W15QKN16R0057-0004.pdf

PDF 43 KB Posted

Attached to
M2 Fixed, M2 Flexible, and M2A1 Machine Guns Federal contract opportunity
Solicitation number
W15QKN16R0057
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to M2 Fixed, M2 Flexible, and M2A1 Machine Guns, newest first.
File Type Posted
W15QKN16R0057-0005.pdf PDF
W15QKN16R0057-0003.pdf PDF
Attachment_0016_-_Solicitation_Q_and_A__6_to_7.docx DOCX document
Attachment_0015_-_Solicitation_Q_and_A__1_to_5.docx DOCX document
W15QKN16R0057-0002.pdf PDF
Amendment_0001_W15QKN16R0057-0001.pdf PDF
W15QKN16R0057.pdf PDF
Exhibit_A_-_DD_1423_-_CDRLS_A001-A015.pdf PDF
Attachment_0008_-_Special_Packaging_Instruction__AM5910630_M2_Fixed_MG.pdf PDF
Attachment_0007_-_Special_Packaging_Instruction_AM8401484_M2_Flex.pdf PDF
Attachment_0010_-_Technical_Data_Package_M2_Flexed_Machine_Gun.docx DOCX document
Attachment_0005_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_0013_-_Form_3002_Clearance_of_Technical_Information_for_Public_Release.pdf PDF
Attachment_0004_-_Certificate_of_Destruction.doc DOC document
Attachment_0001_-_AMSTA-AR_1350_-_Technical_Data_REquest_Questionnnaire.pdf PDF
Attachment_0006_-_Scheduled_Government_Furnished_Property.pdf PDF
Attachment_0009_-_Special_Packaging_Instruction_AM13028723_M2A1_MG.pdf PDF
Attachment_0003_-_DD2345_Military_Critical_Technical_Data_Agreement.pdf PDF
Attachment_0011_-_Technical_Data_Package_M2_Fixed_Machine_Gun.docx DOCX document
Attachment_0002_-_Non_Disclosure_and_Non_Use_Agreement.doc DOC document
Attachment_0014_-_Use_and_Non-Disclosure_Agreement_for_Government_Technical_Data.pdf PDF
Attachment_0012_-_Technical_Data_Package_M2A1_Machine_Gun.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0004 2016JUL07

W15QKN

ARMY CONTRACTING COMMAND - NJ

PICATINNY ARSENAL, NJ 07806-5000

GLORIA THOGULUVA

EMAIL: GLORIA.THOGULUVA.CIV@MAIL.MIL

W15QKN-16-R-0057

2016MAY25

X

X

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 14

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: GLORIA THOGULUVA

Buyer Office Symbol/Telephone Number: ACC-NJ-SW/(973)724-5366

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

Amendment 0004 is being issued to provide quantities for all production Contract Line Item Numbers (CLINs) for the Rental Equivalent_______________

Evaluation Factor, and to make a correction to the method of calculating the Evaluated Royalty amount in the Solicitation. As a result, the following have been modified:

1. Section L-15, Clause 52.245-4003, Use and Rental of Government Property, paragraph (3) has been revised to add Maximum Quantities for each of the 18 CLINs. Also, Clause 52.245-4003 has been updated to the latest version dated June 2016 (previous version was dated

January 2014).

2. Section L.3.3.2, Table for Rental Equivalent Evaluation Factor, for use in calculating the amount of rent that would otherwise be charged in accordance with FAR 52.245-9, Use and Charges, has been revised to add quantities for each of the CLINs for the M2 Flexed, M2

Fixed and M2A1 Machine Guns.

3. Section M.3.6.3 Evaluated Royalty Amount has been revised to reflect that the correct royalty fee is 1.65% (instead of 5%), and applies to the total price (instead of a portion of) the M2A1 Machine Gun.

4. All other terms and conditions remain the same and in effect.

*** END OF NARRATIVE A0005 ***

2 14

W15QKN-16-R-0057 0004

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________

L-1 CHANGED 52.245-4003 USE AND RENTAL OF GOVERNMENT PROPERTY (LS6020) JUN/2016

(a) For competitive and non-competitive acquisitions, as defined in FAR 52.245-1(f)(1)(i)-(x), the offeror/contractor shall submit with their offer/proposal a Property Management Plan which describes how the offeror plans to manage any Government

Property that may currently be in their possession and/or may be provided to them under this resultant contract based on the areas of Acquisition of Property; Receipt of Government Property; Records of Government Property; Physical Inventory; Subcontractor

Control; Reports; Relief of Stewardship Responsibility and Liability; Utilizing Government Property; Maintenance; and Property

Closeout. This includes any customary commercial practices, voluntary consensus standards, or industry leading practices and standards that the offeror may use.

(b) For competitive acquisitions, pursuant to FAR 45.201(b), the contractor is responsible for all costs related to making the

Government property available for use, such as payment of all transportation, installation or rehabilitation costs.

