the severity of the winter season. Scheduled deliveries will be arranged by the TYAD point of contact (POC) and the contractor. Deliveries shall be made within seven (7) calendar days after receipt of each order. Deliveries may be made Monday – Thursday, 0700 – 1500 hours. No weekend or holiday deliveries authorized.

7. Deliveries: The Contractor shall deliver all treatments to the location specified in “Time and Place of Performance” noted below. All deliveries shall be F.O.B.

Destination. All freight and transportation costs shall be included in the unit costs.

8. Time and Place of Performance – The date and time of deliveries will be coordinated with the contractor by the TYAD POC. All deliveries will be made to

Tobyhanna Army Depot 11 Hap Arnold Blvd Tobyhanna, PA 18466

Delivery point at TYAD for each deicing treatment will be as follows:

1. Pre-Snow Event Liquid Road Deicer: Building 701; to be unloaded by contractor

2. Road Deicing Treatment: Building 701; to be unloaded by contractor

3. Sidewalk Bag Salt: 1st Street, Building 41; to be unloaded by Government personnel

9. Inspections and Acceptance The contractor will contact the TYAD POC upon arrival at TYAD and provide to the TYAD POC all delivery slips indicating the type of deicer and quantities delivered.

10. Government Furnished Property There is no Government Furnished Property provided to the Contractor under this SOW.

11. Brand Name or Equal:

All items to be procured under this action have a brand name or equal equivalent with defined salient specifications which any proposed equivalents must meet.

11.1 All items proposed by the contractor as being an equivalent to the specified Brand Name items and components listed in the PWS will be evaluated by TYAD prior to being used. The contractor shall submit in writing a request identifying a proposed replacement and detailing the salient specifications by providing a detailed specification sheet in order for TYAD to ensure the proposed item meets or exceeds the requirements for the specified item.

11.2 If at any time during solicitation or the course of the contract, an accepted item becomes discontinued or is no longer available by the manufacturer, the contractor shall submit in writing a request identifying a proposed replacement and detailing the salient specifications by providing a detailed specification sheet in order for TYAD to ensure the proposed item meets or exceeds the requirements for the specified item.

12. BUY AMERICAN ACT (BAA):

The brand name items specified in this SOW were compiled IAW FAR and DFARS Part 25 foreign acquisition and are in full compliance of all applicable regulations, including but not limited to, the BAA.

13. INVOICING/WIDE AREA WORKFLOW (WAWF):

Invoicing must be IAW DFARS 252.232-7006. Tobyhanna POC to be provided at time of award.

14. Antiterrorism Operations Security (AT OPSEC):

DEPOT ACCESS FOR THE CONTRACTOR:

A background check and approval from Tobyhanna Army Depot (TYAD) Law Enforcement is required for all contractor and subcontractor personnel prior to on-site access at TYAD. All persons seeking entrance to TYAD shall submit to and comply with all security standards and requirements in force at the time such persons are seeking entry. All contractors, regardless of resident status or citizenship, will be subject to vehicle search and intense in-processing by TYAD security personnel prior to being granted access to TYAD. This security screening process may be time consuming and access may be delayed or denied. The contractor shall ensure ELTY Form 648-C is completed for all contractor and subcontractor personnel requiring depot access to include warranty services. The TYAD point of contact (POC) will provide ELTY Form 648-C, “Request Access to Tobyhanna Army Depot” to the contractor/vendor at least ten days prior to the expected visit date for completion. The contractor/vendor shall return the completed ELTY Form 648-C to the TYAD POC in a timely manner so the same may be submitted to Security for processing no later than seven days prior to the visit. All of the required fields on the form shall be complete and accurate by the contractor/vendor for timely processing. This requirement is inclusive of on-site supervisory or managerial personnel and sub-contractor personnel that the Contractor anticipates will be performing work or visiting on-site. This security screening does not relieve the contractor of any responsibilities to conduct thorough pre-employment background checks and drug screening. Contractor workers will not be granted access to the work site until security screening is completed and access is approved. Any contractor personnel on-site who fail screening will not be permitted further access to TYAD. See “Access and General Protection/Security Policy and Procedures”.

Access and General Protection/Security Policy and Procedures. Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by TYAD Law Enforcement. Contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by the government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

Submit the completed ELTY Forms 648-C form(s) to the COR or POC.

