A07_18Q0089_Solicitation.pdf
PDF 374 KB Posted
- Attached to
- L393 Teradyne System Maintenance
- Solicitation number
- W25G1V18Q0089
About this file
Preventative Maintenance and On Call Service for the L393 Teradyne System Bids must be emailed to: Kimberly.m.jurkiewicz.civ@mail.mil
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE BELOW FOR SEPARATE SHIPPING INSTRUCT
XXX
XXX PA 00000
TEL: FAX:
W25G1V729002A8
REQUEST FOR QUOTATIONS
(THIS IS NOT AN ORDER) 1
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED RATING
W25G1V-18-Q-0089 09-Jan-2018 5a. ISSUED BY
8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE
IMPO RTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State, and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e) (f)
SEE SCHEDULE
AMOUNT
% No. % NO TE: Additional provisions and representations [ ] are [ ] are not attached.
13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and
ZIP Code)
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
15. DATE OF
QUOTATION
16. NAME AND TITLE OF SIGNER (Type or print) ( Include area code)
TELEPHONE NO.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)
PREVIOUS EDITION NOT USABLE Prescribed by GSA
FAR (48 CFR) 53.215-1(a)
THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE
6. DELIVER BY (Date)
SEE SCHEDULE
AND/OR DMS REG. 1
UNDER BDSA REG. 2
4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE
REQUEST NO.
ACC-APG DIVISION E
11 HAP ARNOLD BLVD
TOBYHANNA PA 18466-5100
9. DESTINATION (Consignee and address, including ZIP Code)
7. DELIVERY
[ ]X FOB
DESTINATION
[ ] OTHER
(See Schedule)
23-Jan-2018(Date) PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.
570 615 7066KIMBERLY M JURKIEWICZ
(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:
d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS
W25G1V-18-Q-0089
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot Preventative Maintenance and Calibration
FFP
L393 AUTOMATED TEST SYSTEM PREVENTATIVE MAINTENANCE (2
PM VISITS FOR THE YEAR), CALIBRATION OF 2 CIRCUIT CARDS (Part numbers provided in SOW), AND PHONE SUPPORT FOR THE YEAR FOR
THE TERADYNE L393 AUTOMATED TEST EQUIPMENT. REFER TO THE
STATEMENT OF WORK IN SECTION C.
CONTRACT WILL BE SET-UP AS A DRAW DOWN CONTRACT WITH
CONTRACTOR INVOICING FOR EACH SERVICE ADMINISTERED. REFER
TO STATEMENT OF WORK IN SECTION C.
PRICING MUST BE ENTERED IN ITEM 1.14 BID STRUCTURE CHART OF
STATEMENT OF WORK (REFER TO PROVIDED BID CHART TO ENTER
COSTS).
**EMAIL BIDS TO: KIMBERLY.M.JURKIEWICZ.CIV@MAIL.MIL
PLEASE REFERENCE THE SOLICITATION ID 18Q0089 IN THE EMAIL
SUBJECT FOR PROPER IDENTIFICATION
*PERIOD OF PERFORMANCE USED IN SOLICTATION IS AN ESTIMATED
DATE RANGE*
COR/WAWF POC: DEREK DALBO, Email:
DEREK.E.DALBO.CIV@MAIL.MIL
The contractor shall submit invoices supported with documentation through WAWF to the POC for validation purposes prior to any payments being authorized.
ALTERNATE CONTRACT POC: Chris Cognini, 570-615-6656, Email:
christian.f.cognigni.civ@mail.mil
BASIS OF AWARD LOCATED IN SECTION 'C'
Wage rates can be found on the Service Contract Act side of www.wdol.gov Determination No. 2015-4259 Rev. No. 5 Date of revision 12/26/2017
FOB: Destination
NSN: AASSVC729002A8
MILSTRIP: W25G1V729002A8
PURCHASE REQUEST NUMBER: W25G1V729002A8
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Lot
ON CALL MAINTENANCE
FFP
Teradyne L393 On Call Unscheduled Maintenance (described below and in Section 1.9 of Statement of Work). Statement of Work in Section C.
Unscheduled Maintenance. In the event of a failure to the L393, Tobyhanna Army Depot shall contact the contractor and report the failure via phone or email. The contractor shall be required to provide a qualified service representative to travel to Tobyhanna Army Depot. The qualified field representative shall arrive on-site for unscheduled maintenance within two (2) working days from notification. If the failure can diagnosed via phone call and replacements parts are required (reference 1.4), the contract shall ship the replacement part(s) to TYAD.REFER TO
STATEMENT OF WORK IN SECTION 'C'
COR/WAWF POC: DEREK DALBO, Email:
DEREK.E.DALBO.CIV@MAIL.MIL
The contractor shall submit invoices supported with documentation through WAWF to the POC for validation purposes prior to any payments being authorized.