(c) For competitive acquisitions, in accordance with FAR 45.202(a), the Government shall consider any potentially unfair competitive advantage that may result from an offeror using Government property. To eliminate the competitive advantage, a rental equivalent evaluation factor shall be added to each offer which is predicated on the use of Government property which the offeror or ______________________________________________________________________________________ its subcontractors has in their possession. Pursuant to FAR 45.201(c), such offerors, including prospective subcontractors, are__________________________________________ required to submit the following with their offer:

(1) A list including a description of all Government property that the prime contractor and/or its subcontractors propose to use on a rent-free basis. The list shall identify the accountable contract under which the property is held and the authorization for its use (from the contracting officer having cognizance of the property);

(2) The dates during which the property will be available for use (including the first, last, and all intervening months) and, for any property that will be used concurrently in performing two or more contracts, the amounts of the respective uses in sufficient detail to support prorating the rent;

(3) The amount of rent that would otherwise be charged in accordance with FAR http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_237.htm Use and Charges.

(4) A description of the offerors property management system.

(5) Provide calculations and rationale for Government property in accordance with FAR clause 52.245-9 for rental adjustment purposes for the entire period of contract performance. Show calculations for [insert level of detail required for your specific solicitation, such as each ordering period or base period and each option period or each CLIN]. [If your solicitation contains quantity ranges, include the remainder of this subparagraph and insert a chart which details the quantities the offerors shall use for computing the rental cost of the

Government property. See example below. When the price evaluation methodology includes application of weights that are not disclosed to the offerors in the solicitation, care must be taken when determining the appropriate quantities for the chart so as not to disclose the weightings and evaluation methodology and to ensure the offer is not under or over evaluated by utilizing quantities too low or too high in computing the rental costs. If your solicitation does not include quantity ranges, exclude the remainder of this subparagraph.] For purposes of calculating the hours of usage, for items with a single numeric quantity, offerors shall use the quantity stated. For items with a quantity range, the offeror shall use [insert the appropriate quantity that is consistent with the quantity used for the evaluation of price (i.e., the maximum quantity in the highest quantity range)]. For example:

CLIN Item Description Maximum Quantity

0001 Ordering Period 1, M2 Flexed Machine Gun 1,000

0002 Ordering Period 1, M2 Fixed Machine Gun 1,000

0003 Ordering Period 1, M2A1 Machine Gun 1,000

0004 Ordering Period 2, M2 Flexed Machine Gun 934

0005 Ordering Period 2, M2 Fixed Machine Gun 933

0006 Ordering Period 2, M2A1 Machine Gun 933

0007 Ordering Period 3, M2 Flexed Machine Gun 934

0008 Ordering Period 3, M2 Fixed Machine Gun 933

0009 Ordering Period 3, M2A1 Machine Gun 933

0010 Ordering Period 4, M2 Flexed Machine Gun 934

0011 Ordering Period 4, M2 Fixed Machine Gun 933

0012 Ordering Period 4, M2A1 Machine Gun 933

3 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

0013 Ordering Period 5, M2 Flexed Machine Gun 934

0014 Ordering Period 5, M2 Fixed Machine Gun 933

0015 Ordering Period 5, M2A1 Machine Gun 933

0016 Ordering Period 6, M2 Flexed Machine Gun 934

0017 Ordering Period 6, M2 Fixed Machine Gun 933

0018 Ordering Period 6, M2A1 Machine Gun 933

L.1 PROPOSAL INSTRUCTIONS:

L.1.1 General:

L.1.1.1 Offerors shall provide information by addressing each Factor in the format and sequence identified in the solicitation. The

Production Capability Factor, Quality System Factor, Management System Factor, and Past Performance Factor will be evaluated on an

Acceptable or Unacceptable basis. The Factors identify the minimum requirements that are key to successful contract performance. An

Offeror must receive an Acceptable rating for all non-price Factors to be considered for award. In order to be rated Acceptable, the proposal must clearly meet the minimum requirements of the solicitation. The Offerors must provide information in sufficient detail to allow the Government to award for the Solicited Item to one or more Offerors whose proposals are determined to be the Lowest Priced

Technically Acceptable (LPTA) based on the evaluation criteria outlined in this solicitation.

L.1.1.2 The proposal must not merely repeat the solicitation requirements, but rather must provide convincing documentary evidence in support of conclusive statements of how contract requirements will be met.

L.1.1.3 The Government does not assume the duty to search for data to cure problems it finds in proposals. The burden of proving acceptability remains with the Offerors.

L.1.1.4 The Government intends to award without discussions (see FAR 52.215-1). Proposals that do not contain the information requested in this solicitation risk being determined Unacceptable by the Government. The Government will not assume the Offeror possesses any capability, understanding, or commitment not specified in the proposal.

L.1.1.5 Alternate Proposals: Alternate proposals will not be accepted.

L.1.1.6 Offerors proposals shall be made valid for 180 days upon date of receipt.