SECURITY TRAINING REQUIREMENTS FOR THE CONTRACTOR

iWATCH Army Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH Army Program. This will consist of utilizing the tools and media products on the informational iWATCH Army website to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR/POC. The iWATCH training is available at the following website:

https://myarmyonesource.com select Family Programs and Services, in the drop down boxes select: Go To, iWATCH Army –“See Something, Say Something”. The contractor shall notify the COR/POC within 10 calendar days of review of the information on the website for any new employees or subcontractor personnel to assure the ELTY form 583 or contractor equivalent is properly documented. Completion of contractor employee training will be documented on ELTY form 583, TYAD On-Post Training Record or contractor equivalent.

Operations Security (OPSEC) Training. Per AR 530-1, Operations Security, contractor employees must complete Level I OPSEC training prior to the contract report date and for any additional or new contractor employees, who start after that period.

The training is available at the following website:

http://cdsetrain.dtic.mil/opsec/index.htm The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR/POC within 10 calendar days after completion of training. Completion of contractor employee training will be documented on ELTY form 583, TYAD On-Post Training Record or contractor equivalent.

All security training certificates shall be provided to the Contracting Officer’s Representative (COR)/Point of Contact (POC) and the Contract Specialist/Purchasing Agent.

15. VISITOR RESTRICTIONS:

TOBYHANNA ARMY DEPOT ON-SITE CONTRACTOR WORKFORCE AND VISITOR

RESTRICTIONS

1. NON-RESIDENT/NON-IMMIGRANT ALIENS

a. All non-resident/non-immigrant aliens must have approval prior to being permitted access to Tobyhanna Army Depot (TYAD). Such approval must be obtained by requesting access through the following: apply at the alien-resident’s embassy; proceed to the U.S. Embassy; proceed to the Department of the Army; proceed to Army Materiel Command; proceed to U.S. Communications-Electronics Command; proceed to TYAD.

b. All non-resident/non-immigrant aliens granted access to TYAD are required to be escorted by Government personnel. One Government escort can accommodate a maximum of two non-resident/non-immigrant aliens.

https://myarmyonesource.com/ http://cdsetrain.dtic.mil/opsec/index.htm

c. Due to limited availability of Government personnel, contractors shall not be permitted to employ non-resident/non-immigrant aliens as part of the contractor’s on-site workforce.

Limited exceptions to this restriction may be considered on a case-by-case basis. Such exceptions shall only be considered where a specialized skill or trade is not otherwise available, and even under such circumstances would only be considered for very limited duration, e.g., a few hours/days. However, even if limited exception is considered, access may still be denied. Contractors whose personnel are either denied entry to TYAD or permitted limited entry to TYAD due to the security requirements pertaining to non-resident aliens/non-immigrants are not relieved of their obligation to provide the required contract performance and must do so at no additional cost to the Government. Any contractor failing to perform or that fails to perform in a timely manner under such circumstances may be terminated for default or other contractual remedies as appropriate.

d. Due to limited availability of Government personnel, visitors requiring escort may not be permitted access, or access may be limited to a certain time and duration.

2. FOR THE PURPOSE OF FORMAL ESCORTED SITE VISITS

Resident aliens (immigrants) in possession of a valid Form I-551, Alien Registration Receipt Card (“Green Card”), are not required to obtain approval as set forth in paragraph 1.a. above (but see paragraph 5, below). Such individuals must have proper identification in addition to a valid form I-551 in their physical possession at all times while at TYAD.

Individuals lacking proper identification and valid form I-555 will be denied access to

TYAD.

3. SECURITY SEARCHES, IN-PROCESSING, AND SECURITY SCREENING

All persons seeking entrance to TYAD must submit to and comply with all security standards and requirements in force at the time such persons are seeking entry. All visitors and contractors, regardless of resident status or citizenship, will be subject to vehicle search and intense in-processing by TYAD Security personnel prior to being granted access to TYAD. This security screening process may be time consuming and access may be delayed or denied.

Any Contractors who will be working on site, company representatives who will be visiting periodically, and any companies or contractors requesting or requiring TYAD badges for other business reasons must submit a completed TYAD form 648-C to their contract or depot point of contact. The completed form must be submitted at least five (5) workdays in advance of on-site performance for each employee intended for onsite performance or five (5) workdays in advance of visits or other business at the depot. Any contractor employee (s) already on site who have not been screened, will be subject to security screening. This requirement is inclusive of on-site supervisory or managerial personnel and sub-contractor personnel that the Contractor anticipates will be performing work or visiting on-site. This security screening does not relieve the contractor of any responsibilities to conduct thorough pre-employment background checks and drug screening. Contractor workers will not be granted access to the work site until security screening is completed and access is approved. Any contractor personnel on site who fail screening will not be permitted further access to TYAD.

4. SUBMISSION OF BIDS OR PROPOSALS

Bidders/offerors who hand carry bids or quotes do so at their own risk. Bidders/offerors are solely responsible for the timely submission of bids /proposals/quotations, any delays security measures notwithstanding.

