VA118-10-RP-0052_IndustryDayBrief.pdf
PDF 682 KB Posted
- Attached to
- Transformation Twenty-One Total Technology (T4)
- Solicitation number
- VA11810RP0052
About this file
T4 Industry Day Brief
View the file
Other files
Show 40 more
Latest 50 of 81 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Transformation Twenty-One Total Technology (T4)
INDUSTRY DAY
April 23, 2010
Sharon Fernandes Contracting Officer
Technology Acquisition Center
(732) 578-5431
Email: Sharon.fernandes@va.gov
Administrative Remarks
Ask Questions – Cards distributed during registration
Briefings, Q&A, Attendee List, etc. will be posted online at the following websites under VA118-10-RP-https://www.fbo.gov/ http://www1.va.gov/oamm/oa/tac/
Restrooms
No Smoking
Please Put All Beepers/Cell Phones in Silent Mode
Lunch Options
Boxed lunch
Concord Café
JR’s
McDonald’s – left on Hwy 35
Houlihan’s – right on Hwy 35
Quizno’s – right on Hwy 35
Technology Acquisition Center (TAC)
Sharon Fernandes, Contracting Officer
Brandon Utt, Contract Specialist
Ed Erskine, Technical Representative
Michael Hier, Contracting Representative
Industry Day Agenda
April 23, 2010 – Sheraton Hotel, Eatontown, NJ
8:00-8:15 - Administrative Remarks
8:15-8:30 - Welcome – Mr. Glenn Haggstrom
8:30-9:15 - Proposed Acquisition Strategy – Sharon Fernandes
9:15-9:30 – Organizational Conflict of Interest – Robert Russo
9:30-10:00 - Technical Requirements – Ed Erskine
10:00-12:00 – Questions and Answers
Industry Day Agenda
April 23, 2010 – Sheraton Hotel, Eatontown, NJ
12:00-12:30 – Lunch/Networking
12:30-1:30 – Small Business Session – Sharon Fernandes
1:30-2:00 – Office of Small and Disadvantaged Business Utilization – Frances Bond
WELCOME TO T4
INDUSTRY DAY
Mr. Glenn Haggstrom, Executive Director
Department of Veterans Affairs
Office of Acquisition, Logistics & Construction
Proposed Acquisition Strategy
Sharon Fernandes, Contracting Officer
Department of Veterans Affairs
Technology Acquisition Center
What is T4?
T4 is:
Contractor-provided solutions in support of information technology and telecommunications, Task Areas include: program management and strategy planning, systems/software engineering, enterprise network, cyber security, operation and maintenance and IT facility support.
Program ceiling $12B
Five-year Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Task Order (MATO) contract
Individual Task Orders shall be issued on a best value, performance-based Time-and-Materials (T&M), Cost Reimbursement (CR), and/or Firm-Fixed- Price (FFP) basis
T4 is not:
A Hardware contract
Intended to replace all VA’s IT service contracts 10
Why T4?
T-21 Assessments identified a need to rapidly respond to requirements gaps.
Supports Program Management Accountability System (PMAS)
Savings for the Government – reduced cycle time, fewer source selections, increased savings associated with contract administration, overhead, program management, and competition in a post award environment
Provides a vehicle to bring service dollars currently going directly to GSA or other agencies under VA oversight and control
Provides greater insight to industry of VA’s total information technology needs resulting in better solutions
MARKET RESEARCH
Market Research
Disciplined process & analysis
Supports acquisition and small business strategy
Responses to market survey
Industry Day feedback
One-on-One sessions
Meetings with industry
Other sources
Market Research
NAICS 541512 – Computer Systems Design Services
This U.S. industry comprises establishments primarily engaged in planning and designing computer systems that integrate computer hardware, software, and communication technologies. The hardware and software components of the system may be provided by this establishment or company as part of integrated services or may be provided by third parties or vendors. These establishments often install the system and train and support users of the system.
Predominant requirement
Representative of industry sector
Market survey feedback
PROPOSED ACQUISITION STRATEGY
Proposed Acquisition Strategy
BASIS FOR AWARD
Award will be made on a best value basis
Evaluation Factors will include: Technical, Past Performance, Price, Veteran Involvement, and Small Business Participation Plan
Sample Tasks – Technical Factor
Anticipate awarding up to 15 prime contracts
Small Business Reserve
Two-step source selection process
Two Step Source Selection Process
SDVOSBs and VOSBs will be given the opportunity to compete
(1) in the open market
(2) reserve – competition among only SDVOSBs and VOSBs
Two-step source selection process
Step One The Government will select for award from those proposals included within the competitive range without regard to the size of the offeror.
