EWPMTBasicPWSDraftv7.pdf

PDF 3 MB Posted

Attached to
Electronic Warfare Planning Management Tool (EWPMT) GFI Discussion
Solicitation number
W15P7T-13-R-C104
Issued by

About this file

Draft Basic PWS-G

View the file

Other files

File Type Posted
EWPMTTaskOrder1PWSDraftv6.pdf PDF
EWPMTDraftSectionM.pdf PDF
EWPMTDraftSectionL.pdf PDF
EWPMT_PBS_(DRAFT)_03JUN12.pdf PDF
Blank_Visit_Request.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED//PROCUREMENT SENSITIVE

Performance Work Statement (PWS) for the

Electronic Warfare Planning and

Management Tool

(EWPMT)

Version 7.0

25 July 2012 i

Table of Contents

1 Scope

1.1 Background

1.2 Program Objectives

1.2.1 Stand-Alone Operation

1.3 Contract Administration Guidelines

1.3.1 Task Orders (TOs)

1.3.2 Request for Task Execution Plan (RTEP)

1.3.3 Task Execution Plan (TEP)

1.3.3.1 TEP Requirements for all submitted TEPs

1.3.4 TEP Preparation and Submission

1.3.4.1 TEP Format

1.3.5 TEP Evaluation

1.3.6 Issuance of Task Orders

1.3.7 Deliverables

1.3.8 Electronic Format

1.3.9 Purchase Authorizations

1.3.9.1 Purchasing Scope

1.3.10 Travel

1.3.11 Accountability

1.3.11.1 Task Order Leader (TOL)

1.3.12 Task Order Completion

2 Applicable Documents

2.1 Department of Defense – Specifications, Standards and Handbooks

2.2 Other Government Documents, Drawings and Publications

2.3 Non Government Documents – Commercial Standards

3 Program Requirements

3.1 Schedule Objectives

3.2 Program Management

3.2.1 Program Management

3.2.2 Cost Reporting

3.2.2.1 Contract Work Breakdown Structure (CWBS)

3.2.2.2 Contract Performance Report (CPR)

ii

3.2.2.3 Schedule Risk Assessment (SRA)

3.2.2.4 Resource/Spend Plan

3.2.2.5 Contract Funds Status Report (CPSR)

3.2.3 Design Review and Integrated Product Team (IPT) Meetings

3.2.3.1 Working Group IPTs

3.2.3.2 Design Reviews

3.2.4 Data Deliverables

3.2.5 Quality Assurance

3.2.6 Public Private Partnership

3.3 System Engineering

3.3.1 System Engineering

3.3.2 System Design

3.3.3 Interface Control

3.3.4 Risk Management

3.3.5 Studies and Analyses

3.4 Software Engineering

3.4.1 Software Development

3.4.2 Software Development Environment (SDE)

3.4.2.1 SDE Resource Requirements

3.4.2.2 SDE Operation and Initial Government Acceptance

3.4.2.3 SDE Transitioning and Final Acceptance

3.4.2.4 Software Maintenance Training

3.5 Security

3.5.1 Security Requirements

3.5.2 Program Technology Protection

3.5.3 Anti-Tamper (AT)

3.5.4 Information Assurance (IA)

3.5.5 Information Assurance Vulnerability Alert (IAVA) Compliance

3.5.6 Information Security (INFOSEC)

3.5.7 Communications Security (COMSEC)

3.5.8 Operations Security (OPSEC)

3.5.9 Anti-Terrorism (AT)

3.5.10 NATO Information

3.5.11 Foreign Disclosure/Export

iii

3.5.12 Personnel Security

3.5.13 Assessment of Program Security Effectiveness

3.6 Test and Evaluation

3.6.1 Software Testing

3.6.1.1 Test Readiness Review (TRR)

3.6.1.2 Test Completion Review (TCR)

3.6.1.3 Capability Drop Deliveries

3.6.2 Integration and Test (I&T)

3.6.3 Operational Test

3.7 Configuration Management

3.7.1 Class Changes

3.7.2 Contractor Configuration Control Board (CCCB)

3.7.3 Product or System Improvement

3.8 Integrated Logistics Support

3.8.1 Reliability, Availability and Maintainability Program

3.8.2 Technical Manuals

3.8.2.1 Technical Manual Development

3.8.2.2 Technical Manual Validation

3.8.2.3 Technical Manual Verification

3.8.3 Software Maintenance Program

3.8.4 Training and Training Materials

3.8.5 Supply Support

3.8.5.1 Field Support Representatives (FSRs)

3.8.6 Manpower and Personnel Integration (MANPRINT)

3.8.7 Initial Product Support Plan (PSP) for Performance Based Logistics (PBL) 38

3.8.8 PBL Metrics Guidance

3.9 Purchased Equipment

3.10 Development and Test Capability

3.11 Safety Assessment Report (SAR)

3.12 Government Furnished Equipment/Information (GFE/GFI)

4 CDRL List

1 SCOPE

The scope of this effort is to define and design the EWPMT capability. This Performance Work

Statement (PWS) defines the range of services and effort necessary to design, build, integrate, test and deliver the EWPMT system. These services shall include engineering design, procurement incidental to performing the stated PWS efforts, integration, production and installation of Hardware, Software, and Systems. The ordering period for this effort is for five

(5) years from date of contract award.

1.1 Background

The Electronic Warfare Planning and Management Tool (EWPMT) is part of the Integrated

Electronic Warfare System (IEWS) Family of Systems (FoS). The IEWS FoS includes Multi-function Electronic Warfare (MFEW), Defensive-Electronic Attack (D-EA), and EWPMT.