5. CONTRACTOR ON-SITE WORKFORCE – ADDITIONAL SECURITY

REQUIREMENTS

A. This section is in addition to the requirements above regarding non-resident aliens (non-immigrants) for on-site performance. Prior to the commencement of performance under the contract and within seven (7) workdays of contract award, the Contractor shall submit to the Chief, Security Division, Tobyhanna Army Depot, a roster of all contractor personnel, inclusive of on-site supervisory or managerial personnel and sub-contractor personnel, that the Contractor anticipates will be performing work on-site. The roster shall indicate which individuals are U.S. citizens and which are resident aliens (immigrants).

The following documentation shall accompany the roster for each individual named on the roster as a resident alien (immigrant):

a) A copy of a verifiable form of identification, such as a driver’s license or a passport;

and

b) A copy of a valid Department of Justice Immigration and Naturalization Service Form I-551, Alien Registration Receipt Card (“Green Card”).

Contractors who fail to identify any and all resident aliens (immigrants) who will be used for on-site performance and who will seek access to Tobyhanna Army Depot as a worker for or through the contractor, inclusive of managerial and subcontractor personnel, may be subject to civil and criminal penalties and sanctions as well as contract remedies.

B. Within five (5) workdays of the submission of the roster, documentation, and TYAD form 648-C, the Government will have completed the security check and the Contractor shall be notified whether all listed personnel will be permitted to work on-site. However, actual access to Tobyhanna Army Depot by the roster personnel will remain contingent upon such resident alien (immigrant) individuals presenting two (2) forms of identification as they process into the Depot through the Security building: a valid Form I-551, Alien Registration Receipt Card (“Green Card”) in addition to at least one other verifiable form of identification.

C. The roster that the Contractor submits is amendable. However, up to five (5) workdays will be required to perform a security check on any personnel added to the roster. The

Contractor is urged to include contingency or “back-up” personnel in the original roster in order to avoid delays due to roster amendment.

D. Contractors whose personnel are denied entry to TYAD due to the security requirements are not relieved of their obligation to provide the required contract performance and must do so at no additional cost to the Government. Any contractor failing to perform or that fails to perform in a timely manner under such circumstances may be terminated for default or be subject to other contractual remedies as appropriate.

16. INSURANCE REQUIREMENTS - CONTRACTING OFFICER'S NOTICE:

The contractor shall procure and maintain during the entire period of his performance under this contract the following minimum insurance:

(a) WORKER'S COMPENSATION AND EMPLOYER'S LIABILITY. Contractors are required to comply with applicable Federal and State Worker's Compensation and Occupational Disease Statutes. If the Employer's liability section of the insurance policy, except then contract operations are so commingled with a contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in states with exclusive or monopolistic funds that do not permit Worker's Compensation to be written by private carriers.

(b) GENERAL LIABILITY. Bodily Injury Liability Insurance Coverage written on the comprehensive form of policy of at least $500,000 per occurrence shall be required.

Property Damage Liability Insurance is not normally required.

(c) AUTOMOBILE LIABILITY. Automobile Liability Insurance written on the comprehensive form of policy is required. The policy shall provide for Bodily Injury and Property Damage Liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for Bodily Injury and $20,000 per occurrence for Property Damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.

17. TAX EXEMPTION CERTIFICATION - CONTRACTING OFFICER'S

INSTRUCTION:

In accordance with the supremacy clause of the United States Constitution, Federal Acquisition Regulations and Pennsylvania State Law, Tobyhanna Army Depot, as an instrumentality of the United States Government, is generally immune from taxation by State and local jurisdictions. In lieu of an exemption certificate, and as provided for in paragraph 1.b. of Pennsylvania Sales and Use Tax Regulation Number 200, it is suggested that you retain a copy of this purchase order and this notice as documentary evidence that Tobyhanna Army Depot is immune from State and local taxation. If your state is other than Pennsylvania and requires certification other than this form, or should you have questions concerning the parameters of immunity from taxation, contact the person identified as the contract administrator in the contract.

18. Standard Specifications for Projects Under the National Environmental Policy Act in Accordance with 32 CFR 651 Proponent ELTY-ISR-E:

****Spill Response Procedures 1-2- 3****

1. Stop work

2. Call 911

3. Evacuate Area

*********Damaged Asbestos?********* Call Environmental Branch (EB) at

615-7098

*******Environmental Questions?******

Call EB 615-7098

1. Air Pollution Control The contractor must control fugitive emissions, including dust, during the course of their contract. The contractor must obtain approval from the Environmental Branch (EB) prior to exhausting equipment to the outside. The contractor must not allow any pollutant or particulate matter to be released to the atmosphere at levels that are visible from outside of Tobyhanna Army Depot (TYAD). The contractor must not perform work that will release pollutants or particulate matter to the atmosphere when the wind speed exceeds ten miles per hour and will result in adverse effects to the surrounding areas.