L.1.2 Proposal shall be submitted to the following addresses:

Army Contracting Command - New Jersey

ACC-NJ-SW, Bldg. 9

ATTN: Gloria Thoguluva, Telephone: (973) 724-5366

Picatinny Arsenal, NJ 07806-5000

E-mail: gloria.thoguluva.civ@mail.mil

All questions concerning this procurement, either technical or contractual must be submitted in writing to the Contracting Officer. No direct discussion between the technical representative and a prospective Offeror will be conducted. Questions shall be sent to the following point of contact:

Army Contracting Command - New Jersey

ACC-NJ-SW, Bldg. 9

ATTN: Anthony Aurillo, Telephone: (973) 724-2024

Picatinny Arsenal, NJ 07806-5000

E-mail: anthony.r.aurillo.civ@mail.mil

L.1.3 The proposal shall consist of the following:

L.1.3.1 Each proposal shall be submitted in the English language and consist of and include all of the following:

a. One (1)signed and completed paper copy of the attached Standard Form 33 (SF 33) and continuation sheets (Sections A through M) signed by a person authorized to enter into the proposed contract on behalf of the Offeror. Acknowledgment of all amendments to the solicitation and all continuation sheets are to be filled in as directed, i.e., proposed prices in the Pricing Matrices in Section B, any fill-ins required, such as Contract Data Requirements List: DD Form 1423 with Blocks 17 and 18 completed if required, and

Certifications and Representations in Section K. Offerors are directed to thoroughly read the solicitation and fill in the required

4 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

information in the appropriate solicitation clauses. For any fill-ins that are not applicable, the Offeror must acknowledge by indicating N/A. The proposal must also include computation for the use of Government Property, if applicable.

b. Original and two (2) paper copies and five (5) electronic CD copies of the proposal volumes, as reflected in L.3., compiled using the

Microsoft Office for Windows suite of applications, submitted on a single-write CD-ROM to prevent accidental erasure of the data therein, formatted for a MS Windows computer. The Price Factor shall be contained on a separate CD from non-price Factors. Price breakdown will include MS Excel spreadsheets with formulae intact. Process flows may be delivered in hard copy if not compatible with the above software. CD copy must mirror the submitted hard copies. If the CD copy and hard copy differ, the CD copy supplied for each

Factor will be used for the evaluation. Each CD must be clearly marked with Offerors Name and Solicitation Number. Alternatively, files may be provided in Portable Document Format (.pdf).

c. Representations through System for Award Management. The purpose of electronic Representations and Certifications is to provide all

Offerors with a portal in which to submit Reps/Certs in a publicly accessible format, nullifying the requirement to submit identical information in response to each and every Federal contract solicitation. As a requirement under the instant solicitation, all Offerors must submit Reps/Certs data into the System for Award Management (S.A.M.) at https://www.sam.gov/ and provide one (1) hard copy and one

(1) electronic copy (on CD) submitted as an .XPS file. Any Offeror that has previously submitted Reps/Certs data into SAM is reminded to update the data prior to submitting with the proposal.

L.1.3.2 Each Large Business Offeror shall provide a Small Business Subcontracting Plan that contains all the elements required by FAR

52.219-9, alternate II. This plan shall be incorporated into any resultant contract in reference to this RFP.

L.2 FORMAT FOR PROPOSALS

L.2.1 Each proposal shall be submitted in separate volumes. Volume I will consist of Factors 1, 2, and 3; Volume II will consist of

Factor 4; Volume III will consist of Factor 5 and Volume IV shall consist of offerors representations and certifications. Each proposal must include all volumes and shall be submitted by the closing date and time of the solicitation. Failure to provide any volume may result in the proposal being given an Unacceptable rating. Information provided shall be specific to each Factor.

Page limitation for each Factor is as follows:

Factor 1: Production Capability (Maximum of 40 pages)

Factor 2: Quality System (Maximum of 40 pages)

Factor 3: Management System (Maximum of 40 pages)

Factor 4: Past Performance (No Maximum)

Factor 5: Price (No Maximum)

L.2.2 Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer. A Table of Contents should be created using the Table of Contents feature in MS Word. MS Word (.doc) files shall use the following page setup parameters:

Margins Top, Bottom, Left, Right - 1"

From Edge Header, Footer 0.5"

Page Size, Width 8.5"

Page Size, Height 11"

L.2.3 Length:

L.2.3.1 Each volume shall be as brief as possible, consistent with complete submission. The page count will be made by counting the pages from left to right, consecutively. Pages that exceed the page limitation will be returned to the Offeror and will not be evaluated. Each paragraph shall be separated by at least one blank line. Annexes, documentation and attachments that are submitted by the Offeror, which are not required as part of the RFP, will count against the page limitations. If pages are printed on both sides, each side will count as a separate page. The following will not count against page limitations: volume title pages, table of contents pages, cross-referencing pages, indices, acronym lists and page dividers (used to separate proposal sections). Pages should not exceed 8-1/2 inches in width by 11 inches in length; foldout pages depicting such items as sketches, Factory floor layouts, etc. may be used, with each fold counted as one page. The font used shall not be less than 10 point.

L.2.3.2 Deviation from Requested Format. Request for deviations from the requested format shall be submitted to the Procuring

Contracting Officer (PCO) no later than 15 days after release of the solicitation. Offerors shall provide an explanation, in a clearly relatable format such as a matrix, of any differences between the manner in which the proposal was requested and the manner in which it is proposed to be submitted.

L.2.3.3 The Offeror is responsible for including sufficient details to permit a complete and accurate evaluation of the proposal.

Offerors shall provide a proposal that, at a minimum, addresses those evaluation Factors and sub-Factors required in Section M of the

RFP. Each proposal shall address all the requirements of the RFP and the Statement of Work (Section C).

