This solicitation requests offers for the regular overhaul and dry-docking of the USNS BURLINGTON (T-EPF 10) at the contractor's shipyard. The contractor will be responsible for planning and accomplishing all specified work items within 66 calendar days of the vessel's arrival. Work includes categories of hull structure, propulsion machinery, electrical systems, auxiliary systems, communications and navigation aids, outfitting and habitability, HVAC, and dry-docking services. The solicitation identifies labor categories, material requirements, inspection and acceptance criteria, and delivery terms. Pricing must be provided for category A work items along with additional government-required labor, other direct costs, and optional category B work items if exercised. The closing date for offers is 18 June 2021. The solicitation was issued by the Department of the Navy Military Sealift Command.

View the file

Other files for this federal contract opportunity

Other files attached to USNS BURLINGTON ROH / DD, newest first.
File Type Posted
USNS BURLINGTON ROH DD N3220521R4190 AMENDMENT 0004.pdf PDF
Q AND A Responses 37.pdf PDF
Q AND A Responses 34.pdf PDF
Q AND A Responses 36.pdf PDF
USNS BURLINGTON ROH DD N3220521R4190 AMENDMENT 0003.pdf PDF
Q AND A Responses 3 REV ( 10 JUNE 2021).pdf PDF
Q AND A Responses 29.pdf PDF
Q AND A Responses 19.pdf PDF
Q AND A Responses 16.pdf PDF
Q AND A Responses 14.pdf PDF
Q AND A Responses 13.pdf PDF
Q AND A Responses 10.pdf PDF
Q AND A Responses 31.pdf PDF
Q AND A Responses 30.pdf PDF
Q AND A Responses 26.pdf PDF
Q AND A Responses 23.pdf PDF
Q AND A Responses 18.pdf PDF
Q AND A Responses 17.pdf PDF
Q AND A Responses 11.pdf PDF
Q AND A Responses 8.pdf PDF
Q AND A Responses 22.pdf PDF
Q AND A Responses 1 REV (10 JUNE 2021).pdf PDF
Q AND A Responses 33.pdf PDF
Q AND A Responses 32.pdf PDF
Q AND A Responses 28.pdf PDF
Q AND A Responses 24.pdf PDF
Q AND A Responses 20.pdf PDF
Q AND A Responses 9.pdf PDF
USNS BURLINGTON ROH DD N3220521R4190 AMENDEMENT 0001.pdf PDF
Q AND A Responses 2.pdf PDF
Q AND A Responses RFE.pdf PDF
Q AND A Responses 6.pdf PDF
Q AND A Responses 3.pdf PDF
Q AND A Responses 7.pdf PDF
Q AND A Responses 5.pdf PDF
Q AND A Responses 4.pdf PDF
J - 2 Category A Items BURLINGTON 21R4190 REV 1.xlsx XLSX spreadsheet
J-6.zip ZIP file
J - 13 Past Performance Questionnaire - BURLINGTON 21R4190.docx DOCX document
J - 8 Request for Spec Clarification - BURLINGTON 21R4190.doc DOC document
J - 11 Dry Dock Evaluation Form - BURLINGTON.docx DOCX document
J - 14 Technical Data Non-Disclosure - BURLINGTON 21R4190 (1).docx DOCX document
J - 9 Disclosure of Lobbying Activities - BURLINGTON 21R4190.doc DOC document
J - 12 Past Performance Data - BURLINGTON 21R4190.doc DOC document
J-13 Past Performance Questionnaire - BURLINGTON 21R4190.docx DOCX document
J - 2 Category A Items BURLINGTON 21R4190.xlsx XLSX spreadsheet
J - 3 Category B Items - BURLINGTON 21R4190.xls XLS spreadsheet
J-4 GFP BURLINGTON 21R4190.xlsx XLSX spreadsheet
J-1 WORK ITEMS LIST FOR BURLINGTON 21R4190.docx DOCX document
J- 7 MSC Ship Repair Facility Survey - BURLINGTON 21R4190.docx DOCX document
Show all 50

USNS BURLINGTON ROH / DD has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 03:00 PM local t ime 18 Jun 2021

X

A X B X C X D

EX

X

G F 39 - 51

52 - 60 H 61 - 70 alvinia.jenkins@navy .mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 70

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N32205 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 0 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

N/A - Received VIA DoD SAFE conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

ALVINIA JENKINS (757) 443-5881

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 9

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

10 - 18

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

21 X K REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 22 - 24 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

25 - 37

PART II - CO NTRACT CLAUSES

MILITARY SEALIFT COMMAND NORFOLK

SUBMITT INVOICES

IAW CONTRACT

MSC NORFOLK VA 23511-4419

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

19 May 2021

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N3220521R4190

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

FFP

Category "A" WIs

FFP

Prepare for and accomplish the ROH/DD of the USNS BURLINGTON (T-EPF 10) Total Category "A" WIs $_____________ Proposed unit price per KWh of electrical shore power $_____ IAW WI 0011, 7.1.1 Proposed unit price per gallon of potable water $______ IAW WI 0011, 7.1.3 Proposed unit price per gallon of distilled water $______ IAW WI 0011, 7.1.4 Proposed unit price per gallon of bilge water removal $______ IAW WI 0011, 7.1.18 Proposed unit price per crane usage $______ IAW WI 0011, 7.9 Proposed Hazardous Waste handling fee rate IAW WI 0023, 7.4. ______%

CDRLs FOR CLINs INCLUDING OPTION CLINs, IF EXERCISED:

The data to be furnished hereunder shall be prepared and submitted IAW the CDRL, DD Form 1423, Exhibit A, attached hereto. The CDRLs form a part of the schedule of this solicitation.