TYAD will monitor the wind speed; it is the contractor’s responsibility to obtain wind speed information through the Contracting Officer Representative (COR).

2. Asbestos The contractor must ensure that all materials used in the performance of this contract are asbestos-free.

Unless specified in the contract, the contractor must not disturb any existing Asbestos- Containing Material (ACM) in the performance of this contract. If ACM, or suspect ACM might be disturbed in performance of this contract, the contractor must avoid coming in contact with the material and immediately notify the COR and the Contract Administrator in writing. The COR must coordinate with EB to have the material tested to determine if there is ACM. If the material is determined to be ACM and the contractor cannot avoid disturbing the material, the COR will notify the Contracting Officer. The Contracting Officer will direct a change pursuant to the contract clauses entitled “Changes” and “Differing Site Conditions.” If ACM, or suspect ACM has been disturbed, the contractor must immediately notify the COR and call the EB. The contractor will shut down and not move any equipment or supplies near the damaged ACM. The contractor will evacuate all non-contaminated contractor personnel from the immediate vicinity. Any contractor personnel thought to be contaminated with asbestos must remain in the area until the EB responds. If the damaged material is determined to be ACM and there is potential for further damage, the Contracting Officer will direct a change pursuant to the clauses of the contract clauses entitled “Changes” and “Differing Site Conditions.”

Asbestos abatement required under the contract as originally awarded must be in accordance with United Facilities Guide Specification 02 83 14 00 10 and as otherwise required in the contract. Asbestos abatement not required under the contract as originally awarded, can be incorporated into the existing contract via contract modification, or by the Government taking responsibility for the asbestos abatement.

The method of acquiring the abatement is at the discretion of the Government. The contractor must have an asbestos abatement work plan that has been approved by EB prior to beginning any asbestos abatement work.

3. Backflow The contractor shall have a backflow prevention device installed on all contractor equipment that is connected to Tobyhanna Army Depot’s (TYAD) water distribution system. The contractor shall have a water meter installed to monitor water consumption during all phases of the contract. Water use will be reported monthly to the Environmental Branch.

4. Burning The contractor must not burn refuse and debris anywhere on TYAD.

5. Buy Recycled-Content Materials The Contractor must comply with Resource Conservation and Recovery Act (RCRA) Section 6002 (42 U.S.C. 6962, Federal Procurement) in the acquisition of materials with recycled content to meet the standards of Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management; January 26, 2007.

Specific designated items in this contract for which recycled content standards have been established have been set forth in the specification (e.g., insulation, roofing materials, carpet, carpet pad, paint, floor tiles, shower and restroom dividers).

Recovered Material Certification: As required by the RCRA, the contractor must certify that the percentage of recovered materials to be used in the performance of the contract will be at least the amount required by the applicable contract specifications (see Federal Acquisition Regulation (FAR) Provision 52.223-4, Recovered Material Certification). Prior to application for final payment, the contractor must provide a report in accordance with FAR Clause 52.223-9, Estimate of Percentage of Recovered Material Content for Environmental Protection Agency (EPA) Designated Items, to the Contracting Office. Compliance with this program does not relieve the contractor from meeting all other specification requirements.

http://www.fedcenter.gov/Bookmarks/index.cfm?id=1294 http://www.fedcenter.gov/Bookmarks/index.cfm?id=1294 http://uscode.house.gov/search/criteria.shtml http://www.fedcenter.gov/programs/eo13423/ https://www.acquisition.gov/far/loadmainre.html

6. Cultural Resources The contractor must not adversely affect any property listed on the National Register of Historic Places (NRHP) or properties eligible for inclusion on the NRHP without consultation and approval from the EB through the COR. If there is a discovery of any historic properties, including archeological sites and graveyards, work will cease immediately until requirements of National Historic Preservation Act, as amended, have been met. All archaeological artifacts found at TYAD or TYAD-controlled properties are U. S. Government property until a determination is made otherwise.

7. Demolition Notification If a project involves the demolition of any load-bearing structural members, whether or not asbestos is present, 25 days prior to the demolition, the Commonwealth of Pennsylvania Asbestos Abatement and Demolition/Renovation Notification Form 2700- FM-AQ0021 must be submitted to EB as specified in the Unified Facilities Guide Specification 02 83 14 00 10. The contractor may obtain a copy of the form from the

EB.