Facing an electromagnetic environment that is congested and contested among adversaries and non-aligned parties and the proliferation of EW technologies worldwide, the Army intends to develop a framework to integrate current and future EW capabilities into a networked, modular system capable of providing a unified EW capability across the force. The EWPMT is software that gives Electronic Warfare Officers (EWO) mission planning capability to plan, coordinate, manage, and deconflict unit EW activities. It will provide battle management for distributed, networked EW capability, aligned with fires and synchronize air/ground electromagnetic spectrum operations across the G2/3/6 areas of responsibility.

1.2 Program Objectives

The objective of this effort is to deliver EWPMT consisting of 6 notional Capability Drops

(CDs). The first Capability Drop (CD) will be fielded by 2014 and provides the current force with essential EW mission planning and management tools. The following Figure 1 depicts a notional layout of functions planned for each CD. CDs will also incorporate lessons learned during the implementation of prior deployments. Subsequent capability enhancements will see improved synchronization between joint, inter-agency, and coalition partners. The EWPMT should reach Initial Operational Capability (IOC) no later than 2015 and Full Operational

Capability (FOC) no later than 2018.

Figure 1: EWPMT Capability Drop Functions

The EWPMT design shall leverage common infrastructure and interoperability services available on the Command Post Computing Environment (CP CE).

The Offeror shall use Modular Open Systems Approach (MOSA) to:

(1) Facilitate development of a modular architecture and allow for affordable intraoperability.

(2) Ensure that the system design is sufficiently flexible and robust to accommodate changing technology and requirements.

(3) Facilitate integration with other systems and use of commercial products from multiple sources both in the initial design and in future enhancements.

(4) Enable technology insertion as currently available 3 rd

Party commercial products mature and new commercial products become available in the future.

(5) Allow for affordable support.

(6) Allow continued access to technologies and products supported by many suppliers (a broad industrial base which does not restrict available sources to the detriment of competition)

For systems that tend to evolve and improve with time, the EWPMT MOSA architecture shall utilize a Service Oriented Architecture (SOA) exposing capabilities as Web Services in accordance with (IAW) Common Operating Environment (COE).

1.2.1 Stand-Alone Operation

In the event that EWPMT is unable to test, integrate and deploy with the CPCE provisioned computing environment, the purchase of dedicated EWPMT hardware is required. This hardware shall include computer servers, storage area networks (SAN), laptops, network equipment and all associated accessories that match CPCEv2 specification for corresponding items. The purchase of operating systems and supporting software and their licenses may also be required. For all software that appears on the CPCEv2 common software list, the software shall match the version specified by CPCEv2.

1.3 Contract Administration Guidelines

This is a Indefinite Delivery Indefinite Quantity (ID/IQ) contract under which seperate Task

Orders will be issued.

1.3.1 Task Orders (TOs)

Task Orders will be issued as Cost Plus Fixed-Fee (CPFF), Cost Plus Incentive Fee (CPIF) and

Firm Fixed Price (FFP). CD 1 development effort will be issued as Task Order 1 and will provide for the basic award amount To meet program objectives (Section 1.2), individual

Requests for Task Execution Plans (RTEPs) for which the contractor shall submit proposals may be issued by the Government over the course of the contract. These RTEPs will be issued for tasks as defined under the Program Requirements (Section 3) of this PWS.

1.3.2 Request for Task Execution Plan (RTEP)

It is the Government‘s intent to issue RTEPs that reflect a Performance-Based Contracting approach. In a Performance-Based RTEP the Government will specify requirements in terms of performance objectives and the Contractor will propose ―how to‖ best satisfy those objectives.

The RTEP will contain a PWS, and will require the Contractor‘s proposal to address metrics to measure and evaluate performance. Each PWS may vary in scope and duration depending upon the level of service required and the acquisition phase of the system (i.e., requirement analysis, development, production, fielding and/or operation). Each PWS will include technical or cost metrics by which the contractor‘s performance will be measured against a resulting Task Order.

1.3.3 Task Execution Plan (TEP)

The Government‘s RTEP does NOT constitute an authorization to start work. The Government is not required to approve the resulting TEP and issue a Task Order. Within thirty (30) calendar days of receipt of the RTEP, (unless otherwise specified by the Contracting Officer), the

Contractor shall submit one TEP.

1.3.3.1 TEP Requirements for all submitted TEPs

Cost and Pricing Data shall be addressed as specified in RTEP:

Information shall be provided and fields designated with an asterisks will be required to be submitted via email:

Proposal Summary including:

Task number*;

Date submitted*;

Contractor‘s name*;

Contractor task leader contract information;

Primary subcontractor(s) and vendors by name (ass applicable)*;

Proposed start and finish dates*;

Proposed total cost with separate option or CLIN pricing, as applicable*;

Reference to any unique terms or conditions, or an requests to deviate from standard contract terms and conditions

Deliverables and Schedules*

Complete description of the technical approach to satisfying task requirements

A GANTT chart indicating expected start and completion dates, for all critical project tasks and sub-tasks

1.3.4 TEP Preparation and Submission

Task Orders are performance based and the Contractor's performance will be assessed in accordance with the requirements defined in the task order.