POC: Chris Cognini, 570-615-6656, Email: christian.f.cognigni.civ@mail.mil
BASIS OF AWARD LOCATED IN SECTION 'C'
*PERIOD OF PERFORMANCE USED IN SOLICTATION IS AN ESTIMATED
DATE RANGE*
Wage rates can be found on the Service Contract Act side of www.wdol.gov Determination No. 2015-4259 Rev. No. 5 Date of revision 12/26/2017
Line Item 0002 Is in accordance with FAR 13.302-2 Unpriced Purchase Orders
See Section C for Basis of Award
During the solicitation process, it is not necessary for vendor to quote on this line item. At time of award, funding will be provided.
The awardee shall submit to the POC a written report, consisting of the conditions and recommendations (if any) on the Teradyne Automated Test System L393, to include estimated repair time, price breakdown, parts, and labor categories required to make recommended repairs. No work shall commence until written approval is received from the POC.
The Government is under no obligation to use all or any of the funds provided in Line Item 0002. The award amount of this contract is a ceiling for the work to be performed. Payments will only be made for the actual work performed. The contractor exceeds the ceiling at their own risk. Changes to the contract ceiling will be made by contract modification only.
NET AMT
CLAUSES INCORPORATED BY FULL TEXT
AMC-LEVEL PROTEST PROGRAM (JUL 2012) ACC-APG TYD 5152.233-4001
If you have complaints about this procurement, it is preferable that you first attempt to resolve those concerns with the responsible Contracting Officer. However, you can also protest to Headquarters, AMC. The HQ, AMC-Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with the General Accounting Office (GAO) or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO. The AMC protest decision goal is to resolve protests within 20 working days from filing. To be timely, protests must be filed within the periods specified in FAR 33.103. Send protests (other than protests to the Contracting Officer) to:
Headquarters U.S. Army Materiel Command Office of Command Counsel 4400 Martin Road Rm: A6SE040.001 Redstone Arsenal, AL 35898-5000 Fax: (256) 450-8840 E-mail: amcprotests@conus.army.mil
The AMC-Level Protest Procedures are accessible via the Internet at:
www.amc.army.mil/amc/commandcounsel.html. If Internet access is not available, contact the Contracting Officer or HQ, AMC, to obtain the AMC-Level Protest Procedures.
(End of clause) mailto:amcprotests@conus.army.mil http://www.amc.army.mil/amc/commandcounsel.html
Section C - Descriptions and Specifications
BASIS OF AWARD
BASIS OF AWARD
The award will be based on the total price of CLIN 0001 to include the Firm Fixed Price for Preventative Maintenance, Calibration, and Phone Support as stated in the Statement of Work.
CLIN 0002 will be for the On Call Maintenance and will not be used in the evaluation of bids.
STATEMENT OF WORK
PERFORMANCE WORK STATEMENT (PWS) for Calibration, Preventative and Remedial Service on TERADYNE L393 FUNCTIONAL TESTER
ACRONYMS:
COR: Contracting Officer Representative NIST: National Institute of Standards and Technology OEM: Original Equipment Manufacturer TYAD: Tobyhanna Army Depot
DELIVERIES:
All deliverables shall be delivered to Tobyhanna Army Depot, Building 72. All deliverables shall be coordinated through the COR.
QUALITY:
National Institute of Standards and Technology
ISO 17025
ISO 9100/9110
COR:
Derek Dalbo 11 Hap Arnold Blvd Tobyhanna, Pa 18466 Building 1A derek.e.dalbo.civ@mail.mil 570-615-9377 mailto:derek.e.dalbo.civ@mail.mil
1.0 Description of Service/Supplies and General Information. The contractor shall provide all equipment, materials, labor and transportation (including travel and per diem) to support and maintain all hardware on the L393. The contractor shall support the Teradyne L393 Automated Test System (ATS), which is used to perform diagnostic tests to the AN/TRC-194 and AN/FRC-181 terminal subassemblies, located in Building 72 at Tobyhanna Army Depot, Tobyhanna Pa 18466. The serial number of the L393 is 9115821. The contractor shall support the L393 at a per incident basis.
1.1 Calibration. (Firm Fixed Price Line Item 0001). The contractor shall provide calibration to the two (2) circuit cards integrated in the L393. The circuit cards shall be calibrated at a one
(1) year interval and calibration shall be traceable to National Institute of Standards and Technology (NIST) and in accordance with ISO 17025 accreditation. The contractor shall notify Tobyhanna Army Depot within 30 days of the expiration of the calibration.
Calibration shall be completed at Tobyhanna Army Depot, Building 72 facility.
L393 Circuit Cards That Require Calibration Nomenclature Part Number Serial Number Analog Multimeter CC 849-546-01 N/A Standards CC 849-541-01 N/A
1.2 Unscheduled Maintenance. (Line Item 0002 Unpriced - Funds will be made available to draw down from at time of award). In the event of a failure to the L393, Tobyhanna Army Depot shall contact the contractor and report the failure via phone or email. The contractor shall be required to provide a qualified service representative to travel to Tobyhanna Army Depot. The qualified field representative shall arrive on-site for unscheduled maintenance within two (2) working days from notification. If the failure can diagnosed via phone call and replacements parts are required (reference 1.4), the contract shall ship the replacement part(s) to TYAD.