8. Drinking Water The contractor must not perform any work on the TYAD potable water system prior to obtaining approval from the EB and the Installation Planning and Maintenance Division certified operator through the COR. If a permit is required due to construction or proposed chemical feed changes, it will be the responsibility of the contractor to obtain all permits associated with the project. Permit applications will first be reviewed and approved by the Environmental Branch before being submitted to regulatory authorities.

Any piping or additions added to the TYAD water system must be disinfected following American Water Works Association circular C651-05 "Disinfecting Water Mains."

Construction will be kept outside of drinking water wellhead protection zones when feasible. All new buildings and remodeled buildings will be equipped with a water meter that can easily be read from the exterior of the building.

9. Endangered Species The contractor is responsible for meeting requirements of the Endangered Species Act of 1973. The contractor must not disturb any endangered species, their habitat or offspring during the implementation of this contract.

10. Emergency/Spills All emergencies and spills must be reported to the TYAD Fire Department by calling 911 from a TYAD phone or (570) 615-7300. If a 911 call is placed on a cell phone, the call will go to the Monroe County Emergency Office. Notify the Monroe County Emergency Office that you are at TYAD and the call will be forwarded to TYADs Fire Department. The contractor must ensure all personnel working on site are trained in the proper procedure according to 29 CFR 1910.120 (if applicable) to initiate a spill response to handle the hazardous substances they are working with. The contractor will take the necessary actions to prevent and contain spills of hazardous materials.

11. Energy Efficiency http://www.ecfr.gov/cgi-bin/text-idx?rgn=div8&node=29:5.1.1.1.8.8.33.14

The Energy Policy Act of 2005 section 109 and the Energy Independence and Security Act of 2007 require all new construction at federal facilities to be 30% better than ASHRAE 90.1. Energy Policy Act of 2005 section 104 and the Energy Independence and Security Act of 2007 require all new equipment to be Energy Star qualified when available. This is applicable to heating, ventilation and air conditioning equipment, plumbing, building materials, lighting, commercial food service equipment and appliances.

12. Environmental Automation and Control Systems The contractor will not alter, modify, remove or tamper with any environmental automation or control system unless previous arrangement have been made with EB.

This includes sensors, programmable logic controllers, equipment housing, power supplies, meters or other hardware/sensor technology.

13. Erosion and Sedimentation Control The contractor shall protect streams, lakes and wetlands from sediment discharges caused by the contractor's activities. The contractor shall also provide (where applicable) an erosion and sedimentation control plan in compliance with state and local laws and regulations, to the COR for approval prior to executing any soil-disturbing activities. The contractor must submit a National Pollutant Discharge Elimination System Permit to the Pennsylvania Department of Environmental Protection (PADEP) prior to any construction activity that encompasses more than one acre. All permits must be reviewed and approved by the EB prior to being sent to any regulatory authority. The contractor shall not disturb any wetlands. Contractor will remove all silt fencing and other temporary control measures once the site is stabilized. Contractor will remove all spoils from TYAD unless a previously approved disposal site has been established. The contract COR will be responsible for management and control of the spoils disposal site.

14. Fluorescent and Mercury-Bearing Lamps The contractor is to collect, containerize, manage and recycle fluorescent and mercury-bearing lamps in accordance with 40 CFR 273, Standards for Universal Waste Management. A copy of the manifest/Bill of Lading must be given to the EB through the COR five days in advance of shipment by the contractor so that it can be reviewed for accuracy and completeness. The contractor must install low mercury bulbs when available.

15. Hazardous Materials Stored and Labeled The contractor must ensure all hazardous materials (HM) at the work site are properly stored and labeled. The contractor must not leave any HM behind at the completion of the job for any reason. HM must not be stored outside without adequate secondary containment and shelter.

16. Hazardous Waste The contractor must ensure that all hazardous wastes (HW) at the work site are http://www1.eere.energy.gov/femp/news/news_detail.html?news_id=9780 http://www.gpo.gov/fdsys/pkg/PLAW-110publ140/html/PLAW-110publ140.htm http://www.gpo.gov/fdsys/pkg/PLAW-110publ140/html/PLAW-110publ140.htm http://www.ecfr.gov/cgi-bin/text-idx?SID=a06a1b1906508b535f4f994c2d511658&c=ecfr&tpl=/ecfrbrowse/Title40/40cfrv28_02.tpl properly stored and labeled in a pre-approved location designated by the EB. The contractor must provide copies of any shipping documents for HW/Universal Waste/Toxic Substances Control Act waste. If the TYAD EPA number is being used for shipping purposes, only EB is authorized to sign a manifest and the manifest (or copy) must be supplied prior to the day of shipment for review. The EB will keep originals. If HW or waste requiring special handling (e.g., asbestos) is being turned over to the government for disposal, the contactor must notify the EB through the COR when the waste is ready to be moved.