5 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

L.2.3.4 File Packaging - All of the proposal files shall be compressed (zipped) into one file using WinZip version 6.2 or later, or as separate uploads in their native format, i.e. doc, xls, ppt, etc. *Please note Self extracting .exe files will not be accepted.*

L.3 SPECIFIC PROPOSAL INSTRUCTIONS:

Offerors are responsible for including sufficient details (i.e. drawings, test data) to permit a complete and accurate evaluation strictly from a technical standpoint. The Technical Volume(s) shall have a separate index, which contains narrative titles, which are cross-referenced to both the applicable Statement of Work (SOW) paragraph and page number. This index shall not count against the Page limitation for the Technical Volume. The narrative discussions shall also be related to the applicable SOW paragraph by placing the appropriate SOW number at the beginning of the discussion text. The proposal shall be detailed and clearly stated to allow an assessment by the Government without the need for additional clarifications. The Offeror shall provide detailed narrative discussions that address both the SOW and the Contract Data Requirements List (CDRLs) of the solicitation. All information and data provided shall be specific to the M2 Flexible, M2 Fixed, and M2A1 .50 Caliber Machine Guns, components and assemblies, except for the area of Past Performance. In the response to the Request for Proposal the Offeror must address the following Factors:

L.3.1 VOLUME I

L.3.1.1 Factor 1 Production Capability

The Offeror shall provide a detailed description and process map of the proposed manufacturing processes for both the prime contractor and major/key subcontractors to include the steps required for manufacture, assembly, inspection, marking, packaging and storage as well as sequence of operations for all assemblies, subassemblies and parts. This description should include the processes for precision/robotic welding, hot and cold riveting, heat treating, chrome plating, phosphating, precision machining, barrel manufacture, and barrel rifling. This description shall indicate which elements are manufactured in-house, which are subcontracted, and which are purchased material/parts. The Offeror must identify both prime and major/key subcontractors essential manufacturing and test facilities, equipment and tooling. The Offeror must provide information and data on facilities, equipment, and tooling required to meet a minimum production rate of 50 total M2 Flexible, M2 Fixed, and M2A1s per month to include bottlenecks and down time. The first delivery is required no later than 270 days after delivery order award. ___

L.3.1.2 Factor 2 Quality System

The Offeror shall identify the Quality Management System they will use and whether or not it is certified to, compliant with, or exceeds the requirement ISO 9001: 2008 (or a Quality Management System equivalent). Provide proof of certification. Describe the system in sufficient detail to demonstrate its suitability for use in performing the resulting contract, particularly if it is a unique system.

Describe the process that will be used to flow down all quality requirements to major/key subcontractors and how it will be used to verify there is adequate control of vendor product.

The Offeror shall describe their process for the fabrication, assembly, inspection, test, and specific process for inspection of each safety critical characteristic identified in the Technical Data Package. The description shall include each piece of equipment involved.

The approach to control the process and the system for notification of non-compliance shall be indicated as well as the process to control safety critical characteristics at the subcontract level. Describe all processes to meet quality requirements on Major and

Minor Characteristics.

The Offeror shall describe their internal corrective action procedures when non-conforming product is identified.

L.3.1.3. Factor 3 Management System:

The Offeror shall provide an Integrated Master Schedule (IMS) that supports a minimum production and delivery rate of 50 total M2

Flexible, M2 Fixed, and M2A1s per month. The Offeror shall also include major/key subcontractor and supplier schedules as part of the

IMS. An analysis of the critical path and associated risks will be provided.

The Offeror shall describe their Configuration Management System. Describe how Configuration Management requirements are flowed down, managed, and controlled at the major/key subcontractor level. The Offeror will also describe its inventory control system. The Offeror shall describe their process to document and control the approved manufacturing processes.

The Offeror shall identify the essential skills required (production, production support, and technical) and their availability. Provide a description of any necessary training and certifications that are required. Identify key positions, the reporting chain, their responsibilities, skills, and qualifications relevant to this acquisition.

L.3.2 VOLUME II

L.3.2.1 Past Performance Factor. Offerors shall identify pertinent past history, which indicates that similar efforts of equal or greater complexity have been performed using the Offerors existing plant capability and demonstrate satisfaction of customer requirements.

6 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

L.3.2.2 Offerors shall submit a list of all recent Government contracts (prime and major subcontracts) in performance or awarded within the past 5 years, or awarded earlier than 5 years ago, but for which deliveries occurred or were scheduled to occur within the past five years, which are relevant to the efforts required by this solicitation. Data concerning the prime Offeror shall be provided first, followed by each proposed major subcontractor, in alphabetical order. Offerors are reminded that both independent data and data provided by the Offerors in their proposals may be used to evaluate the Offerors past performance. Since the Government may not necessarily interview all of the sources provided by the Offerors, it is incumbent upon the Offeror to explain the relevance of the data provided. The Government does not assume the duty to search for data to cure problems it finds in proposals. The burden of providing thorough and complete past performance information remains with the Offerors. Proposals that do not contain the information requested by this paragraph may result in rejection or receipt of a high performance risk evaluation by the Government. This part shall be organized into the following sections:

(1) Section 1 Contract Descriptions. This section shall include the following information in the following format:

(a) Contractor/Subcontractor place of performance, CAGE Code and DUNS Number. If the work was performed as a subcontractor, also provide the name of the prime contractor and Point of Contact (POC) within the prime contractor organization (name, and current address, e-mail address, and telephone and fax numbers).