1.3.4.1 TEP Format

1.3.4.1.1 Cover Letter

One page Cover Letter, to include:

Duration for which proposal is valid

Total value of the proposal by Base and Option periods

Point of Contact for questions

Task Number

1.3.4.1.2 Technical Approach

Microsoft Word or PDF Format

Identify Technical POC for Prime and major subcontracotrs/vendors (if applicable) with phone number and email address

Separate stand-alone section identifying any Special Terms and Conditions, Deviations, and/or Critical Assumptions

Type of Contract (FFP, CR)

Period of Performance specified

No marketing materials; information relevant to the requirement only

1.3.4.1.3 Cost/Price

Microsoft Excel or PDF are the required software and formats

(CR only) All Prime, Subcontactor and Vendor Labor costs, Material costs, Travel, and

Other Direct Costs (ODC) must be broken out. Summary Tab for Cost roll-up, and separate Tabs for Base Period and any Option

Separate tabs for subcontractors or vendors is desired

Performance based payment milestones, if applicable

Cost or pricing data or information other than cost or pricing data may be required IAW

FAR 15.403-1(c).

1.3.5 TEP Evaluation

The Government will evaluate TEP submittals to assess technical acceptability and fair and reasonable price.

1.3.6 Issuance of Task Orders

Upon Government approval of the TEP and designation of an appropriate fund cite, the

Contracting Officer will issue a Task Order to the Contractor. Contractor work shall commence only after issuance of the Task Order by the Contracting Officer.

1.3.7 Deliverables

Task Orders will reference the Document Summary List for any data deliverables as required.

All documentation developed under or in support of any Task Order on this contract, but not specifically called out as a deliverable in the task order PWS, shall be made available to the

Government upon request for review and/or inspection.

1.3.8 Electronic Format

In general, all correspondence, Task Execution Plans or any Task Order deliverables on this contract, will be compatible with the latest Microsoft Office Suite utilized by the requiring office.

1.3.9 Purchase Authorizations

If applicable, each TEP shall contain a proposed Bill of Materials (BOM).

1.3.9.1 Purchasing Scope

The Government may authorize and require the contractor to purchase components, equipment, systems and subsystems under individual Task Orders that require the design and development of prototypes of potential solutions, rack and stack operations, integration, test and verification, repair and installation, shipment activities and maintenance of developed items in fully operational status.

Any purchased material (durable and nonexpendable) will become the property of the government (GFE) in accordance with FAR 52-245-1. All purchases, to include purchases made by subcontractors, that are not covered in the original proposed Bill of Materials shall be approved by the Contracting Officer or Task Order COR prior to purchase.

1.3.10 Travel

Travel will be in accordance with the individual Task Order requirement. Travel details must be provided to and approved by the COR prior to the commencement of travel. All extended travel must approved by the COR prior to the commencement of travel. All travel must be in accordance with applicable C4ISR and local command policies as well at the Joint Travel

Regulation, PAM 715-16 and AR 715-9.

The Government will identify all travel requirements in the Task Order PWS.

1.3.11 Accountability

The Contractor shall be accountable to the Government for all contractor work. The employees of the Contractor shall perform independently of Government supervision and control in accordance with specific Task Orders and this PWS. Each task order will have a designated

Government Technical Point of Contact (TPOC) to serve as the single individual to identify task order technical requirements on that Task Order.

Any loss or damage to GFM/GFE/Contractor Acquired Property (CAP) shall be reported to the

PCO or designee within three (3) day of the discovery. A statement explaining the circumstances of the loss/damage shall be submitted on a DA Form 4697, Report Survey.

1.3.11.1 Task Order Leader (TOL)

With each Task Order proposal the Contractor shall designate one of the performing technical personnel to act (in addition to their contracted task assignments) as the Task Order Leader

(TOL). This individual will be responsible for interaction and coordination with the TPOC, making work assignments to other Task Order support personnel in accordance with Task Order requirements as clarified through discussion and understandings with the TPOC. The TOL will be responsible for ensuring accuracy and timely completion of all tasking.

1.3.12 Task Order Completion

The contractor shall submit to the Contracting Officer‘s Representative (COR) a Material

Inspection and Receiving Report (DD Form 250).

2 APPLICABLE DOCUMENTS

In the event of conflict between the PWS and any of the reference documents, the PWS shall take precedence.

The Contractor shall use the following documents as guidelines to the extent specified herein.

2.1 Department of Defense – Specifications, Standards and Handbooks

The following specifications, standards, and handbooks form a part of this PWS to the extent specified herein and are provided for reference and guidance. Unless otherwise specified, the latest issues of these documents are provided in the Department of Defense Index of

Specifications and Standards (DoDISS) and supplement thereto:

Document Number Document Title

MIL-HDBK-61A(SE) Configuration Management Guidance

MIL-HDBK-454 General Guidelines for Electronic Equipment

MIL-HDBK-502 Acquisition Logistics

MIL-STD-129P Military Marking for Shipping and Storage

MIL-STD-130N Identification Marking of U.S. Military Property

MIL-STD-881C Work Breakdown Structures for Defense Materiel Items

MIL-STD-882E System Safety

MIL-STD-2525C Common Warfighting Symbology

MIL-STD-31000 Technical Data Packages

MIL-STD-40051-1A

Preparation of Digital Technical Information for Interactive Electronic

Technical Manuals (IETMs)

2.2 Other Government Documents, Drawings and Publications

The following Government documents, drawings, and publications form a part of this PWS to the extent specified herein.