17. ISO 14001

TYAD is an ISO 14001 certified facility. All contractor and subcontractor employees on site must comply with TYAD Regulation 200-5, “Environmental Management System (EMS).” The contractor may obtain these regulations through the project COR.

18. Limit of Disturbance The contractor must confine the limit of disturbance of the project to the smallest area possible.

19. Mercury-Bearing Equipment The contractor must not install any equipment, switches, or devices (including thermostats) that contain mercury or lead.

20. Safety Data Sheets (SDSs) The contractor must submit SDSs for all hazardous materials proposed for use, including paints, solvents, adhesives, etc., to the EB through the COR five working days prior to material being brought on post. The contractor must keep a copy of all SDSs required for the project at the jobsite.

21. Migratory Bird Protection The contractor is responsible for meeting requirements of the Migratory Bird Treaty Act of 1918 (as amended). The contractor must not disturb any migratory bird, their nesting area or offspring during the implementation of this contract.

22. National Pollutant Discharge Elimination System (NPDES) Permits The contractor must not perform any work on existing NPDES structures or treatment units unless previously approved in writing by the Installation Planning and Maintenance Division certified operators and the Environmental Branch. This includes work within the sewage treatment plant, sewage lift stations, sewage conveyance pipes, Industrial Operations Facility pretreatment plant and storm water sewer systems. If a permit is required, it will be the responsibility of the contractor to obtain all permits prior to work being performed. All permit application packages must first be reviewed by the Environmental Branch prior to being sent to any regulatory authority.

23. Net Zero Water http://www.fsa.usda.gov/FSA/webapp?area=home&subject=ecrc&topic=waf-ma http://www.fsa.usda.gov/FSA/webapp?area=home&subject=ecrc&topic=waf-ma

The contractor will minimize the use of potable water during the construction project.

Water used during the construction project will be monitored and measured using portable water meters if possible. Installed restroom equipment will consist of high-efficiency fixtures that use reduced volumes of water. Employ strategies that in aggregate use 20% less water than the water use baseline calculated for the building after meeting the Energy Policy Act of 1992 fixture performance requirements.

Automatic hands-free flushometers will not be used. Water-free urinals will not be used.

Flushometers will be the piston variety that fail in the closed position. New building construction and renovations will include installation of a water meter that is capable of being read from the outside of the building.

24. Noise The contractor must not allow the noise level to exceed 65 decibels at any point outside TYAD property. If noise levels exceed 65 decibels, a plan must be prepared by the contractor to mitigate the noise levels and submit to the EB for approval through the COR. The contractor will monitor the fence line to confirm this limit.

25. Ozone Depleting Substances (ODS) The contractor must be responsible for ensuring that all personnel who perform maintenance and repair activities on refrigeration equipment have been trained and certified by an EPA-approved Section 608 program. The contractor must not use Class I or Class II ODS or install equipment that contains Class I or II ODS.

25. Paints The contractor must not use paints containing zinc chromate or strontium chromate pigments and paints containing lead in excess of 0.06 percent by weight of the total nonvolatile content (calculated as lead metal).

26. Pest Management At no time during the execution of this contract must the contractor provide a food source or harborage for any pests. The contractor must coordinate through the COR to the EB prior to application any pesticide usage. Pesticides are required to be approved by the EB. The contractor must report all usage of pesticides through the COR to the EB. After completion of the contract, the contractor must ensure there is no passage for pests to enter facilities or structures related to work performed by the contractor.

27. Polychlorinated Biphenyls (PCBs) The contractor must not bring items containing PCBs onto TYAD. Light ballasts that are clearly marked "Contains no PCBs," or that are marked with a manufacture date after 1978 must be disposed of by the contractor as construction demolition debris. Any light ballast that is not marked as containing no PCBs that has a manufacture date prior to 1978, or that cannot be determined whether it contains PCBs, must be disposed of by the contractor at an approved and licensed facility for PCBs. The contractor must submit a shipping manifest and certificate of disposal of the PCB-containing items to the EB through the COR.

http://www.epa.gov/ozone/title6/608/608fact.html

28. Recycling The contractor must comply with TYADs general recycling plan for recyclable materials such as aluminum, steel, cardboard, paper, plastic and wood. The contractor should contact the EB for additional information on the recycling of materials through the COR.

