VA69D-18-B-1635-A00005000.docx

DOCX document 21 KB Posted

Attached to
676-CSI-001 Construct Warehouse Tomah VAMC - Tomah, WI Federal contract opportunity
Solicitation number
VA69D18B1635
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

VA69D-18-B-1635 A00005 VA69D-18-B-1635 A00005.docx

View the file

Other files for this federal contract opportunity

Other files attached to 676-CSI-001 Construct Warehouse Tomah VAMC - Tomah, WI, newest first.
File Type Posted
36C25218C0059-000.docx DOCX document
VA69D-18-B-1635-A00006000.docx DOCX document
VA69D-18-B-1635-A00006001.pdf PDF
VA69D-18-B-1635-A00005003.pdf PDF
VA69D-18-B-1635-A00005001.pdf PDF
VA69D-18-B-1635-A00005002.pdf PDF
VA69D-18-B-1635-008.docx DOCX document
VA69D-18-B-1635-A00004001.pdf PDF
VA69D-18-B-1635-A00004002.pdf PDF
VA69D-18-B-1635-A00004003.pdf PDF
VA69D-18-B-1635-A00004000.docx DOCX document
VA69D-18-B-1635-A00003001.pdf PDF
VA69D-18-B-1635-A00003000.docx DOCX document
VA69D-18-B-1635-A00003003.pdf PDF
VA69D-18-B-1635-A00003002.pdf PDF
VA69D-18-B-1635-A00003005.pdf PDF
VA69D-18-B-1635-A00003004.pdf PDF
VA69D-18-B-1635-00002000.docx DOCX document
VA69D-18-B-1635-00002001.pdf PDF
VA69D-18-B-1635-00001000.docx DOCX document
VA69D-18-B-1635-006.pdf PDF
VA69D-18-B-1635-002.docx DOCX document
VA69D-18-B-1635-003.pdf PDF
VA69D-18-B-1635-007.pdf PDF
VA69D-18-B-1635-005.pdf PDF
VA69D-18-B-1635-004.pdf PDF
VA69D-18-B-1635-000.docx DOCX document
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) A00005 01-02-2018 676-18-1-6981-001

676-CSI-001

36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee

WI

53214-1476 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee

WI

53214-1476 To all Offerors/Bidders

VA69D-18-B-1635

11-15-2017

X X X

676-3680162-6981-854200-3220 23CINR000

X

AMENDMENT A00005:

Reference Amendment A00005 continuation page(s) and attachments for additional details.

The location and deadline for bid submission has not changed since the last amendment was published.

Bid opening is TUESDAY, 01/16/2018 at 1:00 p.m. CST

Kristi Kluck Contracting Officer

NCO1215L2-74921

SOLICITATION VA69D-18-B-1635

AMENDMENT 00005

01/02/2018

PROJECT:676-CSI-001 Construct Warehouse
LOCATION:Tomah VA Medical Center in Tomah, WI

Amendment 00005 hereby incorporates the following change(s) into the solicitation package:

A.) VENDOR QUESTIONS, 12/20/2017:

1. Throughout the specs there is requirements for low pollutant-emitting materials. It says to comply with VOC limits specified in Section 01 81 13 Sustainable Construction Requirements.

I have looked through all of the specs and have not found this section. (An example of where this is called for would be Section 07 22 00, 2.2, B, 2.) Could you provide this section?

VA REPLY: See attached Spec Section 01 81 13

1. Section 07 22 00, 2.1, A, 1 calls for an overall average R-Value of R-33 minimum. Are you looking for an average R-33 or a minimum R-33?

VA REPLY: Average R-33 (Minimum) per specification 07 22 00, paragraph 2.1.A.1

1. Section 07 22 00, 3.5, B states that there is a concrete deck. I have not found any concrete decks on the roof plans or roof framing plans. Are there any concrete decks and if so could you provide a location?

VA REPLY: No concrete decks.

1. Section 07 22 00, 3.6, H calls for multiple methods of installation. Can you provide clarity on which method of insulation installation is to be used?

VA REPLY: Method 1 - Adhered insulation.

1. Section 07 53 23, 2.4, F calls for water based bonding adhesive. Because the window of time that water based adhesives can be used is limited, can we provide standard solvent based bonding adhesive? If solvent based is not approved because low pollutant-emitting material requirements are a concern, can we provide Low-VOC bonding adhesive?

VA REPLY: Provide water-based adhesive, as specified.

1. Section 07 53 23, 2.3, A, 2 states to see Section 09 06 00 Schedule of Finishes for the membrane color. This section is not provided in the specs. Can you provide this section or provide the color of membrane to be used?

VA REPLY: Membrane shall be WHITE.

1. Section 07 53 23, 2.5 gives details for fasteners to be used with concrete pavers. There is no detail on the roof plan showing concrete pavers. Can you confirm that there are no pavers on the roofing portion of this project?

VA REPLY: There are pavers shown on the roof plan (from roof hatch and around PV array.

1. Section 07 53 23, 2.6 calls for a 6mil separation sheet. Previously in Section 07 22 00, 2.5, A. a 40mil self-adhering vapor barrier is called for. Can you clarify which takes precedence?

VA REPLY: The separation sheet is required under ballast/roof paver. Separation sheet is not required under ballast due to fully adhered system. A separation sheet is required under the roof pavers.

1. Section 07 22 00, 2.5, B. Calls for a substrate board. Is the substrate board being included to achieve a certain Fire Rating or is it included to provide an acceptable base to adhere the vapor barrier? If it is to provide a base for the vapor barrier, Carlisle and Versico have a self-adhering vapor barrier that is approved to adhere directly to the metal deck. Can we take this substrate board out of the roofing assembly?

VA REPLY: The substrate board is to be mechanically attached & provide flat surface for fully adhered roof system. Vapor barrier should be adhered to the top of the substrate board.

If there are any open, un-answered questions a contractor has submitted, please send a follow-up e-mail to Kristi.Kluck3@va.gov.

Location and date for the public bid opening has NOT changed since the last amendment was issued. Bids are due no later than the public bid opening start time of Tuesday, January 16, 2018, 1:00 p.m. CST at 115 S. 84th Street - Suite 101, Milwaukee, WI 53214-1476.

List of Attachments:

See attached document: S06 Att1 P01 SOW_Att1a Vol1 Bid SPECS_01.02.2018 676-CSI-001 Part TOC.

See attached document: S06 Att2 P01 SOW_Att1a Vol1 Bid SPECS_01.02.2018 676-CSI-001 Part 018113.

See attached document: S06 Att3 DOL Wage Rates.Rev 2017.12.22 as of 2018.01.02.

File details come from the government source that posted it.