1.3 Telephone Support. (Firm, Fixed Price Line Item 0001) The contractor shall provide a toll-free number for a representative from Tobyhanna Army Depot to call to report on-site service calls, calibration, parts exchange, and over the phone troubleshooting. The telephone support will be unlimited and based upon the contractors’ normal operating business hours.
The contractor shall provide on-call telephone assistance within twenty four (24) hours after notification. If the contractor cannot repair problem with the phone support, the contractor shall provide unscheduled maintenance as listed in section 1.2.
1.4 Replacement Parts. The contractor shall ship replacement, identical parts or those approved as Original Equipment Manufacturer (OEM) substitutes per OEM specification item within the time specified by the service type ordered. Part shall be shipped by the contractor, through a common carrier. If replacement parts cannot be met due to obsolescent issues, the contractor shall provide written notification the Contracting Officer Representative (COR) to identify the issue and provide estimated time for repair.
1.5 Parts and Labor Usage. If the contractor determines that a certain part has a high usage of activity, the contractor shall work with the Government to determine a root cause and provide suggestions to mitigate the excessive usage of the part(s). The contractor shall provide a detailed written report. The report shall include answers to the following questions:
a) What was the cause of the failure(s)/problem(s)?
b) What will be done to correct?
c) Was failure do to user negligence?
d) How do we ensure this does not happen again?
1.6 Government Logbook. The contractor shall enter data into a Government maintained logbook upon each visit. The Contractor shall make entries in the log when on-site, noting name, date and time of arrival and departure, with a description of the repair work done to the system.
1.7 On-Site Maintenance. Malfunctions during routine maintenance, the contractor shall provide on-site unscheduled maintenance assistance when requested by the Technical Representative. The contractor shall provide a qualified service representative to arrive on-site for unscheduled maintenance within two working days from notification.
1.8 Downtime. The contractor shall provide on-site diagnosis and correction of all hardware failures. Down time begins when the contractor is notified by the Government and shall not exceed ten consecutive work days, unless replacement parts services are required as identified in paragraph 1.3. Once repair begins, unscheduled repair efforts shall continue, uninterrupted, during the normal work week (Mon – Fri) until station are operational.
1.9 Preventative Maintenance (PM). (Firm Fixed Price Line Item 0001). The contractor shall provide two (2) PM visits per year, The first PM shall take place one month after contract award and will be done at a semi-annual basis (6 months after first maintenance is completed). The PM shall include cleaning of system of dust or any corrosion, cleaning filters, inspecting cooling fans and replacing if not operating properly, utility power maintenance, DC power overvoltage maintenance, ground offset voltage measurement, Upon completion of the PM, the contractor shall be required to run the self test and provide the station print out of the test results to the Technical Representative and COR.
1.10 Invoicing: Contractor shall invoice based on per incident basis and shall provide a copy of that invoice to the COR.
1.11 Training. All contractor employees, to include subcontractor employees, requiring access to government installations, facilities and controlled areas shall complete AT Level I awareness training 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 10 days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: HTTPS://atlevel1.dtic.mil/at. All contractor employees must also complete annual AT awareness training. Upon request, the contractor will be provided one copy of the AT level I training slides for use with employees who may not have computer access. TYAD will not be responsible for printing copies of slides for training purposes. TYAD reserves the right to provide instructor led training and will so advise the contractor within one week of the start of performance or at the time of annual training, if that will be the training approach to be utilized. Completion of contractor employee training will be documented on ELTY form 583, TYAD On-Post Training Record, or contractor equivalent.
1.12 Hours of Operation and Performance. Work shall be performed on-site at Tobyhanna
Army Depot, Building 72 on normal operating hours, 0700 – 1630, Monday – Friday, excluding Federal holidays.
1.13 Monthly Status Reports. The contractor shall submit a Monthly Status Report to the
COR. Status reports can be submitted electronically using the contractors’ format. The report shall include the following: Contract number, date of incidents, and serial number(s) of equipment serviced, parts removed/replaced, and on-site labor provided. In addition, the contractor shall identify any issues regarding obsolete parts and time estimated for repair.
The monthly status reports shall be submitted to the COR, by email, by the 15th of each month.