The COR will coordinate with EB to have the contractor recycle metals, cardboard, etc., through TYADs recycling program. All Construction and Demolition (C&D) material transferred from a construction project into the TYAD recycling program must be segregated and material type and weights submitted to the project COR for consolidation. Any material entering the TYAD recycling program that is not documented and properly reported will be absorbed into the TYAD recycling program and not count towards the C&D requirement of the project. Clean wood shall be recycled by the contractor off TYAD property.

29. Refuse and Construction Demolition Debris Removal and Disposal During the performance of all construction, renovation and demolition projects, a minimum of 60 percent of all non-hazardous construction demolition debris shall be diverted from the landfill for reuse or recycling. The contractor shall provide written certification to the COR of the type and tonnage of debris reused or recycled from the contract. All refuse and the construction demolition debris not recovered for reuse or recycling shall be disposed of at a PADEP permitted and Monroe County Municipal Waste Management Authority authorized facility. The contractor shall comply with the Monroe County Solid Waste Management Plan and PA Act 90, including all licensing requirements. Monroe County has specific landfills that is must be transported to per Monroe County guidance which is available on the county website (http://www.thewasteauthority.com) and any contractors can call the Monroe County Municipal Waste Management Authority at (570) 643-6100. The contractor shall provide a disposal certificate or landfill weight slip to the COR for all solid waste disposed of during the performance of this contract. The COR will then provide copies of the disposal certificate or landfill weight slips with the quarterly consolidated C&D report from The Installation Planning and Maintenance Division to EB.

30. Removal Materials The contractor must remove from the site prior to the acceptance of work by the Government, all materials not identified to remain in place, including excess paints, building materials and equipment purchased by the contractor for the execution of this project.

31. Site Preservation and Restoration The contractor must ensure that the land resources associated under this contract be preserved in their present condition, or be restored to a like condition after completion of construction. This post construction appearance will appear to be natural and not detract from the appearance of the project.

32. Trees and Shrubs Protection The contractor must be responsible for the protection of all trees and shrubs on site.

The contractor must not allow any heavy equipment, vehicular traffic or stockpiling of materials within ten feet from the drip line of any tree. The contractor must not allow any toxic materials to be stored within 100 feet (35.5 meters) of the drip line of any tree.

The contractor must not nail protective devices, signs, utility boxes or other objects to trees to be retained on the site.

33. Unexploded Ordnance (UXO) All work that is done in the UXO area must include the support and clearance by a UXO technician. In addition, all personnel entering the UXO area must have UXO recognition training. The COR will escort the contractor to the EB for UXO recognition training. The COR will provide a map of the UXO area to the contractor.

34. Water Quality The contractor shall not pollute streams, lakes or reservoirs. All work under this contract shall be performed in such a manner that pollution will not be created in streams, surface waters or underground water located within, or adjacent to the project area. The contractor shall not spill, emit, dump or otherwise discharge any hazardous, toxic, harmful or unauthorized pollutant, substance or material, including petroleum products, cleaning agents or paints, onto the ground, into the air or into any waters or nearby storm drain. The contractor shall execute any preventative measures required to prevent any hazardous, toxic or harmful material stored or used on the project site from entering any stormwater drain. Nothing shall be allowed to spill, emit, dump or otherwise discharge any hazardous, toxic or harmful material or pollutant into any sink, toilet, drain, utility or receptacle without written permission from the EB through the COR. The contractor shall protect streams, lakes and wetlands from sediment discharges caused by his activities.

19. CONTRACTOR SAFETY STANDARDS FOR TYAD:

January 2017

Below are the contractor requirements for any work done on Tobyhanna Army Depot (TYAD). It is the responsibility of the contractor to enforce the below requirements.

Failure to enforce safety requirements on the depot can result in termination of the contract.

Important phone numbers

Emergency: 911 (or from a cell phone: 570-615-7117) Security: 570-615-7550 Fire Department: 570-615-7300 Safety: 570 615 7027

S.10.0 SAFETY REQUIREMENTS:

Contractors shall comply with:

Title 29 Code of Federal Regulations-1910 (OSHA General Industry Standards), Title 29 Code of Federal Regulations-1926 (Construction Industry Standards), National Fire Protection Association Codes, Uniform Facilities Code, other codes as required to maintain safety standards.

All Safety requirements as stated in the statement of work.

S 10.1 OSHA VOLUNTARY PROTECTION PROGRAM STAR SITE – Tobyhanna Army Depot is an Occupational Safety and Health Administration (OSHA) Voluntary Protection Program (VPP) site. Tobyhanna Army Depot requires full contractor compliance with all safety regulations and standards. The Contractor is responsible for maintaining, monitoring and enforcing all rules, regulations and codes.