(b) Government contracting activity, and current address, Procuring Contracting Officer's name, e-mail address, telephone and fax numbers.

(c) Governments technical representative/COR, and current e-mail address, telephone and fax numbers.

(d) Government contract administration activity and the Administrative Contracting Officer's name, and current e-mail address, telephone and fax numbers.

(e) Government contract administration activity's Pre-Award Monitor's name and current e-mail address, telephone and fax numbers.

(f) Contract Number and, in the case of Indefinite Delivery type contracts, GSA contracts, and Blanket Purchase Agreements, include

Delivery Order Numbers also.

(g) Contract Type (specific type such as Fixed Price (FP), Cost Reimbursement (CR), Time & Materials (T&M), etc.) In the case of

Indefinite Delivery contracts, indicate specific type (Requirements, Definite Quantity, and Indefinite Quantity) and secondary contract type (FP, CR, T&M, etc)).

(h) Awarded price/cost.

(i) Final or projected final price/cost.

(j)Original delivery schedule, including dates of start and completion of work.

(k) Final or projected final, delivery schedule, including dates of start and completion of work.

(2) Section 2 - Performance. Offerors shall provide a specific narrative explanation of each contract listed in Section 1 describing the objectives achieved and detailing how the effort is relevant to the requirements of this solicitation.

(a) For any contracts that did not/do not meet original schedule or technical performance requirements, provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. The Offerors shall list each time the delivery schedule was revised and provide an explanation of why the revision was necessary. All Requests for Deviation and Requests for

Waiver shall be addressed with respect to causes and corrective actions. The Offerors shall also provide a copy of any Cure Notices or

Show Cause Letters received on each contract listed and a description of any corrective action implemented by the Offeror or proposed subcontractor. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.

(b) For all contracts, the Offeror shall provide data on all manufacturing warranty returns. Data shall delineate total number of warranty returns, number of Could Not Duplicate (CND), number of failures attributable to GFE component failures, and number and nature of failures attributable to the Offerors delivered product.

(3) Section 3 Subcontracts. Offerors shall provide an outline of how the effort required by the solicitation will be assigned for performance within the Offerors corporate entity and among the proposed subcontractors. The information provided for the prime Offeror and each proposed major subcontractor must include the entire company name, company address, CAGE Code, DUNS Number and type of work to be performed by citing the applicable Government SOW subparagraph number. This includes all subcontractors who will be providing critical hardware/services or whose subcontract is for more than 25% of the unit price.

(4) Section 4 New Corporate Entities. New corporate entities may submit data on prior contracts involving its officers and employees.

However, in addition to the other requirements in this section, the Offeror shall discuss in detail the role performed by such persons in the prior contracts cited. Information should be included in the files described in the sections above.

7 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(5) Past Performance Questionnaire. For all contracts identified in Section 1, Past Performance Questionnaires must be completed and submitted (Attachment 0005). The Offeror shall complete Part I of the Past Performance Questionnaire and e-mail the questionnaire to both the Government contracting activity and technical representative responsible for the past/current contract. The POC's shall be instructed to electronically complete Part II of the questionnaire and e-mail the entire questionnaire to the Contracting Officer within

30 calendar days of the release of the RFP, to anthony.r.aurillo.civ@mail.mil. The Offeror shall also e-mail to the Contracting Officer a list of all the POCs who were sent a questionnaire. The Government must receive this list within 30 calendar days after release of the RFP. The POC List shall be submitted in Word for Windows Table Format to include the following fields: Solicitation Number; Company

Name; Contract Number; Government Agency; POC Last Name, First Name; POC Title; POC Telephone Number; POC E-Mail Address; Date E-Mailed to POC (month/day).

(6) Offerors are cautioned that the Government may use data obtained from other sources. Since the Government may not necessarily interview all of the sources provided by the Offerors, it is incumbent upon the Offerors to explain the relevance of the data provided.

L.3.3 VOLUME III

L.3.3.1 Price Factor: The Offeror shall submit a firm fixed unit price for all Contract Line Item Numbers (CLINs) in Section B (except for items that are Not Separately Priced) for all ordering periods. CLINs that contain quantity ranges require firm fixed unit prices for all range quantities. Submission of data in accordance with the Contract Data Requirements List (CDRL), DD Form 1423, is a requirement for the contract but shall be Not Separately Priced. If an Offeror fails to propose prices for all quantities and ordering periods, the Government may reject the offer.

The proposed price for production CLINS shall be inclusive of all fabricating, testing, Initial Product Inspection, other inspections, packaging and delivery of the solicited item.

Offerors shall assert in their offer whether they are the owner or a licensee of the technology/technical data for the M2A1, and whether they are an entity of GDOTS, GDOTS affiliate, or GDOTS licensees. If no assertion is provided, the government will assume that the

Offeror is not an owner or licensee of any technology/technical data for the M2A1 and are not affiliated with GDOTS, resulting in inclusion of the computed Royalty Amount in the Offerors total evaluated price.

Delivery Orders will be issued in accordance with the procedures for Future Delivery Orders as stated in Section H of this solicitation.

L.3.3.2 In accordance with FAR 45.202(a), the Government shall consider any potentially unfair competitive advantage that may result from an Offeror using Government property. To eliminate the competitive advantage, a rental equivalent evaluation factor shall be added to each offer which is predicated on the use of Government property. Offerors shall refer to Local Clause 52.245-4003 Use and Rental of

Government Property in Section L for submission instructions.