1.14 BID Structure CHART for Teradyne L393 (CLIN 0001) Firm, Fixed Price
Preventative Maintenance (Enter Firm, Fixed PriceTOTAL for the 2 Semi-Annual Visits- see 1.9
Circuit Card Calibration (Enter Firm, Fixed Price total for 2 Circuit Cards (see 1.1)
Phone Support Firm, Fixed Price (see 1.3)
TOTAL CLIN 0001 Firm Fixed Price PM, Calibration, and Phone Support https://atlevel1.dtic.mil/at
DEPOT ACCESS FOR THE CONTRACTOR:
A background check and approval from Tobyhanna Army Depot (TYAD) Security Branch is required for all contractor and subcontractor personnel prior to on-site access at TYAD. All persons seeking entrance to TYAD shall submit to and comply with all security standards and requirements in force at the time such persons are seeking entry. All contractors, regardless of resident status or citizenship, will be subject to vehicle search and intense in-processing by TYAD security personnel prior to being granted access to TYAD. This security screening process may be time consuming and access may be delayed or denied. The contractor shall ensure ELTY Form 648-C is completed for all contractor and subcontractor personnel requiring depot access to include warranty services. The TYAD point of contact (POC) will provide ELTY Form 648-C, “Request Access to Tobyhanna Army Depot” to the contractor/vendor at least ten days prior to the expected visit date for completion. The contractor/vendor shall return the completed ELTY Form 648-C to the TYAD POC in a timely manner so the same may be submitted to Security for processing no later than seven days prior to the visit. All of the required fields on the form shall be complete and accurate by the contractor/vendor for timely processing. This requirement is inclusive of on-site supervisory or managerial personnel and sub-contractor personnel that the Contractor anticipates will be performing work or visiting on-site. This security screening does not relieve the contractor of any responsibilities to conduct thorough pre-employment background checks and drug screening. Contractor workers will not be granted access to the work site until security screening is completed and access is approved. Any contractor personnel on-site who fail screening will not be permitted further access to TYAD. See “Access and General Protection/Security Policy and Procedures”.
Access and General Protection/Security Policy and Procedures. Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by TYAD Security Branch. Contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by the government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
Submit the completed ELTY Forms 648-C form(s) to the COR or POC.
SECURITY TRAINING REQUIREMENTS FOR THE CONTRACTOR
Antiterrorism (AT) Level I Training. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training prior to contract report date. This training is required for any additional or new contractor employees, who start after that period. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR/POC within 10 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website:
http://jko.jten.mil/courses/atl1/launch.html for their training. Completion of contractor employee training will be documented on ELTY form 583, TYAD On-Post Training Record, or contractor equivalent. As applicable, contractor employees must complete annual AT awareness training as it pertains the length of the contract.
iWATCH Army Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH Army Program. This will consist of utilizing the tools and media products on the informational iWATCH Army website to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR/POC. The iWATCH training is available at the following website:
https://myarmyonesource.com select Family Programs and Services, in the drop down boxes select: Go To, iWATCH Army –“See Something, Say Something”. The contractor shall notify the COR/POC within 10 calendar days of review of the information on the website for any new employees or subcontractor personnel to assure the ELTY form 583 or contractor equivalent is properly documented. Completion of contractor employee training will be documented on ELTY form 583, TYAD On-Post Training Record or contractor equivalent.
Operations Security (OPSEC) Training. Per AR 530-1, Operations Security, contractor employees must complete Level I OPSEC training prior to the contract report date and for any additional or new contractor employees, who start after that period.
The training is available at the following website:
http://cdsetrain.dtic.mil/opsec/index.htm The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR/POC within 10 calendar days after completion of training. Completion of contractor employee training will be documented on ELTY form 583, TYAD On-Post Training Record or contractor equivalent.
All security training certificates shall be provided to the Contracting Officer’s Representative (COR)/Point of Contact (POC) and the Contract Specialist/Purchasing Agent.
http://jko.jten.mil/courses/atl1/launch.html https://myarmyonesource.com/ http://cdsetrain.dtic.mil/opsec/index.htm
IF A COMMON ACCESS CARD (CAC) AND INFORMATION SYSTEMS/NETWORK
ACCESS BY CONTRACTOR WORKERS AT TYAD OR ANOTHER GOVERNMENT
SITE IS REQUIRED:
Common Access Card (CAC) and Information Systems/Network Access by Contractor Workers. Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.
All contractor employees and associated sub-contractor employees with access to a Government Information System (IS) must be sponsored in Army Knowledge Online (AKO), registered in the ATCTS (Army Training Certification Tracking System) at commencement of services, and must successfully complete the DoD Cyber Awareness training prior to issuance of network access to the IS and then annually thereafter and sign the acceptable use policy annually.
IF SECURITY CLEARANCES APPLY:
Security Clearances. Performance of work will require access to classified information or equipment IAW the DD Form 254, Contract Security Classification Specification, provided as an attachment. Contractor shall comply with FAR 52.204-2, Security Requirements.
This clause involves access to information classified “Confidential,” “Secret,” or “Top Secret” and requires contractors to comply with— (1) The Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DoD 5220.22-M); (2) any revisions to DOD 5220.22-M, notice of which has been furnished to the contractor.
Contractor personnel performing IT sensitive duties are subject to investigative and assignment requirements IAW AR 25-2, AR 380-67, DoD 8570.0 and affiliated regulations. Army regulation available at www.apd.army.mil.
Threat Awareness and Reporting Program (TARP). For all contractors with security clearances, per AR 381-12, TARP contractor employees must receive initial and annual TARP training by a CI Agent or other trainer as specified in 2-4b.
ENVIRONMENTAL PROTECTION
11.0 ENVIRONMENTAL PROTECTION REQUIREMENTS - In addition to the following conditions, the contractor shall provide and maintain, during the life of the contract, environmental protection. Plan for and provide environmental protective measures during normal construction practice. Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project. Comply with all Federal, State of Pennsylvania, and local environmental regulations pertaining to the environment, including but not limited to, hazardous waste, stormwater discharge, erosion control, water, air, soil, and noise pollution. See Appendix I (Standard Specifications for Projects Under the National Environmental Policy Act).