AR-25-2

Information Management: Management of Subsystems Information

Assurance

AR 385-40 Safety and Health Accidents and Injuries

AR 715-9 Contractors Accompanying the Force

DODI 6055.11

Protection of DoD Personnel from Exposure to Radio Frequency

Radiation and Military Exempt Lasers

DODI 8500.2 Information Assurance Implementation

MIST SP 800-53, Rev. 3 Recommended Security Controls for Federal Information Systems and

Organizations

TBD IEWS Security Classification Guide

TBD Performance Based Specification - Government (PBS-G)

DoD Information Assurance Certification and Accreditation Procedures

(DIACAP)

2.3 Non Government Documents – Commercial Standards

ANSI/TIA/EIA-568-A Commercial Telecommunications Cabling Standard

ASME Y14.100 Engineering Drawing Practices

ASME Y14.24 Types and Applications of Engineering Drawings

ASME Y14.34M Associated Lists

ISO 10007

Quality Management Systems - Guidelines for Configuration

Management

3 PROGRAM REQUIREMENTS

The tasks outlined in this PWS include program management, system engineering, design engineering, software engineering, configuration management, technical data package, quality assurance, material procurement, systems integration & test, demonstration support, and logistics support for the EWPMT system.

The Contractor shall provide the range of services necessary for the development, build, integration, test and delivery of the EWPMT.

The Contractor shall:

Provide an Integrated Master Schedule and Work Breakdown Structure consistent with the PWS tasks called out.

Conduct the following reviews; Systems Requirement Review (SRR), Systems

Functional Review (SFR), Preliminary Design Review (PDR), Critical Design Review

(CDR) and Test Readiness Review (TRR). The Contractor can combine the SRR with

SFR.

Generate Systems Engineering MASTER Plan (SEMP).

Perform all required testing.

Provide configuration management functions for EWPMT.

Provide technical documentation, user manuals, and training materials.

Develop embedded training with IEWTPT simulation.

Develop embedded training with IEWTPT interfaces.

Provide security accreditation documentation and provide a security design for the

EWPMT system to operate at required Mission Assurance Category (MAC) II classified

Security levels.

Generate or produce Software Requirements Specifications, Interface Control Documents

(ICD) and a Drawing package.

Transfer the EWPMT software Baseline and documentation to Government configuration management control.

Provide a Technical Data Package (TDP) consistent with requirements cited in MIL-

STD-31000 for both hardware and software, as well as supporting technical documentation, e.g. test plans, procedures, software code, logic diagrams… etc, in accordance with CDRLs/DIDs herein.

Provide a secure, access-controlled Integrated Data Environment (IDE) for use by the

Government and the Contractor, which shall serve as a repository for program management information and data deliverables.

3.1 Schedule Objectives

The Government‘s Integrated Master Plan (IMP) identifies the EWPMT program‘s key objectives against which the offeror/Contractor shall build their Integrated Master Schedule for the program. The Contractor‘s IMS shall take into account both the explicit milestones and implicit milestones inherent to the offeror/Contractor approach in executing the EWPMT program.

3.2 Program Management

3.2.1 Program Management

The Contractor shall establish and maintain a data management system for control, tracking, and accountability of all program data and documentation set forth in the Contract Data

Requirements List (CDRL).

The Contractor shall have a Program Management team structure necessary to support execution of the EWPMT effort.

The Contractor shall track and manage the status of tasks and schedule of events for all tasks within this PWS utilizing an Integrated Master Schedule (IMS).

The Contractor shall interface with the Government through an Integrated Product Team (IPT) structure. The Government‘s IPT structure includes Management/Integration, System

Engineering & Logistics, Supportability/Acquisition, Test & Evaluation, Cost, Security and

Requirements IPTs. These IPTs shall include Government, Federally Funded Research and

Development Centers (FFRDC), and Government System Engineering and Technical Assistance

(SETA) participation.

The Contractor shall prepare and submit a monthly status report (A001) addressing the topical areas which follow. The Contractor shall brief program progress and report statuses of all activities associated with the EWPMT effort and provide technical overview presentations at monthly Program Management Reviews (PMRs). The Contractor shall identify areas of program risk and concern, tasks completed, action item status, schedule progress, funding status, Integrated Logistics Support (ILS) status and notification of design changes. These meetings shall be held on mutually agreeable dates at an agreed upon location.

The Contractor shall participate in interface, analysis, and planning meetings with Government agencies and other contractors on an as required basis. The Government will provide details, and identify objectives for these meetings not less than 5 working days prior to the meeting date.

3.2.2 Cost Reporting

3.2.2.1 Contract Work Breakdown Structure (CWBS)

The Contractor shall develop and maintain a CWBS that follows MIL-HDBK-881 for the

EWPMT development (A003). The CWBS shall be an extension of the project summary Work

Breakdown Structure (WBS). It shall reflect the requirements of this PWS, and provide the basis for management and for cost reporting at and below the cost account level. The Contractor shall use the CWBS as the baseline for contract planning, the Contract Performance Report (CPR), the

Integrated Master Schedule (IMS), and the Contractor Cost Data Report (CCDR).

3.2.2.2 Contract Performance Report (CPR)

The Government requires CPR reporting for the EWPMT cost reimbursement task orders. The

CPR shall use the WBS that will be implemented at Task Order award and as changed by future modifications.

The Contractor shall provide the CPR in Formats 1, 2, and 5. The Contractor shall provide an attachment to format 1 to include current software size (SLOC). The CPR thresholds for explanation of applicable variances, which are subject to Government review and may be modified, are as follows:

(1) Format #1 – Work Breakdown Structure: Format to provide separate breakout of overhead.

(2) Format #2 – Organizational Categories: Contractor Format.

(3) Format #5 - Explanations and Problem Analyses.

3.2.2.3 Schedule Risk Assessment (SRA)

The Schedule Risk Assessment shall follow the Integrated Master Schedule (IMS) format.