The following quantities shall be used to calculate the amount of rent that would otherwise be charged in accordance with FAR 52.245-9, Use and Charges:

| CLIN | Item Description | Qty |

| 0001 | Ordering Period 1 M2 Flexed Machine Gun | 1,000 |

| 0002 | Ordering Period 1 M2 Fixed Machine Gun | 1,000 |

| 0003 | Ordering Period 1 M2A1 Machine Gun | 1,000 |

| 0004 | Ordering Period 2 M2 Flexed Machine Gun | 934 |

| 0005 | Ordering Period 2 M2 Fixed Machine Gun | 933 |

| 0006 | Ordering Period 2 M2A1 Machine Gun | 933 |

| 0007 | Ordering Period 3 M2 Flexed Machine Gun | 934 |

| 0008 | Ordering Period 3 M2 Fixed Machine Gun | 933 |

| 0009 | Ordering Period 3 M2A1 Machine Gun | 933 |

| 0010 | Ordering Period 4 M2 Flexed Machine Gun | 934 |

| 0011 | Ordering Period 4 M2 Fixed Machine Gun | 933 |

8 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

| 0012 | Ordering Period 4 M2A1 Machine Gun | 933 |

| 0013 | Ordering Period 5 M2 Flexed Machine Gun | 934 |

| 0014 | Ordering Period 5 M2 Fixed Machine Gun | 933 |

| 0015 | Ordering Period 5 M2A1 Machine Gun | 933 |

| 0016 | Ordering Period 6 M2 Flexed Machine Gun | 934 |

| 0017 | Ordering Period 6 M2 Fixed Machine Gun | 933 |

| 0018 | Ordering Period 6 M2A1 Machine Gun | 933 |

L.3.3.3 Any HUBZone Small Business Concern shall provide proof of HUBZone certification with its proposal submission.

L.3.3.4 Unbalanced Pricing - If the Offerors unit prices appear unbalanced when comparing them from ordering period to ordering period) the Offeror shall provide documentation, including calculations and supporting rationale, explaining the apparent unbalanced pricing.

*** END OF NARRATIVE L0001 ***

9 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION M - EVALUATION FACTORS FOR AWARD

M.1 BASIS FOR AWARD

M.1.1 The Government intends to make no more than two (2) awards as a result of this RFP. The basis for award of contracts resulting from this solicitation will be the result of the evaluation of the Factors specified in Section M of the solicitation utilizing the

Lowest Priced Technically Acceptable (LTPA) Source Selection methodology.

M.1.1.2 In the event more than one (1) award is made, subsequent delivery orders will be initiated through letters of contemplation and shall be competed utilizing best value techniques (LPTA or Trade Off), which shall be outlined in Section H of the Solicitation and in accordance with Fair Opportunity as prescribed in FAR 16.505(b)(1). However, the Government reserves the right to award a sole source order if the conditions at FAR 16.505(b) (2) exist.

M.1.2 Each responsive Offeror will be evaluated against the evaluation criteria to determine whether the Offeror has the technical expertise, equipment, and personnel required to manufacture and deliver/manage the product in accordance with the delivery schedule as delineated in Section F of the solicitation. The Government will assign a rating of Acceptable or Unacceptable for all the non-price

Factors. In order to be considered for award, there must be an Acceptable rating in every non-price Factor. Offerors must include all three weapon variants (M2 Fixed, M2 Flexible, and M2A1) in their proposals or they will not be eligible for award.

M.1.3 The Government intends to award a contract without discussions (except for clarification as described in FAR 15.306(a)), as permitted by FAR 15.306(a) (3) and FAR 52.215-1. However, the Government reserves the right to conduct discussions to permit Offerors to revise their proposals.

M.1.4 Minimum Acceptability: If an Offeror takes exception to any of the terms and conditions of the solicitation, the offer may not be considered for contract award. All Offerors are urged to ensure that their initial proposals are submitted with the most favorable terms in order to reflect their best possible potential.

M.2. FACTORS TO BE EVALUATED:

M.2.1 The Government will evaluate each proposal and the Source Selection Authority (SSA) will assess the results of the following

Factors, listed below:

Factor 1: Production Capability

Factor 2: Quality System

Factor 3: Management System

Factor 4: Past Performance

Factor 5: Price

M.3. EVALUATION APPROACH:

M.3.1 TECHNICAL EVALUATION APPROACH

M.3.1.1 Careful, full, and impartial consideration will be given to all proposals received pursuant to the RFP. A team of Government personnel will evaluate each proposal Factor. For evaluation purposes, Offerors must demonstrate technical acceptability in all non-price factors by meeting the Government requirements of the RFP in the areas outlined in the non-price factors below.

M.3.2 FACTOR 1: PRODUCTION CAPABILITY

M.3.2.1 The minimum requirements have been met if the description of the manufacturing process and process map lays out a clearly defined approach to meet the minimum monthly requirement of 50 total M2 Flexible, M2 Fixed, and M2A1 .50 Cal Machine Guns; and the production rates/schedule clearly demonstrates that the minimum monthly delivery rate of 50 total M2 Flexible, M2 Fixed, and M2A1 machine guns will be achieved.