A. The contractor shall submit MSDSs for all hazardous materials proposed for use including paints, solvents, adhesives, etc. These copies of MSDSs will be provided to the EMD through the COR prior to material being brought on post.
B. The contractor shall not install any equipment, switches, or devices (including thermostats) that contain mercury or lead.
C. The contractor shall not pollute streams, lakes, or reservoirs with fuels, oils, bitumens, calcium chloride, acid, construction wastes, or any other harmful materials. All work under this contract shall be performed in such a manner that pollution will not be created in streams, surface waters, or underground water located within, or adjacent to the project area. The contractor shall not spill, emit, dump, or otherwise discharge any hazardous, toxic, harmful, or unauthorized pollutant, substance, or material, including petroleum products, cleaning agents, or paints, onto the ground, into the air, or into any waters or nearby storm drain. The contractor shall execute any preventative measures required to prevent any hazardous, toxic, or harmful material stored, or used on the project site from entering any storm water drain. Nothing shall be allowed to spill, emit, dump, or otherwise discharge any hazardous, toxic, or harmful material or pollutant into any sink, toilet, drain, utility, or receptacle without written permission from the EMD through the COR. The contractor shall protect streams, lakes, and wetlands from sediment discharges caused by his activities.
D. The Contractor shall comply with the Public Law 42 U.S.C. 6962, Resource
Conservation and Recovery Act (RCRA) in the acquisition of materials with recycled content to meet the standards of Executive Order 13423. Specific designated items in this contract for which recycled content standards have been established have been set forth in the specification (e.g., insulation, roofing materials, carpet, carpet pad, paint, floor tiles, shower, and restroom dividers). Recovered Material Certification: As required by the RCRA, the contractor will certify that the percentage of recovered materials to be used in the performance of the contract will be at least the amount required by the applicable contract specifications (see Federal Acquisition Regulation (FAR) Provision 52.223-4, Recovered Material Certification). In contracts exceeding $100,000, prior to application for final payment, the contractor shall provide a report in accordance with FAR Clause 52.223-9, Estimate of Percentage of Recovered Material Content for Environmental Protection Agency (EPA) Designated Products, to the Contracting Office. Compliance with this program does not relieve the contractor from meeting all other specification requirements.
E. The contractor will ensure that no Asbestos-Containing Materials (ACM) are used in the performance of this contract. Unless specified for abatement in the contract, the contractor will not disturb any existing ACM in the performance of this contract. If ACM, or suspect ACM might be disturbed by the work, the contractor shall avoid coming in contact with the material and immediately notify the DPW POC and the Contract Administrator in writing (fax or e-mail acceptable) of the possible ACM. The DPW POC will coordinate with the Environmental Management Division (EMD) to obtain laboratory tests to determine if there is ACM. If the material is determined to be ACM, and disturbing it cannot be avoided, the DPW POC will notify the Contracting Officer. The Contracting Officer will direct a change pursuant to the contract clauses entitled “Changes” and “Differing Site Conditions.” If ACM, or suspect ACM has been disturbed, the contractor shall immediately notify the DPW POC and call the EMD at (570) 895-7098. The contractor will shut down and not move any equipment or supplies near the damaged ACM.
The contractor will evacuate all non-contaminated contractor personnel from the immediate vicinity. Any contractor personnel thought to be contaminated with asbestos (e.g., evidence of dust on clothing) should remain in the area, but as far away as possible from the damage, until the EMD responds. If the damaged material is determined to be ACM and there is potential for further damage, the Contracting Officer will direct a change pursuant to the clauses of the contract clauses entitled “Changes” and “Differing Site Conditions.”
Asbestos abatement required under the contract as originally awarded shall be in accordance with Section 13280, Removal and Disposal of Asbestos Materials, and as otherwise required in the contract. Asbestos abatement not required under the contract as originally awarded, can be incorporated into the existing contract via contract modification, or with the government taking responsibility for the asbestos abatement. The method of acquiring the abatement is at the discretion of the Government.
F. If a project involves the demolition of any load-bearing structural members, whether or not asbestos is present, twenty (20) days prior to the demolition, the Commonwealth of Pennsylvania, Asbestos Abatement and
Demolition/Renovation Notification, Form 2700-FM-AQ0021, revised 8/2005 (or the most recent version), shall be submitted to the proper authorities as specified in Section 13280, Removal and Disposal of Asbestos Materials.
The form is available from the EMD.
G. The contractor is to collect, containerize, recycle, and manage florescent and mercury bearing lamps in accordance with 40 CFR 273. A copy of the manifest/Bill of Lading shall be given to the EMD five days in advance of shipment by the contractor through the COR so that it can be reviewed for accuracy and completeness.