3.2.2.4 Resource/Spend Plan

The Contractor shall prepare and submit a report that portrays resource and manpower actuals and projections for the contract period (A040). The report shall address, and update with each submission, all portions of the contract.

WBS

Level

Cost & Schedule

Current Month

Cost & Schedule

Cum to Date

At Complete

1 +/- 10% +/- 10% +/- 3%

2 +/- 15% +/- 15% +/- 5%

3 +/-20% +/- 20% +/-10%

3.2.2.5 Contract Funds Status Report (CPSR)

The Contractor shall prepare and submit a Contract Funds Status Report (CFSR) for any Cost

Reimbursable Task Order (A002). The Contractor shall use DD Form 1586 to prepare the

CFSR.

3.2.3 Design Review and Integrated Product Team (IPT) Meetings

3.2.3.1 Working Group IPTs

The Contractor shall conduct Working Group IPT Meetings with the designated Government representatives as required. These meetings shall be held on mutually agreeable dates and locations.

3.2.3.2 Design Reviews

Design Reviews shall be conducted as specified below. The Contractor shall provide presentation and source material for all meetings and reviews. (A005)

The Contractor shall conduct the following reviews:

EWPMT Systems Requirements Review (SRR)

EWPMT Systems Functional Review (SFR). SFR can be conducted in conjunction with the SRR

EWPMT Preliminary Design Review (PDR)

EWPMT Critical Design Review (CDR)

A Preliminary Design Review shall be conducted for each of the EWPMT capability drops. The purpose of the PDR is to demonstrate that the preliminary design meets all system requirements with acceptable risk and within the cost and schedule constraints and establishes the basis for proceeding with detailed design. It will show that the correct design options have been selected, interfaces have been identified, and verification methods have been described. The

Requirements Definition Documents (RDDs) (A006), System/Subsystem Specification (SSS)

(A007), Software Requirements Specification (SRS) (A008), Interface Control Document (ICD)

(A009), and Software Architecture Design Document (SADD) (A010) shall be delivered no later than (NLT) 30 days prior to the review.

A Critical Design Review shall be conducted for each of the EWPMT capability drops. The purpose of the CDR is to demonstrate the maturity of the design and to ensure that the "build-to" baseline contains detailed specifications that can meet functional and performance requirements.

The Software Design Document (SDD) (A011), Interface Design Description (IDD) (A012), Software Version Description Document (SVDD) (A013) and Database Design Document

(DBDD) (A014) shall be delivered NLT 30 days prior to the review.

3.2.4 Data Deliverables

The Contractor shall develop, prepare and deliver contract data deliverables, called for in the

Contract Data Items List (CDRL) associated with the PWS paragraphs herein as identified in

Paragraph 4 of this PWS. The Contractor is responsible for all lower tier data generated by team members/subcontractors and/or vendors.

The Contractor shall ensure that data is delivered on schedule and in a quality manner, and that the information/data provided is clear in its content, cohesive within the data item as well as the overall contract (PWS) effort.

NOTE: Where Government review and comment is required, that review will be based on information presented. If the information required (by the CDRL) is deemed to be deficient in any way, it will be rejected without Government editing.

Prepare and deliver each data item in accordance with its corresponding contract CDRL, DD

Form 1423-1 and preparation instructions therein (Block 16).

Each data item shall be identified and tracked in the IMS.

Ensure all data deliverables are traceable to specific tasks defined in the PWS.

All data shall be in Contractor format unless otherwise specified and mutually agreed to

Develop and maintain a Data Access List (DAL) of all relevant Contractor/subcontractor generated data posted to the Integrated Data Environment including proprietary documents (appropriately marked).

Provide the Government complete access to all internal data generated in the performance of this contract, regardless of delivery requirement to the Government.

3.2.5 Quality Assurance

The Contractor shall conduct Quality Assurance in accordance with industry best practices for quality assurance.

The Contractor shall deliver a Quality Assurance Plan (A039). The plan shall identify the organizational structure, quality interfaces and the quality activities conducted during all product development, integration, test and delivery.

3.2.6 Public Private Partnership

The Contractor shall partner with government components within US Army Communications-

Electronics Research, Development, and Engineering Center (CERDEC) to leverage

Government of the Shelf (GOTS)/GPR modules and components in use in other programs (e.g.

at a minimum the Contractor shall leverage the Communications Effects Simulator (CES), the

Spectrum Planning Advisor (SPA), and the Spectrum Knowledge Repository (SKR) – all modules of the Electromagnetic Battle Manager, EMBM). The Contractor‘s design architecture, development plan, and schedule shall leverage these S/W modules to reduce cost, schedule, and performance risk to the program. Furthermore, the Contractor shall collaborate with government partners and synchronize development and software release and sustainment schedules.

The Contractor shall work with US Army CERDEC laboratories or CECOM SEC to verify and validate interfaces with unclassified and classified spectrum data sources (eg SXXI, ARAT, SKR, JDSR), for use within their product. The Contractor shall work with US Army CERDEC to verify that analyctical models (e.g. propagation, interference, deconfliction) performed within their product provide precision and results corresponding to other tools in use by DOD spectrum managers e.g. Spectrum XXI Online, CJSMPT, etc. CERDEC Point of Contact (POC) is Bob

Shields (443)395-8665 and the CECOM SEC POC is Wayne Field (443) 861-3480.