S.10.2 JOB HAZARD ANALYSIS (JHA) – Prior to the start of work, the contractor shall prepare a JHA for each phase of work that will be done under the contract. A phase is any operations involving a certain type of work. Some examples would be demolition, excavation, masonry work, concrete pouring, roofing, and electrical wiring.

Work done by each subcontractor is also a phase. The JHA will:

1. List the activity being performed and identify the sequence of work steps,

2. List the hazards associated with each step, and the procedures and training required to eliminate or reduce the risk to an acceptable level.

NOTE: Review of the JHAs does not constitute approval of the adequacy of the safety measures identified for the job or compliance with OSHA rules and regulations.

S.10.3 SAFETY PLAN - Contractors with ten (10) or more employees will submit a written Contractor Safety Plan prior to beginning construction. The Safety Plan is the formal plan on how the contractor intends to have zero accidents. The safety plan typically includes:

1. Statement of safety and health policy.

2. Administrative responsibilities for implementing the safety plan, including identification of personnel responsible for safety and accident prevention.

3. A means for coordinating and controlling work activities of contractors, subcontractors, and suppliers.

4. Initial safety indoctrination and follow up safety training.

5. Provisions for frequent safety inspections of work sites to ensure compliance with the

Plan.

Records showing the inspections and deficiencies and the means, timetable, and individual responsible for their correction.

6. Who is responsible for investigating and reporting accidents, reporting occupational health exposure and maintaining accident and exposure data.

7. Emergency response capability to minimize the consequences of accidents.

8. Contingency plans for severe weather such as windstorms, lightning, tornados, etc.

9. Plans for maintaining job site cleanup and safe access.

10. Public safety requirements such as signs and barricades.

11. Prevention of alcohol and drug abuse on the job.

12. Details of hazard communication program.

13. Provisions for updating the plan.

14. The plan should also address any unusual aspects of the project.

16. Contractor shall erect a board on site for the purpose of posting all permits, Safety data sheets, wage determinations, safety plans etc. An updated copy of the Safety Plan will be available on the job site at all times. It is the contractor's responsibility to ensure that adequate safety measures are instituted to comply with OSHA requirements and prevent accidents.

S.10.4 FALL PROTECTION – Personnel performing any work on elevated surfaces, six (6) feet or more above a lower level, shall comply with 29CFR 1926.500 through

1926.503. There are no certified anchorage points or permanent guardrail systems on any Tobyhanna Army Depot roof.

S.10.5 ELECTRICAL SAFETY – Follow the current Tobyhanna Army Depot standard.

This standard is based on NFPA 70E.

S.10.6 DEPOT REQUIRED PERMITS/APPROVALS:

Permits are required for:

1. Excavation: Contractors must utilize the PA 1 Call system and coordinate with contracting officer representative (COR) for excavations prior to any groundbreaking including digging, drilling and stake driving. See appendix L for permitting details.

2. Trenching: Contractors must obtain approval from the Safety Branch before any trenching deeper than 5 feet. The contractor must have a trenching plan and the appropriate safety equipment. The contractor is to request approval from the Safety Branch by e-mail through the contracting officer representative.

3. Burning/fire: permits must be obtained daily from the Fire Department.

4. Use of cranes on the depot: see S.10.13

4.13

S.10.7 CONFINED SPACES: Contractors must follow all OSHA requirements. The contractor must request access from TYAD Safety Branch before entering any confined space area. The contractor is to request approval from the Safety Branch by e-mail through the contracting officer representative.

4.14 4.15

S.10.8 LOCKOUT/TAGOUT PROCEDURE: - The Contractor shall perform this work in accordance with 29 CFR 1910.147, The Control of Hazardous Energy.

Sequence of Lockout/Tagout Procedure:

Locate and identify all isolating devices. More than one energy source (electrical, steam, etc.) may be involved.

Notify the COR that a lockout/tagout system is going to be used.

Shut down the equipment normally.

1. Operate energy isolating device (switch, valve, etc) to isolate the equipment from the energy source. Using safe management practices, ensure any energy that may be stored in the equipment is dissipated. Attempt to start the equipment using the normal technique. If the equipment does start, determine where the energy is coming from and why the isolating device did not work. After the equipment is truly isolated, make certain all starting devices are in the “off” position. If more than one person will be working on the equipment they should each have their own lock.

2. After work is complete, ensure all personnel are safely out of the way, all tools are removed, all safety guards are in place, and the equipment is safe to operate. Each individual who worked on the equipment should remove their own lock.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.