STATEMENT OF WORK Harris Tower Cabling - OASAM.doc
DOC document 35 KB Posted
- Attached to
- Voice/Data Cable Installation
- Solicitation number
- USDOL-WHD-11-00001
About this file
This document has the requirements for the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QUESTIONS 2.pdf | ||
| Questions 1.pdf | ||
| Floor Plan Harris Tower Room 650.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (FAR 8.405-2)
EPS Attachment
AGENCY MAKING THE REQUEST
Agency Name: DOL; Department/Division: WHD Street:61 Forsyth Street, SW; Suite: 7M40 City: Atlanta; State: GA; Zip30303)
AGENCY POINT OF CONTACT
Requestor’s Name: Yvonne Owens
WORK TO BE PERFORMED
The Department of Labor, (DOL), Wage and Hour Division (WHD), is requiring a contractor to install a total of 63 cables. Install two data and one voice per user station. Purchase and install a new 4ft secure data cabinet (see attached link) http://www.werackyourworld.com/pdf/Catalog28Pages/480E-2432.pdf
Project Requirements:
DOL/WHD requires for cabling 21 work stations, each station will have 2 data (cat 6) and 1 voice (cat 6). All data cables must terminate on cat 6 patch panel installed in new secure data cabinet with lock and key. Voice cables must terminate on 110 Block in adjacent suite 600 on wall. All data and voice cables will home run from adjacent suite 650 to suite 600. Approximate average distance from work area to new data cabinet location 150ft to 175ft.
LOCATION OF WORK
Department of Labor/WHD
Peachtree Center Harris Towers
223 Peachtree street Suite #650
Atlanta, GA. 30303
PERIOD OF PERFORMANCE
Cabling for termination in systems furniture will be initially coiled in place awaiting delivery of systems furniture. Subsequent final installation and termination must be coordinated with the systems furniture vendor. That contact information will be provided upon award.
Start Date:
TBD
Month: TBD
Year: 2010 End Date:
TBD
Month: TBD
Year: 2010
DELIVERABLE SCHEDULE
The vendor selected to provide service and/or deliverables for this project shall meet the following requirements:
Cabling DATA
· Purchase and install (42) data cables 4 pair CAT 6 (All pairs must be terminated and tested) - Approximate average distance from work area to new data cabinet location 150ft to 175ft.
· Data cables will terminate on blue CAT 6 RJ45 568B 8-Conductors Modular Information Outlets at the workstation end and on a 48 port patch panel in the secure data cabinet.
· Purchase and install (one) 3 position faceplate at 21 customer specified workstation locations.
· Purchase and install 21 cat 6 patch cables from the 48 port patch panel to the D-link LAN switch (provided by DOL).
· ALL cables must be properly tested and labeled
· Purchase and install One secure 4 ft data cabinet with lock and key on wheels: http://www.werackyourworld.com/pdf/Catalog28Pages/480E-2432.pdf (Two data cables and one voice cable per station)
Cabling Voice
· Purchase and install 21 cat 6 Voice cables (All pairs must be terminated). Approximate average distance from work area to new data cabinet location 150ft to 175ft
· Voice cables will terminate on white CAT 6 RJ45 568B 8-Conductor Modular Information Outlets at the workstation end, and on new 110 block on wall in suite 600
· Provide and install (one) 3 position faceplate at 21 customer specified workstation locations.
APPLICABLE PERFORMANCE STANDARDS
ALL cables must be properly tested and labeled.
SPECIAL REQUIREMENTS
Work location outlets will utilize either flush mounted 3 port faceplates (for offices) or 3-port systems furniture faceplates. Cabling for termination in systems furniture will be initially coiled in place awaiting delivery of furniture. Subsequent final installation and termination must be coordinated with the systems furniture vendor.