3.3 System Engineering

3.3.1 System Engineering

The Contractor shall develop and deliver a System Engineering Master Plan (SEMP). (A015)

The Contractor shall develop a SEMP for the development of the full operational capability

(FOC) of the 22 EWPMT functions for the various Capability Drops outlined in Figure 1. The plan shall lay out the software development plan for each capability drops and identify any functionality requiring multiple capability drops to achieve full functionality. The Contractor shall track and maintain the status of each of the 22 functions partial or full implementation. The

Contractor shall brief the plan as part of each appropriate capability drop PDR and the final plan at the appropriate capability drop CDR.

The Contractor shall capture the EWPMT System Engineering Documentation in a database tool and the Government shall have access to that database.

3.3.2 System Design

The Contractor shall perform system engineering and analysis leading to an EWPMT system design and development strategy which satisfies the allocated requirements in the EWPMT

Performance Based Specification – Government (PBS-G).

3.3.3 Interface Control

The Contractor shall develop EWPMT interfaces and document technical requirements in the

ICD. The ICD documents all external data exchanges implemented in EWPMT and it includes information on the systems involved in the interface, the data exchanged, the ports and protocols used to exchange the data, the security (encryption, authentication) utilized by the interface and include diagrams graphically depicting the interface. (A016)

3.3.4 Risk Management

The Contractor shall develop, document, and then implement a process for Risk Management.

This process shall include methods and procedures for identifying risks, assessing risks, developing mitigation plans and contingency plans for risks. The Contractor shall present Risks and mitigation efforts at Program Reviews.

The Contractor‘s Risk Management Plan and approach shall be included as part of the SEMP.

3.3.5 Studies and Analyses

The Contractor shall perform studies and analyses as required by applicable Task Orders. Such studies/analyses may include logistics/supportability, engineering, financial, operational, etc.

The Contractor shall perform non-recurring engineering studies and analyses to evaluate the viability of potential solutions to various technical problems, such as how two systems might be integrated or that a certain bandwidth can be achieved with a given technology. The development of prototypes may be required. The Contractor shall evaluate unproven technology applications and identify potential risks. Results shall be documented and submitted as required by applicable Task Orders. The Contractor shall provide configuration support service if required by applicable Task Orders. The Contractor shall attend design reviews, technical interchange meetings, and conferences as required.

3.4 Software Engineering

The Contractor shall ensure that all EWPMT Capability Drops retain interoperability and backward compatibility with all interoperable systems in the CS 15-16/COE v.2 and future COE versions architectures.

The Contractor‘s system engineering and software designs shall reflect industry MOSA open standards, utilize the operating system provided in the Army Golden Master program, and align with CP CE architecture and technology governances.

The Contractor shall document all software releases in the Software Version Description

Document, and shall update the Software Users Manual accordingly.

The Contractor shall plan software builds in support of trouble report fixes, PM Mission

Command Quarterly release cycles or CP CE release cycles, software blocking transition and required participation in system-of-system integration events.

The Contractor shall develop new versions of EWPMT software such that the new versions will be able to replace a previously fielded version and shall not lose any interoperability with other existing systems, system services, components in the field.

The Contractor shall conduct detailed design analysis of software defects, security patches, software change proposals or enhancements for all tasks to determine the required software fixes

/ upgrades necessary to the EWPMT software design. Prior to implementing the fixes/upgrades required, the Contractor shall discuss design work with the Government in working group meetings to support the Government decision making process.

3.4.1 Software Development

The Contractor shall develop software to implement the software functionality of the allocated requirements of the PBS-G.

The Contractor shall develop the required SOA software services IAW the DCGS-A Service

Interface Specification, V1.0. Appendix A shall be the minimum set for implementation.

The Contractor shall document all system requirements allocated to Computer Software

Configuration Items (CSCI) in a Software Requirements Specifications.

The Contractor shall document final software product baseline for all CSCI for EWPMT in a

Software Product Specification. (A017)

All new software and modifications to existing software (including COTS, GOTS, and firmware) shall be developed utilizing IEEE/EIA 12207 as a guide and shall be documented in the Software

Version Description Document (SVDD).

The Contractor shall perform configuration management on all software.

The Contractor shall provide Software Installation scripts and procedures. (A018)

The Contractor shall provide to the Government recommended Software applications or tools for approval to implement. The Contractor shall recommend selection criteria and shall perform selection based on the criteria that has been agreed-to by the Government.

For each capability drop, the Contractor shall deliver a Software Development Kit (SDK) for any

EWMPT interface designed and exposed for the ability to integrate new or alternative capability and technologies. Each SDK shall include the API, developer documentation and tool with sufficient detail for new developers to effectively use the defined EWPMT interface.

3.4.2 Software Development Environment (SDE)

The Contractor shall design, procure, and make operational in the Contractor‘s plant, a SDE that shall be sufficient to develop and test the EWPMT, as well as meet life cycle software support requirements. The SDE shall comply with the Joint Technical Architecture (JTA) – Army. The

SDE shall inclue all hardware, support software, software tools, test support tools, test support tool documentation, associated data files, and all appropriate licenses. The SDE shall provide the Government the capability to modify the EWPMT source code, documentation and data; and to build, test, install, and operate all EWPMT support software, and associated utilities.

3.4.2.1 SDE Resource Requirements

The Contractor shall provide 50% spare capacity for the following computing resources of the proposed environment:

(1) Processor utilization

(2) Random Access Memory (RAM)

(3) Hard disk secondary storage space

(4) Input/Output (I/O) bandwidth for peripheral and communications interfaces

(5) Physical I/O connections for peripheral and communications interfaces.

The SDE shall have the capability to run the EWPMT software in the same manner as the

EWPMT would run in an operational environment.