H. The contractor shall ensure that all hazardous wastes at the work site are properly stored and labeled in a pre-approved location designated by the EMD. The contractor shall provide copies of any shipping documents for Hazardous Waste/Universal Waste/Toxic Substances Control Act waste. If the depot EPA number is being used for shipping purposes, only EMD is authorized to sign a manifest and the manifest (or copy) must be supplied prior to the day of shipment for review. The EMD will keep originals. If hazardous waste or waste requiring special handling (e.g., asbestos) is being turned over to the government for disposal, the contactor shall notify the EMD through the DPW POC when the waste is ready to be moved.
I. The contractor will not perform any work on the depot potable water system until prior approval is obtained from the EMD and the D/EL certified operator through the DPW POC. If a permit is required due to construction or proposed chemical feed changes, it will be the responsibility of the contractor to obtain all permits associated with the project. Any piping or additions added to the depot water system must be disinfected following American Water Works Association (AWWA) circular C601-68 "Disinfecting Water Mains."
J. The contractor shall have a backflow prevention device installed on all contractor equipment that is connected to the depot's water distribution system. The contractor shall have a water meter installed to monitor water consumption of all new buildings constructed.
K. The contractor shall protect streams, lakes, and wetlands from sediment discharges caused by the contractor's activities. The contractor shall also provide (where applicable) an erosion and sedimentation control plan in compliance with state and local laws and regulations, to the COR for approval prior to executing any soil disturbing activities. The contractor shall not disturb any wetlands. The contractor shall submit a storm water permit to PADEP prior to any construction activity that encompasses more than one acre.
L. During the performance of all construction, renovation, and demolition projects, a minimum of 50 percent of all non-hazardous construction demolition debris shall be diverted from the landfill for reuse or recycling. The contractor shall provide written certification to the COR of the type and tonnage of debris reused or recycled from the contract. All refuse and the construction demolition debris not recovered for reuse or recycling shall be disposed of at a PADEP permitted and Monroe County Municipal Waste Management Authority authorized facility. The contractor shall comply with the Monroe County Solid Waste Management Plan and PA Act 90, including all licensing requirements. The contractor shall provide a disposal certificate or landfill weight slip to the DPW POC for all solid waste disposed of during the performance of this contract.
M. The contractor shall not bring items containing PCBs onto the depot. Light ballasts that are clearly marked "Contains no PCBs", or that are marked with a manufacture date after 1978 shall be disposed of by the contractor as construction demolition debris. Any light ballast that is not marked as containing no PCBs that has a manufacture date prior to 1978, or that cannot be determined whether it contains PCBs, shall be disposed of by the contractor at an approved and licensed facility.
N. The contractor shall submit a shipping manifest and certificate of disposal of the PCB-containing items to the EMD through the DPW POC.
O. The contractor shall not use paints containing zinc chromate or strontium chromate pigments and paints containing lead in excess of 0.06 percent by weight of the total nonvolatile content (calculated as lead metal).
P. At no time during the execution of this contract shall the contractor provide a food source or harborage for any pests. The contractor shall coordinate all herbicide and pesticide usage and report all usage through the DPW POC to the EMD prior to application. After completion of the contract, the contractor shall ensure there is no passage for pest to enter facilities or structures related to work performed by the contractor.
CONTRACTOR SAFETY STANDARDS
CONTRACTOR SAFETY STANDARDS FOR TYAD
January 2017
Below are the contractor requirements for any work done on Tobyhanna Army Depot (TYAD). It is the responsibility of the contractor to enforce the below requirements.
Failure to enforce safety requirements on the depot can result in termination of the contract.
Important phone numbers
Emergency: 911 (or from a cell phone: 570-615-7117) Security: 570-615-7550 Fire Department: 570-615-7300 Safety: 570 615 7027
S.10.0 SAFETY REQUIREMENTS:
Contractors shall comply with:
Title 29 Code of Federal Regulations-1910 (OSHA General Industry Standards), Title 29 Code of Federal Regulations-1926 (Construction Industry Standards), National Fire Protection Association Codes, Uniform Facilities Code, other codes as required to maintain safety standards.
All Safety requirements as stated in the statement of work.
S 10.1 OSHA VOLUNTARY PROTECTION PROGRAM STAR SITE – Tobyhanna Army Depot is an Occupational Safety and Health Administration (OSHA) Voluntary Protection Program (VPP) site. Tobyhanna Army Depot requires full contractor compliance with all safety regulations and standards. The Contractor is responsible for maintaining, monitoring and enforcing all rules, regulations and codes.
S.10.2 JOB HAZARD ANALYSIS (JHA) – Prior to the start of work, the contractor shall prepare a JHA for each phase of work that will be done under the contract. A phase is any operations involving a certain type of work. Some examples would be demolition, excavation, masonry work, concrete pouring, roofing, and electrical wiring.
Work done by each subcontractor is also a phase. The JHA will:
1. List the activity being performed and identify the sequence of work steps,
2. List the hazards associated with each step, and the procedures and training required to eliminate or reduce the risk to an acceptable level.
NOTE: Review of the JHAs does not constitute approval of the adequacy of the safety measures identified for the job or compliance with OSHA rules and regulations.
S.10.3 SAFETY PLAN - Contractors with ten (10) or more employees will submit a written Contractor Safety Plan prior to beginning construction. The Safety Plan is the formal plan on how the contractor intends to have zero accidents. The safety plan typically includes:
1. Statement of safety and health policy.
2. Administrative responsibilities for implementing the safety plan, including identification of personnel responsible for safety and accident prevention.
3. A means for coordinating and controlling work activities of contractors, subcontractors, and suppliers.
4. Initial safety indoctrination and follow up safety training.
5. Provisions for frequent safety inspections of work sites to ensure compliance with the
Plan.
Records showing the inspections and deficiencies and the means, timetable, and individual responsible for their correction.
6. Who is responsible for investigating and reporting accidents, reporting occupational health exposure and maintaining accident and exposure data.
7. Emergency response capability to minimize the consequences of accidents.
8. Contingency plans for severe weather such as windstorms, lightning, tornados, etc.
9. Plans for maintaining job site cleanup and safe access.
10. Public safety requirements such as signs and barricades.
11. Prevention of alcohol and drug abuse on the job.
12. Details of hazard communication program.
13. Provisions for updating the plan.
14. The plan should also address any unusual aspects of the project.
16. Contractor shall erect a board on site for the purpose of posting all permits, Safety data sheets, wage determinations, safety plans etc. An updated copy of the Safety Plan will be available on the job site at all times. It is the contractor's responsibility to ensure that adequate safety measures are instituted to comply with OSHA requirements and prevent accidents.
S.10.4 FALL PROTECTION – Personnel performing any work on elevated surfaces, six (6) feet or more above a lower level, shall comply with 29CFR 1926.500 through
1926.503. There are no certified anchorage points or permanent guardrail systems on any Tobyhanna Army Depot roof.
S.10.5 ELECTRICAL SAFETY – Follow the current Tobyhanna Army Depot standard referenced in Appendix G in the SOW. This standard is based on NFPA 70E.
S.10.6 DEPOT REQUIRED PERMITS/APPROVALS:
Permits are required for:
1. Excavation: Contractors must utilize the PA 1 Call system and coordinate with contracting officer representative (COR) for excavations prior to any groundbreaking including digging, drilling and stake driving. See appendix L for permitting details.
2. Trenching: Contractors must obtain approval from the Safety Branch before any trenching deeper than 5 feet. The contractor must have a trenching plan and the appropriate safety equipment. The contractor is to request approval from the Safety Branch by e-mail through the contracting officer representative.
3. Burning/fire: permits must be obtained daily from the Fire Department.
4. Use of cranes on the depot: see S.10.13
S.10.7 CONFINED SPACES: Contractors must follow all OSHA requirements. The contractor must request access from TYAD Safety Branch before entering any confined space area. The contractor is to request approval from the Safety Branch by e-mail through the contracting officer representative.
S.10.8 LOCKOUT/TAGOUT PROCEDURE: - The Contractor shall perform this work in accordance with 29 CFR 1910.147, The Control of Hazardous Energy.
Sequence of Lockout/Tagout Procedure:
Locate and identify all isolating devices. More than one energy source (electrical, steam, etc.) may be involved.
Notify the COR that a lockout/tagout system is going to be used.
Shut down the equipment normally.
1. Operate energy isolating device (switch, valve, etc) to isolate the equipment from the energy source. Using safe management practices, ensure any energy that may be stored in the equipment is dissipated. Attempt to start the equipment using the normal technique. If the equipment does start, determine where the energy is coming from and why the isolating device did not work. After the equipment is truly isolated, make certain all starting devices are in the “off” position. If more than one person will be working on the equipment they should each have their own lock.
2. After work is complete, ensure all personnel are safely out of the way, all tools are removed, all safety guards are in place, and the equipment is safe to operate. Each individual who worked on the equipment should remove their own lock. If that person is not available, he or she should be contacted to ensure their work is safe.
4. Remove the energy isolating device and restore the equipment to service.
5. The equipment is now energized again.
S.10.9 PROTECTION TO THE DRINKING WATER SYSTEM: - The contractor will not perform any work on the depot potable water system until prior approval is obtained from the Environmental Branch and the certified operator through the Directorate, Installation Services COR.
S.10.10 PROTECTION OF PERSONNEL: - At no time is any depot employee to be put at risk to illness or injury. No construction actions are exempt from this requirement.
1. Where pedestrian and driver safety is endangered, use appropriate traffic barricades.
Anchor barricades to prevent displacement by wind. Notify the COR prior to beginning such work.
2. Where demolition is required, continuously evaluate the condition of the structure being demolished and take action to protect personnel working around the project site.
No structural element will be left standing without sufficient support to prevent collapse.
3. Personal Protective Equipment for visitors: three complete sets of personal protective equipment shall be available to visitors for entry to the regulated area.
Visitors shall be provided with training equivalent to that provided to Contractor employees in the use of personal protective equipment and the site safety and health requirements.
S.10.11 FIRE AND EMERGENCY SERVICES: - Hot work permits to be issued by the fire department between the hours of 0800 and 1600.