SEE PARAGRAPH 1.

FOB: Destination

NET AMT

FFP

AGR and ODC

FFP

AGR

(5,000) man-hours @ $________ per man-hour = $_____________

ODC

Base $500,000.00 Proposed G&A Rate _______________% Subtotal: $_____________ Proposed Profit Rate _______________% Subtotal: $_____________

SEE PARAGRAPH 2, 3, AND 4.

OPTION

FFP

Category "B" WI 0025

FFP

WI 0025 - Physical Security at Private Contractor's Facility in FPCON Charlie - Delta

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

SEE PARAGRAPH 5.

OPTION

FFP

Category "B" WI 0030

FFP

WI 0030 - Continuation of Services

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

TOTAL PROPOSED PRICE FOR CLINS 0001 THROUGH 0004

The contractor shall enter the total proposed price of all CLINs.

SEE PARAGRAPH 5.

SECTION B

SECTION B

1. Attachment J-2, Category “A” WIs, provides a WI breakdown of CLIN 0001 pricing.

2. AGR and ODC

a. This CLIN contains the FBLR (e.g., G&A, overhead, profit, supervision, consumables, and/or support functions, etc.) and the ODC profit and G&A rate. These rates are used for pricing changes negotiated during the contract. Changes are inherent to vessel repair contracts and should be expected by Contractors. Additionally, this CLIN includes G&A and profit rates for ODC to be used for negotiating changes. These rates shall prevail even when the contract is extended/modified. The number of AGR man-hours and the ODC base amount are estimates that were generated for evaluation purposes. The actual amounts of man-hours and ODC may be used interchangeably under the contract which could result in a distribution and amount of man-hours and ODC that is either higher or lower than that stated in CLIN 0002. Any additional AGR or ODC required beyond the CLIN 0002 estimated amount shall be added through contract modification using the same AGR and ODC rates agreed upon at contract award. Any unused AGR or ODC will be de-obligated from the contract at the same AGR and ODC rates agreed upon at contract award. The contractor agrees that the number of man-hours included in its proposed price for such AGR shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the Journeyman level expended in direct production as exemplified by the following functions:

Abrasive cleaning/blasting Tank cleaning

Welding Machinists (inside and outside) Burning Brazing Carpentry Electrical work Electronic work Shipfitting

Lagging Painting Boilermaking Pipefitting Sheetmetal work Engineering Rigging Staging/scaffolding General labor Fire Watch

b. Direct production man-hours will not include those functions (whether charged directly or indirectly by the contractor’s accounting system) which are defined herein as support for production functions. Necessary support functions shall be considered to be included in the offeror's FBLR for direct production man-hours. Examples of support functions include:

Testing Quality Assurance

Planning Cleaning (except tank cleaning) Material handling & warehousing Security Surveying Administration Transportation Purchasing staff Lofting Other indirect support Supervision

c. Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor's FBLR and not separately priced.

d. The rates for profit and G&A on CLIN 0002 above shall be the same rates used by the contractor in its responses to the Request for CCO Proposals issued under this contract. The ACO will apply these rates to the ODCs for each CCO when it is negotiated and settled.

e. The base cost stated in this CLIN does not include profit or G&A rates.

f. This does not include any material cost for Category “A” WIs. The material cost for Category “A” WIs has been included under CLIN 0001.

3. AGR details.

a. The Government may utilize CLIN 0002 for, and not limited to, man-hours generated from a discrepancy found between WIs and the current conditions or a needed repair found during the open and inspect phase of the WI.

This work may consist of supplemental, emergent, or new work. AGR does not include work performed pursuant to DFARS 252.217-7005 - Inspection and Manner of Doing Work, 252.217-7013 - Guarantees, or other contract clauses relating to the correction of defects. The contractor agrees that CLIN 0002 AGR man-hours, if ordered, shall be performed concurrently with CLIN 0001 and any or all Category “B” WIs exercised, during the contract’s performance period, without impacting, accelerating, or causing delay or disruption to the work required by the aforementioned WIs, to any other Government contract, or to any other work in progress for the Government. Work under this CLIN may coincide with ODC, and therefore will be performed concurrently.

b. As a result of a discrepancy found between the WI and the current conditions or a needed repair found during the open and inspect phase of the WI, the contractor may submit a CFR to the ACO and the PPE. As a result of this report submission, the ACO may request a proposal from the contractor. Whenever the Government orders AGR pursuant to this CLIN, the contractor shall submit a price proposal for such work. This proposal shall be submitted within three (3) days of the receipt of the Government's request for a proposal, or within such additional time provided in writing by the ACO. The contractor's failure to submit its proposal within the three (3) day period, or such extended period of time as may be granted, may be considered a failure of the parties to negotiate a fair and reasonable price for the AGR and will permit the ACO to take any of the three (3) options set forth in subparagraph “d” below. AGR proposals shall be priced using the FBLR set forth in Section B, CLIN 0002. The rate established in CLIN 0002 will be used in evaluating the contractor's proposal and for negotiating changes. As part of the contractor’s proposal submission for AGR, the following shall be included:

- FBLR

- Proposed Labor Mix/Categories

- Proposed Man Hours

- Total Proposed AGR

c. Considering FBLRs have been pre-approved in CLIN 0002, proposal evaluation may be limited to: (1) evaluating the mix of labor categories and associated man-hours to ensure that they are reasonable to meet the Government’s minimum requirements in addressing these discrepancies or repairs found; and (2) as a result of the mix of labor categories and man-hours, the subsequent AGR price is fair and reasonable IAW FAR 15.404-1(b) – Price analysis for commercial and non-commercial items. In the event that a fair and reasonable price cannot be negotiated, the ACO reserves the right to procure these ODCs utilizing alternative means described in subparagraph “d”, below.

d. Upon receipt of the contractor's price proposal for the AGR the contractor and the ACO shall negotiate the scope of the effort. If a fair and reasonable price cannot be negotiated between the contractor and the ACO, the ACO reserves the right to:

1) Have the work performed by the Government;

2) Issue a unilateral modification; or

3) Cancel the requirement.

e. The contractor knowingly and voluntarily waives all claims against the Government and/or other third-party contractors for delay, disruption, loss of efficiency, or other impact arising out of or based upon the presence of Government or other contractor employees performing the AGR at the contractor's facility. Furthermore, in cases described in subparagraphs “d.1” and “d.2” above, the contractor waives any right to claims of interference underthe DFARS 252.217-7011 - Access to Vessels.

f. The contractor warrants and hereby certifies that its price for the firm fixed portion of this contract (CLIN0001) does not include any amount for AGR (CLIN 0002). Settlement of AGR (CLIN 0002) will be for the purposeof providing funding. In the event the Government requires additional work, authorization to proceed shall be made only by the ACO. The Contractor is to perform and invoice against CLIN 0002 ONLY for work that has been AUTHORIZED through a settled CCO and incorporated into the contract through a contract modification. All funding remaining on CLINs 0001 through 0004 at contract completion shall be de-obligated.

4. ODC details.

a. The Government may utilize CLIN 0002 for and not limited to, material and equipment generated from a discrepancy found between WIs and the current conditions or a needed repair found during the open and inspect phase of the WI. This work may consist of supplemental, emergent, or new work. ODC does not include work performed pursuant to DFARS 252.217-7005 - Inspection and Manner of Doing Work, 252.217-7013 - Guarantees, or other contract clauses relating to the correction of defects. The contractor agrees that CLIN 0002 ODC, if ordered, shall be performed concurrently with CLIN 0001 and any or all Category “B” WIs exercised, during the contract’s performance period, without impacting, accelerating, or causing delay or disruption to the work required by the aforementioned WIs, to any other Government contract, or to any other work in progress for the Government.Work under this CLIN may coincide with AGR, and therefore will be performed concurrently.

b. As a result of a discrepancy found between the WI and the current conditions or a needed repair found during the open and inspect phase of the WI, the contractor may submit a CFR to the ACO and the PPE. As a result of this report submission, the ACO may request a proposal from the contractor. Whenever the Government orders ODC pursuant to this CLIN, the contractor shall submit a price proposal for such work. This proposal shall be submitted within three (3) days of the receipt of the Government's request for a proposal, or within such additional time provided in writing by the ACO. The contractor's failure to submit its proposal within the three (3) day period, or such extended period of time, may be considered a failure of the parties to negotiate a fair and reasonable price for the ODC and will permit the ACO to take any of the three options set forth in subparagraph “e” below. As part of the contractor’s proposal submission for ODCs, the following shall be included:

Material Equipment

-Part number - Part number -Order quantity - Order quantity -Unit price - Unit price -Total price - Total price

Other Direct Costs not captured above

- Travel

- Per diem (lodging, M&IE daily rates)

- Subcontractor Proposal Breakdown shall include but not be limited to, Material (Part number, Order Quantity, Unit Price, and Total Price), equipment (Part Number, Order Quantity, Unit Price, and Total Price), labor (FBLR, Proposed Labor Mix/Categories, and Proposed Manhours), and ODC (Travel and Per Diem)

The G&A and profit rates proposed shall be the same as the rates provided under CLIN 0002.

c. The contractor shall demonstrate due diligence in the assessment, evaluation, and determination resulting in the proposed utilization of other than local specialized labor resources. Only with ACO approval to proceed will a contractor, technical representative, or subcontractor be reimbursed for reasonable per diem costs (transportation, travel expenses, lodging, meals, and incidental expenses) required in connection with the associated change order.

Per diem costs are considered reasonable, allowable, and reimbursable only to the extent that they do not exceed the allowed per diem rate in effect at the time of travel as set forth in the JTR.

d. Considering G&A and profit rates have been pre-approved in CLIN 0002, proposal evaluation may be limited to: (1) evaluating the mix of ODCs proposed to ensure that they are reasonable to meet the Government’s minimum requirements in addressing these discrepancies or repairs found; and (2) the price is fair and reasonable IAW FAR 15.404-1(b) – Price analysis for commercial and non-commercial items. In the event that a fair and reasonable price cannot be negotiated, the ACO reserves the right to procure these ODCs utilizing alternative means described in subparagraph “e”, below.

e. Upon receipt of the contractor's price proposal for the AGR the contractor and the ACO shall negotiate the scope of the effort. If a fair and reasonable price cannot be negotiated between the contractor and the ACO, the ACO reserves the right to:

1) Have the work performed by the Government;

2) Issue a unilateral modification; or

3) Cancel the requirement.

f. The contractor knowingly and voluntarily waives all claims against the Government and/or other third-party contractors for delay, disruption, loss of efficiency, or other impact arising out of or based upon the presence of Government or other contractor employees performing this work at the contractor's facility. Furthermore, in cases described in subparagraphs “e.1” and “e.2” above, the contractor waives any right to claims of interference under the DFARS 252.217-7011 - Access to Vessels.

g. The contractor warrants and hereby certifies that its price for the firm fixed portion of this contract (CLIN 0001) does not include any amount for the ODC (CLIN 0002). Settlement of ODC (CLIN 0002) will be for the purpose of providing funding. In the event the Government requires additional work, authorization to proceed shall be made only by the ACO. The contractor is to perform and invoice against CLIN 0002 ONLY for work that has been AUTHORIZED through a settled CCO and incorporated into the contract through a contract modification. All funding remaining on CLINs 0001 through 0004 at contract completion shall be de-obligated.

5. Attachment J-3, Category “B” WIs, provides a WI breakdown of CLIN 0003 and 0004 pricing.

Section C - Descriptions and Specifications

DESCRIPTIONS AND SPECIFICATION

ACRONYM TABLE

ABIH American Board of Industrial Hygiene ABR Agreement for Boat Repair ABS American Bureau of Shipping ACO Administrative Contracting Officer AGR Additional Government Requirements AIHA American Industrial Hygiene Association ALT Alternate AMT Amount BLDG Building CCO Contract Change Order CD Compact Disc CDRL Contract Data Requirements List CD-ROM Compact Disc Read-Only Memory CFM Contractor Furnished Material CFP Contractor Furnished Property CFR Condition Found Report CHENG Chief Engineer CFR Code of Federal Regulations CIH Certified Industrial Hygienist CLIN Contract Line Item Number CONUS Contiguous United States CPARS Contractor Performance Assessment Reporting System DBIDS Defense Biometric Identification Systems DFARS Defense Federal Acquisition Regulation Supplement DOD Department of Defense DOD SAFE Department of Defense Secure Access File Exchange DON Department of the Navy EMAIL Electronic Mail ESRS Electronic Subcontract Report System FAPIIS Federal Awardee Performance and Integrity Information System FAR Federal Acquisition Regulation FBLR Fully-Burdened Labor Rate F/CC Fibers Per Cubic Centimeter FPCON Force Protection Condition FTR Federal Travel Regulations G&A General and Administrative GFI-TD Government Furnished Information – Technical Data GFM Government Furnished Material GFP Government Furnished Property GPE Governmentwide Point of Entry IAW In Accordance With ID Identification ISO International Organization for Standardization JTR Joint Travel Regulations KO Contracting Officer KWh Kilowatt Hour LLTM Long Lead Time Material LPTA Lowest Price Technically Acceptable M&IE Meals and Incidental Expenses MSC Military Sealift Command

MSCREP Military Sealift Command Representative MM Millimeter MSRA Master Ship Repair Agreement MTA Mid-Term Availability N/A Not Applicable NCACS Navy Commercial Access Control System NDA Non-Disclosure Agreement NO Number NSP Not Separately Priced ODC Other Direct Costs PAT Proficiency in Analytical Testing PDF Portable Document Format PII Personally Identifiable Information PM Program Manager PPE Principle Port Engineer PRIME Prime Contractor QA Quality Assurance QC Quality Control REV Revision RFC Request for Specification Clarification RFP Request for Proposal ROH/DD Regular Overhaul/Dry-Docking SECNAV Secretary of the Navy SF Standard Form SUB Subcontractor TPSN Time Phased Sequencing Network TWA Time-Weighted Average USC United States Code USCG United States Coast Guard USNS United States Naval Ship VR Voyage Repair WAWF Wide Area Workflow WI Work Item

SCOPE OF WORK

1. The contractor shall prepare for and accomplish the VR, overhaul, or alterations of the USNS BURLINGTON (T- EPF 10) as specified herein and IAW the WI package as provided in Attachment J-1 – WI Package (Specifications).

Unless otherwise specified, all work shall be performed at the contractor’s shipyard.

2. In performing the WIs specified, the contractor shall be responsible for all of the following related work (in case of a discrepancy, the terms and conditions stated in the WIs take precedence over the following terms and conditions):

a. Providing the necessary management, procurement, production, testing, technical capability and resources, and quality assurance services.

b. Ensuring the timely procurement of CFM/CFP and the timely reporting, receipt, storage, installation, and accountability of GFM/GFP IAW FAR 52.245-1 and DFARS 252.211-7007, 252.245-7001, 252.245-7002, 252.245-7003, and 252.245-7004.

c. Using progress measurement systems to determine the physical progress of completed work for each of the elements in the scheduling plan, including material and manpower control, engineering, production, tests and trials IAW the CDRL and the contractor's own Technical Proposal, and the WI package. The progressing system shall permit a direct comparison of the physical progress of completed work to the planned performance measurement baseline for each of the elements in the scheduling plan.

d. Using management procedures and systems to identify behind-schedule conditions and unfavorable schedule variances based on the TPSN submitted with the contractor’s proposal. The applied procedures and systems shall provide timely identification of scheduling problem areas to permit prompt management action to correct unsatisfactory conditions.

e. Developing a performance milestone schedule/critical path chart to measure scheduled performance.

Deviations from the milestone schedule/critical path chart dates in WI 0013 must be submitted to and approved by the KO. A performance milestone schedule and critical path chart shall be developed and submitted IAW the WI Package. The performance milestone schedule shall include and clearly identify primary and parallel critical paths.The resource loaded performance milestone schedule shall include, at a minimum, those milestones identified in WI 0013.

f. Using approved quality control procedures as required by this contract and the WI package to ensure procured material and performed production work conforms to the required quality standards.

g. Ensuring the ship's equipment and systems remain configured to existing baselines with regard to procured material, production work, and software.

h. Applying stringent configuration control procedures to ensure that configuration baselines are maintained for procured material and production work.

i. Providing for staging and storing of material (both Government-furnished and contractor-furnished) and LLTM for use in the availabilities from the date of award.

j. Managing all subcontractors’ performance during the availability. Ensure subcontractor work is to the same quality and standards as expected from the prime contractor. Develop and maintain a subcontractor management plan. The plan shall ensure that all communication and control of subcontractors is maintained by the prime contractor.

k. Employing good judgment and sound engineering practice and principles, particularly when WIs do not describe all details of accomplishing the work. The contractor shall be expected to have, either organically or through subcontractors, access to competent engineers who have a history of working solutions in a maritime environment.

3. Contract work shall be performed by an eligible contractor as defined below.

a. The contractor shall be capable of performing the full scope of the requirement stated herein within its own facilities, utilizing its own shop(s) and work force, or be capable of subcontracting for these elements beyond its managerial, technical, or physical capability or capacity. The contractor shall assume full responsibility for the integrated scheduling, cost, and quality of subcontractor performance.

b. The contractor shall be a company recognized as engaged in ship repair work and possess an organization capable of the full scope of planning, engineering, quality control, shipboard/offship production and component/system testing and trials. The contractor shall provide industry certifications such as: MSRA, ABR, or ISO Certification that would further emphasize the contractor's ability to perform the work. To be determined responsible, the contractor shall submit acceptable evidence to demonstrate its ability to accomplish the work. This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and/or subcontractors) at the time of award. The contractor’s proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm's eligibility for contract award:

1) Administration/Management Control. Established organization geared toward ship repair at all levels of size, value, and complexity, and toward technology innovation and process improvement.

Clear lines of authority. Delegation of responsibility. Mid-level managerial positions in place.

Competent and experienced employees with ship repair experience. Capability to develop and integrate planning, estimating, and scheduling functions. Defined managerial responsibilities for production, quality assurance, material procurement/control, and subcontractor control.

2) Financial Control. Segregation of accounting costs. Adequate accounting system.

Favorable cash flowratios. Availability of a line of credit or other source of financial income to support the work effort. Prompt payment of subcontractors and suppliers.

3) Production Control. A production organization. On board (or ability to obtain) trade mix/skills to perform ship repair work. Control of production efforts. Integration of other key functions with production. Use of scheduling techniques. Methods of progressing. Training available to trades employees.

4) Production Technical Support. Engineering and design support capabilities (in-house or subcontracted) with sufficient capability to diagnose and evaluate technical problems and ssues and to make competent technical recommendations to MSC when necessary and appropriate. The offeror shall be fully cognizant of ABS rules and USCG regulations and how they apply and impact this specification package.

5) Material/Procurement Control. A material purchasing department with staff. Procedures for control of material (purchasing, monitoring, receipt, inspection, segregation, issuance, nonconformance, and disposal). An inventory system – ordering, tagging warehousing.

CFM/GFM storage, control and protection. Existing environmentally-controlled warehouse space.

Material handling equipment. Familiarity with the Navy logistics support system.

6) Subcontractor Control. Procedures for selecting, scheduling, managing, monitoring and controlling subcontractors.

7) Quality Control/Test and Trials. A quality control organization/department/staff. Quality assurance procedures/manual. Calibration and metrology system availability. Test memo writing capability. Nondestructive Testing capabilities. Welding procedures and welders’ qualifications.

Ability to perform trend analysis. Quality control system shall be certified or equivalent to ISO 9001:2001 standards.

8) Safety/Security. Safety Organization/Manager or Engineer. Safety manual/procedures. Safety training. First-aid capabilities or medical services. Fire protection/procedures. Physical yard security/security procedures.

9) Hazardous Material/Waste Control. Proper procedures and facilities to meet the legal requirements for removal, storage, and disposal of hazardous waste. Segregated storage.

Documentation of licensed subcontractors responsible for control of hazardous waste removal, storage, and disposal. Appropriate state/federal agency-issued hazardous waste generator number.

Disposal records which indicate type of material, date, and place of disposal.

10) Facilities. Although facility requirements may vary with the work authorized for a specific ship, the contractor must be a ship repair company that possesses or has available the following facilities:

o Pier, with services in place, accessible to the CLASS size ship for berthing o Structural Shop o Machine Shop o Pipe Shop o Electrical/Electronic Shop o Carpentry Shop o Rigging Equipment o Dry-dock – when required for docking of vessel in performance of the specification

11) Agreements. To be determined responsible, a prospective contractor must possess an MSRA, ABR or submit acceptable evidence in lieu of the aforementioned to effectively communicate and demonstrate its ability to obtain required resources.

c. The government reserves the right to perform a site survey(s) for verification of policies, procedures, capabilities and facilities prior to award.

4. Asbestos removal requirements.

a. During the performance of this contract the contractor and subcontractors may be required to perform work which involves the removal or disturbance of asbestos or asbestos-containing products. This requirement applies to each instance of asbestos removal or disturbance.

b. The contractor shall comply with the precautions required in 29 CFR 1910.1001, 29 CFR 1926.58 and 40 CFR Part 61 and all other applicable Federal, state, and local restrictions. The contractor shall forward a copy of all required notices, licenses and permits to the KO immediately upon issuance or receipt.

c. The latest change to the Federal, state, and local regulations in effect at the time of issuance of the contract shall govern. Compliance with these regulations is mandatory and is necessary to protect the employees of the contractor and Naval personnel from exposure to asbestos fibers in excess of the OSHA Action level airborne concentration (currently 0.1 f/cc of air).

d. During removal or disturbance, the contractor shall control airborne asbestos concentrations outside the removal boundary to less than 0.1 f/cc at all times.

e. After removal or disturbance is complete, the areas within the removal boundary shall not be released for reoccupancy until clearance air sampling demonstrates these spaces have concentrations of asbestos less than 0.1 f/cc.

f. In all respects, the performance of air sampling and analysis shall be performed IAW the OSHA Reference Method (Appendix A of 29 CFR 1910.1001), with the following additional specifications:

1) Aggressive clearance sampling shall be performed on 25 mm cassettes at 2.0 liters per minute for a minimum of four (4) hours.

2) In performing the clearance sampling, the pump shall be placed within the compartment where the removal or disturbance occurred. When this operation is conducted in a multilevel space, at least one pump shall be placed on each level.

3) Air sampling shall be performed by a person competent in sampling procedures and overseen by a CIH by the ABIH.

4) Laboratory analysis of samples shall be performed by a participant in the AIHA PAT Program Rated proficient for asbestos and air.

g. Personal sampling shall be conducted using breathing zone air samples which are representative of the 8-hour TWA exposure of each individual. Samples shall be collected and analyzed using the OSHA Reference Method contained in either 29 CFR 1910.1001 (as amended) or 29 CFR 1926.58 (as amended).

h. The contractor agrees to indemnify MSC for any fines assessed by Federal, state, or local agencies, for the contractor's failure to properly follow applicable regulations.

i. The contractor shall insert this instruction in all subcontracts entered into under this contract.

5. Post-award substitution of any major subcontractor should not be effected unless the proposed substitution is submitted to the KO and official approval is obtained. The post-award substitution or insertion of a second-tier subcontractor will be treated in the same manner as the substitution of a major subcontractor and requires specific approval by the KO.

6. Substitution of key personnel.

a. The contractor agrees to assign to this contract those persons identified as key personnel who are necessary to fulfill the requirements of this contract and whose resumes were submitted with the proposal.

No substitution of key personnel shall be made except IAW these instructions.

b. All proposed substitutions must be submitted, in writing, at least seven (7) days in advance of the proposed substitutions to the KO and must provide the information required by paragraph “c” below.

c. All requests for substitution must provide a detailed explanation of the circumstances necessitating the proposed substitution, a resume for the proposed substitute, and any other information as requested by the KO. All proposed substitutes must have qualifications equal to or higher than the qualifications of the person to be replaced. The KO or his authorized representative will evaluate such requests and promptly notify the contractor of the approval or disapproval thereof.

7. It is anticipated the ship will arrive at the contractor’s yard on or about 01 November 21. All work shall be completedin no more than 66 calendar days from the actual start date designated by the Government at the time of contractaward.

8. The place of performance for this contract shall be the contractor’s facility.

Table 1: List of WIs:

SECTION 000 GENERAL REQUIREMENTS Category

001 INTENT, SCOPE, GENERAL CONDITIONS AND DEFINITIONS NSP

002 TECHNICAL AND MANUFACTURER’S REPRESENTATIVES NSP

003 APPROACH, BERTH, AND MOORING REQUIREMENTS NSP

004 TESTING AND QUALITY ASSURANCE NSP

005 ELECTRICAL SAFETY PROCEDURE REQUIREMENTS NSP

006 HEAVY WEATHER PLAN NSP

007 COLD WEATHER PLAN NSP

024 PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY (NSP) NSP

CATEGORY “A” WORK ITEMS

010 FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT) A

011 FURNISH GENERAL SERVICES A

012 TELEPHONE SERVICES A

013 PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS A

014 PREPARATION OF WEIGHT AND MOMENT REPORT A

015 INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS A

016 FIRE PROTECTION AND SHIP’S SAFETY PROGRAM A

017 HANDLING SHIP’S STORES A

018 DELIVERY AND REDELIVERY OF THE VESSEL A

019 SHIPBOARD ACCESS AND SECURITY A

020 GAS FREE CERTIFICATES A

021 CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES A

022 DOCK TRIALS AND SEA TRIAL A

023 HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR’S FACILITY A

026 VESSEL FINAL CLEANING A

090 DAILY COVID 19 PREVENTION AND CONTROL SERVICES A

CATEGORY “B” WORK ITEMS

025 PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY B

030 CONTINUATION OF SERVICES B

SECTION 100 HULL STRUCTURE

CATEGORY “A” WORK ITEMS Category

101 TEPF_CSI_STRUCTURAL INSPECTION (1 YR) A

102 TEPF_CSI_AVIATION FACILITY SUPPORT A

103 FUEL TANK REPAIR A

104 ALUMINUM WELD REPAIR, CRACK LOG A

105 TEPF_CSI__CSI_FLIGHT DECK TIE DOWN INSPECTION (1 YR) A

152 TEPF_CCSI_ABS ANNUAL SURVEY – TANK INSPECTION A

156 TEPF_CCSI_FLIGHT DECK PRESERVATION (3 YR) A

163 TEPF_CCSI_FLIGHT DECK SAFETY NET INSPECTION AND TEST (1 YR) A

SECTION 200 PROPULSION MACHINERY

CATEGORY “A” WORK ITEMS

201 TEPF_CSI_CLEAN HEAT EXCHANGERS (1 YR) A

202 TEPF_CSI_REDUCTION GEAR SERVICE (1 YR) (SCSI) A

204 TEPF_CSI_PROPULSION LINE SHAFT BEARING INSPECTION

AND MAINTENANCE (1 YR) (SCSI) A

211 WATERJET FLEXIBLE HYDRAULIC HOSE REPLACEMENT A

SECTION 300 ELECTRICAL

CATEGORY “A” WORK ITEMS

302 TEPF_CSI_DISTRIBUTION AND CONTROL PANELS SERVICE AND INSPECT (1 YR) A

320 TEPF_CSI_CLEAN TRANSFORMERS (2.5 YR) A

353 TEPF_CCSI_THERMOGRAPHIC SURVEY (1 YR) A

SECTION 400 COMMUNICATION AND NAVIGATIONAL AIDS

CATEGORY “A” WORK ITEMS

422 TEPF_CSI_HYDROGEN SULFIDE SENSOR REPLACEMENT (3 YR) A

451 TEPF_CCSI_ANNUAL RADAR SERVICE (ABS) A

452 TEPF_CCSI_ANNUAL ECDIS SERVICE (SCSI) A

453 TEPF_CCSI_ANNUAL GYRO SERVICE A

454 TEPF_CCSI_ANNUAL VDR RECERTIFICATION (ABS) A

455 TEPF_CCSI_ANNUAL RADIO COMMUNICATION EQUIPMENT

RECERTIFICATION (ABS) A

456 TEPF_CCSI_MAGNETIC COMPASS SERVICE (2 YR) A

459 TEPF_CCSI_ECHO SOUNDER SERVICE (1 YR) A

460 TEPF_CCSI_ANNUAL INSPECTION OF ALARMS A

SECTION 500 AUXILIARY SYSTEMS

CATEGORY “A” WORK ITEMS

503 TEPF_CSI_SEWAGE PLANT MAINTENANCE (1 YR) A

505 TEPF_CSI_REVERSE OSMOSIS UNIT MAINTENANCE (1 YR) A

509 TEPF_CSI_AIR COMPRESSOR SERVICE (8K HRS) A

511 RIDE CONTROL SYSTEM MAINTENANCE (1YR) (SCSI) A

512 TEPF_CSI_STERN RAMP MAINTENANCE (1 YR) (SCSI) A

514 TEPF_CSI_STERN RAMP HYDRAULIC HOSE REPLACEMENT (2 YR) (SCSI) A

515 TEPF_CSI_FIRE MAIN RELIEF VALVE INSPECTION (3 YR) (SCSI) A

517 TEPF_CSI_VACUUM SEWAGE COLLWCTION SYSTEM MAINTENANCE (1 YR) A

523 TEPF_CSI_STERN RAMP FIBER ROPE REPLACEMENT INTERIM DOCKING A

(5 YR) (SCSI) A

532 INSPECT SUBMERSIBLE BILGE PUMPS A

539 TEPF_CSI_HEF MAINTENANCE (1 YR) (SCSI) A

546 TEPF_CSI_INSPECT DECK CRANES (1 YR) A

561 TEPF_CCSI_GAUGE CALIBRATION (1 YR) A

562 TEPF_CCSI_SCBA ANNUAL INSPECTION A

563 TEPF_CCSI_SCBA AIR COMPRESSOR AND FILLING STATION INSPECTION AND

MAINTENANCE (1 YR) A

565 TEPF_CCSI_FIXED GAS FIREFIGHTING SYSTEM INSPECTION AND TEST

(1 YR) (SCSI) A

567 TEPF_CCSI_FIXED FOAM FIREFIGHTING SYSTEM INSPECTION

(1 YR) (SCSI) A

569 TEPF_CCSI_FIRE & SMOKE DETECTION & ALARM SYSTEM (ANNUAL) A

570 TEPF_CCSI_PORTABLE FIRE EXTINGUISHER SERVICE (1 YR) A

571 TEPF_CCSI_FIRE AND SMOKE DAMPER SERVICE (1 YR) A

573 TEPF_CCSI_FIRE HOSES (1 YR) A

574 TEPF_CCSI_FIRE DOORS AND SHUTTERS (1 YR) (SCSI) A

581 TEPF_CSI_RANGE HOOD FIRE EXTINGUISHING SYSTEM (1 YR) (SCSI) A

590 TEPF_CSI_STERN RAMP OEM SUPPORT (1 YR) (SCSI) A

SECTION 600 OUTFIT, FURNISHING AND HABITABILITY

CATEGORY “A” WORK ITEMS

602 TEPF_CSI_ GALLEY EQUIPMENT INSPECTION AND CALIBRATION (2.5 YR) A

604 TEPF_CSI_MARINE EVACUATION SYSTEM (MES) CERTIFICATION (1 YR) A

605 TEPF_CSI_ FORKLIFT INSPECTION (1 YR) A

606 TEPF_CSI_ LIFE VEST SERVICING, PASSENGER (1 YR) A

607 GENERAL CLEANING & FRESHWATER WASHING A

643 TEPF_CCSI_ ANNUAL RESCUE BOAT AND DAVIT INSPECTION (ABS) A

655 TEPF_CCSI_ IMMERSION SUIT SERVICE (3 YR) A

657 TEPF_CCSI_ACCOMMODATION LADDER INSPECTION (1 YR) A

SECTION 800 HVAC

CATEGORY “A” WORK ITEMS

801A TEPF_CSI_ HVAC AND REFRIGERATION SYSTEM MAINTENANCE (1 YR) A

802 TEPF_CSI_ MACHINERY SPACE PLENUM CLEANING (1 YR) A

805 MISC INSULATION AND LAGGING A

851 TEPF_CCSI_ ANNUAL GALLEY VENTILATION AND GAYLORD HOOD CLEANING A

852 TEPF_CCSI_ ANNUAL LAUNDRY VENT CLEANING A

SECTION 900 DRYDOCK

CATEGORY “A” WORK ITEMS

901 TEPF_CCSI_0901_A_DRYDOCKING AND UNDOCKING (ANNUAL) A

904 TEPF_CSI_ CATHODIC MONITORING SYSTEM INSPECTION MAINTENANCE (1 YR) A

905 TEPF_CSI_ RIDE CONTROL SYSTEM (RCS) MAINTENANCE (2 YR) A

910 TEPF_CSI_ REPLACE ANODES (2.5 YR) A

911 TEPF_CSI_ SPEED LOG SYSTEM MAINTENANCE (2.5 YR) A

929 WATERJET MAINTENANCE A

934 TEPF_CSI_ INSPECT SEA VALVES AND SEA CHEST (2.5 YR) A

966 SHAFT ALIGNMENT AND BEARING CHECKS A

989 TEPF_CSI_ UNDERWATER HULL CLEANING AND PAINTING - SPOT BLAST (2.5) A

SECTION 1000 UNDERWAY REPLENISHMENT GEAR

CATEGORY “A” WORK ITEMS

1001 TEPF_CSI_ UNREPVERTREP EQUIPMENT AND SYSTEM TESTING (1 YR) A

Section D - Packaging and Marking

WOOD PACKAGING MATERIAL (WPM)

WOOD PACKAGING MATERIAL (WPM) - ADDITIONAL DELIVERY INSTRUCTIONS

In accordance with the requirements of International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging Material (WPM). WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames, and cleats. Packaging materials exempt from the requirements are materials that have undergone a manufacturing process such as corrugated fiberboard, plywood, particleboard, veneer and oriented strand board. All WPM shall be constructed from Heat Treated (HT to 56 degrees Centigrade for 30 minutes) lumber and certified by an accredited agency recognized by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org).

All materials must include certification markings in accordance with ALSC standards and be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved "DUNNAGE" stamp. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment of materials at the point of entry.

(end of instructions)

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

252.217-7005 Inspection and Manner of Doing Work JUL 2009 252.217-7006 Title DEC 1991 252.217-7013 Guarantees DEC 1991

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 01-NOV-2021 TO

05-JAN-2022

N/A N/A

0002 POP 01-NOV-2021 TO

05-JAN-2022

0003 POP 01-NOV-2021 TO

05-JAN-2022

0004 POP 01-NOV-2021 TO

05-NOV-2021

52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.247-55 F.O.B. Point For Delivery Of Government-Furnished

Property

JUN 2003

Section G - Contract Administration Data

CLAUSES INCORPORATED BY FULL TEXT

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

INVOICE

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

NOT APPICABLE

https://www.sam.gov/ https://wawf.eb.mil/ https://wawf.eb.mil/

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

INVOICE COMBO

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC N68732 Issue By DoDAAC ____ Admin DoDAAC** ____ Inspect By DoDAAC ____ Ship To Code N62387 Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) N62387 Service Acceptor (DoDAAC) N62387 Accept at Other DoDAAC ____ LPO DoDAAC N62387 DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

MSCHQ_WAWF@NAVY.MIL

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

mailto:MSCHQ_WAWF@NAVY.MIL

(End of clause)

MSC SPECIFIC WIDE AREA WORKFLOW (WAWF) INSTRUCTIONS (AUG 2012)

The information contained in this instruction is supplemental to DFARS 252.232-7006.

The information contained in the table in DFARS 252.232-7006 is for WAWF purposes only. Information included in DFARS 252.232-7006 and this WAWF instruction apply only to WAWF Invoicing and WAWF Receiving Reports. Contradictory information elsewhere in this contract, e.g. Ship to DoDAAC, shall be followed per the terms and conditions of the contract.

When entering the invoice into WAWF, the Contractor shall fill in the DoDAAC fields or DoDAAC extensions exactly as shown in the table in DFARS 252.232-7006. Fields that should not be filled in when entering the invoice into WAWF will be indicated with the direction, “Leave Blank.”

In some situations the WAWF system will pre-populate the “Pay DoDAAC,” “Admin By DoDAAC” and “Issue By DoDAAC.” The Contractor shall verify that those DoDAACs automatically entered by the WAWF system match the information in the table in DFARS 252.232-7006. If these DoDAACs do not match, then the Contractor shall correct the field(s).

If Receiving Reports are required, ensure that the “Inspection” and “Acceptance” defaults of “destination” for both fields are not changed in the WAWF online interface.

The CLINs on the WAWF invoice shall be entered exactly as set forth in the contract document including CLIN number (e.g. 0001), Quantity (may be adjusted for actual quantity or dollar value delivered and invoiced), and Unit Price (e.g. $1.00). The dollar amounts on each CLIN or SubCLIN on the WAWF invoice shall reflect final performance values, but in no instance can the dollar amount for each CLIN or SubCLIN exceed what is specified in the contract document. The Contractor shall bill to the lowest level, e.g., the SubCLIN level. The Quantity and Unit of Measure fields must be filled out exactly as indicated in the CLINs and SubCLINs to reduce the possibility of the invoice being delayed or rejected during processing.

Before closing out of an invoice session in WAWF, but after submitting the document or documents, the Contractor will be given the option to send additional email notifications by clicking on…

This is the start of the file's text. The full file is on GovTribe.