3.4.2.2 SDE Operation and Initial Government Acceptance

The SDE shall be operated and maintained by the Contractor during the development of the

EWPMT and associated support software.

The Contractor shall develop and deliver a complete set of SDE design documentation, to a level that will allow the Government to recreate the SDE without additional design details. (A041)

The complete SDE, including all associated documentation, support software, tools, spare parts, and licenses, shall be inventoried upon formal acceptance of the EWPMT software.

Initial acceptance of the SDE by the Government shall occur following an acceptance demonstration at the Contractor‘s site, as required by applicable Task Order. The Contractor shall demonstrate that the executable mission area software can be regenerated from the source code and maintained from the delivered support software and other supplied resources, and that the support software and other supplied resources of the SDE can perform their intended function.

3.4.2.3 SDE Transitioning and Final Acceptance

The Contractor shall inventory, pack, ship, deliver, install and make operational the SDE at a

Government designated location, as required by applicable Task Orders. The Contractor shall conduct demonstrations on the installed SDE to prove the capability of the SDE to support software maintenance. The Contractor shall demonstrate that the executable mission-area software can be regenerated from the source code and maintained from the delivered support software and other supplied resources, and that the support software and other supplied resources of the SDE can perform their intended function. The demonstrations shall serve as the

Government‘s final acceptance test of the SDE.

3.4.2.4 Software Maintenance Training

The Contractor shall conduct a software maintenance course for a maximum of twelve (12)

Government designated personnel in the Government‘s facility. The training course shall not exceed three weeks in duration, and shall be conducted only once. The training course shall be conducted using the installed SDE no later than two weeks after the SDE has been demonstrated to be able to perform its intended functions. The course shall include, as a minimum:

(1) An overview of the EWPMT operation and software

(2) Architecture of the software development environment

(3) Procedures associated with the system administration of the target and development environments

(4) Procedures for the generation and installation of target system software in the development environment

(5) Procedures for the generation and installation of support software in the development environment

(6) Procedures for the collection and analysis of data associated with troubleshooting target system software

(7) Procedures for the generation and maintenance of EWPMT application documentation.

The Contractor shall develop and deliver course materials (A042). The course materials shall make maximum use of COTS and deliverable documents. The course will include hands-on exercises. A copy of all presentation materials shall be provided to each student. The

Government shall have the right to video tape the training completed.

3.5 Security

The Contractor shall adhere to security guidelines as found in the DD254 form for this effort and as contained in the Army Tactical Automatic Information Systems (AIS) Security Classification

Guide (SCG), April 2008, and the Operations Security (OPSEC) Plan for PM EW, October 2008.

The Contractor shall extend all relevant security guidelines to their sub-contractors. The

Contractor shall develop, conduct and implement an annual security training and awareness program using the above documents for guidance for all contractor personnel with a need to know. The training program will address security objectives and responsibilities for these personnel. The Contractor shall provide an annual EWPMT Program Security Training Report with initial report delivered 60 DAC (A043). This report will identify the content of the security training and all personnel in attendance. Subsequent Security Training Reports will be submitted annually.

3.5.1 Security Requirements

The Contractor shall establish and maintain a SECRET facility clearance with SECRET safeguarding capability. The Contractor facility shall have a valid accreditation from the DoD

Security Service (DSS) for the PWS Period of Performance. The Contractor will require access to Secret Collateral, Controlled Unclassified/For Official Use Only (CUI/FOUO) information, COMSEC information, NATO Secret information/terminals, access to the SIPRNET at a

Government Facility and will be authorized to use the Defense Technical Information Center

(DTIC). The Contractor will require access to classified information/material up to SECRET at

U. S. Government facilities in Afghanistan. The Contractor is not authorized a COMSEC

Account nor the use of the Defense Courier Service (DCS) for this effort.

The Army Tactical AIS SCG will be the governing document with which the Contractor must comply with regards to information classification-until revised, replaced or superseded. The

Government will provide a copy of the applicable classification guidance to the contractor. The

Contractor will receive and derivatively generate classified material in performing this contract.

In performing this contract, the Contractor will receive and generate derivatively classified material and fabricate/modify/store classified hardware and software. When related hardware/system is loaded with classified software it becomes a classified item at the classification level of the software. Without a classified software load, associated hardware/system is an unclassified controlled (FOUO) item. The Contractor shall design, build, integrate, manufacture, test and document the System so that it is certifiable and accreditable by the proper Government authorities to operate. The Contractor shall assist the Government in conducting any necessary certification and accreditation tests.

Classified Automation Information Systems (AIS) will be required at the Contractor‘s facility.

Classified systems and personnel security must be IAW the NISPOM. Contractor personnel performing IT sensitive duties are subject to investigative and assignment requirements IAW AR

25-2, AR 380-67 and affiliated regulations.

3.5.2 Program Technology Protection

Protecting Critical Program Information (CPI) is a cornerstone of our program's success. CPI is components, engineering, design, or manufacturing processes, technologies, system capabilities and vulnerabilities; and other information that gives the system its unique capability on the battlefield or provides the ability for other countries to reproduce the essential capabilities or mission. CPI consists of those items that if compromised, would degrade combat effectiveness, shorten the expected combat-effective life of the system, or significantly alter program direction.

This includes classified military information or controlled unclassified information (CUI/FOUO) about such programs, technologies, or systems.

The Contractor shall assist and support the USG in performing a CPI assessment on the system during System Development & Demonstration (SDD) and/or any other follow on actions, Pre-planned Product Improvement (P3I) or system upgrades as necessary. The Contractor shall participate in Government lead IPT that facilitate CPI assessments. The CPI assessment is a structured approach to identify the "technical know-how" in the areas of Concept, Material, Design, Manufacturing, and Integration that enables the hardware and / or software elements to meet the threshold of CPI as defined in Critical Program Information Protection within the

Department of Defense, DoDI 5200.39,. If CPI is identified, the USG shall prepare a Program

Protection Plan (PPP). The USG shall provide the contractor with written guidance reference implementation of countermeasures to protect CPI. The Contractor shall provide a

Countermeasures Implementation Plan to the USG within 30 days of receiving countermeasures via Contract Deliverable (A044). Included in this plan shall be a Limited Access Roster (LAR) identifying which contractor personnel have either a need-to-know of the CPI, a need to have access to the CPI, or both need-to-know and access. The Contractor shall provide subsequent updates to the Countermeasures Implementation Plan on a quarterly basis. These status reports shall cite any additions and/or deletions to the LAR as approved by the Contractor‘s Senior

Management. If there are no program protection affects, then the quarterly report shall indicate

―Nothing to Report (NRT) for this period.‖

The Government will provide the Contractor and all EWPMT End Users system/technology protection guidance via the EWPMT System Security Procedures (SSP).

3.5.3 Anti-Tamper (AT)

AT Techniques are system security engineering solutions designed to protect CPI and/or critical technologies inherit within a weapon or defense item; in order to deter exploitation if the system-if lost, stolen in battle or loaned/sold to foreign allies. Should a Government requirement arise for EWPMT AT solutions, then appropriate contractual modifications would be initiated detailing the Contractor‘s performance requirements .

3.5.4 Information Assurance (IA)

The system shall include effective countermeasures to mitigate risks associated with system threats and vulnerabilities. IA requirements and security certification and accreditation should be properly addressed throughout the entire program life cycle. The system shall comply with current DoD and Army Directives, Instruction, Policies, Standards, Architectures, and Services on IA and security. The Contractor shall generate the appropriate security accreditation documents as required. (A019). These regulations include:

DoDI 8510.01, DoD Information Assurance Certification & Accreditation Process

(DIACAP), 28 November 2007

Army Regulation (AR) 25-1 4 December 2008

Army Knowledge Management and Information Technology Clinger Cohen Act of 1996

Subtitle III, Title 40 U.S. Code Committee on National Security Systems (CNSS) 4009 dated 20 Mar 2007

National Information Assurance (IA) Glossary DoD Directive (DoDD) 8570.1 dated 15

Aug 2004

Information Assurance Training, Certification and Workforce Management DoD Manual

(DoDM) 8570.01M dated 20 Apr 2010

Information Assurance Workforce Improvement Program DoD Instruction (DoDI)

5000.2 dated 8 Dec 2008

Operation of the Defense Acquisition System DoDI 8580.1 dated July 9 2004

Information Assurance in the Defense Acquisition Systems Federal Information Security

Management Act (FISMA) dated 24 Oct 2002

NSTISSP No. 11, National Policy Governing the Acquisition of Information Assurance

(IA) and IA-Enabled Information Technology Products, June 2003

The Contractor shall comply and cooperate with Government provided IA compliance requirements for all EWPMT Software Applications, IS and IT components. The Contractor shall also insist the Government in the execution of DoDI 8510.01, the DoD IA Certification and

Accreditation Process (DIACAP) as follows:

Implementation of Security Technical Implementation Guidelines (STIGS) and Security

Recommendation Guides (SRG).

All contractor employees and associated sub-contractor employees must complete the

DoD IA awareness training before issuance of network access and annually thereafter.

All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01-M and AR 25-2 within six months of employment.

Per DoD 8570.01-M , DFARS 252.239.7001 and AR 25-2, the contractor employees supporting IA/IT functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award.

All contractor employees with access to a government info system must be registered in the ATCTS (Army Training Certification Tracking System) at commencement of services, and must successfully complete the DOD Information Assurance Awareness prior to access to the IS and then annually thereafter.

3.5.5 Information Assurance Vulnerability Alert (IAVA) Compliance

The Contractor shall track all applicable IAVAs and determine impacts of patches to the system and report to the Government when patches or mitigation mechanism can be applied to the system. Subsequent to Government review and approval, the Contractor shall implement the necessary repairs that have no adverse effects on the system‘s operations. From time of IAVA notification the Contractor shall have 90 days to complete the repair.

The Contractor shall be responsible for the security design of the EWPMT System to a Mission

Assurance Category (MAC) II Classified.

3.5.6 Information Security (INFOSEC)

The Contractor personnel shall properly mark, store and handle all material they acquire, generate or create IAW AR 380-5, in conjunction with the The Army Tactical AIS SCG. The

Contractor should obtain guidance from the Government‘s Program Security Staff regarding appropriate marking, storage and destruction of classified and For Official Use Only materials.

In addition to guidance in associated DD-254, Appendix D, unused FOUO will be shredded. A

Controlled Unclassified document containing FOUO information shall be appropriately marked

―UNCLASSIFIED//FOR OFFICIAL USE ONLY.‖

EWPMT Technical Documents shall be marked U//FOUO at a minimum, or SECRET as appropriate with the content of the information within. Program Technical and/or acquisition documents below and the like, shall bear the appropriate Distribution Statement and Export

Controlled Warning markings.

Training Manuals/documentation

Technical Manuals/documentation

Engineering Drawings

SW/HW Configurations Items

Performance Specifications

System Architecture

Maintenance Manuals/documentation

Reports and…