M.3.2.1.1 The description of the manufacturing process and process map, for both the prime and major/key subcontractors to include: (1) the processes for precision/robotic welding, hot and cold riveting, heat treating, chrome plating, phosphating, precision machining, barrel manufacture, and barrel rifling; (2) the steps required for its manufacture, assembly, inspection, marking, packaging and storage as well as the sequence of operations for all major assemblies, subassemblies and parts; (3) which elements are manufactured in-house, which are subcontracted and which material/parts are purchased; and (4) both prime and major/key subcontractors essential manufacturing and test facilities, equipment and tooling.

M.3.2.2.2 The production rates/schedule shall include: (1) bottlenecks and down times; and (2) available and maximum capacities of the proposed prime and major/key subcontractor facilities, equipment and tooling.

M.3.2.2 Production Capability Factor Ratings:

10 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Acceptable/Unacceptable Ratings

| Rating | Description |

| Acceptable | Proposal clearly meets the minimum requirements |

| | of the solicitation. |

| Unacceptable | Proposal does not clearly meet the minimum |

| | requirements of the solicitation. |

M.3.3 FACTOR 2: QUALITY SYSTEM

M.3.3.1 The evaluation will verify the presence and adequacy of a Quality Management System to meet solicitation requirements. The minimum requirements have been met if the defined system is certified to, compliant with, or exceeds the requirement of ISO 9001:2008

(or a Quality Management System equivalent); and

M.3.3.2 The Offeror demonstrates an adequate understanding of the safety critical characteristic, the feasibility of the approach, and the manufacturing and quality processes at the prime and subcontractors facilities ensure that manufactured items meet all safety critical requirements of the solicitation; and

M.3.3.3 The approach to internal corrective action is clearly defined, adequate, and feasible, so as to ensure the process for identifying, analyzing (failure investigation), segregating and disposing of non-conforming material will ensure only conforming material will be delivered to the Government.

M.3.3.4 Quality System Factor Ratings:

Acceptable/Unacceptable Ratings

| Rating | Description |

| Acceptable | Proposal clearly meets the minimum requirements |

| | of the solicitation. |

| Unacceptable | Proposal does not clearly meet the minimum |

| | requirements of the solicitation. |

M.3.4 FACTOR 3: MANAGEMENT SYSTEM

M.3.4.1 The minimum requirements have been met if the Offerors Integrated Master Schedule (IMS) clearly demonstrates that their approach to meeting the minimum monthly requirement (considering downtime and delays) is feasible, and incorporates a realistic critical path that synchronizes the production rates and schedules with the time and sequencing of the IMS; and

M.3.4.2 The offeror has existing Configuration Management, Inventory Control, and Manufacturing Process Control systems that are clearly defined and adequate to support the minimum production and delivery requirements, as well as effectively flow them down to major/key subcontractors; and

M.3.4.3 The Offeror clearly defines the necessary skills needed to manufacture the item, and identifies the key production positions and their qualifications, as well as their reporting chain and the lines of responsibility sufficient to meet the contract requirements.

M.3.4.4 Management System Factor Ratings:

Acceptable/Unacceptable Ratings

| Rating | Description |

| Acceptable | Proposals clearly meets the minimum requirements |

| | of the solicitation. |

11 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

| Unacceptable | Proposals does not clearly meet the minimum |

| | requirements of the solicitation. |

M.3.5 FACTOR 4: PAST PERFORMANCE

M.3.5.1 The Offeror and its major/key subcontractors will be evaluated on the quality of their relevant and recent past performance, as it relates to the probability of success on this contract. Both independent data and data provided by Offerors in their proposals may be used to evaluate the Offerors past performance.

M.3.5.2 For the purpose of evaluating proposals, recent is defined as occurring within the following time standards: 1) occurring within the past 5 years, or 2) awarded earlier than 5 years ago, but for which deliveries occurred or were scheduled to occur within the past five years. However, the Government may evaluate any performance in the period subsequent from the closing date, but prior to the date of award. Relevant is defined as contracts demonstrating technical/management capabilities the same as or similar to those required to perform on this item. Major/key subcontractors are defined as those that will be providing critical hardware or whose subcontract is for more than 25% of the unit price.

M.3.5.3 This evaluation will encompass all aspects of schedule, performance and supportability, including the Offerors detailed record of: 1) compliance of products, services, documents, and related deliverables to specification requirements and standards of good workmanship; 2) commitment to customer satisfaction and business-like concern for customers interest, and 3) timeliness of performance for services and product deliverables, including the administrative aspects of performance.

M.3.5.4 Based on the Offerors previous and current experience and performance on same or similar items (maximum 5 years) including the frequency of cost growths and schedule delays, the Government will assess those risks associated with the Offerors past performance.

The Government will focus its inquiry of the Offerors record of performance as it relates to all solicitation requirements, including cost, schedule, and quality of product, timeliness of performance, business practices, and customer significant achievement. Offerors are cautioned that the Government may use data obtained from other sources.

M.3.5.5 Past Performance Factor Ratings:

The evaluation will result in a single rating. A rating of Acceptable or Unacceptable will be assigned to the Offerors past performance submission.

