Virtual Photo Tour 654-20-132 Reduced Size 2.pdf

PDF 33 MB Posted

Attached to
Y1DA--NRM: 654-20-132 -- Refrigeration Replacement Bldg. 1
Solicitation number
36C26121R0021
Issued by

About this file

This document outlines a federal contract opportunity for refrigeration replacement services. The solicitation number is 36C26121R0021 and concerns project 654-20-132 to replace refrigerant at Building 1 as described in the statement of work. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21. Interested parties should respond with refrigeration replacement solutions by the response date to be considered for award of this contract to replace refrigerant at the specified VA location.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHARENEllioS Text Box Penthouse level, electrical tie-in here. Door leads out to 5th level roof.

Roof above level 5, location of condensor units in two locations.

Roof above level 5, location of condensor units in two locations, and power comes from inside door.

View from roof level 5 looking down to entry into Pipe Shop (old boiler area) for 1st floor units.

Basement pipe shop (old boiler area) where new piping will run across ceiling to 1st floor units.

New piping enters here above ACT for 3 units.

New evaporators in 4 units on Level 1.

This is entry for units 07, 07A, and 08.

New evaporators in 4 units on Level 1.

Unit 09 to right.

Line

New evaporators in 4 units on Level 1.

This is unit 09.

Elevator to 2nd floor Kitchen and to Basement old equipment.

Hallway from elevator to loading dock.

View from roof of 5th level down to second level roof showing pathway for piping.

Second Floor roof overview.

Roof above level 5 at top and side of wall for drop of 4 lines going to Kitchen area units.

Roof above level 5 at top and side of wall for drop of 4 lines going to Kitchen area units.

Second floor roof where new piping is run for units 130A and 130B.

Second floor roof where new piping is run for two units, through wall.

Kitchen area, Large walk-in unit.

VHARENEllioS

Kitchen area, Entry area from right for new piping.

Kitchen area, Entry area from left for new piping.

Kitchen area, Large walk-in unit.

Kitchen area, old pipe for removal.

Kitchen area, old pipe for removal.

Second floor roof where new piping is run for units 130A and 130B.

Kitchen area, Entry area for new piping to supply units 130A and 130B.

Kitchen area, Entry area for new piping to supply units 130A and 130B.

Kitchen area, Walk-in units 130A and 130B.

Piping and equipment to be demolished.

Piping to be demolished.

Remove electrical wiring and conduits to panel, and plug panel holes.

Cooling tower equipment, fencing, and piping to be removed.

Cooling tower chemical treatment room, to be emptied of equipment and piping..

Basement area, piping and equipment to be removed.

Basement area, piping and equipment to be removed.

003
005
007
010
011
013
015
016
018
020
021
026
028
030
031
036
037
039
041
042
044
046
047
049
050
051
053
055
056
057
058
059
060
061
062
063
064
065
066
068
069
071
073
074
076
078
083
087
088
089
090
091
092
093
095
096
097
098
099
101

File details come from the government source that posted it. Updated .