If 4 SDVOSB offerors and 3 VOSB offerors are selected for award, no further progression to step 2 will be required.
Step Two If 4 SDVOSB offerors and 3 VOSB offerors are not selected for award, large business and non-SDVOSB/VOSB offerors will be eliminated from further consideration.
The Government will award contracts up to 4 SDVOSB and 3 VOSB offerors remaining in the competitive range.
If none of the proposals remaining in the competitive range are from SDVOSB or VOSB offerors, the Government reserves the right to make no further awards.
Acquisition Strategy
Aggressive Small Business Subcontracting goals for all offerors Proposed goals will be made part of the contract
Task order competitions will consider past performance as well as meeting subcontracting goals
For the purpose of meeting our contracting goals, the Government will set-aside at the task order level
PROPOSED CONTRACT/TASK ORDER
REQUIREMENTS
Request for Task Execution Plan (RTEP)
Yes/No Bids within two (2) working days
Submission of Task Execution Plan within (7) working days
Proposal Submission shall include: Summary, Technical Approach, Veterans Involvement, Pricing, Schedule, and Metrics
Proposal Submission may vary dependent upon Task Order Type: Firm Fixed Price, T&M, or Cost Reimbursement
No Past Performance Volume required
Contractor Reporting Requirements
Monthly Status Report
Contract Performance Report
Government Furnished Equipment Report
Subcontracting
Proposed Meetings and Reviews
Project Office Initial Program Reviews
Post Award Conferences
Monthly Program Reviews
Quarterly Prime Program Reviews
Task Order Kickoff Meetings
Acquisition Timeline
MILESTONES
Request for Proposal (RFP) Release – May 31, 2010
Proposals Due – June 30, 2010
Contract Award – September 30, 2010
ORGANIZATIONAL CONFLICT
OF INTEREST
Robert Russo, Staff Attorney Department of Veterans Affairs
Office of General Counsel
ORGANIZATIONAL AND CONSULTANT
CONFLICTS OF INTEREST
FAR SUBPART 9.5
VAAR CLAUSE 852.209-70 ORGANIZATIONAL CONFLICTS OF INTEREST (OCI)
Addresses conflicts that may occur as a result of the solicitation, not future conflicts arising from any work to be performed under the resulting contract.
Requires offerors to provide a statement that describes all relevant facts concerning any past, present or currently planned interest (financial, contractual, organizational, or otherwise) or actual or potential organizational conflicts of interest relating to the services to be provided under this solicitation.
T4 TAILORED ORGANIZATIONAL CONFLICTS OF INTEREST CLAUSE
Per FAR 9.507-1 and VAAR 809.507-1 (a) places restraints upon a contractor’s eligibility for future contracts.
ORGANIZATIONAL CONFLICT OF INTEREST
DEFINITION
FAR 2.101, an organizational conflict of interest means that because of other activities or relationships with other persons, a person is unable or potentially unable to render impartial assistance or advice to the Government, or the person’s objectivity in performing the contract work is or might be otherwise impaired, or a person has an unfair competitive advantage.
THREE MAJOR CATEGORIES OF
PROHIBITED OCIs
IMPAIRED OBJECTIVITY
BIASED GROUND RULES
UNEQUAL ACCESS TO INFORMATION
IMPAIRED OBJECTIVITY OCI
Contracts for the evaluation of offers for products or services shall not be awarded to a contractor that will evaluate its own offers for products or services, or those of a competitor, without proper safeguards to ensure objectivity to protect the Government’s interests. FAR 9.505-3.
The concern is that the firm’s ability to render impartial advice to the Government could appear to be undermined by its relationship with the entity whose work product is being evaluated.
BIASED GROUND RULES OCI
These occur when a firm as part of its performance of a Government contract has in some sense set the ground rules for the competition for another Government contract by, for example, writing the statement of work or the specifications.
Primary concern is that the firm could skew the competition, whether intentionally or not, in favor of itself. FAR 9.505-1, 9.505-2.
These situations may also involve a concern that the firm, by virtue of its special knowledge of the agency’s future requirements, would have an unfair advantage in the competition of those requirements.
UNEQUAL ACCESS TO INFORMATION OCI
These occur when a firm has access to nonpublic information (usually proprietary information belonging to other contractors) as part of its performance of a Government contract and where that information may provide the firm with an unfair competitive advantage in a later competition for a Government contract. FAR 9.505.
Does the information known to a competitor (prospective contractor or subcontractor) confer a competitive advantage?
Is the information unknown to other potential offerors?