Past Performance Evaluation Ratings

| Rating | Description |

| Acceptable | Based on the Offerors performance record, the Government |

| | has a reasonable expectation that the Offeror will |

| | successfully perform the required effort or the Offerors |

| | performance record is unknown. |

| Unacceptable | Based on the Offerors performance record, the Government |

| | has no reasonable expectation that the Offeror will be |

| | able to successfully perform the required effort. |

NOTE: In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a) (2) (iv)). Therefore, the Offeror shall be determined to have unknown past performance. In the context of Acceptability/Unacceptability, unknown shall be considered Acceptable. Additionally, an unacceptable past performance will be considered any information that supports a less than satisfactory rating from sources where the information is from informal rating systems such as PPIRS or FAPPIS.

M.3.6 FACTOR 5: PRICE

M.3.6.1 Prices proposed in Section B of the solicitation will be utilized to compute a total evaluated price in the performance of a price analysis in accordance with FAR 15.404-1(b). However, if deemed necessary by the Contracting Officer, a cost analysis may be performed per FAR 15.404-1(c).

M.3.6.2 A price evaluation will be conducted by totaling the weighted evaluated firm-fixed prices for all CLINs (i.e. production) for all ordering periods. For CLINs with a single numeric quantity, the weighted evaluated price will be calculated by multiplying the proposed firm-fixed unit price by the set quantity by the weighted percent. For CLINs with multiple quantity ranges, a weighted evaluated price will be calculated. The weighted evaluated price will be calculated as follows:

12 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

1) The evaluated quantity for each quantity range will be the maximum quantity within that range.

2) The evaluated quantity will be multiplied by the proposed firm-fixed unit price to determine the evaluated amount for each quantity range.

3) The evaluated amount will be multiplied by the weighted percent per quantity range to derive the weighted evaluated price per quantity range. The weighted evaluated price will be rounded to the nearest hundredth (two (2) decimal points).

4) The weighted evaluated prices per quantity range will be summed for all quantity ranges within each production CLIN to compute a total weighted evaluated price for each CLIN.

5) The total weighted evaluated price for each CLIN will be multiplied by the weight per weapon system to derive the weighted evaluated price for each CLIN. The weighted evaluated price will be rounded to the nearest hundredth (two decimal places).

M.3.6.3 Evaluated Royalty Amount. In accordance with the license agreement between the U.S. Government and General Dynamics Ordnance and Tactical Systems (GD-OTS), a 1.65% royalty fee will apply to the M2A1 Machine Gun. Therefore, an evaluated royalty amount will be added to the M2A1 Machine Gun total evaluated price (TEP) of Offerors other than GD-OTS. The royalty price adjustment will be calculated by applying a royalty rate of 1.65% of the price of each M2A1 Machine Gun. The royalty price adjustment will be calculated as follows:

Royalty Adjustment Amount

| | Weighted | | |

| | Evaluted Price | | |

| | for M2A1 | | Evaluted |

| Ordering | Machine Gun | Royalty | Royalty |

| Period | Production Units | % | Amount* |

| O.P. 1 | $13,757,177.50 | | |

| O.P. 2 | $13,894,749.28 | | |

| O.P. 3 | $14,033,696.77 | | |

| O.P. 4 | $14,174,033.74 | | |

| O.P. 5 | $14,315,774.08 | | |

| O.P. 6 | $14,458,931.82 | | |

| TOTAL | $84,634,363.19 | 1.65% | $1,396,466.99 |

*Rounded to the nearest hundredth (two (2) decimal places.

NOTE: The unit prices contained in the sample above were fabricated for demonstration purposes only and in no way reflect the unit____ prices the Government expects to pay.

The weighted evaluated prices for the M2A1 Machine Gun for all ordering periods will be summed to derive the Total Weighted Evaluated

Price. The Total Weighted Evaluated Price for the M2A1 Machine Gun units will be multiplied by the 1.65% royalty to calculate the

Evaluated Royalty Amount for the M2A1 Machine Guns.

M.3.6.4 If Government Property is proposed for use in performance of any contract resulting from the solicitation, the total evaluated price will be adjusted to include a rental equivalent Factor for each item of such property calculated in accordance with FAR clause

52.245-9. This adjustment will apply for the use of Government property by the Offeror as well as any subcontractor thereto. The value of the Offerors proposed Government Property will also be evaluated for cost realism.

C.6.5 Price Evaluation Preference for HUBZone Small Business Concerns: If a HUBZone certified small business concern submits an offer in response to the solicitation, in accordance with FAR 52.219-4, when applicable and as required by the provision, an adjustment will be made by adding the applicable factor(s) to the price of other offers.

M.3.6.6 The total evaluated price will be the sum of the weighted evaluated price for the production quantities, the evaluated royalty amount (for Offerors other than GD-OTS) and, if applicable, a rental equivalent Factor for the value of any Government Property and the price evaluation preferences for HUBZone Small Business Concerns, when applicable.

13 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

M.3.6.7 Price Inconsistencies. A proposal is presumed to represent an Offerors best effort to respond to the solicitation. Any inconsistency, whether real or apparent, between promised performance and price, should be explained in the proposal. Any significant inconsistencies, if unexplained, raise a fundamental issue of the Offerors understanding of the nature and scope of work required and his/her financial ability to perform the contract and may be grounds for rejection of the proposal.

M.3.6.8…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .