Statement_of_Work_for_Substation_InstallationTraining_Tools_and_Equipment.pdf
PDF 29 KB Posted
- Solicitation number
- W15QKN-16-T-1091
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
HTRTS-M SUBSTATON INSTALLATION TRAINING TOOLS AND EQUIPMENT
16 Nov 2015
1.0 Scope: High Tech Regional Training Site – Maintenance (HTRTS-M) conducts 25 Series (Signal/Communications) Military Occupational Skill – Transition (MOS-T) training to Active Component (AC), Reserve Component (RC) and National Guard (NG) soldiers in support of the One Army School System. HTRTS-M will begin conducting the 25L10 Cable System Installer – Maintainer course beginning FY16. HTRTS-M has not conducted the course in the recent past and therefore requires the procurement of equipment and supplies to meet this requirement.
The contractor shall provide, and deliver the products addressed in ATTACHMENT 1 of this statement of work to the High Tech Regional Training Site – Maintenance (HTRTS-M) in Sacramento, California.
1.1 General: This is a non-personal services contract providing the products identified in the
Scope to the High Tech Regional Training Site – Maintenance, Sacramento, California. The Government shall not exercise any supervision or control over the contract service providers performing the services described herein.
1.2 Applicability:
1.3 Order Type: This effort shall be a proposed on a firm-fixed-price basis.
1.4 Period of Performance/Place of Performance: The place of performance shall be High Tech
Regional Training Site, Sacramento, California 95828, DODAAC W81W5E.
All HTRTS-M Substation Installation Training Tools and Equipment shall be delivered to:
High Tech Regional Training Site-Maintenance (HTRTS-M)
DODAAC W81W5E.
Bldg 661 6201 Midway Street Sacramento, CA 95828
1.5 Government Furnished Equipment/Materials/Facilities: N/A
1.6 Inspection/Acceptance/FOB Terms: Inspection and acceptance shall at Destination. FOB shall be at Destination.
1.7 Security:
1.7.1 Access and general protection/security policy and procedures: Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.7.2 For contractors that do not require CAC, but require access to a DoD facility or installation:
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014/AR 190-13), applicable installation, facility, and area commander installation/facility access and local security policies and procedures (provide by government representative), or , at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.7.4 Threat Awareness Reporting Program: For all contractors with security clearances. Per AR 381-12 Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training by a CI agent or other trainer as specified in 2-4b.
2.0 Applicable Documents: N/A
3.0 Requirements: The HTRTS-M will use the products addressed in Attachment 1 of this statement of work to conduct Substation Installation Training in support of the 25L10 Course IAW with TRADOC and Industry standards and the 25L10 Training Plan of Instruction
(POI).
3.1. The contractor shall provide and deliver products that meet the specifications, brand names or equivalent, and quantity of items addressed in Attachment 1 of this statement of work.
3.2 Technical Support: N/A
3.3 Hours of Operation: N/A
3.5 Recognized Holidays: N/A
4.0 Deliverables: The contractor shall provide, and deliver all products addressed in Attachment
1 of this statement of work within 30 days of awarded of contract.
5.0 Travel/Special Requirements: N/A
ATTACHMENT 1: PAGE 1
SUBJECT: SOW – HTRTS-M Substation Installation Training Tools and Equipment
QUANTITY ITEM
50 Each Voice/Data 66 Block Bridging Clip, Bridging Clip 2 Position, Phosphorous Bronze
110 Each Modular Surface Jack Color White, Number Of Ports 1, Mounting Screw Cover Type Snap On
500 Each 3M Scotchlok IDC UY2 Connectors, 19-26 AWG 300 Each Modular Plug Type Plug 6 Position 4 Contact 26 AWG To 24 AWG, Conductor
Non-Plenum Cable For Handset Cords 100 Each Ez-Rj45 Connector
50 Each Distribution Ring 6-1/8-Inch By 3-1/8-Inch By 4-3/8-Inch By 3-3/4-Inch Die Cast Aluminum Distributing Ring
20 Each Connecting Block 110 Cat5e Use W/110 Blocks 20 Each 110 Sys, Fldterm Kit, Cat5/6, 64pr,W/Legs
100 Each 8" Natural 18 Tensile Nylon 6.6 Mini Locking Cable Tie 60 Each Block Modular 66m 25pr, S66™ 25-Pair Field-Terminated M Series Connecting
Block.
60 Each Stand-Off Bracket For 66 Blocks 15 Each Replacement 110 Blade, Application Punch Down Tool 15 Each Replacement 66 Blade, Application Punch Down Tool
5000 Feet Crossconnect Wire Rating Nonplenum Insulation Material PVC Conductor Size 24 AWG 1000 Ft Spool Bl/Wh
3000 Feet Bulk Line Cortdage 4 Conductor Line Cord 1000 Ft At4clc Bulk Flat Line Cable - 1000 Feet Satin Silver
2000 Feet 4pr Cat5e UTP Cable Blue 1000ft M57553B, 5e LAN Riser, Blue 3000 Feet Category 3 Cable Non Plenum UTP Gray 25 Pairs 1000ft M55700
30 Each Data Communication Jack Cat 5 Wiring Format 8 Position Rj45 T568b Blue 110 Termination
15 Each Mechanics Tool Bag, Navy 8 Internal Pockets 2 External Pockets 15 Each 6" Needle Nose Pliers, 6'' (152 Mm) Journeyman Standard Long-Nose Pliers -
Side-Cutting 15 Each 6" Diagonal Cutting Plier 6-Inch Standard Diagonal-Cutting Pliers-Tapered
Nose 15 Each Scotchlock Crimping Ratchet Bell-System Pliers Connector Crimping 15 Each Crimping Ratchet Rj11/Rj45, All In One Snagless Modular Plug Crimper 15 Each Spudger, Plastic, Pointed/Flat, Pk10 15 Each #2 Phillips Screwdriver 15 Each Impact Tool, Type Impact Tool Kit With 66/110 Cut Blade 15 Each Cable Tester Cat 5/6
ATTACHMENT 1: PAGE 2
SUBJECT: SOW – HTRTS-M Substation Installation Training Tools and Equipment
QUANTITY ITEM
15 Each Probe And Toner In Case 15 Each Screwdriver Cushion-Grip Round-Shank P Flat Tip Screwdriver 15 Each TS22 Butt Set OSP With Alligator Clips Telephone Test Set (Butt Set) 15 Each Electrician Scissors With Stripping Notches; Scraper and File On Outside Of
Both Blades; Screw Hinge Permits Adjustment; Overall Length: 5-1/4-Inch, Weight: 0.20-Pound
15 Each TurTEL 8 Modular Adapter (Module Jack Tester) 15 Each Cable Ring Cutting Tool Standard Neuses Tool 15 Each Double Stripper With Cutter 24/26 AWG
300 Each 8" Black 120 Lb Cable Tie - 50 Pcs/Bag 400 Each 14.9" 120 Tensile Mini Black Dome-Top Barb-Ty Cable Ties 50 Pcs 50 Each Two Port VERSATAP Faceplate Ivory 50 Each Single-Gang, Wall Box, Ivory 4 Each Grip Swivel 1-1/2" Seg-1 4 Each Grip Swivel 1-1/2" Seg-2 7 Each Square Drive Extensions .38 In. - 6 In. Extension 3/8 Drive 6 7 Each 3/8" Drive Deep Socket 7/16 12 Point 7 Each Socket 3/8' Drive 13 Mm 12 Point Deep 7 Each Nut Driver Magnetic Cushion Grip 3/8inx6in, 3/8 In. Magnetic Tip Nut Driver 2 Each Hand Wire Wrap And Unwrap Tool 4 Each Tape Measure 25-Feet Tape Measure Has Single Hook 2 Each 9-1/2-Inch Journeyman High Leverage Cable Cutter 7 Each Can Wrench With Hex Head 4 Each Cable Pipe Locator Cable Sheath Fault Locator 3m Dynatel Pipe/Cable/Fault
Locator 2273-U3t3 3 Each Dymo Rhino Pro 4200 Label Maker Kit Specifically Designed For Tough
Environments And Labeling Requirements Usable On Heat-Shrink Tubing, Creating A Fixed Length Label, With A Bar Code Or Wrapping A Cable With Flexible-Nylon Tape Or Equivalent
1 Each Electricians True RMS Multimeter 6 Each 42 In. Pedestal Mounting Stake, With Hardware 6 Each Distribution Upcbd3 Closure, Distribution Housing Pedestal 6 In
File details come from the government source that posted it. Updated .