Technical Requirements
Ed Erskine, Technical Representative
Department of Veterans Affairs
Acquisition Rapid Response Office
The T4 PWS has been structured to reflect the breadth and depth of Information Technology (IT) services spanning the life cycle of a system or project
The T4 PWS has been written to accommodate the breadth of the Department of Veterans Affairs IT requirements
The PWS provides general requirements for IT services. Specific technologies or services will be defined in individual task orders
T4 Performance Work Statement (PWS) Overview
Major Areas include:
Program Management support Systems/Software Engineering Cyber Security Operation and Maintenance IT Facilities
Tasks Orders may reflect a specific area of the PWS or cover multiple functional areas as functional areas are not mutually exclusive
T4 PWS Overview
December 1, 2009 the TAC issued a Request for Information (RFI) on the PWS (industry comments reviewed and revisions made)
February 17, 2010 the TAC issued an RFI for Market Research (industry comments reviewed and revisions made)
April 19, 2010, the TAC posted the latest draft T4 PWS to industry
T4 PWS Chronology
The PWS is broken into different sections:
Applicable Documents are listed within Paragraph 2.0 (Specific task orders may impose additional applicable documents)
Technical Functional areas of paragraph 4.0 define the services that a Contractor team will need to perform
General Technical and contractual requirements are defined in the remainder of the document
T4 Technical Requirements
Areas of note for VA specific tasks:
Para 3.8, must comply with Project Management Accountability System (PMAS)
PMAS is a performance based Project Management discipline PMAS mandates all new IT projects use an incremental development approach with delivery of new functionality to the customer in cycles of 6 months PMAS is to be used in concert with the ProPath IT Project
Management tool
Areas of note for VA specific tasks (cont.):
In Para 3.8, Contractors shall support the VA Enterprise Framework and comply with the OI&T Technical Reference Model
Para 6.0 and Addendum A refers to the security requirements.
Note that a new VA Information Assurance (IA) Security Handbook
6500.6 was published on March 12, 2010 which is referenced in the PWS
The goal is to provide applicable documents and links to PMAS and ProPath in a bidder’s document library
T4 Technical Functional Areas
4.1 Program Management (PM), Strategy, Enterprise Architecture and Planning Support:
This functional area is to provide Program and Project Management, monitoring and analysis, strategy, enterprise architecture and planning support. These services may be at the enterprise or on an individual project level. Individual requirements include the following:
Strategy and Planning Standards, Policy, Procedure and Process Development Requirements Development and Analysis Support Requirements Packages Technology Refresh and
Configuration Reviews Studies and Analyses
Program Management Support Product Data IT Services Management
Guidance Development Toolkit Guidance
4.2 Systems Software Engineering:
This functional area is to provide systems/software engineering support for any or all phases of a system/software lifecycle and can cover the entire range of VA systems to include healthcare information processing, payroll processing, decision support systems etc. Individual requirements include the following:
Design and Development Architecture Development IT Service Management
Implementation Enterprise
Application/Services Web Application Design and
Development Human-Computer Interaction System/Software Integration
Modeling and Simulation Informatics Services Engineering and Technical
Documentation Current System and Data
Migration Development Toolkit Support
4.3 Software Technology Demonstration and Transition:
This functional area is to test and evaluate advanced technologies. Specific requirements include the following:
Demonstrations and transition support Compare new technologies against current systems Transition effective technologies into use Potential technologies that can be explored are:
Software Architectures Databases Web Based Apps Enterprise Solutions Wireless Security
4.4 Test and Evaluation Support:
This functional area is to provide support in all phases of the testing life cycle.
Specific requirements include the following:
Prepare test plans and procedures Design test cases Conduct and witness tests and provide tech support Coordinate test plans IAW applicable regulations Analyze/evaluate/document test results Participate in all technical reviews, as required.
4.5 IV&V:
This functional area is to review, evaluate and verify the procedures used to develop and test third party systems/software.
4.6 Enterprise Network Support:
This functional area is to provide comprehensive life cycle systems/network administration for VA enterprise systems worldwide that may include:
Additionally, this functional area is to provide complete services for the planning, designing, delivering and maintenance for the following systems:
Data Comm Systems Voice Systems Video Systems
LAN/WAN Systems Transmission Systems
Information Systems Storage Systems
Security Systems Network Systems
4.7 Enterprise Management Framework:
This functional area is to support the execution of the enterprise management framework. Specific requirements include the following:
Development of open database connectivity to a federal repository Performance, functionality and validation testing of technologies Testing to compare multiple vendors Evaluation of emerging technologies that enable efficiencies Development of solution driven architecture Analyze compliance to organizational technical standards
4.8 Cyber Security:
This functional area is to define and deliver strategic, operational and process aspects of cyber security and to ensure that adequate LAN/Internet, data, information and system security are in accordance with organizational standard operating procedures, conditions, laws and regulations. Specific requirements include the following:
• Information Assurance
• Logical Security
• Certification and Accreditation
• Security Operational Support
4.9 Operations and Maintenance:
This functional area is to operate, repair and maintain systems, applications, and IT environments in support of applications and/or system components for production environments. Specific requirements include:
System Administration Network Administration Application Support Hardware Support Security Management Disaster Recovery/COOP Capacity/Availability Planning and Management
Service/Help Desk/Call Center Support License Maintenance Service Level Agreements Database/Data Warehouse
Administration Data Center Administration
4.10 Training:
This functional area is to identify training requirements and to obtain, develop or conduct training programs throughout the life cycle of a system, application or product. Specific requirements may include:
Develop training plans, manuals, and other documentation Conduct training on the entire spectrum of IT systems Incorporate Electronic Training Tools
4.11 IT Facilities:
This functional area is to provide a total IT solution to the customer. Requirement does not include performing significant facility or building modification. Specific requirements may include:
Incidental Facility Design and Modification Services Site Surveys Facility Cabling Installation Physical Security Systems
Facility work will not be done without prior approval of the appropriate agencies
T4 PWS Summary
The T4 PWS is a broad and comprehensive list of requirements that define the necessary functional areas that will support the transformation of VA IT
The T4 PWS contains the general functional areas. Specific requirements will be provided in individual task orders
The Government welcomes industry questions/comments.
Thank you for the comments you have already provided
QUESTIONS & ANSWERS
Ground Rules
Questions submitted on cards provided
TAC Representatives shall gather from audience
Government shall caucus to answer
Contracting Officer shall brief out Government responses
SMALL BUSINESS SESSION
Reserve Process Example
Step One:
Example: Through the best value source selection process, the Government selected the most highly rated proposals without regard to the size of the offeror:
Offeror A Large Business Offeror F VOSB
Offeror B Large Business Offeror G VOSB
Offeror C Large Business Offeror H Small Business
Offeror D SDVOSB Offeror I Small Business
Offeror E SDVOSB
Since only 2 SDVOSBs and 2 VOSBs were selected from the most highly rated proposals, the source selection process will continue to Step Two.
Reserve Process Example (Cont.)
Step Two:
Large business and non-SDVOSB/VOSB small business offerors are eliminated from further consideration.
Remaining Competitive Range:
Offeror J SDVOSB Offeror N VOSB
Offeror K SDVOSB Offeror O VOSB
Offeror L SDVOSB Offeror P VOSB
Offeror M SDVOSB
In order to satisfy the 4 SDVOSB reserve awards, from which 2 SDVOSBs were previously selected in Step One, 2 SDVOSBs will be selected from the remaining offerors in the competitive range.
Reserve Process Example (Cont.)
Step Two continued:
In order to satisfy the 3 VOSB reserve awards, from which 2 VOSBs were previously selected in Step One, 1 VOSB (including SDVOSBs) will be selected from the offerors remaining in the competitive range.
Remaining Competitive Range:
Offeror L SDVOSB
Offeror M SDVOSB
Offeror N VOSB
Offeror O VOSB
Offeror P VOSB
Frequently Asked Questions
1. Does the Government intend to separate the Program Management, Testing, and Independent Validation and Verification Tasks from the T4 PWS?
A. No, the Government intends to include the functional areas as stated in the technical briefing.
2. Will proposal submissions be mandated to be electronic?
A. Yes.
3. Why does the Performance Work Statement lack specific details regarding the task areas?
A. The PWS serves as an overarching description of the functional areas comprising the T4 effort. At the task order level, requirements will be specified in greater detail.
4. Will the required levels for technical standards such as Earned Value Management, ANSI , CMMI, ISO, IPv6 be further defined?
A. Currently the technical standard concerns are being reviewed.
5. Can an offeror submit a proposal as a prime as well as be a team member for another prime offeror?
A. Yes.
6. Are there any restrictions on Small Business Contracting Teaming Arrangements?
A. Since the proposed acquisition strategy provides for full and open competition with reserve awards to SDVOSBs/VOSBs, there are no restrictions with regard to small business teaming arrangements since the Limitation on Subcontracting clause does not apply.
Frequently Asked Questions
7. Will Mentor Protégé agreements be considered?
A.Yes, currently the acquisition strategy is considering the incorporation of Mentor Protégé agreements.
8. Is the Government requesting feedback from industry regarding the labor category types and descriptions?
A. The Government intends to issue a draft solicitation thereby giving industry the opportunity to submit questions for Government consideration.
9. Will there be overtime rates incorporated into the contract?
A. No.
10. Will any of the OCONUS locations include hostile areas and/or warzones?
A. The T4 acquisition strategy is to support VA requirements.
12. Will the Government consider multiple awards in each functional area?
A. No.
13. What will the requirement be regarding Past Performance Volume submission?
A. Prime offerors will be required to submit their recent and relevant past performance as well as the past performance of their major subcontractors.
Instances of past performance at either the prime or subcontractor level can be submitted. 56
Office of Small and Disadvantaged Business Utilization
(OSDBU)
Frances M. Bond Small Business Specialist
Today’s Topics
• VA Mission
• Procurement Preference Goals
• VetBiz and CCR
• Contracting & Subcontracting Opportunities
• Marketing to Prime Contractors / VA
• Joint Venture Agreements
VA Mission “With malice toward none, with charity for all, with firmness in the right as God gives us to see the right, let us strive on to finish the work we are in, to bind up the Nation’s wounds, to care for him who shall have borne the battle, and for his widow and orphan, to do all which may achieve and cherish a just and lasting peace among ourselves and with all nations.”
--Abraham Lincoln
FY 2009 Socioeconomic Procurement Preference Goals
Category Statutory VA Accomplishment
Small Business 23% 28.70%
Small Disadvantaged Business (including Section 8(a))
5% 8.71%
Women-Owned Small Business 5% 3.42%
Veteran-Owned Small Business None 19.28%
Service-Disabled Veteran- Owned Small Business 3% 16.28%
HUBZone Small Business 3% 2.02%
VA Hierarchy of Small Business Programs* (Open Market Acquisitions**)
It is the policy of the VA that firms in the following categories be given maximum practicable opportunity to participate in our acquisitions, including subcontracting:
1. Service-disabled Veteran-owned firms***
2. Veteran-owned firms***
3. HUBZone firms and Small Disadvantaged Businesses (tied)
4. All others (including general small business)
*P.L. 109-461 ***Registered in www.VetBiz.gov
**Not applicable to FSS, Federal Prison Industries, Ability One. 61
P.L. 109-461 Set-Aside Authorities
SDVOSB:
Competitive – Unlimited by dollar value
Sole-Source – Limited to $5 million
VOSB:
Competitive – Unlimited by dollar value
Sole Source – Limited to $5 million
CCR and VetBiz
– It is vital that Contractors be registered in the www.CCR.gov web page
– It is vital that SDVOSB Contractors and VOSB Contractors be registered in both www.ccr.gov and www.VetBiz.gov
–Why?
http://www.ccr.gov/ http://www.ccr.gov/ http://www.vetbiz.gov/
Prime Contractors
• When is a Subcontracting Plan required?
(Ref: FAR 19.7)
– When a Construction Contract or modification is expected to exceed $1,000,000 ($550,000 for other types of contracts)
Subcontractors - Improve Your Chances Service-Disabled Veteran-Owned & Veteran-Owned Small Business need to be registered on both www.CCR.gov and www.VetBiz.gov
Small Businesses need to market their capabilities, expertise, experience, and commitment to potential prime contractors. The Prime Contractors need quality subcontractors who will also help them achieve the socio-economic goals that are established in the subcontracting plans they submit to the VA.
In addition to SDVOSB and VOSB status, if you have 8(a) / SDB
Certification or HUBZONE certification, be sure to let the potential prime contractors know. Of course, your foremost marketing efforts to them must stress your capabilities, experience, pricing competitiveness, and your ability to get the job done right and on time.
http://www.ccr.gov/ http://www.vetbiz.gov/
Joint Ventures
• SDVOSB and one or more other business concerns may submit an offer on a competitive procurement if each company is:
– A Small Business under the size standard to the NAICS code for the procurement
• Revenue Base – Procurement exceeds half the size standard to the NAICS assigned to the contract
• Employee Based – Procurement exceeds $10,000,000
Joint Ventures (continued)
• Other Factors of JV agreement:
– SDVOSB must be the managing partner
– Employee of the SDVOSB must be project manager
– 51% of profits distributed to SDVOSB
– JV agreement must obligate all parties to ensure performance
– Final records kept by SDVOSB for JV
– Contract execution in the name of the JV
VA Office of Small & Disadvantaged Business Utilization www.va.gov/osdbu / 1-202-461-4300
Frances.Bond@va.gov / 1-202-461-4260
VA Center for Veterans Enterprise
1-866-584-2344 www.VetBiz.gov http://www.va.gov/osdbu / mailto:Frances.Bond@va.gov
CLOSING REMARKS
File details come from the government source that posted it. Updated .