1. Contractors required must have to an appropriate number and correct type of fire extinguishers.
2. A fire watch must be set during the hot work and for 30 minutes after operation.
The fire department will be notified when flammable or hazardous materials are used.
3. Use of a plasma torch will require special approval by the fire department.
4. Any fire, even one that is extinguished must be reported to the fire department.
5. Ambulance services provided at a cost to contractors and the fire department will transport to the nearest hospital. Advanced life support, helicopter transport, etc. is all at the contractor's expense.
6. The fire department will respond to the fire, ambulance, hazmat and confined space incidents.
S.10.12 IF AN INCIDENT HAPPENS: -
1. Any serious injury or medical emergency:
a. Dial 911 and give accurate location and nature of emergency. Make sure to tell the operator that you are calling from Tobyhanna Army Depot.
b. Send someone to the nearest exit to assist responders.
c. Treat victims to the best of your ability.
d. Call the work order desk at 570-615-7805 if there is any blood or body fluids that must be cleaned up.
2. In the event of the smell of natural gas:
a. Call the fire company at 570-615-7117 or dial 911.
b. Have all personnel evacuate the area, if the smell is significant.
c. Assist the fire company to determine the leak as appropriate.
3. In the case of a fire:
a. If the fire is small, use a fire extinguisher.
b. Otherwise, dial 911 and pull the fire alarm.
c. Evacuate the building.
S.10.13 CRANE LIFT OPERATIONS AT TOBYHANNA ARMY DEPOT:
A Lift Plan for Crane Operations will be submitted to the Safety and Occupational Health Office (SOHO) at least five business days prior to a lift operation. It shall include:
1. A description of the operation to be performed, specific personnel assignments (Lift Director, Safety Coordinator, Operator, rigger, etc.) and signaling and any other details pertaining to activities during the lift.
2. A drawn Site Plan with specifications including work zone, support equipment locations, evacuation area, traffic control, electrical power line clearances (if applicable), lift path, surface conditions at crane location, etc.
3. Training/Certifications (scans) for crane operator and other lift-team members included in the lift operation.
4. Equipment nomenclature and a certificate of comprehensive annual inspection records, including any deficiencies and corrective action.
5. Load chart for crane, with target capacities specific to the crane/boom configuration and lift details clearly marked.
6. Lift calculations, including rigging components and configuration.
7. Weather conditions are always part of the ongoing safety assessment and may result in rescheduling of the lift.
A Production Lift Plan pertains to repetitive lifts within a work project, and may be outlined with one lift plan depicting the nomenclature and general capacities of the equipment to be utilized. Besides the 7 items above, the plan will also include how often the crane will be used and how traffic and personnel safety will be handled.
THE CONTRACTOR IS RESPONSIBLE FOR JOB-SITE SAFETY.
IN ANY CONFLICT BETWEEN STANDARDS, THE STRICTER OF THE TWO SHALL
APPLY. IF UNSURE CONTACT TYAD SOHO at 570-615-7027
INSURANCE REQUIREMENTS
INSURANCE REQUIREMENTS - CONTRACTING OFFICER'S NOTICE
The contractor shall procure and maintain during the entire period of his performance under this contract the following minimum insurance:
(a) WORKER'S COMPENSATION AND EMPLOYER'S LIABILITY. Contractors are required to comply with applicable Federal and State Worker's Compensation and Occupational Disease Statutes. If the Employer's liability section of the insurance policy, except then contract operations are so commingled with a contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in states with exclusive or monopolistic funds that do not permit Worker's Compensation to be written by private carriers.
(b) GENERAL LIABILITY. Bodily Injury Liability Insurance Coverage written on the comprehensive form of policy of at least $500,000 per occurrence shall be required.
Property Damage Liability Insurance is not normally required.
(c) AUTOMOBILE LIABILITY. Automobile Liability Insurance written on the comprehensive form of policy is required. The policy shall provide for Bodily Injury and Property Damage Liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for Bodily Injury and $20,000 per occurrence for Property Damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.
ARMY DEPOT ONSITE RESTRICTIONS
TOBYHANNA ARMY DEPOT ON-SITE CONTRACTOR WORKFORCE AND VISITOR RESTRICTIONS
1. NON-RESIDENT/NON-IMMIGRANT ALIENS
a. All non-resident/non-immigrant aliens must have approval prior to being permitted access to Tobyhanna Army Depot (TYAD). Such approval must be obtained by requesting access through the following: apply at the alien-resident's embassy; proceed to the U.S. Embassy; proceed to the Department of the Army; proceed to Army Materiel Command; proceed to U.S. Communications-Electronics Command; proceed to TYAD.
b. All non-resident/non-immigrant aliens granted access to TYAD are required to be escorted by Government personnel. One Government escort can accommodate a maximum of two non-resident/non-immigrant aliens.
c. Due to limited availability of Government personnel, contractors shall not be permitted to employ non-resident/non-immigrant aliens as part of the contractor's on-site workforce. Limited exceptions to this restriction may be considered on a case-by-case basis.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.